Dissolved Air Floatation Thickener Unit 1 AND 2 Upgrades
- The Village of Fort Sumner, New Mexico, is soliciting engineering services for wastewater treatment plant improvements—design work, construction-phase engineering, and construction oversight—under a sole-source procurement, with proposals due August 29, 2026. The Village intends to award the contract to Bohannan Huston, Inc. (BHI) without competitive bidding. BHI has served as Engineer of Record since the project's inception in 2020 and produced all preliminary engineering reports, design plans,...
- The City of Sanford, Florida is issuing an Invitation for Bid (IFB 24/25-31R) for the rehabilitation of biosolids treatment equipment at two wastewater reclamation facilities. The procurement encompasses the rehabilitation of one gravity belt thickener unit at the North Wastewater Reclamation Facility, including the provision of two new independent master control panels and field instrumentation, and the rehabilitation of one belt filter press at the South Wastewater Reclamation Facility,...
- The State of New Mexico General Services Department Purchasing Division is requesting bids on hydraulic suction dredging services at Glenwood Pond under ITB 70-51600-26-05671, with bids due September 15, 2026 at 2:00 PM and a mandatory pre-bid meeting on August 18, 2026 at 11:00 AM at the Glenwood State Fish Hatchery near Silver City. The scope covers removal of approximately 7,000 cubic yards of sediment from Glenwood Pond in Catron County to increase hatchery operations, maintain Clean Water...
- The City of Milton, Florida is seeking a qualified contractor to expand the Sundial Wastewater Treatment Plant (WWTP) through a formal Invitation to Bid (ITB). The project encompasses comprehensive infrastructure upgrades, including installation of vortex grit removal equipment, a 0.25 MGD biological nutrient removal process, an additional aeration basin, a chlorine contact chamber, and a chemical building. Specific deliverables include replacing an existing mechanical screen, biosolids...
- The City of Bradenton is requesting bids on construction services for rehabilitation of Sedimentation Basin and Flocculator No. 2 at the Bradenton Water Treatment Plant, with bids due August 7, 2026 at 2:30 p.m. A non-mandatory pre-bid meeting is scheduled for July 16, 2026 at 10:00 a.m. at the project site (5600 Natalie Way E, Bradenton, FL 34203). Bidders must be Florida-licensed general contractors with demonstrated experience in concrete repair using epoxy injection and high-performance...
- San Antonio Water System (SAWS) is requesting sealed bids for replacement and installation of slide gates, filters, pump stations, and associated civil improvements at the Steve M. Clouse Water Recycling Center, with bids due August 25, 2026, and a non-mandatory pre-bid meeting and site visit on August 5, 2026 at 1:00 PM CDT at 3495 Valley Road, San Antonio, Texas. SAWS requires bidders to comply with the Small Business Opportunities Program (SBOP) by submitting a Good Faith Effort Plan...
The City of Santa Fe, New Mexico is requesting bids for dissolved air floatation thickener unit upgrades at the Pueblo Riverwalk Water Reclamation Facility under an Invitation to Bid, with electronic bids due September 29, 2026 at 2:00 p.m. This is a public works project exceeding $60,000 and subject to New Mexico prevailing wage requirements under Wage Decision No. SF-26-2708-H (Wage Scale H) and the City of Santa Fe living wage ordinance ($14.03 per hour minimum). All contractors and subcontractors must register with the New Mexico Department of Workforce Solutions prior to bid opening. The City may apply an 8 percent resident contractor preference or, for resident veteran contractors with less than $6 million gross revenue, a 10 percent preference, provided no federal funds are used and a valid Resident Certificate from the New Mexico Taxation & Revenue Department is submitted. The scope includes modification of the air-water saturation system for the dissolved air floatation process, installation of new air-entraining pumps and associated electrical connections, a structural stand for a break tank supplying non-potable water to the pumps, SCADA and control integration for all newly installed equipment, and associated demolition, abandonment, and replacement work across all required disciplines. The price sheet requests lump sum pricing for two Evoqua Whitewater Package Pump Systems with control panel, one break tank with flow control and instrumentation, installation of all equipment, and equipment start-up and training. Work must maintain continuous wastewater treatment throughout construction; SCADA outages are limited to eight hours per process area, and equipment start-ups are restricted to Monday through Thursday unless Owner-approved. The contract term may extend from one to ten years, with the City retaining the right to award for the whole term or renew annually by mutual agreement. Bidders must submit 5 percent bid security as a New Mexico-licensed surety bond or cashier's check. The successful bidder must post 100 percent Performance and Labor and Material Payment Bonds and maintain comprehensive liability and workers' compensation insurance plus one year thereafter, with minimum one-year warranties on non-roofing work and materials. A non-mandatory pre-bid conference is scheduled for September 3, 2026 at 2:00 p.m. via Microsoft Teams, and a non-mandatory site visit is September 4, 2026 at 9:00 a.m. at 73 Paseo Real, Santa Fe.
Name | Description | Size | Type | Posted |
|---|---|---|---|---|
Wage_Scale_H.pdf | 303KB | 8/4/26 | ||
Dissolved_Air_Floatation_Thickener_Unit_1_AND_2_Upgrades.pdf | 333KB | 8/14/26 | ||
NMDWS_Wage_Decision_(3).docx | 520KB | Document | 8/4/26 | |
DAF_Unit_1_&_2_Upgrade_Project_Manual.pdf | 8MB | 7/29/26 | ||
DAF_Unit_1_&_2_Upgrade_Plan_Set.pdf | 10MB | 7/29/26 |