EWEB 22-124-G Control House for Currin Substation
Closed State & local contract opportunity Posted
- Solicitation number
- S-P00140-00003290
- State
- Oregon
- Responses due
Opportunity facts
- Jurisdiction
- UNSPSC codes
- 39121000 Power conditioning equipment
- 39121023 Static var compensators
- 39121024 Synchronous condensers
- 39121116 Low voltage switchgear
- 26131808 Substation load control switchgears
- 26131811 Current limiting reactors
- 26131812 Gas insulated switchgears
- 39121115 Medium voltage switchgear
- 26131815 Electric accumulator
- 39121105 Switchgear systems
Opportunity details come from oregonbuys.gov. Updated .
About this opportunity
The Eugene Water & Electric Board (EWEB) is seeking to procure a prefabricated control building for the Currin Substation rebuild located in Lane County, Oregon. The procurement is a Request for Proposals (RFP) #22-124-G for a fully integrated control house that includes medium-voltage metal clad switchgear, station service, substation protection and control panels, and communications equipment. Key deliverables include a complete control building that requires the successful bidder to provide, assemble, and install 115kV control panels and RTU cabinet, with EWEB preparing pier foundations for building placement. The contractor will be responsible for reassembling shipping sections, reconnecting equipment and control circuits, and performing site testing before final building turnover. The solicitation was posted on May 26, 2022, with a firm bid submission deadline of June 28, 2022. Through three addenda, EWEB has clarified technical specifications, scope of work, and contractor responsibilities while maintaining the original proposal timeline.
No specific set-aside designations or restrictions on vendor participation were detailed in the available documentation. The bid tab suggests multiple vendors submitted pricing, indicating an open competitive procurement process. While specific budget ranges were not explicitly stated, the comprehensive technical requirements for the control house suggest a substantial capital investment. The project involves complex electrical infrastructure integration, requiring vendors with specialized expertise in substation control building design and installation. No incumbent vendor information was provided, and the documents do not specify precise award values or budget constraints. The procurement appears focused on technical capabilities and compliance with EWEB's detailed specifications for the Currin Substation control house project, with the ultimate goal of modernizing and enhancing the electrical utility's infrastructure in the Lane County region.
Opportunity text
EWEB wishes to procure a prefabricated control building for their rebuild of Currin Substation. This building will be fully integrated with medium-voltage metal clad switchgear and is to come equipped with full station service, substation protection and control panels, and communications equipment.
Files
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity