Ford ES FNS Improvements Summer 2024, P24010

Closed State & local contract opportunity Posted

Solicitation number
PE-63310-NONST-2024-000000009
State
Georgia
Responses due

Opportunity facts

Jurisdiction
UNSPSC codes
Show all 41

Opportunity details come from ssl.doas.state.ga.us. Updated .

About this opportunity

Paragraph 1:

The Cobb County School District (CCSD) in Georgia has issued a Request for Proposal (RFP) for the Ford ES FNS Improvements Summer 2024 project, designated as Project Number S5S005FORE and Proposal Number RFP P24010. The project consists of the replacement of the existing cooler and freezer, including condensers, evaporators, refrigerant piping, controls, lighting, and the replacement of the existing generator, including electrical panels, disconnects, transfer switches, transformer, and conduits at Ford Elementary School. The RFP is open to General Contractors, and a mandatory pre-proposal conference/site visit will be held on October 10, 2023. The closing date and time for proposals is 3:00 PM ET on November 1, 2023. Contractors must pre-qualify by October 17, 2023, and provide proof of previous job experience within 30% of the cost of this project. The proposal documents will be issued by the Architect/Engineer, MWL Architecture, LLC, upon receipt of a non-refundable check.

Paragraph 2:

The RFP does not mention any set-aside designations or restrictions on the types of organizations that can respond. The incumbent vendor or current contractor is not specified. The RFP states that Cobb County School District reserves the right to award the project on whatever basis is in the interest of the Owner and to accept or reject any or all proposals. The proposal must be accompanied by a bid bond in the amount of 5% of the proposal price, and the successful offeror will be required to furnish a Performance Bond and a Payment Bond in the amount of 100% of the contract price. The budget range or potential award value is not provided in the RFP.

Opportunity text

The project at Ford Elementary School consists of, but is NOT limited to, the replacement of the existing cooler and freezer, including condensers, evaporators, refrigerant piping, controls, lighting, etc. In addition, the existing generator will be replaced including electrical panels, disconnects, transfer switches, transformer, conduits, etc.

Files

File Type Posted
A_ FordESFNSImprovementsSummer2024_P24010_In.pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for State & Local Contractors