Eagan Civic Center Gymnasium Painting

Closed State & local contract opportunity Posted

Solicitation number
25-0272-PR
State
Missouri
Responses due

Opportunity facts

Jurisdiction
Point of contact

Opportunity details come from procurement.opengov.com. Updated .

About this opportunity

The City of Florissant, Missouri, through its Parks and Recreation Department, is soliciting bids under an Invitation for Bid to repaint the gymnasium at the James J. Eagan Civic Center, with a non-mandatory pre-bid meeting on November 10, 2026 and bids due November 24, 2026 at 2:00 p.m. Eligibility requires certification of participation in the Federal Apprenticeship Program and the Missouri boycott-of-Israel certification under Section 34.600, which does not apply to contracts with total potential value below $100,000 or to contractors with fewer than ten employees.

The contractor must furnish all labor, materials, equipment, tools, supervision, and access equipment such as lifts, scaffolding, and ladders. Work includes painting the gymnasium ceiling black, repainting walls in a designated base color, and applying three accent stripes (two at 2 feet high and one at 3 feet high). Estimated areas are 11,187 square feet of ceiling and 9,328 square feet of walls. An optional alternate covers a 12-foot by 12-foot Parks and Recreation logo on one wall. The City removes the drop ceiling before painting. The contractor must protect the floor, basketball goals, bleachers, and fixtures, and work around ceiling-mounted lighting, ventilation, and fire protection equipment unless the City directs otherwise.

Required documentation includes a Certificate of Insurance naming the City as additional insured, E-Verify work authorization documentation, and a minimum of three references. Performance and payment bonds are required at 100 percent of contract value, and subcontracting is limited to 50 percent of contract value. Missouri prevailing wage requirements apply, with penalties of $100 per worker per calendar day for violations. All on-site employees must complete a ten-hour OSHA construction safety course within 60 days of work commencement.

The contract period runs from December 2026 through March 2027 with no renewal option. Work must commence January 18, 2027, with cleanup and inspection complete by February 5, 2027 and final completion by February 8, 2027. Payment is net 30 with certified payrolls submitted alongside monthly invoices, a 5 percent retainage applies, and liquidated damages are $300 per calendar day for delays. Bids are evaluated on pricing (40 percent), technical capability and experience (25 percent), schedule and availability (20 percent), scope accuracy (10 percent), and warranty (5 percent). Questions are due November 19, 2026, and bids must be submitted electronically through the OpenGov portal.

Opportunity text

General work description:

The City of Florissant is seeking a qualified painting contractor to provide all labor, materials, equipment, tools, and supervision necessary to repaint the gymnasium at the James J. Eagan Civic Center. The project includes painting the gymnasium ceiling black and repainting the walls with a designated base color and three additional accent color stripes.

All work shall be completed in a professional and workmanlike manner, with appropriate preparation and protection of the gymnasium floor, equipment, fixtures, and other existing surfaces.

Scope of Work

A. Site Preparation and Protection

  • Inspect all surfaces to be painted and notify the City of any existing damage or conditions that may affect the finished product.
  • Protect the gymnasium floor, basketball goals, bleachers, doors, windows, lights, vents, electrical fixtures, and other surfaces or equipment not designated for painting.
  • Provide all necessary lifts, scaffolding, ladders, and other equipment required to safely access the ceiling and upper wall areas.
  • Properly prepare all surfaces before painting, including cleaning, removing loose or peeling paint, and addressing minor surface imperfections.
  • Mask and cover all adjacent surfaces to prevent paint overspray, splatter, or other damage.

B. Gymnasium Ceiling

  • Paint the entire designated gymnasium ceiling black.
  • Prepare the ceiling surface to promote proper paint adhesion and a consistent finish.
  • Apply a suitable primer where necessary based on the existing surface and condition.
  • Apply the number of finish coats necessary to achieve uniform color, coverage, and appearance, following the paint manufacturer's recommendations.
  • Protect or carefully work around existing lighting, ventilation systems, fire protection equipment, and other ceiling-mounted fixtures unless otherwise directed by the City.
  • The City will be removing the drop ceiling prior to painting.

C. Gymnasium Walls

  • Prepare all designated wall surfaces for painting.
  • Apply base color to the designated wall areas throughout the gymnasium.
  • Apply three additional accent color stripes in locations and widths approved by the City of Florissant.
    • two stipes at 2ft high
    • one stripe at 3ft high
  • Ensure the accent strips are straight, level, consistent in width, and cleanly defined, with sharp edges and no visible bleeding between colors.
  • Apply sufficient coats to provide uniform coverage and a consistent finish across all designated surfaces.
  • Wall colors will be chosen with the selected vendor

D. Paint and Materials

  • Provide all paint, primer, masking materials, drop cloths, and related supplies necessary to complete the project.
  • Use commercial-grade paints appropriate for an indoor municipal gymnasium, including ceiling and wall surfaces.
  • Provide durable, washable wall paint suitable for a high-traffic recreation facility.
  • Submit proposed paint products, colors, finishes, and manufacturer specifications to the City for approval before purchasing materials or beginning work.
  • The City will approve all final colors and the layout of the two accent stripes before application.

Schedule and Coordination

The contractor shall complete all work within the following project period:

  • Start Date: January 18, 2027
  • Final Cleanup and Inspection: Completed by February 5, 2027
  • Final Completion February 8, 2027

The contractor shall coordinate with the City of Florissant Parks and Recreation Department before beginning work. The contractor must confirm access requirements, staging locations, work hours, and any facility restrictions with the City.

The contractor shall provide a proposed work schedule identifying surface preparation, ceiling painting, wall painting, accent stripe application, drying time, cleanup, and final inspection.

All work must be performed in a manner that allows the City to resume normal facility operations by the required completion date.

Contractor Responsibilities

The contractor shall:

  • Furnish all labor, supervision, materials, equipment, tools, and transportation required for the project.
  • Maintain a safe, orderly work area and comply with all applicable federal, state, and local safety requirements.
  • Ensure employees are properly trained to operate lifts and other equipment used for the project.
  • Providing 3/4 inch plywood for protection while driving lifts across the gymnasium flooring.
  • Provide appropriate ventilation and follow all manufacturer requirements for application, drying, and curing.
  • Prevent unauthorized access to the work area while painting or other hazardous operations are underway.
  • Remove all masking materials, debris, empty containers, and other project-related waste upon completion.
  • Repair or pay for damage caused by the contractor to City property, equipment, or existing finishes.
  • Notify the City promptly of unforeseen conditions, delays, or additional work that may affect the schedule or project cost.
  • Obtain written approval from the City before performing work outside the approved scope.
  • Provide dumpster for all waste materials or remove debris from work area each day.

Quality Standards and Acceptance

  • All completed work shall be uniform in appearance and free of visible runs, drips, excessive brush marks, roller marks, overspray, missed areas, and unacceptable color variations.
  • The three accent stripes shall have consistent widths and clean, straight edges. All painted surfaces shall receive adequate coverage in accordance with the paint manufacturer's specifications.
  • The City reserves the right to inspect the work during the project and upon completion. Any deficiencies identified by the City shall be corrected by the contractor at no additional cost before final acceptance.
  • Final acceptance will be contingent upon completion of the scope of work, satisfactory cleanup, correction of identified deficiencies, and approval by the City of Florissant.

Estimated Square Footage:

Gymnasium Walls: 9,328 sq. ft.

Ceiling Painting: 11, 187 sq. ft.

All square footage measurements provided are estimates for bidding purposes only. The contractor shall independently verify all dimensions and actual paintable square footage prior to submitting a bid to ensure accurate pricing.

Location:

James J. Eagan Civic Center
1 James J. Eagan Drive
Florissant, MO 63033

Site Visits:

Contact: Jimmy Kirincich
Director of Parks and Recreation
Phone: 314-461-2721
Email: Jkirincich@florissantmo.com

Alternates:

Logo Specifications-See attachment for logo

  • Logo size: 12 feet wide × 12 feet tall.

  • Application: Painted directly onto the wall.

  • Colors: Match the official Parks & Recreation logo colors, including green, teal and brown. Colors palette to be provided to awarded contractor.

  • Finish: Matte or low-sheen finish.

  • Layout: Maintain the logo's original proportions.

  • Surface preparation: Include layout, masking, surface preparation and painting in the bid.