DFCM Construction - Prequalified Mechanical Stage II - Southern Utah University- AFEC AHU #7, #8 & Controls Upgrade - Project #27052730
Open State & local contract opportunity Posted
- Solicitation number
- CR27030
- State
- Utah
- Responses due
Opportunity facts
Opportunity details come from utah.bonfirehub.com. Updated .
About this opportunity
The Utah Division of Facilities Construction and Management (DFCM) is soliciting Stage II bids for removal and replacement of air handlers 7 and 8 at Southern Utah University's America First Event Center under Project #27052730, with bids due December 21, 2026 at 3:00 p.m. Only contractors prequalified through DFCM's Stage I process and currently listed on the DFCM Prequalified Contractors list may bid. A mandatory meeting is set for December 8, 2026 at 12:30 p.m. in Cedar City, and prime contractors must sign in to maintain bid eligibility.
Scope covers replacing AHU-7 and AHU-8, new cooling coil circulation pumps and relief fans, re-balancing of existing VAV units, supply grilles, and diffusers, and integration with the existing building management system through direct digital controls. Roofing modifications must be performed by the existing warranty holder, American Frontier Roofing. A hazardous materials survey identified asbestos-containing pin adhesive and pipe thread sealant in the air handler rooms, and the report requires a licensed abatement contractor to remove those materials before replacement work begins. Mechanical work cannot start until DFCM building officials approve the seismic design, with deferred seismic submittals due about 15 days after Notice to Proceed. Testing, adjusting, and balancing must be performed by a firm certified by AABC or NEBB. Materials must be new and domestically made. The owner occupies the building throughout construction, and work is limited to 8:00 a.m. to 5:00 p.m., Monday through Friday.
The construction cost estimate is $1.27 million. Liquidated damages are $750.00 per day. Construction is scheduled to begin May 3, 2027, with substantial completion on August 6, 2027. Bid bonds must equal 5% of the bid, and the awardee must furnish performance and payment bonds at 100% of the contract sum within ten business days of contract receipt. Award goes to the lowest responsive and responsible bidder.
Questions are due December 11, 2026, and the addendum deadline is December 15, 2026. Subcontractor lists are due December 22, 2026 by email to dfcmcontracts@utah.gov.
Opportunity text
**Stage II Invitation to Bid** **Only contractors who have been prequalified under a Stage I Prequalification for Contractors and are currently on the respective DFCM Prequalified Contractors list as of the date of this solicitation are eligible to bid on this project.** The State of Utah - Division of Facilities Construction and Management (DFCM) is requesting bids for the referenced project: **Project Description: Remove and replace air handlers 7 & 8 at the SUU AFEC building.** **Construction Cost Estimate: $1,274,789.00**
Files
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity