Fire Logistics Building HVAC Replacement Project
Awarded State & local contract opportunity Posted
- Solicitation number
- BL104-21
- State
- Georgia
- Responses due
Opportunity facts
- Jurisdiction
- NIGP codes
- 91017 Energy Computerized Control System (Hvac, Lighting, Utilities, Etc) Installation, Maintenance And Repair Services
- 93648 Industrial Equipment (Not Construction And Repair, Or Hvac) Maintenance And Repair
- 94155 Hvac Systems Maintenance And Repair, Power Plant
- 96702 Air Conditioning, Heating, And Ventilating Equipment (Hvac) Manufacturing Services
- UNSPSC codes
- 72151510 Environmental system control installation service
- 72151507 Electronic controls installation service
- 72151509 Energy management controls installation service
- 73152100 Manufacturing equipment maintenance and repair services
- 73152107 Machining equipment rebuild and refurbishment service
- 72151508 Computerized controls installation service
- Point of contact
-
- Chris Duncan christopher.duncan@gwinnettcounty.com (770) 822-8741
Opportunity details come from ssl.doas.state.ga.us. Updated .
About this opportunity
Gwinnett County, Georgia is soliciting bids for HVAC system replacements at its Fire Logistics Building, with proposals due October 28, 2021.
The scope includes replacement of two split-system air conditioning units with gas-fired furnaces, evaporator coils, and condensing units of equivalent type and capacity; one ductless split-system air conditioning unit with a new system of the same specifications; nine gas-fired unit heaters with new units matching existing type and capacity; and five ceiling exhaust fans with equivalent new fans. All associated electrical, sheet metal, piping, controls, and insulation work is included.
Contact: Chris Duncan, project buyer, 770-822-8741.
Opportunity text
This project includes the replacement of two (2) split system air conditioning units, including gas-fired furnaces, evaporator coils and condensing units with new units of the same type and capacity, replacement of one (1) existing ductless split system air conditioning unit with a new system of the same type and capacity; replacement of nine (9) existing gas-fired unit heaters with new unit heaters of the same type and capacity; and replacement of five (5) existing ceiling exhaust fans with new fans of the same type and capacity. The work also includes all electrical, sheet metal, piping, controls and insulation work associated with the replacements.
Files
| File | Type | Posted |
|---|---|---|
| Award Information | — |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity