Fire Station No. 4 Renovation & Expansion
Closed State & local contract opportunity Posted
- Solicitation number
- CSP #22-02-26
- State
- Texas
- Responses due
Opportunity facts
- Jurisdiction
- NIGP codes
- 90922 Building Construction, Non-Residential (Office Bldg., Etc.)
- 90923 Building Construction, Residential (Apartments, Etc.)
- 90928 Building Construction, Medical
- 91116 C.i.p., Construction/Rehabilitation, Buildings
- 91220 Construction, Fire Protection (Includes Fire Escapes, Fire And Smoke Barriers, Firestops)
- UNSPSC codes
- 72100000 Building and facility maintenance and repair services
- 72154015 Fire escape installation service
- 72111100 Multiple unit dwelling construction services
- 72111101 New apartment building construction service
- 72111102 New cooperative construction service
- 72111111 General residential construction contractor service
- 95122101 Residential home
- 95122005 Diagnostic screening room
- 95122007 Pathology room or laboratory
- 95122001 Clinic
Show all 28
- 95122008 Catheter room
- 72121402 Fire station construction service
- 72120000 Nonresidential building construction services
- 71122507 Stack building services
- 95121514 Ticket office
- 95122100 Accommodation buildings and structures
- 95122104 Daycare center
- 95122103 Childrens home
- 95122000 Hospital buildings and structures
- 95122002 Nursing home
- 95122004 Intensive care unit
- 72110000 Residential building construction services
- 72111103 New condominium construction service
- 95122102 Flat or apartment
- 95122105 Retirement home
- 72121403 Hospital construction service
- 95122006 Fluoroscopy room
- 95122003 Operating room or theater
Opportunity details come from templetx.bonfirehub.com. Updated .
About this opportunity
The City of Temple, Texas is requesting proposals for renovation and expansion of Fire Station No. 4 located at 411 Waters Dairy Road, with proposals due August 4, 2026.
The scope includes a 550-square-foot addition to expand sleeping quarters on the east side, a gear-storage addition on the southwest corner, demolition and reconstruction of exterior siding and stone around the entire facility, and interior renovation of residential quarters including updates to walls, ceilings, electrical, plumbing, and mechanical systems. Site paving improvements will provide a more secure parking layout. The construction must match the existing wood-framed building without modifying the current roof structure. The apparatus bay must remain fully operational throughout renovation of residential areas, with the fire department operating from a mobile-home trailer on site and responding to emergency calls with their vehicles. Detailed MEP and civil drawings specify requirements for maintaining apparatus-bay functionality during construction.
The project encompasses approximately 2,400 square feet of existing residential space. The architect's estimate of probable cost is $1,882,650. The selected contractor must complete all work within 426 consecutive calendar days from Notice to Proceed. The contractor shall furnish all labor and materials and perform all work to completion.
Opportunity text
Proposal submittals will be received to furnish all labor and materials and perform all work for the construction of the following described project: FIRE STATION NO. 4 RENOVATION & EXPANSION This project consists of the renovation and expansion of Fire Station No. 4, located at 411 Waters Dairy Road, Temple, TX. The approximately 2,400-square-foot residential quarters will receive a 550-square-foot addition on the east side to expand the sleeping quarters. The renovation includes demolition and reconstruction of the exterior siding and stone around the entire facility. An addition will be added on the southwest corner of the building to serve as gear storage. Site improvements will be made to the paving to provide a more secure parking layout. The construction will match the existing wood-framed building and will not require modifications to the current roof structure. Interior renovations will be made to the residential quarters, including updates to walls, ceilings, electrical, plumbing, and mechanical systems. The apparatus bay will remain fully operational throughout the renovation of the residential areas. Refer to the MEP and Civil drawings for details on maintaining full functionality of the apparatus bay during construction. Fire department personnel will remain on site at all times, operating from a mobile-home trailer and responding to calls with their emergency vehicles. The architect's estimate of probable cost associated with this project is $1,882,650. The selected Contractor shall complete the work within 426 consecutive calendar days from Notice to Proceed.
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity