This file consists of approved mechanical design plans prepared by WHW Engineering Inc. for the Southern Utah University (SUU) America First Event Center (AFEC) air handler replacement project (DFCM #27052730) located at 351 W Center Street, Cedar City, Utah. The project scope includes removal and replacement of existing Air Handling Units (AHU-7 and AHU-8), associated fans, re-balancing of existing Variable Air Volume (VAV) units, supply grilles, and diffusers. The design incorporates two new modular air handlers—AHU-7 serving the administration area with a capacity of 16,100 CFM and AHU-8 serving classrooms with a capacity of 26,800 CFM—along with new cooling coil circulation pumps, new relief fans, and comprehensive controls integration with the existing building management system. The plans detail mechanical systems across multiple levels including floor plans, roof plans, sections, details, and equipment schedules. All construction must comply with the 2024 International Mechanical Code (IMC) and 2024 International Plumbing Code (IPC) with Utah annotations, and the project includes deferred seismic submittals required approximately 15 days after Notice to Proceed, with mechanical work prohibited from commencing until DFCM Building Officials approve the seismic design in accordance with ASCE 7-05.
The design includes specific equipment specifications: dual stacked cooling coils for each AHU with 338,000 BTU/h and 640,000 BTU/h capacity respectively, new circulation pumps rated at 71 GPM and 124 GPM, and multiple new pressure relief fans ranging from 2,250 to 7,000 CFM. All new mechanical equipment requires single-point power connections and integration with direct digital control (DDC) systems. The contractor must coordinate with a design-build electrical contractor for all electrical accommodations including new wiring, circuit breakers, disconnects, and VFD (variable frequency drive) installations. Code inspection requirements include verification of seismic compliance for mechanical equipment and piping 4 inches and above, fire caulking at rated walls, and final acceptance contingent upon a state-appointed code inspector's approval. All roofing modifications must be performed by the existing roofing warranty holder (American Frontier Roofing) and approved by the DFCM Roofing Program Director. The contractor bears full responsibility for field verification of existing conditions, coordination between all subcontractors, proper disposal of refrigerants and oils per local, state, and federal regulations, and provision of a complete test and balance report from a licensed and approved contractor for all impacted systems.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A
North: ______ South: ______ East: ______ West: ______
Special Use and Occupancy (e.g. High Rise, Covered Mall): __________________
d) Unlimited Area Building: Yes ______ No ______ Code Section: ______ a a
3) Three Story: A (3)______
2) Two Story: A (2)______
1) One Story: ______
c) Total Allowable Area for:
1_< Allowable Area
Actual Area
b) Sum of the Ratio Calculations for Mixed Occupancies:
a) 0.25I = 100f
F
P 30
WstA I
100100 fIA t taA = A + +
Official for Complex Buildings. Including, but not limited to:
g) Fire Stopping, Including Tested Design Number.
f) Exterior and Interior Accessibility Route.
e) Fire Assembly Locator Sheet.
a) High Rise Requirements.
b) Atriums.
c) Performance Based Criteria.
d) Means or Egress Analysis.
2) Additional Code Information shall be provided at the discretion of the Building
Code Accessibility Chapters, the more restrictive requirement shall govern.
through - ADA Guidelines and specific reference to the International Building
1) In case of conflict with the U.S. Department of Justice Federal Registers Parts
FOOTNOTES:
d) Drinking Fountains: ______ Service Sinks: ______
c) Bath Tubs or Showers: ______
b) Lavatories - Required (m) ______ (f) ______ Provided (m) ______ (f) ______
a) Water Closets - Required (m) ______ (f) ______ Provided (m) ______ (f) _____
M. Minimum Number of Required Plumbing Facilities:
Exit Width Required: ______ Exit Width Provided: ______
Element Hours Assembly ListingListing
Element AssemblyHours
Smoke Partitions
Fire Partitions
Exterior Bearing Walls
Interior Bearing Walls
Exterior Non-Bearing Walls
Structural Frame
Partitions - Permanent
Fire Barriers
Floors - Ceiling Floors
Roofs - Ceiling Roofs
Exterior Doors and Windows
Shaft Enclosures
Fire Walls
BAHTBABABA
Design Wind Speed: ______ mphB. Seismic Design Category: ______
L. Design Occupant Load: ______
K. Fire Resistance Rating Requirements for Building Elements (hours).
Area Modifications:J:
____________________________________________Tabular Area:I:
per Floor (square feet): __________________________Actual AreaH:
Number of Stories: ______ Building Height: ______G:
Required: ______ Provided: ______ Type of Sprinkler System: ____________
Sprinklers:F:
Mixed Occupancies: ______ Nonseparated Uses: ______E.
separation distance (in hours):
Requirements for the Exterior Walls based on the fireFire Resistance RatingD.
C. Type of Construction (circle one):
Change in Use: Yes ______ No ______ Mixed Occupancy: Yes ______ No ______
Guidelines
ADA Accessibility
Building Conservation
Uniform Code for
National Electrical Code
Conservation Code
International Energy
International Fire Code
International Plumbing Code
International Mechanical Code
International Building Code
YearYear
APPLICABLE CODES
A. Occupancy and Group: ________ ________ ________ ________ ________
CODE ANALYSIS
SUU AFEC AIR HANDLERS
DFCM # 27052730
GENERAL:
G001 - TITLE SHEET
G002 - SPECIAL INSPECTION AND TESTING
G003 - NON-STRUCTURAL COMPONENT CHECKLIST FORM
MECHANICAL:
MG001 - MECHANICAL GENERAL NOTES AND LEGEND
MD102 - MECHANICAL DEMOLITION ROOF PLAN
MD401 - MECHANICAL DEMOLITION FLOOR PLANS
ME101.1 - MAIN LEVEL MECHANICAL PLAN AREA C
ME101.2 - MAIN LEVEL MECHANICAL PLAN AREA D
ME102 - MECHANICAL ROOF PLAN
ME301 - MECHANICAL SECTIONS
ME401 - MECHANICAL FLOOR PLANS
ME501 - MECHANICAL DETAILS
ME502 - MECHANICAL DETAILS
ME503 - MECHANICAL DETAILS
ME601 - MECHANICAL SCHEDULES
ME901 - MECHANICAL ISOMETRIC VIEWS
MP401 - LARGE SCALE MECHANICAL PIPING FLOOR PLANS
DRAWING INDEX:
America First Event Center, 351 W Center St, Cedar City, UT 84720
CODE REVIEW STAMP
DESIGN CRITERIA:
THESE DOCUMENTS - DRAWINGS AND SPECIFICATIONS
COMPLY WITH ALL THE REQUIREMENTS OF THE DFCM
STANDARDS FOR MECHANICAL UPGRADES OF
EXISTING BUILDING.
SCOPE:
THIS PROJECT INCLUDES THE REMOVAL AND THE
ASOCIATED FANS, REPLACEMENT OF EXISTING AHU-7 &
AHU-8 AND ALL ASSOCIATED ITEMS.
THE PROJECT SHALL ALSO INCLUDE RE-BALANCING THE
EXISTING VAVS AND SUPPLY GRILLES AND DIFFUSERS
ASSOCIATED WITH AHU-7 & AHU-8.
CODE INSPECTION REQUIREMENTS:
1. BEFORE A FINAL ACCEPTANCE CAN BE ISSUED, THE
STATE APPOINTED CODEINSPECTOR SHALL PROVIDE A
FINAL REPORT RECOMMENDING THAT THE NEW
MECHANICAL WORK IS IN COMPLIANCE WITH THE
DRAWINGS, SPECIFICATIONS AND APPLICABLE CODES
ESPECIALLY FOR THE FOLLOWING ITEMS.
a.)SEISMIC - MECHANICAL AND ELECTRICAL PER
DEFERRED SUBMITTALS.
b.)FIRE CAULKING AT RATED WALLS.
1. SEE ALSO SHEET G002.
DEFERRED SUBMITTALS:
1. SEISMIC FOR ALL PIPING 4" AND ABOVE - INTERIOR.
2. SEISMIC FOR MECHANICAL EQUIPMENT.
3. SEISMIC ENGINEER SHALL PROVIDE A SUBMITTAL
INCLUDING CALCULATIONS AND DETAILS TO THE DFCM
BUILDING OFFICIALS FOR REVIEW. SEISMIC SHALL BE
DESIGNED TO RESIST THE EFFECTS OF EARTHQUAKE
MOTIONS IN ACCORDANCE WITH ASCE 7-05. REFERENCE
IBC SECTION 1613.1.
5. THE DATE OF DEFERRED SUBMITTALS IS
APPROXIMATELY 15 DAYS AFTERNOTICE TO PROCEED.
MECHANICAL WORK CANNOT COMMENCE UNTIL
THEDFCM BUILDING OFFICIALS HAVE APPROVED THE
SEISMIC SUBMITTAL
7. EACH DEFERRED SUBMITTAL IS REQUIRED TO HAVE THE
PROJECT NAME, DFCM NUMBER, PROJECT ADDRESS,
CONFORMANCE LETTER OR STAMP FROM THE DESIGNER
AND A 3"x3" SPACE FOR THE APPROVAL STAMP ON THE
FRONT PAGE.
G001
NA NA NA NA
A-2 A-4 B
X X
NA
3 33'
104,085 SQ. FT.
32,500 SQ. FT.
D 90
11/04/26
DIVISION OF FACILITIES
CONSTRUCTION AND
MANAGEMENT
Jason Van Ausdal
11/24/2026
REVIEWED FOR CODE
COMPLIANCE
L L I D
E A
S
D E
S
IG
N S
A
R R
A N
G E
M E
N T
S A
N D
P L A
N S
I N
D
IC
A T
E D
O R
R E
P R
E S
E N
T E
D B
Y T
H
IS
D R
A W
IN
G
A R
E O
W N
E D
B Y
A N
D T
H E
P R
O P
E R
T Y
O F
W H
W E
N G
IN
E
E R
IN
G
I N
C
A N
D W
E R
E C
R E
A T
E D
E
V O
L V
E D
A
N D
D E
V E
L O
P E
D F
O R
U S
E O
N A
N D
I N
C O
N N
E C
T
IO
N W
IT
H
T H
E S
P E
C
IF
IE
D
P R
O J E
C T
N
O N
E O
F T
H E
I D
E A
S
D E
S
IG
N S
A
R R
A N
G E
M E
N T
S O
R P
L A
N S
S H
A L L B
E U
S E
D B
Y O
R D
IS
C
L O
S E
D T
O A
N Y
P E
R S
O N
F
IR
M
O
R C
O R
P O
R A
T
IO
N F
O R
A N
Y P
U R
P O
S E
W H
A T
S O
E V
E R
W
IT
H O
U T
W R
IT
T
E N
C O
N S
E N
T O
F W
H W
E
N G
IN
E
E R
IN
G
I N
C
W R
IT
T
E N
D
IM
E N
S
IO
N S
O N
T H
E S
E D
R A
W
IN
G S
S H
A L L H
A V
E P
R E
C E
D E
N C
E O
V E
R S
C A
L E
D
IM
E N
S
IO
N S
C
O N
T R
A C
T O
R S
S H
A L L V
E R
IF
Y
A N
D B
E R
E S
P O
N S
IB
L E
F O
R A
L L D
IM
E
N S
IO
N
S A
N D
C O
N D
IT
IO
N S
O N
T H
E J
O B
A N
D T
H
IS
O F
F
IC
E M
U S
T B
E N
O T
IF
IE
D O
F A
N Y
V A
R
IA
T
IO
N F
R O
M T
H E
D
IM
E N
S
IO
N S
A N
D C
O N
D
IT
IO
N
S S
H O
W N
B Y
T H
E S
E D
R A
W
IN
G S
W
A R
N
IN
G
R E
P R
O D
U C
T
IO
N H
E R
E O
F I S
A C
R
IM
IN
A
L O
F F
E N
S E
U N
D E
R
U
.S .C
S
E C
U N
A U
T H
O R
IZ
E
D D
IS
C
L O
S U
R E
M A
Y C
O N
S T
IT
U
T E
T R
A D
S
C R
E T
M
IS
A P
P R
O P
R
IA
T
IO
N I N
V
IO
L A
T
IO
N O
F I .C
.2 -2
-3 -1
E T
S
E Q
A
N D
O T
H E
R L
A W
S
1 2 3 4 5
D
C
B
A
1 2 3 4 5
D
C
B
A
CONSULTANTS
CODE REVIEW STAMP
PROJECT NAME & ADDRESS
MARK DATE REVISION
PROJECT MANAGER:
DRAWN BY:
CHECKED BY:
DATE:
WHW PROJECT NUMBER:
11/04/26STAFF
CL
11/04/2026
26072
CL
SPECIAL INSPECTION AND
TESTING
G002
SUU AFEC Air Handlers
DFCM#27052730
AMERICA FIRST EVENT CENTER, 351 W
CENTER ST, CEDAR CITY, UT 84720
NOT APPLICABLE
NOT APPLICABLE
NOT APPLICABLE
NOT APPLICABLE
NOT APPLICABLE
NOT APPLICABLE
NOT APPLICABLE
NOT APPLICABLE
NOT APPLICABLE
NOT APPLICABLE
NOT APPLICABLE
NOT APPLICABLE
x x x
NOT APPLICABLE
NOT APPLICABLE
NOT APPLICABLE
NOT APPLICABLE
DIVISION OF FACILITIES
CONSTRUCTION AND
MANAGEMENT
Jason Van Ausdal
11/24/2026
L I D
E A
S
D E
S
IG
N S
A
R R
A N
G E
M E
N T
S A
N D
P L A
N S
I N
D
IC
A T
E D
O R
R E
P R
E S
E N
T E
D B
Y T
H
IS
D R
A W
IN
G
A R
E O
W N
E D
B Y
A N
D T
H E
P R
O P
E R
T Y
O F
W H
W E
N G
IN
E
E R
IN
G
I N
C
A N
D W
E R
E C
R E
A T
E D
E
V O
L V
E D
A
N D
D E
V E
L O
P E
D F
O R
U S
E O
N A
N D
I N
C O
N N
E C
T
IO
N W
IT
H
T H
E S
P E
C
IF
IE
D
P R
O J E
C T
N
O N
E O
F T
H E
I D
E A
S
D E
S
IG
N S
A
R R
A N
G E
M E
N T
S O
R P
L A
N S
S H
A L L B
E U
S E
D B
Y O
R D
IS
C
L O
S E
D T
O A
N Y
P E
R S
O N
F
IR
M
O
R C
O R
P O
R A
T
IO
N F
O R
A N
Y P
U R
P O
S E
W H
A T
S O
E V
E R
W
IT
H O
U T
W R
IT
T
E N
C O
N S
E N
T O
F W
G
IN
E
E R
IN
G
I N
C
W R
IT
T
E N
D
IM
E N
S
IO
N S
O N
T H
E S
E D
R A
W
IN
G S
S H
A L L H
A V
E P
R E
C E
D E
N C
E O
V E
R S
C A
L E
D
IM
E N
S
IO
N S
C
O N
T R
A C
T O
R S
S H
A L L V
E R
IF
Y
A N
D B
E R
E S
P O
N S
IB
L E
F O
R A
L L D
IM
E
N S
IO
N
S A
N D
C O
N D
IT
IO
N S
O N
T H
E J
O B
A N
D T
H
IS
O F
F
IC
E M
U S
T B
E N
O T
IF
IE
D O
F A
N Y
V A
R
IA
T
IO
N F
R O
M T
H E
D
IM
E N
S
IO
N S
A N
D C
O N
D
IT
IO
N
S S
H O
W N
B Y
T H
E S
E D
R A
W
IN
G S
W
A R
N
IN
G
R E
P R
O D
U C
T
IO
N H
E R
E O
F I S
A C
R
IM
IN
A
L O
F F
E N
S E
U N
D E
R
U
.S .C
S
E C
U N
A U
T H
O R
IZ
E
D D
IS
C
L O
S U
R E
M A
Y C
O N
S T
IT
U
T E
T R
A
C R
E T
M
IS
A P
P R
O P
R
IA
T
IO
N I N
V
IO
L A
T
IO
N O
F I .C
.2 -2
-3 -1
E T
S
E Q
A
N D
O T
H E
R L
A W
S
1 2 3 4 5
D
C
B
A
1 2 3 4 5
D
C
B
A
CONSULTANTS
CODE REVIEW STAMP
PROJECT NAME & ADDRESS
MARK DATE REVISION
PROJECT MANAGER:
DRAWN BY:
CHECKED BY:
DATE:
WHW PROJECT NUMBER:
11/04/26STAFF
CL
11/04/2026
26072
CL
NON-STRUCTURAL
COMPONENT CHECKLIST
FORM
G003
SUU AFEC Air Handlers
DFCM#27052730
AMERICA FIRST EVENT CENTER, 351 W
CENTER ST, CEDAR CITY, UT 84720
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
DIVISION OF FACILITIES
CONSTRUCTION AND
MANAGEMENT
Jason Van Ausdal
11/24/2026
M
M
P
T
S
PS
F
MECHANICAL LEGEND
SYMBOL ABR, DESCRIPTION
GENERAL TERMINOLOGY
A
ME101
SECTION LETTER DESIGNATION
SECTION DRAWN ON THIS SHEET
A2
AH
DETAIL NUMBER DESIGNATION
CORRESPONDING WITH GRID
LOCATION
MECHANICAL EQUIPMENT DESIGNATION
EQUIPMENT ITEM DESIGNATION
REGISTER, GRILLE OR DIFFUSER
DESIGNATION WITH BALANCING CFM
LISTED BELOW
D-1
CFM
GRILLE OR LOUVER DESIGNATION
WHERE BALANCING NOT REQUIREDR-1
REVISION DESIGNATOR AND NUMBER
KEY NOTE DESIGNATOR AND NUMBER
POINT OF CONNECTION
POINT OF REMOVAL
ABOVE FINISHED FLOOR
ACCESS PANEL
CENTERLINE ELEVATION
GENERAL CONTRACTOR
AFF
AP
POC
POR
C EL.
GC
MECHANICAL CONTRACTORMC
CONTROLS CONTRACTORATC
ELECTRICAL CONTRACTOREC
FIRE PROTECTION CONTRACTORFPC
NOT IN CONTRACTNIC
NOT TO SCALENTS
VITRIFIED CLAY PIPEVCP
NORMALLY CLOSEDNC
COMMONC
NORMALLY OPENNO
SYMBOL ABR, DESCRIPTION
AIR SIDE
EXISTING AIR DUCT TO BE REMOVED
EXISTING AIR DUCT TO REMAIN
NEW AIR DUCT
RECT TO RECT AIR DUCT TAKE-OFF
RECT TO RND AIR DUCT TAKE-OFF
RND TO RND AIR DUCT TAKE-OFF
MEDIUM PRESSURE TAKE-OFF
FLEXIBLE AIR DUCT
RADIUS ELBOW
ECCENTRIC DUCT TRANSITION
CONCENTRIC DUCT TRANSITION
VOLUME DAMPER
SUPPLY AIR DIFFUSER
RETURN & TRANSFER AIR GRILLE
EXHAUST GRILLE OR CEILING EXH. FAN
RETURN & OUTSIDE AIR DUCT UP/DN
RETURN & OA ROUND DUCT UP/DN
SUPPLY AIR DUCT UP/DN
SUPPLY AIR ROUND DUCT UP/DN
EXHAUST AIR DUCT UP/DN
EXHAUST AIR ROUND DUCT UP/DN
ACCESS PANELAP
EXISTING EQUIPMENT TO BE REMOVED
EXISTING EQUIPMENT TO REMAIN
NEW EQUIPMENT
SUPPLY AIR
RETURN AIRRA
SA
EXHAUST AIREA
OUTSIDE AIROA
MIXED AIRMA
RELIEF AIRRF
FLAT OVALFO
MOTORIZED VOLUME DAMPER
BACKDRAFT DAMPER
FIRE DAMPER
SMOKE DAMPER
FIRE & SMOKE DAMPER
WALL MOUNTED THERMOSTAT
WALL MOUNTED TEMP. SENSOR
WALL MOUNTED HUMIDISTAT
WALL MOUNTED FIRESTAT
M
BD
F
S
FS
T
S
H
F
SYMBOL ABR, DESCRIPTION
WET SIDE
PUMP
MVD
BD
FD
SD
FS
T-STAT
H-STAT
F-STAT
REGULATOR
UNION
MANUAL ACTUATOR
PNUEMATIC DIAPHRAM ACTUATOR
ELECTRIC MOTOR ACTUATOR
SOLENOID ACTUATOR
BUTTERFLY VALVE
GATE VALVE
GLOBE VALVE - STRAIGHT PATTERN
GLOBE VALVE - ANGLE PATTERN
MOTORIZED 2-WAY CONTROL VALVE
MOTORIZED 3-WAY CONTROL VALVE
CHECK VALVE
CIRCUIT BALANCING VALVE
BALL VALVE
PRESSURE RELIEF VALVE
THERMAL RELIEF VALVE
SAFETY RELIEF VALVE
PLUG VALVE
NEEDLE VALVE
TRIPLE DUTY VALVE
AUTOMATIC AIR VENT
MANUAL AIR VENT
STRAINER
STRAINER W/ PLUG BLOW OFF
VENTURI
PRESSURE GAUGE W/ COCK - WATER
PRESSURE GAUGE W/ COCK - STEAM
THERMOMETER & THERMOWELL
WATER TEMP SENSOR & THERMOWELL
FLOW SWITCH
PRESSURE SWITCH
THERMOWELL
PRESSURE & TEMP TAP
SYMBOL ABR, DESCRIPTION
WET SIDE
PITCH DOWN
ELBOW UP/DN
TEE UP/DN
EXISTING PIPING TO BE REMOVED
EXISTING PIPING TO REMAIN
NEW PIPING
PIPE CAP OR PLUG
REDUCER - CONCENTRIC / ECCENTRIC
EXPANSION JOINT
FLEXIBLE CONNECTION
ANCHOR POINT
CONDENSATE DRAIN
NATURAL GAS PIPING
CHEMICAL FEED LINE
MAKE-UP WATER LINE
CULINARY COLD WATER
CULINARY HOT WATER
CULINARY HOT WATER RECIRC
CD
G
CF
MU
CW
HW
HWREC
GLYCOL FILL LINEGF
R
M
S
PRESSURE REDUCING VALVEPRV
S
HEATING WATER SUPPLY
HEATING WATER RETURN
CHILLED WATER SUPPLY
CHILLED WATER RETURN
CONDENSER SUPPLY
CONDENSER RETURN
PUMPED CONDENSATE
HWS
HWR
CHWS
CHWR
CS
CR
PC
VENT LINEV
SANITARY SEWERSS
DIRECTION OF FLOW
BACKFLOW PREVENTING VALVE
GENERAL NOTES
G-1 - MECHANICAL INFORMATION IS NOT LIMITED TO THE MECHANICAL
DRAWINGS. CONTRACTOR SHALL BE RESPONSIBLE FOR INFORMATION OF THE
EXISTING BUILDING AND SITE CONDITIONS, EXISTING PIPING, EXISTING
ELECTRICAL, AND EXISTING SUPPORTS.
A - EACH DRAWING SHEET AND THE SPECIFICATIONS HAVE BEEN PREPARED TO
SUPPLEMENT EACH OTHER AND THEY SHALL BE INTERPRETED AS AN INTEGRAL
UNIT WITH ITEMS SHOWN AND NOTED ON ONE AND NOT THE OTHER BEING
FURNISHED AND INSTALLED AS THOUGH SHOWN AND CALLED OUT IN ALL
PLACES. ITEMS IN SPECIFICATIONS OR DRAWINGS LISTED WHICH ARE
DIFFERING IN EFFICIENCY OR QUALITY SHALL BE HELD TO THE GREATEST OF:
EFFICIENCY, QUALITY OR GOVERNING CODE.
B - THE CONTRACTOR WILL BE HELD RESPONSIBLE FOR THE INSTALLATION OF
THE SYSTEMS ACCORDING TO THE TRUE INTENT AND MEANING OF THE
CONTRACT DOCUMENTS.
C - THE CONTRACTOR SHALL INSTALL ALL EQUIPMENT WITH PROPER SERVICE
ACCESS AND CLEARANCES ACCORDING TO MANUFACTURERS
RECOMMENDATIONS. THE CONTRACTOR SHALL REVIEW SUPPLIERS BID
PACKAGES FOR COMPLETENESS AND COMPLIANCE TO THE SPECIFICATIONS,
SCHEDULES, AND DESIGN INTENT (ALL EQUIPMENT AND METHODS). THE
CONTRACTOR SHALL REMOVE AND REINSTALL CORRECTLY AT HIS OWN
EXPENSE ANY EQUIPMENT NOT IN COMPLIANCE.
D - THE CONTRACTOR SHALL CONSULT MANUFACTURERS INSTALLATION
INSTRUCTIONS FOR SIZES, METHODS, ACCESSORIES, AND CLEARANCES IN
SPACE AVAILABLE PRIOR TO BIDDING PROJECT.
E - ANYTHING NOT CLEAR OR IN CONFLICT WILL BE EXPLAINED BY MAKING
APPLICATION TO THE ENGINEER IN WRITING.
G-2 - ANY AND ALL ALTERATIONS TO THE SYSTEM SHOWN SHALL BE SUBMITTED
TO THE ENGINEER PRIOR TO CHANGES FOR APPROVAL. CONTRACTOR SHALL
NOT START ANY CHANGES UNTIL NOTIFIED IN WRITING. IF CHANGES ARE MADE
PRIOR TO APPROVAL CONTRACTOR SHALL TAKE ALL RESPONSIBILITY FOR THE
CHANGES MADE AND ALL COSTS RELATING TO FAILURE OR REPLACEMENT OF
ALTERATIONS.
G-3 - CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS AND LOCATIONS.
G-4 - THE WORKING DRAWINGS ARE DIAGRAMMATIC. THEY DO NOT SHOW
EVERY OFFSET, BEND, OR ELBOW NECESSARY FOR THE COMPLETE
INSTALLATION IN THE SPACE PROVIDED. ALL LOCATIONS FOR MECHANICAL
EQUIPMENT SHALL BE FIELD VERIFIED AND COORDINATED WITH ALL
DRAWINGS. THE CONTRACTOR SHALL PROVIDE OR COORDINATE WITH THE
GENERAL CONTRACTOR PROVISIONS FOR BLOCKOUTS OR CORE DRILLS
THROUGH STRUCTURE.
G-5 - THE INSTRUCTION TO "PROVIDE" ALSO INCLUDES INSTALLATION.
G-6 - MECHANICAL CONTRACTOR SHALL PROVIDE AND INSTALL SMOKE AND
FIRE DAMPERS AS REQUIRED BY LOCAL CODES AND AUTHORITIES.
G-7 - SHEET METAL DUCT SIZES SHOWN ON DRAWINGS ARE FREE AREA
DIMENSIONS.
G-8 - PROVIDE AND INSTALL BALANCING DAMPERS IN ALL SUPPLY AND EXHAUST
AIR BRANCH DUCTS. BALANCE TO CFM SHOWN ON PLAN.
G-9 - SEE ARCHITECTURAL REFLECTED CEILING PLAN FOR EXACT LOCATION OF
DIFFUSERS AND GRILLES.
G-10 - PROVIDE TURNING VANES IN ALL ELBOWS OF RECTANGULAR DUCT.
G-11 - THE CONTRACTOR SHALL ASSUME ALL RESPONSIBILITY IN HANDLING
AND DISPOSING OF REFRIGERANTS, OILS, ETC. ALL SUCH MATERIALS SHALL BE
HANDLED, DISPOSED, AND USED IN ACCORDANCE WITH ALL LOCAL, STATE, AND
FEDERAL LAWS.
G-12 - THE MECHANICAL CONTRACTOR SHALL VERIFY MOTOR VOLTAGES WITH
THE ELECTRICAL DRAWING BEFORE ORDERING MOTORIZED EQUIPMENT AND
CONTROLS.
G-13 - C.F.M. LISTED IS ACTUAL AIR.
G-14 - SUPPLIERS SHALL REVIEW ALL DRAWINGS AND THE SPECIFICATIONS
PRIOR TO SUBMITTING PRICES TO THE CONTRACTOR. ALL QUESTIONS AND
DISCREPANCIES SHALL BE BROUGHT TO THE ENGINEERS ATTENTION PRIOR TO
BIDDING.
G-15 - CONTRACTOR SHALL THOROUGHLY REVIEW AND SIGN SUBMITTALS FOR
COMPLETENESS AND COMPLIANCE TO THE SPECIFICATIONS PRIOR TO
ENGINEERS REVIEW. SUPPLIERS SHALL HIGHLIGHT OR MARK ALL INFORMATION
REQUIRED TO SHOW COMPLIANCE TO THE SPECIFICATIONS. ALL REQUESTED
EXCEPTIONS TO THE SPECIFICATIONS, OR SCHEDULES SHALL BE CLEARLY
NOTED AND EXPLAINED. SUBMITTAL REVIEW AND ACCEPTANCE IS FOR DESIGN
CONCEPT ONLY, AND DOES NOT AT ANY TIME RELIEVE THE CONTRACTOR OF
RESPONSIBILITY TO MEET SPECIFICATIONS, CAPACITIES, OR DESIGN INTENT.
G-16 - ALL MECHANICAL SHALL BE INSTALLED AND CONFORM TO THE 2024
EDITION OF THE IMC AND IPC WITH UTAH ANNOTATIONS AND LOCAL AUTHORITY
REQUIREMENTS.
G-17 - THIS CONTRACTOR SHALL BE RESPONSIBLE FOR THE DRAINING DOWN
AND RE-FILLING OF ALL SYSTEMS NECESSARY TO COMPLETE THE WORK
OUTLINED BY THIS PROJECT. THIS INCLUDES PROVIDING THE REQUIRED
CHEMICAL TREATMENT WHEN RE-FILLING THE SYSTEM.
G-18 - ALL PIPING, MATERIALS, ETC. SHALL BE NEW AND DOMESTIC MADE
UNLESS SPECIFICALLY AUTHORIZED IN WRITING PRIOR TO BID.
G-19 - THIS CONTRACTOR SHALL CONTRACT WITH A DESIGN BUILD ELECTRICAL
CONTRACTOR FOR THE DESIGN AND CONSTRUCTION OF THE ELECTRICAL
PORTION OF THIS PROJECT. ELECTRICAL INSTALLATION AND DESIGN SHALL BE
PER 2023 NEC.
A L L I D
E A
S
D E
S
IG
N S
A
R R
A N
G E
M E
N T
S A
N D
P L A
N S
I N
D
IC
A T
E D
O R
R E
P R
E S
E N
T E
D B
Y T
H
IS
D R
A W
IN
G
A R
E O
W N
E D
B Y
A N
D T
H E
P R
O P
E R
T Y
O F
W H
W E
N G
IN
E
E R
IN
G
I N
C
A N
D W
E R
E C
R E
A T
E D
E
V O
L V
E D
A
N D
D E
V E
L O
P E
D F
O R
U S
E O
N A
N D
I N
C O
N N
E C
T
IO
N W
IT
H
T H
E S
P E
C
IF
IE
D
P R
O J E
C T
N
O N
E O
F T
H E
I D
E A
S
D E
S
IG
N S
A
R R
A N
G E
M E
N T
S O
R P
L A
N S
S H
A L L B
E U
S E
D B
Y O
R D
IS
C
L O
S E
D T
O A
N Y
P E
R S
O N
F
IR
M
O
R C
O R
P O
R A
T
IO
N F
O R
A N
Y P
U R
P O
S E
W H
A T
S O
E V
E R
W
IT
H O
U T
W R
IT
T
E N
C O
N S
E N
T O
F W
G
IN
E
E R
IN
G
I N
C
W R
IT
T
E N
D
IM
E N
S
IO
N S
O N
T H
E S
E D
R A
W
IN
G S
S H
A L L H
A V
E P
R E
C E
D E
N C
E O
V E
R S
C A
L E
D
IM
E N
S
IO
N S
C
O N
T R
A C
T O
R S
S H
A L L V
E R
IF
Y
A N
D B
E R
E S
P O
N S
IB
L E
F O
R A
L L D
IM
E
N S
IO
N
S A
N D
C O
N D
IT
IO
N S
O N
T H
E J
O B
A N
D T
H
IS
O F
F
IC
E M
U S
T B
E N
O T
IF
IE
D O
F A
N Y
V A
R
IA
T
IO
N F
R O
M T
H E
D
IM
E N
S
IO
N S
A N
D C
O N
D
IT
IO
N
S S
H O
W N
B Y
T H
E S
E D
R A
W
IN
G S
W
A R
N
IN
G
R E
P R
O D
U C
T
IO
N H
E R
E O
F I S
A C
R
IM
IN
A
L O
F F
E N
S E
U N
D E
R
U
.S .C
S
E C
U N
A U
T H
O R
IZ
E
D D
IS
C
L O
S U
R E
M A
Y C
O N
S T
IT
U
T E
T R
A
C R
E T
M
IS
A P
P R
O P
R
IA
T
IO
N I N
V
IO
L A
T
IO
N O
F I .C
.2 -2
-3 -1
E T
S
E Q
A
N D
O T
H E
R L
A W
S
1 2 3 4 5
D
C
B
A
1 2 3 4 5
D
C
B
A
CONSULTANTS
CODE REVIEW STAMP
PROJECT NAME & ADDRESS
MARK DATE REVISION
PROJECT MANAGER:
DRAWN BY:
CHECKED BY:
DATE:
WHW PROJECT NUMBER:
11/04/26STAFF
CL
11/04/2026
26072
CL
MECHANICAL LEGEND
AND GENERAL NOTES
MG001
SUU AFEC Air Handlers
DFCM#27052730
AMERICA FIRST EVENT CENTER, 351 W
CENTER ST, CEDAR CITY, UT 84720
DIVISION OF FACILITIES
CONSTRUCTION AND
MANAGEMENT
Jason Van Ausdal
11/24/2026
A L L I D
E A
S
D E
S
IG
N S
A
R R
A N
G E
M E
N T
S A
N D
P L A
N S
I N
D
IC
A T
E D
O R
R E
P R
E S
E N
T E
D B
Y T
H
IS
D R
A W
IN
G
A R
E O
W N
E D
B Y
A N
D T
H E
P R
O P
E R
T Y
O F
W H
W E
N G
IN
E
E R
IN
G
I N
C
A N
D W
E R
E C
R E
A T
E D
E
V O
L V
E D
A
N D
D E
V E
L O
P E
D F
O R
U S
E O
N A
N D
I N
C O
N N
E C
T
IO
N W
IT
H
T H
E S
P E
C
IF
IE
D
P R
O J E
C T
N
O N
E O
F T
H E
I D
E A
S
D E
S
IG
N S
A
R R
A N
G E
M E
N T
S O
R P
L A
N S
S H
A L L B
E U
S E
D B
Y O
R D
IS
C
L O
S E
D T
O A
N Y
P E
R S
O N
F
IR
M
O
R C
O R
P O
R A
T
IO
N F
O R
A N
Y P
U R
P O
S E
W H
A T
S O
E V
E R
W
IT
H O
U T
W R
IT
T
E N
C O
N S
E N
T O
F W
G
IN
E
E R
IN
G
I N
C
W R
IT
T
E N
D
IM
E N
S
IO
N S
O N
T H
E S
E D
R A
W
IN
G S
S H
A L L H
A V
E P
R E
C E
D E
N C
E O
V E
R S
C A
L E
D
IM
E N
S
IO
N S
C
O N
T R
A C
T O
R S
S H
A L L V
E R
IF
Y
A N
D B
E R
E S
P O
N S
IB
L E
F O
R A
L L D
IM
E
N S
IO
N
S A
N D
C O
N D
IT
IO
N S
O N
T H
E J
O B
A N
D T
H
IS
O F
F
IC
E M
U S
T B
E N
O T
IF
IE
D O
F A
N Y
V A
R
IA
T
IO
N F
R O
M T
H E
D
IM
E N
S
IO
N S
A N
D C
O N
D
IT
IO
N
S S
H O
W N
B Y
T H
E S
E D
R A
W
IN
G S
W
A R
N
IN
G
R E
P R
O D
U C
T
IO
N H
E R
E O
F I S
A C
R
IM
IN
A
L O
F F
E N
S E
U N
D E
R
U
.S .C
S
E C
U N
A U
T H
O R
IZ
E
D D
IS
C
L O
S U
R E
M A
Y C
O N
S T
IT
U
T E
T R
A
C R
E T
M
IS
A P
P R
O P
R
IA
T
IO
N I N
V
IO
L A
T
IO
N O
F I .C
.2 -2
-3 -1
E T
S
E Q
A
N D
O T
H E
R L
A W
S
1 2 3 4 5
D
C
B
A
1 2 3 4 5
D
C
B
A
CONSULTANTS
CODE REVIEW STAMP
PROJECT NAME & ADDRESS
MARK DATE REVISION
PROJECT MANAGER:
DRAWN BY:
CHECKED BY:
DATE:
WHW PROJECT NUMBER:
11/04/26Author
Checker
11/04/2026
26072
Designer
MECHANICAL
DEMOLITION ROOF PLAN
MD102
SUU AFEC Air Handlers
DFCM#27052730
AMERICA FIRST EVENT CENTER, 351 W
CENTER ST, CEDAR CITY, UT 847201/16" = 1'-0"
MECHANICAL DEMOLITION ROOF PLAN
SHEET NOTES
1 REMOVE AND REPLACE EXISTING RELIEF FAN IN THIS
APPROXIMATE LOCATION. REMOVE AND REPLACE
EXISTING EQUIPMENT CURB. REMOVE AND REPLACE
ALL EXISTING CONTROLS. FIELD VERIFY.
GENERAL NOTES
1. CONTRACTOR SHALL FIELD VERIFY EXISTING MECHANICAL AND
ARCHITECTURAL CONDITIONS, INCLUDING, BUT NOT LIMITED TO:
EXISTING ROUTING AND LOCATION OF DUCTWORK, PIPING,
ELECTRICAL, AND STRUCTURAL ELEMENTS. CONTRACTOR SHALL
FIELD VERIFY POTENTIAL CONFLICTS BETWEEN NEW MECHANICAL
ELEMENTS AND EXISTING CONDITIONS PRIOR TO BEGINNING
FABRICATION OR ORDERING EQUIPMENT.
2. PRIME CONTRACTOR SHALL PROVIDE ALL COORDINATION BETWEEN
SUB-TIER CONTRACTORS. THIS SHALL INCLUDE THE COORDINATION
BETWEEN SUB-TIER CONTRACTORS, SUB-TIER CONTRACTORS AND
FACILITIES, SUB-TIER CONTRACTORS AND ARCHITECT/ENGINEER.
3. ALL DEMOLISHED EQUIPMENT AND MATERIAL SHALL BE BROKEN
DOWN TO FIT THROUGH DESIGNATED PATHWAYS. FIELD VERIFY
EXACT SCOPE OF DEMOLITION AND REMOVAL PATH. CONTRACTOR
SHALL BE RESPONSIBLE TO REPAIR ANY DAMAGE TO BUILDING
DURING REMOVAL OF EQUIPMENT AND MATERIAL.
4. SOME EXISTING PIPING AND EXISTING DUCTWORK NOT SHOWN ON
THIS SHEET FOR CLARIFICATION. FIELD VERIFY EXISTING CONDITIONS
PRIOR TO BID.
5. COORDINATE WITH DFCM PROVIDED HAZMAT REPORT AND
ABATEMENT CONTRACTOR PRIOR TO ANY DEMOLITION.
6. CONTRACTOR SHALL MAKE PROVISIONS WITH A DESIGN BUILD
ELECTRICIAN TO VERIFY ELECTRICAL CONDITIONS. DESIGN BUILD
CONTRACTOR SHALL PROVIDE ANY NEW WIRING, CIRCUIT BREAKERS,
PANELS, SWITCH GEAR, AND ALL NECESSARY ELECTRICAL
ACCOMMODATIONS FOR ANY NEW OR RE-LOCATED MECHANICAL
EQUIPMENT. CONTRACTOR SHALL COORDINATE THE DEMOLITION AND
REMOVAL OF ANY ELECTRICAL ELEMENTS ASSOCIATED WITH
EXISTING MECHANICAL EQUIPMENT BEING REMOVED. ALL ABANDONED
PIPING AND WIRING SHALL BE REMOVED BACK TO PANEL UNLESS
OTHERWISE APPROVED. ELECTRICIAN SHALL FIELD VERIFY AND
CONFIRM ELECTRICAL SCOPE AND EXISTING CONDITIONS PRIOR TO
ANY DEMOLITION WORK AND ORDERING ANY NEW MECHANICAL
EQUIPMENT.
7. PROVIDE UPDATED GRAPHICS AND PROGRAMMING FOR ALL NEW
AND EXISTING TEMPERATURE CONTROLS AND MOTORIZED DAMPERS.
8. PROVIDE FULL TEST AND BALANCE REPORT OF ALL IMPACTED
SYSTEMS BY LICENSED AND APPROVED TEST AND BALANCE
CONTRACTOR.
9. ALL ROOFING MODIFICATIONS SHALL BE PERFORMED BY
WARRANTY HOLDING CONTRACTOR (AMERICAN FRONTIER ROOFING
435-479-5218) AND APPROVED BY DFCM ROOFING PROGRAM
DIRECTOR.
DIVISION OF FACILITIES
CONSTRUCTION AND
MANAGEMENT
Jason Van Ausdal
11/24/2026
ME301
A
G
C
A
TC
A
TC
A
TC
4"ø CHWR (E)
4"ø CHWS (E)
4"ø CHWR (E)
4"ø CHWS (E)
40"ø SA (E)
90"x42" (E)
32"x28" MPS (E)
32"ø MPS (E)
ME301
A
TC
6"ø CHWS (E)
6"ø CHWR (E) 6"ø HWR (E)
6"ø HWS (E)
100"x36" OA (E)
78"x30" (E)
104"x42" (E)
48"x30" (E)
26"x30" (E)
20"ø MPS (E)
6"ø CWS (E)
6"ø CWR (E)
3 18"ø EA (E)
100"x36" OA (E)
A
TC
48"x48" SA (E)
6"ø CHWS (E)
6"ø CHWR (E)
6"ø HWR (E)
6"ø HWS (E)
28"x22" EA (E)
E
XIS
TIN
G
O U
TS
ID
E A
IR
P
LE
N U M
ME301
ME301
A L L I D
E A
S
D E
S
IG
N S
A
R R
A N
G E
M E
N T
S A
N D
P L A
N S
I N
D
IC
A T
E D
O R
R E
P R
E S
E N
T E
D B
Y T
H
IS
D R
A W
IN
G
A R
E O
W N
E D
B Y
A N
D T
H E
P R
O P
E R
T Y
O F
W H
W E
N G
IN
E
E R
IN
G
I N
C
A N
D W
E R
E C
R E
A T
E D
E
V O
L V
E D
A
N D
D E
V E
L O
P E
D F
O R
U S
E O
N A
N D
I N
C O
N N
E C
T
IO
N W
IT
H
T H
E S
P E
C
IF
IE
D
P R
O J E
C T
N
O N
E O
F T
H E
I D
E A
S
D E
S
IG
N S
A
R R
A N
G E
M E
N T
S O
R P
L A
N S
S H
A L L B
E U
S E
D B
Y O
R D
IS
C
L O
S E
D T
O A
N Y
P E
R S
O N
F
IR
M
O
R C
O R
P O
R A
T
IO
N F
O R
A N
Y P
U R
P O
S E
W H
A T
S O
E V
E R
W
IT
H O
U T
W R
IT
T
E N
C O
N S
E N
T O
F W
G
IN
E
E R
IN
G
I N
C
W R
IT
T
E N
D
IM
E N
S
IO
N S
O N
T H
E S
E D
R A
W
IN
G S
S H
A L L H
A V
E P
R E
C E
D E
N C
E O
V E
R S
C A
L E
D
IM
E N
S
IO
N S
C
O N
T R
A C
T O
R S
S H
A L L V
E R
IF
Y
A N
D B
E R
E S
P O
N S
IB
L E
F O
R A
L L D
IM
E
N S
IO
N
S A
N D
C O
N D
IT
IO
N S
O N
T H
E J
O B
A N
D T
H
IS
O F
F
IC
E M
U S
T B
E N
O T
IF
IE
D O
F A
N Y
V A
R
IA
T
IO
N F
R O
M T
H E
D
IM
E N
S
IO
N S
A N
D C
O N
D
IT
IO
N
S S
H O
W N
B Y
T H
E S
E D
R A
W
IN
G S
W
A R
N
IN
G
R E
P R
O D
U C
T
IO
N H
E R
E O
F I S
A C
R
IM
IN
A
L O
F F
E N
S E
U N
D E
R
U
.S .C
S
E C
U N
A U
T H
O R
IZ
E
D D
IS
C
L O
S U
R E
M A
Y C
O N
S T
IT
U
T E
T R
A
C R
E T
M
IS
A P
P R
O P
R
IA
T
IO
N I N
V
IO
L A
T
IO
N O
F I .C
.2 -2
-3 -1
E T
S
E Q
A
N D
O T
H E
R L
A W
S
1 2 3 4 5
D
C
B
A
1 2 3 4 5
D
C
B
A
CONSULTANTS
CODE REVIEW STAMP
PROJECT NAME & ADDRESS
MARK DATE REVISION
PROJECT MANAGER:
DRAWN BY:
CHECKED BY:
DATE:
WHW PROJECT NUMBER:
11/04/26STAFF
CL
11/04/2026
26072
CL
LARGE SCALE
MECHANICAL
DEMOLITION FLOOR
PLANS
MD401
SUU AFEC Air Handlers
DFCM#27052730
AMERICA FIRST EVENT CENTER, 351 W
CENTER ST, CEDAR CITY, UT 84720
1/4" = 1'-0"
LEVEL 1 MECHANICAL DEMOLITION
FLOOR PLAN
SHEET NOTES
1 REMOVE EXISTING CHILLED WATER PIPING BACK TO
THIS APPROXIMATE LOCATION. FIELD VERIFY EXACT
ROUTING AND POINTS OF REMOVAL.
2 REMOVE EXISTING DUCTWORK BACK TO THIS
APPROXIMATE LOCATION. FIELD VERIFY EXACT
ROUTING AND POINTS OF REMOVAL.
3 REMOVE EXISTING AIR HANDLING UNIT IN THIS
APPROXIMATE LOCATION. REMOVE EXISTING COIL
PIPING, CONTROLS, DUCTWORK, AND ALL
ASSOCIATED ITEMS. COORDINATE WITH DESIGN
BUILD ELECTRICIAN TO REMOVE EXISTING
ELECTRICAL ACCOMMODATIONS BACK TO PANEL.
FIELD VERIFY.
4 REMOVE EXISTING PNEUMATIC CONTROL VALVE IN
THIS APPROXIMATE LOCATION. COORDINATE WITH
CONTROLS CONTRACTOR TO REMOVE ALL
PNEUMATIC TUBING BACK TO COMPRESSOR. FIELD
VERIFY.
5 EXISTING DUCTWORK IN THIS APPROXIMATE
LOCATION SHALL REMAIN.FIELD VERIFY.
6 EXISTING MECHANICAL PIPING IN THIS APPROXIMATE
LOCATION SHALL REMAIN.FIELD VERIFY.
7 REMOVE EXISTING DAMPER AND PNEUMATIC
ACTUATOR IN THIS APPROXIMATE LOCATION.
COORDINATE WITH CONTROLS CONTRACTOR TO
REMOVE ALL PNEUMATIC TUBING BACK TO
COMPRESSOR. FIELD VERIFY.
8 REMOVE EXISTING CHILLED WATER COIL PUMP IN
THIS APPROXIMATE LOCATION. COORDINATE WITH
DESIGN BUILD ELECTRICIAN TO REMOVE EXISTING
ELECTRICAL ACCOMMODATIONS BACK TO PANEL.
FIELD VERIFY.
9 REMOVE EXISTING CHILLED WATER SECTION IN
VERTICAL PIPING. THE INTENT IS TO REMOVE
ENOUGH PIPING TO INSTALL NEW ISOLATION
VALVES. FIELD VERIFY EXACT ROUTING AND POINTS
OF REMOVAL.
10 SEE SHEET ME301 FOR SECTION VIEW OF THIS
APPROXIMATE AREA.
4 3
N
KEY PLAN
GENERAL NOTES
1. CONTRACTOR SHALL FIELD VERIFY EXISTING
MECHANICAL AND ARCHITECTURAL CONDITIONS,
INCLUDING, BUT NOT LIMITED TO: EXISTING ROUTING
AND LOCATION OF DUCTWORK, PIPING, ELECTRICAL,
AND STRUCTURAL ELEMENTS. CONTRACTOR SHALL
FIELD VERIFY POTENTIAL CONFLICTS BETWEEN NEW
MECHANICAL ELEMENTS AND EXISTING CONDITIONS
PRIOR TO BEGINNING FABRICATION OR ORDERING
EQUIPMENT.
2. PRIME CONTRACTOR SHALL PROVIDE ALL
COORDINATION BETWEEN SUB-TIER CONTRACTORS.
THIS SHALL INCLUDE THE COORDINATION BETWEEN
SUB-TIER CONTRACTORS, SUB-TIER CONTRACTORS
AND FACILITIES, SUB-TIER CONTRACTORS AND
ARCHITECT/ENGINEER.
3. ALL DEMOLISHED EQUIPMENT AND MATERIAL SHALL
BE BROKEN DOWN TO FIT THROUGH DESIGNATED
PATHWAYS. FIELD VERIFY EXACT SCOPE OF
DEMOLITION AND REMOVAL PATH. CONTRACTOR SHALL
BE RESPONSIBLE TO REPAIR ANY DAMAGE TO
BUILDING DURING REMOVAL OF EQUIPMENT AND
MATERIAL.
4. SOME EXISTING PIPING AND EXISTING DUCTWORK
NOT SHOWN ON THIS SHEET FOR CLARIFICATION. FIELD
VERIFY EXISTING CONDITIONS PRIOR TO BID.
5. COORDINATE WITH DFCM PROVIDED HAZMAT REPORT
AND ABATEMENT CONTRACTOR PRIOR TO ANY
DEMOLITION.
6. CONTRACTOR SHALL MAKE PROVISIONS WITH A
DESIGN BUILD ELECTRICIAN TO VERIFY ELECTRICAL
CONDITIONS. DESIGN BUILD CONTRACTOR SHALL
PROVIDE ANY NEW WIRING, CIRCUIT BREAKERS,
PANELS, SWITCH GEAR, AND ALL NECESSARY
ELECTRICAL ACCOMMODATIONS FOR ANY NEW OR RE-
LOCATED MECHANICAL EQUIPMENT. CONTRACTOR
SHALL COORDINATE THE DEMOLITION AND REMOVAL OF
ANY ELECTRICAL ELEMENTS ASSOCIATED WITH
EXISTING MECHANICAL EQUIPMENT BEING REMOVED.
ALL ABANDONED PIPING AND WIRING SHALL BE
REMOVED BACK TO PANEL UNLESS OTHERWISE
APPROVED. ELECTRICIAN SHALL FIELD VERIFY AND
CONFIRM ELECTRICAL SCOPE AND EXISTING
CONDITIONS PRIOR TO ANY DEMOLITION WORK AND
ORDERING ANY NEW MECHANICAL EQUIPMENT.
7. PROVIDE UPDATED GRAPHICS AND PROGRAMMING
FOR ALL NEW AND EXISTING TEMPERATURE CONTROLS
AND MOTORIZED DAMPERS.
8. PROVIDE FULL TEST AND BALANCE REPORT OF ALL
IMPACTED SYSTEMS BY LICENSED AND APPROVED TEST
AND BALANCE CONTRACTOR.
9. ALL ROOFING MODIFICATIONS SHALL BE PERFORMED
BY WARRANTY HOLDING CONTRACTOR (AMERICAN
FRONTIER ROOFING 435-479-5218) AND APPROVED BY
DFCM ROOFING PROGRAM DIRECTOR.
DIVISION OF FACILITIES
CONSTRUCTION AND
MANAGEMENT
Jason Van Ausdal
11/24/2026
T
T
T
T
T
T
T
T
T T
T
T
T
T
TT
T
T
TT
T
T
T
T
T
T
T
T
D
B
VAV
VAV
VAV
VAV
VAV
VAV
VAV
VAV
VAV
VAV
VAV
VAV
VAV
VAV
VAV
VAV
VAV
VAV
VAV
VAV
VAV
VAV
VAV
VAV
VAV
VAV
VAV
VAV
VAV
VAV
EXIST
EXIST
EXIST
EXIST
EXIST
EXIST
EXIST
EXIST
EXIST
EXIST
EXIST
EXIST
EXIST
EXIST
EXIST
EXIST
D-13
EXIST
EXIST
EXIST
EXIST
EXIST
EXIST
EXIST
EXIST
EXIST
EXIST
EXIST
D-13
D-13
EXIST
EXIST
EXIST
EXIST
EXIST
EXIST
EXIST
EXIST
EXIST
EXIST
EXIST
EXIST
EXIST
EXIST
EXIST
EXIST
145 EXIST
EXIST
EXIST
EXIST
EXIST
EXIST
EXIST
EXIST
A L L I D
E A
S
D E
S
IG
N S
A
R R
A N
G E
M E
N T
S A
N D
P L A
N S
I N
D
IC
A T
E D
O R
R E
P R
E S
E N
T E
D B
Y T
H
IS
D R
A W
IN
G
A R
E O
W N
E D
B Y
A N
D T
H E
P R
O P
E R
T Y
O F
W H
W E
N G
IN
E
E R
IN
G
I N
C
A N
D W
E R
E C
R E
A T
E D
E
V O
L V
E D
A
N D
D E
V E
L O
P E
D F
O R
U S
E O
N A
N D
I N
C O
N N
E C
T
IO
N W
IT
H
T H
E S
P E
C
IF
IE
D
P R
O J E
C T
N
O N
E O
F T
H E
I D
E A
S
D E
S
IG
N S
A
R R
A N
G E
M E
N T
S O
R P
L A
N S
S H
A L L B
E U
S E
D B
Y O
R D
IS
C
L O
S E
D T
O A
N Y
P E
R S
O N
F
IR
M
O
R C
O R
P O
R A
T
IO
N F
O R
A N
Y P
U R
P O
S E
W H
A T
S O
E V
E R
W
IT
H O
U T
W R
IT
T
E N
C O
N S
E N
T O
F W
G
IN
E
E R
IN
G
I N
C
W R
IT
T
E N
D
IM
E N
S
IO
N S
O N
T H
E S
E D
R A
W
IN
G S
S H
A L L H
A V
E P
R E
C E
D E
N C
E O
V E
R S
C A
L E
D
IM
E N
S
IO
N S
C
O N
T R
A C
T O
R S
S H
A L L V
E R
IF
Y
A N
D B
E R
E S
P O
N S
IB
L E
F O
R A
L L D
IM
E
N S
IO
N
S A
N D
C O
N D
IT
IO
N S
O N
T H
E J
O B
A N
D T
H
IS
O F
F
IC
E M
U S
T B
E N
O T
IF
IE
D O
F A
N Y
V A
R
IA
T
IO
N F
R O
M T
H E
D
IM
E N
S
IO
N S
A N
D C
O N
D
IT
IO
N
S S
H O
W N
B Y
T H
E S
E D
R A
W
IN
G S
W
A R
N
IN
G
R E
P R
O D
U C
T
IO
N H
E R
E O
F I S
A C
R
IM
IN
A
L O
F F
E N
S E
U N
D E
R
U
.S .C
S
E C
U N
A U
T H
O R
IZ
E
D D
IS
C
L O
S U
R E
M A
Y C
O N
S T
IT
U
T E
T R
A
C R
E T
M
IS
A P
P R
O P
R
IA
T
IO
N I N
V
IO
L A
T
IO
N O
F I .C
.2 -2
-3 -1
E T
S
E Q
A
N D
O T
H E
R L
A W
S
1 2 3 4 5
D
C
B
A
1 2 3 4 5
D
C
B
A
CONSULTANTS
CODE REVIEW STAMP
PROJECT NAME & ADDRESS
MARK DATE REVISION
PROJECT MANAGER:
DRAWN BY:
CHECKED BY:
DATE:
WHW PROJECT NUMBER:
11/04/26Author
CL
11/04/2026
26072
Designer
MAIN LEVEL MECHANICAL
PLAN AREA C
ME101.1
SUU AFEC Air Handlers
DFCM#27052730
AMERICA FIRST EVENT CENTER, 351 W
CENTER ST, CEDAR CITY, UT 84720
3/32" = 1'-0"
MAIN LEVEL MECHANICAL PLAN AREAC
GENERAL NOTES
1. CONTRACTOR SHALL FIELD VERIFY EXISTING
MECHANICAL AND ARCHITECTURAL CONDITIONS,
INCLUDING, BUT NOT LIMITED TO: EXISTING ROUTING
AND LOCATION OF DUCTWORK, PIPING, ELECTRICAL,
AND STRUCTURAL ELEMENTS. CONTRACTOR SHALL
FIELD VERIFY POTENTIAL CONFLICTS BETWEEN NEW
MECHANICAL ELEMENTS AND EXISTING CONDITIONS
PRIOR TO BEGINNING FABRICATION OR ORDERING
EQUIPMENT.
2. PRIME CONTRACTOR SHALL PROVIDE ALL
COORDINATION BETWEEN SUB-TIER CONTRACTORS.
THIS SHALL INCLUDE THE COORDINATION BETWEEN
SUB-TIER CONTRACTORS, SUB-TIER CONTRACTORS
AND FACILITIES, SUB-TIER CONTRACTORS AND
ARCHITECT/ENGINEER.
3. SOME EXISTING PIPING AND EXISTING DUCTWORK
NOT SHOWN ON THIS SHEET FOR CLARIFICATION. FIELD
VERIFY EXISTING CONDITIONS PRIOR TO BID.
4. PROVIDE FULL TEST AND BALANCE REPORT OF ALL
IMPACTED SYSTEMS BY LICENSED AND APPROVED TEST
AND BALANCE CONTRACTOR. RE-BALANCE EXISTING
DIFFUSERS TO CFM SHOWN. RE-BALANCE EXISTING VAV
AIR FLOW, AND HEATING WATER FLOW RATE TO CFM
AND GPM SHOWN IN SCHEDULES.
SHEET NOTES
1 PROVIDE NEW DIFFERENTIAL PRESSURE SENSOR IN
THIS APPROXIMATE LOCATION. FIELD VERIFY.
PROVIDE ALL NEW CONTROLS AND TIE INTO
EXISTING BUILDING MANAGEMENT SYSTEM.
DIVISION OF FACILITIES
CONSTRUCTION AND
MANAGEMENT
Jason Van Ausdal
11/24/2026
VAV
VAV
VAV
VAV
4 VAV
VAV
VAV
VAV
VAV
VAV
VAV
VAV
VAV
VAV
VAV
VAV
VAV
D-14
D-14
D-14
D-14
D-13
D-13
D-13
D-13
D-13
D-13
D-13
D-14
D-14
D-13
D-13
D-13
D-13
D-13
D-13
D-13
D-14
EXIST
D-13
D-13
D-13
D-14
D-14
D-14
D-14
D-13
D-13
D-1
D-1
D-1
(TYP 3)(TYP 3)
(TYP 3) (TYP 3)
(TYP 3)
(TYP 3)
LSS-1
LSS-1
LSS-1
LSS-1
LSS-1
LSS-1
R-2
R-2
D-1
D-1
D-1
EXIST
EXIST
A L L I D
E A
S
D E
S
IG
N S
A
R R
A N
G E
M E
N T
S A
N D
P L A
N S
I N
D
IC
A T
E D
O R
R E
P R
E S
E N
T E
D B
Y T
H
IS
D R
A W
IN
G
A R
E O
W N
E D
B Y
A N
D T
H E
P R
O P
E R
T Y
O F
W H
W E
N G
IN
E
E R
IN
G
I N
C
A N
D W
E R
E C
R E
A T
E D
E
V O
L V
E D
A
N D
D E
V E
L O
P E
D F
O R
U S
E O
N A
N D
I N
C O
N N
E C
T
IO
N W
IT
H
T H
E S
P E
C
IF
IE
D
P R
O J E
C T
N
O N
E O
F T
H E
I D
E A
S
D E
S
IG
N S
A
R R
A N
G E
M E
N T
S O
R P
L A
N S
S H
A L L B
E U
S E
D B
Y O
R D
IS
C
L O
S E
D T
O A
N Y
P E
R S
O N
F
IR
M
O
R C
O R
P O
R A
T
IO
N F
O R
A N
Y P
U R
P O
S E
W H
A T
S O
E V
E R
W
IT
H O
U T
W R
IT
T
E N
C O
N S
E N
T O
F W
G
IN
E
E R
IN
G
I N
C
W R
IT
T
E N
D
IM
E N
S
IO
N S
O N
T H
E S
E D
R A
W
IN
G S
S H
A L L H
A V
E P
R E
C E
D E
N C
E O
V E
R S
C A
L E
D
IM
E N
S
IO
N S
C
O N
T R
A C
T O
R S
S H
A L L V
E R
IF
Y
A N
D B
E R
E S
P O
N S
IB
L E
F O
R A
L L D
IM
E
N S
IO
N
S A
N D
C O
N D
IT
IO
N S
O N
T H
E J
O B
A N
D T
H
IS
O F
F
IC
E M
U S
T B
E N
O T
IF
IE
D O
F A
N Y
V A
R
IA
T
IO
N F
R O
M T
H E
D
IM
E N
S
IO
N S
A N
D C
O N
D
IT
IO
N
S S
H O
W N
B Y
T H
E S
E D
R A
W
IN
G S
W
A R
N
IN
G
R E
P R
O D
U C
T
IO
N H
E R
E O
F I S
A C
R
IM
IN
A
L O
F F
E N
S E
U N
D E
R
U
.S .C
S
E C
U N
A U
T H
O R
IZ
E
D D
IS
C
L O
S U
R E
M A
Y C
O N
S T
IT
U
T E
T R
A
C R
E T
M
IS
A P
P R
O P
R
IA
T
IO
N I N
V
IO
L A
T
IO
N O
F I .C
.2 -2
-3 -1
E T
S
E Q
A
N D
O T
H E
R L
A W
S
1 2 3 4 5
D
C
B
A
1 2 3 4 5
D
C
B
A
CONSULTANTS
CODE REVIEW STAMP
PROJECT NAME & ADDRESS
MARK DATE REVISION
PROJECT MANAGER:
DRAWN BY:
CHECKED BY:
DATE:
WHW PROJECT NUMBER:
11/04/26Author
CL
11/04/2026
26072
Designer
MAIN LEVEL MECHANICAL
PLAN AREA D
ME101.2
SUU AFEC Air Handlers
DFCM#27052730
AMERICA FIRST EVENT CENTER, 351 W
CENTER ST, CEDAR CITY, UT 84720
3/32" = 1'-0"
MAIN LEVEL MECHANICAL PLAN AREA D
GENERAL NOTES
1. CONTRACTOR SHALL FIELD VERIFY EXISTING
MECHANICAL AND ARCHITECTURAL CONDITIONS,
INCLUDING, BUT NOT LIMITED TO: EXISTING ROUTING
AND LOCATION OF DUCTWORK, PIPING, ELECTRICAL,
AND STRUCTURAL ELEMENTS. CONTRACTOR SHALL
FIELD VERIFY POTENTIAL CONFLICTS BETWEEN NEW
MECHANICAL ELEMENTS AND EXISTING CONDITIONS
PRIOR TO BEGINNING FABRICATION OR ORDERING
EQUIPMENT.
2. PRIME CONTRACTOR SHALL PROVIDE ALL
COORDINATION BETWEEN SUB-TIER CONTRACTORS.
THIS SHALL INCLUDE THE COORDINATION BETWEEN
SUB-TIER CONTRACTORS, SUB-TIER CONTRACTORS
AND FACILITIES, SUB-TIER CONTRACTORS AND
ARCHITECT/ENGINEER.
3. SOME EXISTING PIPING AND EXISTING DUCTWORK
NOT SHOWN ON THIS SHEET FOR CLARIFICATION. FIELD
VERIFY EXISTING CONDITIONS PRIOR TO BID.
4. PROVIDE FULL TEST AND BALANCE REPORT OF ALL
IMPACTED SYSTEMS BY LICENSED AND APPROVED TEST
AND BALANCE CONTRACTOR. RE-BALANCE EXISTING
DIFFUSERS TO CFM SHOWN. RE-BALANCE EXISTING VAV
AIR FLOW, AND HEATING WATER FLOW RATE TO CFM
AND GPM SHOWN IN SCHEDULES.
SHEET NOTES
1 PROVIDE NEW DIFFERENTIAL PRESSURE SENSOR IN
THIS APPROXIMATE LOCATION. FIELD VERIFY.
PROVIDE ALL NEW CONTROLS AND TIE INTO
EXISTING BUILDING MANAGEMENT SYSTEM.
DIVISION OF FACILITIES
CONSTRUCTION AND
MANAGEMENT
Jason Van Ausdal
11/24/2026
A
G
C
ME301
32"ø MPS (E)
20"ø MPS (E)
A
TC
78"x30" O A
100"x36" OA (E)
90"x42" (E)
100"x24" RA
AHU
AHU
40"ø SA (E)
40"ø SA
52"x32" SA
18"ø EA (E)
28"x22" EA (E)
ME301
ATC
A
TC
86"x20" RA
78"x30" RA
90"x26" RA
"x
" O
A (E
A
TC
50"x30" RA
42"x36" RF
A
TC
ME301
40"x32" SA
A L L I D
E A
S
D E
S
IG
N S
A
R R
A N
G E
M E
N T
S A
N D
P L A
N S
I N
D
IC
A T
E D
O R
R E
P R
E S
E N
T E
D B
Y T
H
IS
D R
A W
IN
G
A R
E O
W N
E D
B Y
A N
D T
H E
P R
O P
E R
T Y
O F
W H
W E
N G
IN
E
E R
IN
G
I N
C
A N
D W
E R
E C
R E
A T
E D
E
V O
L V
E D
A
N D
D E
V E
L O
P E
D F
O R
U S
E O
N A
N D
I N
C O
N N
E C
T
IO
N W
IT
H
T H
E S
P E
C
IF
IE
D
P R
O J E
C T
N
O N
E O
F T
H E
I D
E A
S
D E
S
IG
N S
A
R R
A N
G E
M E
N T
S O
R P
L A
N S
S H
A L L B
E U
S E
D B
Y O
R D
IS
C
L O
S E
D T
O A
N Y
P E
R S
O N
F
IR
M
O
R C
O R
P O
R A
T
IO
N F
O R
A N
Y P
U R
P O
S E
W H
A T
S O
E V
E R
W
IT
H O
U T
W R
IT
T
E N
C O
N S
E N
T O
F W
G
IN
E
E R
IN
G
I N
C
W R
IT
T
E N
D
IM
E N
S
IO
N S
O N
T H
E S
E D
R A
W
IN
G S
S H
A L L H
A V
E P
R E
C E
D E
N C
E O
V E
R S
C A
L E
D
IM
E N
S
IO
N S
C
O N
T R
A C
T O
R S
S H
A L L V
E R
IF
Y
A N
D B
E R
E S
P O
N S
IB
L E
F O
R A
L L D
IM
E
N S
IO
N
S A
N D
C O
N D
IT
IO
N S
O N
T H
E J
O B
A N
D T
H
IS
O F
F
IC
E M
U S
T B
E N
O T
IF
IE
D O
F A
N Y
V A
R
IA
T
IO
N F
R O
M T
H E
D
IM
E N
S
IO
N S
A N
D C
O N
D
IT
IO
N
S S
H O
W N
B Y
T H
E S
E D
R A
W
IN
G S
W
A R
N
IN
G
R E
P R
O D
U C
T
IO
N H
E R
E O
F I S
A C
R
IM
IN
A
L O
F F
E N
S E
U N
D E
R
U
.S .C
S
E C
U N
A U
T H
O R
IZ
E
D D
IS
C
L O
S U
R E
M A
Y C
O N
S T
IT
U
T E
T R
A
C R
E T
M
IS
A P
P R
O P
R
IA
T
IO
N I N
V
IO
L A
T
IO
N O
F I .C
.2 -2
-3 -1
E T
S
E Q
A
N D
O T
H E
R L
A W
S
1 2 3 4 5
D
C
B
A
1 2 3 4 5
D
C
B
A
CONSULTANTS
CODE REVIEW STAMP
PROJECT NAME & ADDRESS
MARK DATE REVISION
PROJECT MANAGER:
DRAWN BY:
CHECKED BY:
DATE:
WHW PROJECT NUMBER:
11/04/26STAFF
CL
11/04/2026
26072
CL
MECHANICAL FLOOR
PLANS
ME401
SUU AFEC Air Handlers
DFCM#27052730
AMERICA FIRST EVENT CENTER, 351 W
CENTER ST, CEDAR CITY, UT 84720
1/4" = 1'-0"
LEVEL 1 MECHANICAL FLOOR PLAN
SHEET NOTES
1 TIE INTO EXISTING DUCTWORK IN THIS APPROXIMATE LOCATION.
FIELD VERIFY EXACT ROUTING AND POINTS OF CONNECTION.
2 PROVIDE NEW MODULAR AIR HANDLER IN THIS APPROXIMATE
LOCATION. BREAK DOWN AIR HANDLER TO FIT THROUGH
EXISTING 3'-0" X 7'-0" DOOR. OTHER OPTIONS: CONTRACTOR MAY
ELECT TO REMOVE AND REPLACE A SECTION OF ROOFING, OR
WALLS IF PREFERRED FOR MEANS AND METHODS INSTALLATION.
FIELD VERIFY. PROVIDE NEW HOUSEKEEPING PAD EXTENSION.
PROVIDE AIR HANDLER WITH SINGLE POINT POWER
CONNECTION. COORDINATE WITH DESIGN BUILD ELECTRICIAN TO
PROVIDE ALL NEW ELECTRICAL ACCOMMODATIONS, INCLUDING:
NEW WIRING, RACEWAYS, CONDUIT, BREAKERS, DISCONNECTS,
ETC. FOR A FULLY FUNCTIONING SYSTEM. COORDINATE WITH
CONTROLS CONTRACTOR TO PROVIDE NEW DDC CONTROLS
WIRING. TIE INTO EXISTING BUILDING MANAGEMENT SYSTEM.
3 PROVIDE NEW RETURN AIR MOTORIZED DDC
AUTODAMPER/ACTUATOR IN THIS APPROXIMATE LOCATION.
COORDINATE WITH CONTROLS CONTRACTOR TO PROVIDE NEW
CONTROLS WIRING. TIE INTO EXISTING BUILDING MANAGEMENT
SYSTEM. FIELD VERIFY.
4 PROVIDE NEW OUTSIDE AIR MOTORIZED DDC
AUTODAMPER/ACTUATOR IN THIS APPROXIMATE LOCATION.
COORDINATE WITH CONTROLS CONTRACTOR TO PROVIDE NEW
CONTROLS WIRING. TIE INTO EXISTING BUILDING MANAGEMENT
SYSTEM. FIELD VERIFY.
5 PROVIDE NEW RELIEF AIR MOTORIZED DDC
AUTODAMPER/ACTUATOR IN THIS APPROXIMATE LOCATION.
COORDINATE WITH CONTROLS CONTRACTOR TO PROVIDE NEW
CONTROLS WIRING. TIE INTO EXISTING BUILDING MANAGEMENT
SYSTEM. FIELD VERIFY.
6 PROVIDE NEW RELIEF AIR RISER TO ROOF MOUNTED RELIEF FAN
IN THIS APPROXIMATE LOCATION. FIELD VERIFY EXACT ROUTING.
SEE SHEET ME102 MECHANICAL ROOF PLAN FOR CONTINUATION.
7 RE-LOCATE EXISTING SPRINKLER PIPING IN THIS APPROXIMATE
LOCATION AND ANY OTHER LOCATIONS IN THIS ROOM AS
NEEDED TO ACCOMMODATE THE REMOVAL AND INSTALLATION
OF NEW DUCTWORK AND EQUIPMENT. FIELD VERIFY EXACT
ROUTING.
4 3
N
KEY PLAN
GENERAL NOTES
1. CONTRACTOR SHALL FIELD VERIFY EXISTING MECHANICAL AND
ARCHITECTURAL CONDITIONS, INCLUDING, BUT NOT LIMITED TO:
EXISTING ROUTING AND LOCATION OF DUCTWORK, PIPING, ELECTRICAL,
AND STRUCTURAL ELEMENTS. CONTRACTOR SHALL FIELD VERIFY
POTENTIAL CONFLICTS BETWEEN NEW MECHANICAL ELEMENTS AND
EXISTING CONDITIONS PRIOR TO BEGINNING FABRICATION OR
ORDERING EQUIPMENT.
2. PRIME CONTRACTOR SHALL PROVIDE ALL COORDINATION BETWEEN
SUB-TIER CONTRACTORS. THIS SHALL INCLUDE THE COORDINATION
BETWEEN SUB-TIER CONTRACTORS, SUB-TIER CONTRACTORS AND
FACILITIES, SUB-TIER CONTRACTORS AND ARCHITECT/ENGINEER.
3. ALL DEMOLISHED EQUIPMENT AND MATERIAL SHALL BE BROKEN
DOWN TO FIT THROUGH DESIGNATED PATHWAYS. FIELD VERIFY EXACT
SCOPE OF DEMOLITION AND REMOVAL PATH. CONTRACTOR SHALL BE
RESPONSIBLE TO REPAIR ANY DAMAGE TO BUILDING DURING REMOVAL
OF EQUIPMENT AND MATERIAL.
4. SOME EXISTING PIPING AND EXISTING DUCTWORK NOT SHOWN ON
THIS SHEET FOR CLARIFICATION. FIELD VERIFY EXISTING CONDITIONS
PRIOR TO BID.
5. COORDINATE WITH DFCM PROVIDED HAZMAT REPORT AND
ABATEMENT CONTRACTOR PRIOR TO ANY DEMOLITION.
6. CONTRACTOR SHALL MAKE PROVISIONS WITH A DESIGN BUILD
ELECTRICIAN TO VERIFY ELECTRICAL CONDITIONS. DESIGN BUILD
CONTRACTOR SHALL PROVIDE ANY NEW WIRING, CIRCUIT BREAKERS,
PANELS, SWITCH GEAR, AND ALL NECESSARY ELECTRICAL
ACCOMMODATIONS FOR ANY NEW OR RE-LOCATED MECHANICAL
EQUIPMENT. CONTRACTOR SHALL COORDINATE THE DEMOLITION AND
REMOVAL OF ANY ELECTRICAL ELEMENTS ASSOCIATED WITH EXISTING
MECHANICAL EQUIPMENT BEING REMOVED. ALL ABANDONED PIPING AND
WIRING SHALL BE REMOVED BACK TO PANEL UNLESS OTHERWISE
APPROVED. ELECTRICIAN SHALL FIELD VERIFY AND CONFIRM
ELECTRICAL SCOPE AND EXISTING CONDITIONS PRIOR TO ANY
DEMOLITION WORK AND ORDERING ANY NEW MECHANICAL EQUIPMENT.
7. PROVIDE UPDATED GRAPHICS AND PROGRAMMING FOR ALL NEW AND
EXISTING TEMPERATURE CONTROLS AND MOTORIZED DAMPERS.
8. PROVIDE FULL TEST AND BALANCE REPORT OF ALL IMPACTED
SYSTEMS BY LICENSED AND APPROVED TEST AND BALANCE
CONTRACTOR.
9. ALL ROOFING MODIFICATIONS SHALL BE PERFORMED BY WARRANTY
HOLDING CONTRACTOR (AMERICAN FRONTIER ROOFING 435-479-5218)
AND APPROVED BY DFCM ROOFING PROGRAM DIRECTOR.
DIVISION OF FACILITIES
CONSTRUCTION AND
MANAGEMENT
Jason Van Ausdal
11/24/2026
ME301
ATC ATC
ATC
MECH ROOM
0"
MECH ROOM
0' - 0"LOWER ROOF
-1' - 0"
10 11
MECH ROOM
0"
MECH ROOM
0' - 0"
ME301
ME301
MECH ROOM
0"
MECH ROOM
0' - 0"
A L L I D
E A
S
D E
S
IG
N S
A
R R
A N
G E
M E
N T
S A
N D
P L A
N S
I N
D
IC
A T
E D
O R
R E
P R
E S
E N
T E
D B
Y T
H
IS
D R
A W
IN
G
A R
E O
W N
E D
B Y
A N
D T
H E
P R
O P
E R
T Y
O F
W H
W E
N G
IN
E
E R
IN
G
I N
C
A N
D W
E R
E C
R E
A T
E D
E
V O
L V
E D
A
N D
D E
V E
L O
P E
D F
O R
U S
E O
N A
N D
I N
C O
N N
E C
T
IO
N W
IT
H
T H
E S
P E
C
IF
IE
D
P R
O J E
C T
N
O N
E O
F T
H E
I D
E A
S
D E
S
IG
N S
A
R R
A N
G E
M E
N T
S O
R P
L A
N S
S H
A L L B
E U
S E
D B
Y O
R D
IS
C
L O
S E
D T
O A
N Y
P E
R S
O N
F
IR
M
O
R C
O R
P O
R A
T
IO
N F
O R
A N
Y P
U R
P O
S E
W H
A T
S O
E V
E R
W
IT
H O
U T
W R
IT
T
E N
C O
N S
E N
T O
F W
G
IN
E
E R
IN
G
I N
C
W R
IT
T
E N
D
IM
E N
S
IO
N S
O N
T H
E S
E D
R A
W
IN
G S
S H
A L L H
A V
E P
R E
C E
D E
N C
E O
V E
R S
C A
L E
D
IM
E N
S
IO
N S
C
O N
T R
A C
T O
R S
S H
A L L V
E R
IF
Y
A N
D B
E R
E S
P O
N S
IB
L E
F O
R A
L L D
IM
E
N S
IO
N
S A
N D
C O
N D
IT
IO
N S
O N
T H
E J
O B
A N
D T
H
IS
O F
F
IC
E M
U S
T B
E N
O T
IF
IE
D O
F A
N Y
V A
R
IA
T
IO
N F
R O
M T
H E
D
IM
E N
S
IO
N S
A N
D C
O N
D
IT
IO
N
S S
H O
W N
B Y
T H
E S
E D
R A
W
IN
G S
W
A R
N
IN
G
R E
P R
O D
U C
T
IO
N H
E R
E O
F I S
A C
R
IM
IN
A
L O
F F
E N
S E
U N
D E
R
U
.S .C
S
E C
U N
A U
T H
O R
IZ
E
D D
IS
C
L O
S U
R E
M A
Y C
O N
S T
IT
U
T E
T R
A
C R
E T
M
IS
A P
P R
O P
R
IA
T
IO
N I N
V
IO
L A
T
IO
N O
F I .C
.2 -2
-3 -1
E T
S
E Q
A
N D
O T
H E
R L
A W
S
1 2 3 4 5
D
C
B
A
1 2 3 4 5
D
C
B
A
CONSULTANTS
CODE REVIEW STAMP
PROJECT NAME & ADDRESS
MARK DATE REVISION
PROJECT MANAGER:
DRAWN BY:
CHECKED BY:
DATE:
WHW PROJECT NUMBER:
11/04/26STAFF
CL
11/04/2026
26072
CL
MECHANICAL SECTIONS
ME301
SUU AFEC Air Handlers
DFCM#27052730
AMERICA FIRST EVENT CENTER, 351 W
CENTER ST, CEDAR CITY, UT 84720
SHEET NOTES
1/4" = 1'-0"
MECHANICAL ROOM DEMOLITION
SECTION VIEW
1/4" = 1'-0"
MECHANICAL ROOM NEW SECTION
VIEW
1/4" = 1'-0"
AH-7 SECTION VIEW
1/4" = 1'-0"
AH-8 SECTION VIEW
DIVISION OF FACILITIES
CONSTRUCTION AND
MANAGEMENT
Jason Van Ausdal
11/24/2026
1/
2" W
ID
E
R U N N E R
2"
2"
12"C .C
.M
AX.
2"
12"C.C.MAX.
PIPE HANGER DETAIL
C4
SINGLE THICKNESS TURNING VANE DETAIL
A4
DUCT STRAP HANGER DETAIL
A1
SEISMIC SWAY BRACING DETAILS
C1
DUCT LINER DETAIL
B1
B4
COOLING COIL CONDENSATE DRAIN DETAIL
DUCT HANGER DETAIL
A3
B3
IN-LINE PUMP DETAIL
CLEVIS HANGER
SINGLE HORIZONTAL RUN
WITHOUT INSULATION
CLEVIS HANGER
NOTE:
PROVIDE WITH VAPOR BARRIER
ON CHILLED WATER AND
DOMESTIC COLD WATER PIPING
HANGER
BOLT UNISTRUT TO EXISTING
WALL AND CONCRETE USING
EXPANSION ANCHOR BOLTS
MOUNT PIPING TO UNISTRUT
CALCIUM SILICATE
BLOCK
PROVIDE PIPE CLAMPS
WITH BOLTS AND NUTS
16 GA. ZINC COATED SHEET STEEL
SHIELD AT LEAST 12" LONG (TYP)
CALCIUM SILICATE
BLOCK
INSULATION WITH OR WITHOUT
VAPOR BARRIER
ATTACH TO ROOM
OVERHEAD STRUCTURE
SPRING TYPE ISOLATOR
FOR INSTALLATION NEAR
HOT WATER PUMPS
ATTACH TO EXISTING
CEILING
HANGER ROD
HEAVY DUTY
CLEVIS HANGER
PIPE
HANGER ROD
HEAVY DUTY
CLEVIS HANGER
SUPPORT NUT
LOCKING NUT
INSULATION
LOCKING NUT
SUPPORT NUT
PIPE
16 GAGE ZINC COATED
SHEET STEEL SHIELD
AT LEAST 12" LONG.
CALCIUM SILICATE BLOCK
F L O
W
A
IR
SCALE: NONE
LEADING AND
TRAILING
EDGE TO BE PARALLEL
WITH SIDE OF DUCT.
SINGLE THICKNESS
TURNING VANES
1" LONG MINIMUM
TRAILING EDGE
#10 x 3/4" SELF
TAPPING CADMIUM PLATED
SHEET METAL SCREWS TO
ANCHOR STRAPS TO DUCT.
ALL STRAPS TO BE TIGHT
AGAINST DUCT AND SUPPORT
MEMBERS. (TYPICAL)
SCALE: NONE
1"
1" x 18 GAUGE STRAP
HANGERS AT 8'-0"
SPACING.
1" x 18 GAUGE STRAP
HANGERS AT 8'-0"
SPACING.
NO POP RIVETS
ALLOWED
NOTES:
1. SEE SPECIFICATIONS FOR
SEISMIC RESTRAINT
REQUIREMENTS.
ATTACH SECURELY TO
STRUCTURE.
SCALE: NONE
45°
45° 45°
INSULATION WITH
OR WITHOUT
VAPOR BARRIER
CALCIUM SILICATE
BLOCK TYPICAL
PIPE
16 GA. ZINC COATED
SHEET STEEL SHIELD
AT LEAST 12" LONG.
HEAVY DUTY
CLEVIS HANGER
LOCKING NUT
SUPPORT NUT
HANGER ROD, ATTACH
TO OVERHEAD
STRUCTURE
CONNECT TO
STRUCTURE
HANGER
ROD
16 GA. ZINC COATED
SHEET STEEL SADDLE
AT LEAST 12" LONG.
HANGER ROD
VAPOR
BARRIER
INSULATION
PIPE
CONNECT TO
STRUCTURE
CONNECT TO
STRUCTURE
HANGER ROD, ATTACH
TO OVERHEAD
STRUCTURE
SUPPORT NUT
LOCKING NUT
HEAVY DUTY
CLEVIS HANGER
INSULATION WITH
OR WITHOUT
VAPOR BARRIER
MAX. 1/4" SLACK.
PULL HAND TIGHT
PRE-STRECHED, COLOR
CODED CERTIFIED BREAK
STRENGTH CABLE (2) CABLES
PER RESTRAINT PACKAGE
PIPE
16 GA. ZINC COATED
SHEET STEEL SHIELD
AT LEAST 12" LONG.
CALCIUM SILICATE
BLOCK TYPICAL
GRIP NAILS SHALL BE
INSTALLED BY AIR
HAMMER OR BY
AUTOMATIC FASTENER
EQUIPMENT.
INSULATED PINS, FASTENERS
OR GRIP NAILS.
SCALE: NONE
METAL FASTENERS
ENDS OF LINER SHALL BE
BUTTED FIRMLY TOGETHER.
ALL JOINTS, SEAMS, AND
TEARS SHALL BE COATED W/
ADHESIVE DURING
INSTALLATION.
MINIMUM OF 1-1/2" LINER.
SEE SPECIFICATION FOR
INSULATION REQUIREMENT
SHEET METAL
DUCT
TOP AND BOTTOM
SECTIONS OF LINER
SHALL OVERLAP THE
SIDES
DUCTLINER
ONE INCH THICK 1-1/2 LB
DENSITY FIBERGLASS.ALL ENDS OF LINER TO
BE COATED W/ ADHESIVE
NOT MORE THAN 2"
FROM EDGE OF LINER.
SCALE: NONE
DUCT
DUCT
SCALE: NONE
ANGLE IRON SUPPORT
SEE TABLE FOR SIZE
2x2 ANGLE
BRACKET
3/8"∅ BOLT
THREADED ROD
SIZE PER TABLE
THREADED ROD
SIZE PER TABLE
2x2 ANGLE
BRACKET
BOTTOM OF TRUSS
OR BEAM CHORD
BOTTOM OF TRUSS CHORD
INSULATION
SCALE: NONE
CHECK VALVE
BALANCING VALVE
CHWR OUT CHWR IN
BUTTERFLY VALVE
(TYPICAL)
PIPE HANGER
(TYPICAL)
PRESSURE GAUGE
ON INLET AND ON
OUTLET. (TYPICAL)
S E
C R
E T
M
IS
A P
P R
O P
R
IA
T
IO
N I N
V
IO
L A
T
IO
N O
F I .C
.2
-2 -3
-1
E T
S
E Q
A
N D
O T
H E
R L
A W
S
1 2 3 4 5
D
C
B
A
1 2 3 4 5
D
C
B
A
CONSULTANTS
CODE REVIEW STAMP
PROJECT NAME & ADDRESS
MARK DATE REVISION
PROJECT MANAGER:
DRAWN BY:
CHECKED BY:
DATE:
WHW PROJECT NUMBER:
Author
Checker
Issue Date
26072
Designer
MECHANICAL
DETAILS
ME501
SUU AFEC Air Handlers
733 W 9000 S
SANDY, UT 84070
3" MIN.
1/2"
1/
2" W
ID
E
R U N N E R
2"
2"
12"C .C
.M
AX.
2"
12"C.C.MAX.
PIPE HANGER DETAIL
C4
SINGLE THICKNESS TURNING VANE DETAIL
C4
DUCT STRAP HANGER DETAIL
A1
SEISMIC SWAY BRACING DETAILS
C1
DUCT LINER DETAIL
B1
B4
COOLING COIL CONDENSATE DRAIN DETAIL
CLEVIS HANGER
SINGLE HORIZONTAL RUN
WITHOUT INSULATION
CLEVIS HANGER
NOTE:
PROVIDE WITH VAPOR BARRIER
ON CHILLED WATER AND
DOMESTIC COLD WATER PIPING
HANGER
BOLT UNISTRUT TO EXISTING
WALL AND CONCRETE USING
EXPANSION ANCHOR BOLTS
MOUNT PIPING TO UNISTRUT
CALCIUM SILICATE
BLOCK
PROVIDE PIPE CLAMPS
WITH BOLTS AND NUTS
16 GA. ZINC COATED SHEET STEEL
SHIELD AT LEAST 12" LONG (TYP)
CALCIUM SILICATE
BLOCK
INSULATION WITH OR WITHOUT
VAPOR BARRIER
ATTACH TO ROOM
OVERHEAD STRUCTURE
SPRING TYPE ISOLATOR
FOR INSTALLATION NEAR
HOT WATER PUMPS
ATTACH TO EXISTING
CEILING
HANGER ROD
HEAVY DUTY
CLEVIS HANGER
PIPE
HANGER ROD
HEAVY DUTY
CLEVIS HANGER
SUPPORT NUT
LOCKING NUT
INSULATION
LOCKING NUT
SUPPORT NUT
PIPE
16 GAGE ZINC COATED
SHEET STEEL SHIELD
AT LEAST 12" LONG.
CALCIUM SILICATE BLOCK
F L O
W
A
IR
SCALE: NONE
LEADING AND
TRAILING
EDGE TO BE PARALLEL
WITH SIDE OF DUCT.
SINGLE THICKNESS
TURNING VANES
1" LONG MINIMUM
TRAILING EDGE
#10 x 3/4" SELF
TAPPING CADMIUM PLATED
SHEET METAL SCREWS TO
ANCHOR STRAPS TO DUCT.
ALL STRAPS TO BE TIGHT
AGAINST DUCT AND SUPPORT
MEMBERS. (TYPICAL)
SCALE: NONE
1"
1" x 18 GAUGE STRAP
HANGERS AT 8'-0"
SPACING.
1" x 18 GAUGE STRAP
HANGERS AT 8'-0"
SPACING.
NO POP RIVETS
ALLOWED
NOTES:
1. SEE SPECIFICATIONS FOR
SEISMIC RESTRAINT
REQUIREMENTS.
ATTACH SECURELY TO
STRUCTURE.
SCALE: NONE
45°
45° 45°
INSULATION WITH
OR WITHOUT
VAPOR BARRIER
CALCIUM SILICATE
BLOCK TYPICAL
PIPE
16 GA. ZINC COATED
SHEET STEEL SHIELD
AT LEAST 12" LONG.
HEAVY DUTY
CLEVIS HANGER
LOCKING NUT
SUPPORT NUT
HANGER ROD, ATTACH
TO OVERHEAD
STRUCTURE
CONNECT TO
STRUCTURE
HANGER
ROD
16 GA. ZINC COATED
SHEET STEEL SADDLE
AT LEAST 12" LONG.
HANGER ROD
VAPOR
BARRIER
INSULATION
PIPE
CONNECT TO
STRUCTURE
CONNECT TO
STRUCTURE
HANGER ROD, ATTACH
TO OVERHEAD
STRUCTURE
SUPPORT NUT
LOCKING NUT
HEAVY DUTY
CLEVIS HANGER
INSULATION WITH
OR WITHOUT
VAPOR BARRIER
MAX. 1/4" SLACK.
PULL HAND TIGHT
PRE-STRECHED, COLOR
CODED CERTIFIED BREAK
STRENGTH CABLE (2) CABLES
PER RESTRAINT PACKAGE
PIPE
16 GA. ZINC COATED
SHEET STEEL SHIELD
AT LEAST 12" LONG.
CALCIUM SILICATE
BLOCK TYPICAL
GRIP NAILS SHALL BE
INSTALLED BY AIR
HAMMER OR BY
AUTOMATIC FASTENER
EQUIPMENT.
INSULATED PINS, FASTENERS
OR GRIP NAILS.
SCALE: NONE
METAL FASTENERS
ENDS OF LINER SHALL BE
BUTTED FIRMLY TOGETHER.
ALL JOINTS, SEAMS, AND
TEARS SHALL BE COATED W/
ADHESIVE DURING
INSTALLATION.
MINIMUM OF 1-1/2" LINER.
SEE SPECIFICATION FOR
INSULATION REQUIREMENT
SHEET METAL
DUCT
TOP AND BOTTOM
SECTIONS OF LINER
SHALL OVERLAP THE
SIDES
DUCTLINER
ONE INCH THICK 1-1/2 LB
DENSITY FIBERGLASS.ALL ENDS OF LINER TO
BE COATED W/ ADHESIVE
NOT MORE THAN 2"
FROM EDGE OF LINER.
SCALE: NONE
DX COOLING
COIL
CAPPED
CLEANOUT
(TYPICAL)
VACUUM BREAKER OPEN
TO ATMOSPHERE
TO DRAIN.
SLOPE AT
1/4"/FT.
A L L I D
E A
S
D E
S
IG
N S
A
R R
A N
G E
M E
N T
S A
N D
P L A
N S
I N
D
IC
A T
E D
O R
R E
P R
E S
E N
T E
D B
Y T
H
IS
D R
A W
IN
G
A R
E O
W N
E D
B Y
A N
D T
H E
P R
O P
E R
T Y
O F
W H
W E
N G
IN
E
E R
IN
G
I N
C
A N
D W
E R
E C
R E
A T
E D
E
V O
L V
E D
A
N D
D E
V E
L O
P E
D F
O R
U S
E O
N A
N D
I N
C O
N N
E C
T
IO
N W
IT
H
T H
E S
P E
C
IF
IE
D
P R
O J E
C T
N
O N
E O
F T
H E
I D
E A
S
D E
S
IG
N S
A
R R
A N
G E
M E
N T
S O
R P
L A
N S
S H
A L L B
E U
S E
D B
Y O
R D
IS
C
L O
S E
D T
O A
N Y
P E
R S
O N
F
IR
M
O
R C
O R
P O
R A
T
IO
N F
O R
A N
Y P
U R
P O
S E
W H
A T
S O
E V
E R
W
IT
H O
U T
W R
IT
T
E N
C O
N S
E N
T O
F W
G
IN
E
E R
IN
G
I N
C
W R
IT
T
E N
D
IM
E N
S
IO
N S
O N
T H
E S
E D
R A
W
IN
G S
S H
A L L H
A V
E P
R E
C E
D E
N C
E O
V E
R S
C A
L E
D
IM
E N
S
IO
N S
C
O N
T R
A C
T O
R S
S H
A L L V
E R
IF
Y
A N
D B
E R
E S
P O
N S
IB
L E
F O
R A
L L D
IM
E
N S
IO
N
S A
N D
C O
N D
IT
IO
N S
O N
T H
E J
O B
A N
D T
H
IS
O F
F
IC
E M
U S
T B
E N
O T
IF
IE
D O
F A
N Y
V A
R
IA
T
IO
N F
R O
M T
H E
D
IM
E N
S
IO
N S
A N
D C
O N
D
IT
IO
N
S S
H O
W N
B Y
T H
E S
E D
R A
W
IN
G S
W
A R
N
IN
G
R E
P R
O D
U C
T
IO
N H
E R
E O
F I S
A C
R
IM
IN
A
L O
F F
E N
S E
U N
D E
R
U
.S .C
S
E C
U N
A U
T H
O R
IZ
E
D D
IS
C
L O
S U
R E
M A
Y C
O N
S T
IT
U
T E
T R
A
C R
E T
M
IS
A P
P R
O P
R
IA
T
IO
N I N
V
IO
L A
T
IO
N O
F I .C
.2 -2
-3 -1
E T
S
E Q
A
N D
O T
H E
R L
A W
S
1 2 3 4 5
D
C
B
A
1 2 3 4 5
D
C
B
A
CONSULTANTS
CODE REVIEW STAMP
PROJECT NAME & ADDRESS
MARK DATE REVISION
PROJECT MANAGER:
DRAWN BY:
CHECKED BY:
DATE:
WHW PROJECT NUMBER:
11/04/26STAFF
CL
11/04/2026
26072
CL
MECHANICAL DETAILS
ME501
SUU AFEC Air Handlers
DFCM#27052730
AMERICA FIRST EVENT CENTER, 351 W
CENTER ST, CEDAR CITY, UT 84720
DIVISION OF FACILITIES
CONSTRUCTION AND
MANAGEMENT
Jason Van Ausdal
11/24/2026
6 2
6 2
6 2
M
IN
(R
O O
F S
U R
F A
C E
T O
F A
S T
E N
E R
S
N A
IL
E
R S
S
H
IM
S T
O M
A T
C H
IN
S
U L A
T
IO
N D
E P
T H
M
IN
T
O T
O P
O F
C U
R B
18"
MIN.
(CURB TO
PENETRATION
TYP.)
M
COIL WITH CIRC. PUMP
C1
C3
ROOF MOUNTED EXHAUST FAN DETAIL
HOUSEKEEPING PAD
B4
AIR HANDLING UNIT DETAILC4
EQUIPMENT CURB
A2
SIZE CONTROL VALVE FOR 3 PSI PRESSURE
DROP.
BALANCE BYPASS FLOW TO 50% OF COIL
FLOW DURING FULL BYPASS.
CHWS
CHWR
PROVIDE ISOLATION VALVES AS SHOWN.
(TYPICAL)
COIL CIRC. PUMP
1/2" AIR VENT AND COIL DRAINS. (TYP.)3/4"
SCALE: NONE
PROVIDE VENTED P-TRAP
TO DRAIN
3/4"
1/2" AIR VENT AND COIL DRAINS. (TYP.)
PROVIDE VENTED P-TRAP
TO DRAIN
3/4"
SCALE: NONE
DUCT AS REQUIRED. SEE
PLANS
WOOD ROOF CURB
SUPPORT BY MECH. CONT.
EQUAL TO INSULATION
THICKNESS
PRE-FABRICATED ROOF
CURB WOOD NAILER
ROOF MOUNTED EXHAUST
FAN OR VENT
1/4" THICK SPONGE
RUBBER GASKET ALL
AROUND
ANCHOR HOOD TO
CURB
ROOF MEMBRANE
NOTE:
MECHANICAL EQUIPMENT TO
SET LEVEL. ORDER CURB TO
COMPENSATE FOR ROOF SLOPE
ROOF DECK
FRAMING AROUND OPENING
GRAVITY DAMPER
SCALE: NONE
6" MIN.
-1
/2
NOTE:
PAD DIMENSION SHALL EXTEND 6"
BEYOND EQUIPMENT BASES IN ALL
DIRECTIONS.
#4 DOWELS EPOXY GROUTED
INTO EXISTING CONCRETE FLOOR
AT 24" O.C. 4" FROM EDGE (TYP.)
NEW HOUSEKEEPING PAD
PAD SHALL BE LEVEL AS
POSSIBLE FOR THE
PLACEMENT OF NEW
EQUIPMENT
#4 BARS AT 12"
O.C. BOTH WAYS
NEW HOUSEKEEPING PADS
SHALL BE 4" THICK OR MEET
HEIGHT OF EXISTING PAD.
EXISTING CONCRETE FLOOR
DIMENSION IS DEPENDENT ON
EXISTING FLOOR DEPTH. NEW
DOWELS SHALL FIT A MINIMUM OF
2/3 RD'S INTO SLAB.
EPOXY PAINT EQUIPMENT PAD
PRIOR TO PLACING NEW EQUIPMENT
SCALE: NONE
FAN SECTION MIXING BOX
/ FILTER BOX
FLEX
CONN.
RETURN AIR
MOUNT ON
VIBRATION
ISOLATORS
4" HOUSE KEEPING
PAD BY GENERAL
CONTRACTOR
COOLING COIL
MODULE
ROOF DECK -
VARIES BY PROJECT
RIGID
INSULATION -
VARIES BY
PROJECT
ROOFING MEMBRANE -
VARIES BY PROJECT
SEAM PLATE AND
FASTENERS AT 12" O.C.
- FASTEN INTO STUDS
FULLY ADHERED
MEMBRANE - RUN
MEMBRANE OVER TOP OF
CURB AS SHOWN AND NAIL
OFF AT 6" O.C. ON INSIDE
OF CURB
DUCTED MECHANICAL EQUIPMENT
(EQUIPMENT VARIES) - FASTEN TO SIDE OF
CURB W/ MIN. OF 2 HIGH-DOMED, CAPPED,
GASKETED FASTENERS PER SIDE - NOTE THAT
NON-DUCTED MECHANICAL EQUIPMENT SHALL
USE THE "ELEVATED EQUIPMENT PLATFORM"
DETAIL IN LIEU OF THIS CURB DETAIL
NOTE THAT IS CURB CONSTRUCTION IS EXISTING, THE
CONTRACTOR IS RESPONSIBLE FOR MODIFYING / RAISING
THE CURB AS REQUIRED TO ACHIEVE THE MIN. DIMENSIONS
INDICATED (FROM THE FINISHED ROOF SURFACE TO
FASTENERS AND TOP OF CURB) - IN SUCH CASES, LICENSED
MECHANICAL & ELECTRICAL CONTRACTORS MUST PERFORM
ALL REQUIRED CHANGES TO MECHANICAL EQUIPMENT / LINE
SETS/ ELECTRICAL WIRING & CONNECTIONS ETC.
NOTE: CURB MUST BE
CONSTRUCTED SO TOP IS LEVEL
NOTE: ALL GAPS BETWEEN DUCT
& CURB ARE TO BE FILLED IN
WITH INSULATION THAT IS
EQUIVALENT TO THE R-VALUE OF
THE ROOF SYSTEM
PRESERVATIVE TREATED
2X FRAMING / SHIMS
FLEXIBLE ELECTRICAL LINES ARE TO ENTER
BUILDIN…