This document is an Addendum #3 to Request for Proposals (RFP) #22-124-G issued by the Eugene Water & Electric Board (EWEB) for a Control House for the Currin Substation project. The addendum provides clarification that the successful bidder will be responsible for providing, assembling, and installing the 115kV control panels and RTU cabinet, which were previously listed as designed by others. The RFP closing date remains unchanged at June 28, 2022.
The state and local contract opportunity is for EWEB to procure a prefabricated control building that will be fully integrated with medium-voltage metal clad switchgear, and equipped with station service, substation protection and control panels, and communications equipment. The project is located in Lane County, Oregon, which includes the city of Eugene.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
June 22, 2022
ADDENDUM # 3
Title: Control House for Currin Substation
RFP # 22-124-G
This addendum adds additional information to the original RFP document.
QUESTION & ANSWER:
Q1. On pdf viewer page 12 of 197 of the RFP, the following items are listed as element designed by others:
115kV control panels (excluding circuits that need to interface with switchgear) RTU cabinet (excluding circuits that need to interface with switchgear)
We would just like to double check that the awarded company of this contract is to provide this material. Can you please confirm?
A1. Yes, all material required to construct the 115kV control panels and RTU cabinet will be provided, assembled, and installed by the successful bidder.
CLOSING DATE AND TIME
June 28, 2022. Remains unchanged.
This addendum constitutes a MATERIAL CHANGE to the Request for Proposals.
Addendum prepared by:
Sandra Hahn, Purchasing Analyst