This file consists of approved mechanical design plans prepared by WHW Engineering Inc. for the Southern Utah University (SUU) America First Event Center (AFEC) air handler replacement project (DFCM #27052730) located at 351 W Center Street, Cedar City, Utah. The project scope includes removal and replacement of existing Air Handling Units (AHU-7 and AHU-8), associated fans, re-balancing of existing Variable Air Volume (VAV) units, supply grilles, and diffusers. The design incorporates two new modular air handlers—AHU-7 serving the administration area with a capacity of 16,100 CFM and AHU-8 serving classrooms with a capacity of 26,800 CFM—along with new cooling coil circulation pumps, new relief fans, and comprehensive controls integration with the existing building management system. The plans detail mechanical systems across multiple levels including floor plans, roof plans, sections, details, and equipment schedules. All construction must comply with the 2024 International Mechanical Code (IMC) and 2024 International Plumbing Code (IPC) with Utah annotations, and the project includes deferred seismic submittals required approximately 15 days after Notice to Proceed, with mechanical work prohibited from commencing until DFCM Building Officials approve the seismic design in accordance with ASCE 7-05.

The design includes specific equipment specifications: dual stacked cooling coils for each AHU with 338,000 BTU/h and 640,000 BTU/h capacity respectively, new circulation pumps rated at 71 GPM and 124 GPM, and multiple new pressure relief fans ranging from 2,250 to 7,000 CFM. All new mechanical equipment requires single-point power connections and integration with direct digital control (DDC) systems. The contractor must coordinate with a design-build electrical contractor for all electrical accommodations including new wiring, circuit breakers, disconnects, and VFD (variable frequency drive) installations. Code inspection requirements include verification of seismic compliance for mechanical equipment and piping 4 inches and above, fire caulking at rated walls, and final acceptance contingent upon a state-appointed code inspector's approval. All roofing modifications must be performed by the existing roofing warranty holder (American Frontier Roofing) and approved by the DFCM Roofing Program Director. The contractor bears full responsibility for field verification of existing conditions, coordination between all subcontractors, proper disposal of refrigerants and oils per local, state, and federal regulations, and provision of a complete test and balance report from a licensed and approved contractor for all impacted systems.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A

North: ______ South: ______ East: ______ West: ______

Special Use and Occupancy (e.g. High Rise, Covered Mall): __________________

d) Unlimited Area Building: Yes ______ No ______ Code Section: ______ a a

3) Three Story: A (3)______

2) Two Story: A (2)______

1) One Story: ______

c) Total Allowable Area for:

1_< Allowable Area

Actual Area

b) Sum of the Ratio Calculations for Mixed Occupancies:

a) 0.25I = 100f

F

P 30

WstA I

100100 fIA t taA = A + +

Official for Complex Buildings. Including, but not limited to:

g) Fire Stopping, Including Tested Design Number.

f) Exterior and Interior Accessibility Route.

e) Fire Assembly Locator Sheet.

a) High Rise Requirements.

b) Atriums.

c) Performance Based Criteria.

d) Means or Egress Analysis.

2) Additional Code Information shall be provided at the discretion of the Building

Code Accessibility Chapters, the more restrictive requirement shall govern.

through - ADA Guidelines and specific reference to the International Building

1) In case of conflict with the U.S. Department of Justice Federal Registers Parts

FOOTNOTES:

d) Drinking Fountains: ______ Service Sinks: ______

c) Bath Tubs or Showers: ______

b) Lavatories - Required (m) ______ (f) ______ Provided (m) ______ (f) ______

a) Water Closets - Required (m) ______ (f) ______ Provided (m) ______ (f) _____

M. Minimum Number of Required Plumbing Facilities:

Exit Width Required: ______ Exit Width Provided: ______

Element Hours Assembly ListingListing

Element AssemblyHours

Smoke Partitions

Fire Partitions

Exterior Bearing Walls

Interior Bearing Walls

Exterior Non-Bearing Walls

Structural Frame

Partitions - Permanent

Fire Barriers

Floors - Ceiling Floors

Roofs - Ceiling Roofs

Exterior Doors and Windows

Shaft Enclosures

Fire Walls

BAHTBABABA

Design Wind Speed: ______ mphB. Seismic Design Category: ______

L. Design Occupant Load: ______

K. Fire Resistance Rating Requirements for Building Elements (hours).

Area Modifications:J:

____________________________________________Tabular Area:I:

per Floor (square feet): __________________________Actual AreaH:

Number of Stories: ______ Building Height: ______G:

Required: ______ Provided: ______ Type of Sprinkler System: ____________

Sprinklers:F:

Mixed Occupancies: ______ Nonseparated Uses: ______E.

separation distance (in hours):

Requirements for the Exterior Walls based on the fireFire Resistance RatingD.

C. Type of Construction (circle one):

Change in Use: Yes ______ No ______ Mixed Occupancy: Yes ______ No ______

Guidelines

ADA Accessibility

Building Conservation

Uniform Code for

National Electrical Code

Conservation Code

International Energy

International Fire Code

International Plumbing Code

International Mechanical Code

International Building Code

YearYear

APPLICABLE CODES

A. Occupancy and Group: ________ ________ ________ ________ ________

CODE ANALYSIS

SUU AFEC AIR HANDLERS

DFCM # 27052730

GENERAL:

G001 - TITLE SHEET

G002 - SPECIAL INSPECTION AND TESTING

G003 - NON-STRUCTURAL COMPONENT CHECKLIST FORM

MECHANICAL:

MG001 - MECHANICAL GENERAL NOTES AND LEGEND

MD102 - MECHANICAL DEMOLITION ROOF PLAN

MD401 - MECHANICAL DEMOLITION FLOOR PLANS

ME101.1 - MAIN LEVEL MECHANICAL PLAN AREA C

ME101.2 - MAIN LEVEL MECHANICAL PLAN AREA D

ME102 - MECHANICAL ROOF PLAN

ME301 - MECHANICAL SECTIONS

ME401 - MECHANICAL FLOOR PLANS

ME501 - MECHANICAL DETAILS

ME502 - MECHANICAL DETAILS

ME503 - MECHANICAL DETAILS

ME601 - MECHANICAL SCHEDULES

ME901 - MECHANICAL ISOMETRIC VIEWS

MP401 - LARGE SCALE MECHANICAL PIPING FLOOR PLANS

DRAWING INDEX:

America First Event Center, 351 W Center St, Cedar City, UT 84720

CODE REVIEW STAMP

DESIGN CRITERIA:

THESE DOCUMENTS - DRAWINGS AND SPECIFICATIONS

COMPLY WITH ALL THE REQUIREMENTS OF THE DFCM

STANDARDS FOR MECHANICAL UPGRADES OF

EXISTING BUILDING.

SCOPE:

THIS PROJECT INCLUDES THE REMOVAL AND THE

ASOCIATED FANS, REPLACEMENT OF EXISTING AHU-7 &

AHU-8 AND ALL ASSOCIATED ITEMS.

THE PROJECT SHALL ALSO INCLUDE RE-BALANCING THE

EXISTING VAVS AND SUPPLY GRILLES AND DIFFUSERS

ASSOCIATED WITH AHU-7 & AHU-8.

CODE INSPECTION REQUIREMENTS:

1. BEFORE A FINAL ACCEPTANCE CAN BE ISSUED, THE

STATE APPOINTED CODEINSPECTOR SHALL PROVIDE A

FINAL REPORT RECOMMENDING THAT THE NEW

MECHANICAL WORK IS IN COMPLIANCE WITH THE

DRAWINGS, SPECIFICATIONS AND APPLICABLE CODES

ESPECIALLY FOR THE FOLLOWING ITEMS.

a.)SEISMIC - MECHANICAL AND ELECTRICAL PER

DEFERRED SUBMITTALS.

b.)FIRE CAULKING AT RATED WALLS.

1. SEE ALSO SHEET G002.

DEFERRED SUBMITTALS:

1. SEISMIC FOR ALL PIPING 4" AND ABOVE - INTERIOR.

2. SEISMIC FOR MECHANICAL EQUIPMENT.

3. SEISMIC ENGINEER SHALL PROVIDE A SUBMITTAL

INCLUDING CALCULATIONS AND DETAILS TO THE DFCM

BUILDING OFFICIALS FOR REVIEW. SEISMIC SHALL BE

DESIGNED TO RESIST THE EFFECTS OF EARTHQUAKE

MOTIONS IN ACCORDANCE WITH ASCE 7-05. REFERENCE

IBC SECTION 1613.1.

5. THE DATE OF DEFERRED SUBMITTALS IS

APPROXIMATELY 15 DAYS AFTERNOTICE TO PROCEED.

MECHANICAL WORK CANNOT COMMENCE UNTIL

THEDFCM BUILDING OFFICIALS HAVE APPROVED THE

SEISMIC SUBMITTAL

7. EACH DEFERRED SUBMITTAL IS REQUIRED TO HAVE THE

PROJECT NAME, DFCM NUMBER, PROJECT ADDRESS,

CONFORMANCE LETTER OR STAMP FROM THE DESIGNER

AND A 3"x3" SPACE FOR THE APPROVAL STAMP ON THE

FRONT PAGE.

G001

NA NA NA NA

A-2 A-4 B

X X

NA

3 33'

104,085 SQ. FT.

32,500 SQ. FT.

D 90

11/04/26

DIVISION OF FACILITIES

CONSTRUCTION AND

MANAGEMENT

Jason Van Ausdal

11/24/2026

REVIEWED FOR CODE

COMPLIANCE

L L I D

E A

S

D E

S

IG

N S

A

R R

A N

G E

M E

N T

S A

N D

P L A

N S

I N

D

IC

A T

E D

O R

R E

P R

E S

E N

T E

D B

Y T

H

IS

D R

A W

IN

G

A R

E O

W N

E D

B Y

A N

D T

H E

P R

O P

E R

T Y

O F

W H

W E

N G

IN

E

E R

IN

G

I N

C

A N

D W

E R

E C

R E

A T

E D

E

V O

L V

E D

A

N D

D E

V E

L O

P E

D F

O R

U S

E O

N A

N D

I N

C O

N N

E C

T

IO

N W

IT

H

T H

E S

P E

C

IF

IE

D

P R

O J E

C T

N

O N

E O

F T

H E

I D

E A

S

D E

S

IG

N S

A

R R

A N

G E

M E

N T

S O

R P

L A

N S

S H

A L L B

E U

S E

D B

Y O

R D

IS

C

L O

S E

D T

O A

N Y

P E

R S

O N

F

IR

M

O

R C

O R

P O

R A

T

IO

N F

O R

A N

Y P

U R

P O

S E

W H

A T

S O

E V

E R

W

IT

H O

U T

W R

IT

T

E N

C O

N S

E N

T O

F W

H W

E

N G

IN

E

E R

IN

G

I N

C

W R

IT

T

E N

D

IM

E N

S

IO

N S

O N

T H

E S

E D

R A

W

IN

G S

S H

A L L H

A V

E P

R E

C E

D E

N C

E O

V E

R S

C A

L E

D

IM

E N

S

IO

N S

C

O N

T R

A C

T O

R S

S H

A L L V

E R

IF

Y

A N

D B

E R

E S

P O

N S

IB

L E

F O

R A

L L D

IM

E

N S

IO

N

S A

N D

C O

N D

IT

IO

N S

O N

T H

E J

O B

A N

D T

H

IS

O F

F

IC

E M

U S

T B

E N

O T

IF

IE

D O

F A

N Y

V A

R

IA

T

IO

N F

R O

M T

H E

D

IM

E N

S

IO

N S

A N

D C

O N

D

IT

IO

N

S S

H O

W N

B Y

T H

E S

E D

R A

W

IN

G S

W

A R

N

IN

G

R E

P R

O D

U C

T

IO

N H

E R

E O

F I S

A C

R

IM

IN

A

L O

F F

E N

S E

U N

D E

R

U

.S .C

S

E C

U N

A U

T H

O R

IZ

E

D D

IS

C

L O

S U

R E

M A

Y C

O N

S T

IT

U

T E

T R

A D

S

C R

E T

M

IS

A P

P R

O P

R

IA

T

IO

N I N

V

IO

L A

T

IO

N O

F I .C

.2 -2

-3 -1

E T

S

E Q

A

N D

O T

H E

R L

A W

S

1 2 3 4 5

D

C

B

A

1 2 3 4 5

D

C

B

A

CONSULTANTS

CODE REVIEW STAMP

PROJECT NAME & ADDRESS

MARK DATE REVISION

PROJECT MANAGER:

DRAWN BY:

CHECKED BY:

DATE:

WHW PROJECT NUMBER:

11/04/26STAFF

CL

11/04/2026

26072

CL

SPECIAL INSPECTION AND

TESTING

G002

SUU AFEC Air Handlers

DFCM#27052730

AMERICA FIRST EVENT CENTER, 351 W

CENTER ST, CEDAR CITY, UT 84720

NOT APPLICABLE

NOT APPLICABLE

NOT APPLICABLE

NOT APPLICABLE

NOT APPLICABLE

NOT APPLICABLE

NOT APPLICABLE

NOT APPLICABLE

NOT APPLICABLE

NOT APPLICABLE

NOT APPLICABLE

NOT APPLICABLE

x x x

NOT APPLICABLE

NOT APPLICABLE

NOT APPLICABLE

NOT APPLICABLE

DIVISION OF FACILITIES

CONSTRUCTION AND

MANAGEMENT

Jason Van Ausdal

11/24/2026

L I D

E A

S

D E

S

IG

N S

A

R R

A N

G E

M E

N T

S A

N D

P L A

N S

I N

D

IC

A T

E D

O R

R E

P R

E S

E N

T E

D B

Y T

H

IS

D R

A W

IN

G

A R

E O

W N

E D

B Y

A N

D T

H E

P R

O P

E R

T Y

O F

W H

W E

N G

IN

E

E R

IN

G

I N

C

A N

D W

E R

E C

R E

A T

E D

E

V O

L V

E D

A

N D

D E

V E

L O

P E

D F

O R

U S

E O

N A

N D

I N

C O

N N

E C

T

IO

N W

IT

H

T H

E S

P E

C

IF

IE

D

P R

O J E

C T

N

O N

E O

F T

H E

I D

E A

S

D E

S

IG

N S

A

R R

A N

G E

M E

N T

S O

R P

L A

N S

S H

A L L B

E U

S E

D B

Y O

R D

IS

C

L O

S E

D T

O A

N Y

P E

R S

O N

F

IR

M

O

R C

O R

P O

R A

T

IO

N F

O R

A N

Y P

U R

P O

S E

W H

A T

S O

E V

E R

W

IT

H O

U T

W R

IT

T

E N

C O

N S

E N

T O

F W

G

IN

E

E R

IN

G

I N

C

W R

IT

T

E N

D

IM

E N

S

IO

N S

O N

T H

E S

E D

R A

W

IN

G S

S H

A L L H

A V

E P

R E

C E

D E

N C

E O

V E

R S

C A

L E

D

IM

E N

S

IO

N S

C

O N

T R

A C

T O

R S

S H

A L L V

E R

IF

Y

A N

D B

E R

E S

P O

N S

IB

L E

F O

R A

L L D

IM

E

N S

IO

N

S A

N D

C O

N D

IT

IO

N S

O N

T H

E J

O B

A N

D T

H

IS

O F

F

IC

E M

U S

T B

E N

O T

IF

IE

D O

F A

N Y

V A

R

IA

T

IO

N F

R O

M T

H E

D

IM

E N

S

IO

N S

A N

D C

O N

D

IT

IO

N

S S

H O

W N

B Y

T H

E S

E D

R A

W

IN

G S

W

A R

N

IN

G

R E

P R

O D

U C

T

IO

N H

E R

E O

F I S

A C

R

IM

IN

A

L O

F F

E N

S E

U N

D E

R

U

.S .C

S

E C

U N

A U

T H

O R

IZ

E

D D

IS

C

L O

S U

R E

M A

Y C

O N

S T

IT

U

T E

T R

A

C R

E T

M

IS

A P

P R

O P

R

IA

T

IO

N I N

V

IO

L A

T

IO

N O

F I .C

.2 -2

-3 -1

E T

S

E Q

A

N D

O T

H E

R L

A W

S

1 2 3 4 5

D

C

B

A

1 2 3 4 5

D

C

B

A

CONSULTANTS

CODE REVIEW STAMP

PROJECT NAME & ADDRESS

MARK DATE REVISION

PROJECT MANAGER:

DRAWN BY:

CHECKED BY:

DATE:

WHW PROJECT NUMBER:

11/04/26STAFF

CL

11/04/2026

26072

CL

NON-STRUCTURAL

COMPONENT CHECKLIST

FORM

G003

SUU AFEC Air Handlers

DFCM#27052730

AMERICA FIRST EVENT CENTER, 351 W

CENTER ST, CEDAR CITY, UT 84720

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

DIVISION OF FACILITIES

CONSTRUCTION AND

MANAGEMENT

Jason Van Ausdal

11/24/2026

M

M

P

T

S

PS

F

MECHANICAL LEGEND

SYMBOL ABR, DESCRIPTION

GENERAL TERMINOLOGY

A

ME101

SECTION LETTER DESIGNATION

SECTION DRAWN ON THIS SHEET

A2

AH

DETAIL NUMBER DESIGNATION

CORRESPONDING WITH GRID

LOCATION

MECHANICAL EQUIPMENT DESIGNATION

EQUIPMENT ITEM DESIGNATION

REGISTER, GRILLE OR DIFFUSER

DESIGNATION WITH BALANCING CFM

LISTED BELOW

D-1

CFM

GRILLE OR LOUVER DESIGNATION

WHERE BALANCING NOT REQUIREDR-1

REVISION DESIGNATOR AND NUMBER

KEY NOTE DESIGNATOR AND NUMBER

POINT OF CONNECTION

POINT OF REMOVAL

ABOVE FINISHED FLOOR

ACCESS PANEL

CENTERLINE ELEVATION

GENERAL CONTRACTOR

AFF

AP

POC

POR

C EL.

GC

MECHANICAL CONTRACTORMC

CONTROLS CONTRACTORATC

ELECTRICAL CONTRACTOREC

FIRE PROTECTION CONTRACTORFPC

NOT IN CONTRACTNIC

NOT TO SCALENTS

VITRIFIED CLAY PIPEVCP

NORMALLY CLOSEDNC

COMMONC

NORMALLY OPENNO

SYMBOL ABR, DESCRIPTION

AIR SIDE

EXISTING AIR DUCT TO BE REMOVED

EXISTING AIR DUCT TO REMAIN

NEW AIR DUCT

RECT TO RECT AIR DUCT TAKE-OFF

RECT TO RND AIR DUCT TAKE-OFF

RND TO RND AIR DUCT TAKE-OFF

MEDIUM PRESSURE TAKE-OFF

FLEXIBLE AIR DUCT

RADIUS ELBOW

ECCENTRIC DUCT TRANSITION

CONCENTRIC DUCT TRANSITION

VOLUME DAMPER

SUPPLY AIR DIFFUSER

RETURN & TRANSFER AIR GRILLE

EXHAUST GRILLE OR CEILING EXH. FAN

RETURN & OUTSIDE AIR DUCT UP/DN

RETURN & OA ROUND DUCT UP/DN

SUPPLY AIR DUCT UP/DN

SUPPLY AIR ROUND DUCT UP/DN

EXHAUST AIR DUCT UP/DN

EXHAUST AIR ROUND DUCT UP/DN

ACCESS PANELAP

EXISTING EQUIPMENT TO BE REMOVED

EXISTING EQUIPMENT TO REMAIN

NEW EQUIPMENT

SUPPLY AIR

RETURN AIRRA

SA

EXHAUST AIREA

OUTSIDE AIROA

MIXED AIRMA

RELIEF AIRRF

FLAT OVALFO

MOTORIZED VOLUME DAMPER

BACKDRAFT DAMPER

FIRE DAMPER

SMOKE DAMPER

FIRE & SMOKE DAMPER

WALL MOUNTED THERMOSTAT

WALL MOUNTED TEMP. SENSOR

WALL MOUNTED HUMIDISTAT

WALL MOUNTED FIRESTAT

M

BD

F

S

FS

T

S

H

F

SYMBOL ABR, DESCRIPTION

WET SIDE

PUMP

MVD

BD

FD

SD

FS

T-STAT

H-STAT

F-STAT

REGULATOR

UNION

MANUAL ACTUATOR

PNUEMATIC DIAPHRAM ACTUATOR

ELECTRIC MOTOR ACTUATOR

SOLENOID ACTUATOR

BUTTERFLY VALVE

GATE VALVE

GLOBE VALVE - STRAIGHT PATTERN

GLOBE VALVE - ANGLE PATTERN

MOTORIZED 2-WAY CONTROL VALVE

MOTORIZED 3-WAY CONTROL VALVE

CHECK VALVE

CIRCUIT BALANCING VALVE

BALL VALVE

PRESSURE RELIEF VALVE

THERMAL RELIEF VALVE

SAFETY RELIEF VALVE

PLUG VALVE

NEEDLE VALVE

TRIPLE DUTY VALVE

AUTOMATIC AIR VENT

MANUAL AIR VENT

STRAINER

STRAINER W/ PLUG BLOW OFF

VENTURI

PRESSURE GAUGE W/ COCK - WATER

PRESSURE GAUGE W/ COCK - STEAM

THERMOMETER & THERMOWELL

WATER TEMP SENSOR & THERMOWELL

FLOW SWITCH

PRESSURE SWITCH

THERMOWELL

PRESSURE & TEMP TAP

SYMBOL ABR, DESCRIPTION

WET SIDE

PITCH DOWN

ELBOW UP/DN

TEE UP/DN

EXISTING PIPING TO BE REMOVED

EXISTING PIPING TO REMAIN

NEW PIPING

PIPE CAP OR PLUG

REDUCER - CONCENTRIC / ECCENTRIC

EXPANSION JOINT

FLEXIBLE CONNECTION

ANCHOR POINT

CONDENSATE DRAIN

NATURAL GAS PIPING

CHEMICAL FEED LINE

MAKE-UP WATER LINE

CULINARY COLD WATER

CULINARY HOT WATER

CULINARY HOT WATER RECIRC

CD

G

CF

MU

CW

HW

HWREC

GLYCOL FILL LINEGF

R

M

S

PRESSURE REDUCING VALVEPRV

S

HEATING WATER SUPPLY

HEATING WATER RETURN

CHILLED WATER SUPPLY

CHILLED WATER RETURN

CONDENSER SUPPLY

CONDENSER RETURN

PUMPED CONDENSATE

HWS

HWR

CHWS

CHWR

CS

CR

PC

VENT LINEV

SANITARY SEWERSS

DIRECTION OF FLOW

BACKFLOW PREVENTING VALVE

GENERAL NOTES

G-1 - MECHANICAL INFORMATION IS NOT LIMITED TO THE MECHANICAL

DRAWINGS. CONTRACTOR SHALL BE RESPONSIBLE FOR INFORMATION OF THE

EXISTING BUILDING AND SITE CONDITIONS, EXISTING PIPING, EXISTING

ELECTRICAL, AND EXISTING SUPPORTS.

A - EACH DRAWING SHEET AND THE SPECIFICATIONS HAVE BEEN PREPARED TO

SUPPLEMENT EACH OTHER AND THEY SHALL BE INTERPRETED AS AN INTEGRAL

UNIT WITH ITEMS SHOWN AND NOTED ON ONE AND NOT THE OTHER BEING

FURNISHED AND INSTALLED AS THOUGH SHOWN AND CALLED OUT IN ALL

PLACES. ITEMS IN SPECIFICATIONS OR DRAWINGS LISTED WHICH ARE

DIFFERING IN EFFICIENCY OR QUALITY SHALL BE HELD TO THE GREATEST OF:

EFFICIENCY, QUALITY OR GOVERNING CODE.

B - THE CONTRACTOR WILL BE HELD RESPONSIBLE FOR THE INSTALLATION OF

THE SYSTEMS ACCORDING TO THE TRUE INTENT AND MEANING OF THE

CONTRACT DOCUMENTS.

C - THE CONTRACTOR SHALL INSTALL ALL EQUIPMENT WITH PROPER SERVICE

ACCESS AND CLEARANCES ACCORDING TO MANUFACTURERS

RECOMMENDATIONS. THE CONTRACTOR SHALL REVIEW SUPPLIERS BID

PACKAGES FOR COMPLETENESS AND COMPLIANCE TO THE SPECIFICATIONS,

SCHEDULES, AND DESIGN INTENT (ALL EQUIPMENT AND METHODS). THE

CONTRACTOR SHALL REMOVE AND REINSTALL CORRECTLY AT HIS OWN

EXPENSE ANY EQUIPMENT NOT IN COMPLIANCE.

D - THE CONTRACTOR SHALL CONSULT MANUFACTURERS INSTALLATION

INSTRUCTIONS FOR SIZES, METHODS, ACCESSORIES, AND CLEARANCES IN

SPACE AVAILABLE PRIOR TO BIDDING PROJECT.

E - ANYTHING NOT CLEAR OR IN CONFLICT WILL BE EXPLAINED BY MAKING

APPLICATION TO THE ENGINEER IN WRITING.

G-2 - ANY AND ALL ALTERATIONS TO THE SYSTEM SHOWN SHALL BE SUBMITTED

TO THE ENGINEER PRIOR TO CHANGES FOR APPROVAL. CONTRACTOR SHALL

NOT START ANY CHANGES UNTIL NOTIFIED IN WRITING. IF CHANGES ARE MADE

PRIOR TO APPROVAL CONTRACTOR SHALL TAKE ALL RESPONSIBILITY FOR THE

CHANGES MADE AND ALL COSTS RELATING TO FAILURE OR REPLACEMENT OF

ALTERATIONS.

G-3 - CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS AND LOCATIONS.

G-4 - THE WORKING DRAWINGS ARE DIAGRAMMATIC. THEY DO NOT SHOW

EVERY OFFSET, BEND, OR ELBOW NECESSARY FOR THE COMPLETE

INSTALLATION IN THE SPACE PROVIDED. ALL LOCATIONS FOR MECHANICAL

EQUIPMENT SHALL BE FIELD VERIFIED AND COORDINATED WITH ALL

DRAWINGS. THE CONTRACTOR SHALL PROVIDE OR COORDINATE WITH THE

GENERAL CONTRACTOR PROVISIONS FOR BLOCKOUTS OR CORE DRILLS

THROUGH STRUCTURE.

G-5 - THE INSTRUCTION TO "PROVIDE" ALSO INCLUDES INSTALLATION.

G-6 - MECHANICAL CONTRACTOR SHALL PROVIDE AND INSTALL SMOKE AND

FIRE DAMPERS AS REQUIRED BY LOCAL CODES AND AUTHORITIES.

G-7 - SHEET METAL DUCT SIZES SHOWN ON DRAWINGS ARE FREE AREA

DIMENSIONS.

G-8 - PROVIDE AND INSTALL BALANCING DAMPERS IN ALL SUPPLY AND EXHAUST

AIR BRANCH DUCTS. BALANCE TO CFM SHOWN ON PLAN.

G-9 - SEE ARCHITECTURAL REFLECTED CEILING PLAN FOR EXACT LOCATION OF

DIFFUSERS AND GRILLES.

G-10 - PROVIDE TURNING VANES IN ALL ELBOWS OF RECTANGULAR DUCT.

G-11 - THE CONTRACTOR SHALL ASSUME ALL RESPONSIBILITY IN HANDLING

AND DISPOSING OF REFRIGERANTS, OILS, ETC. ALL SUCH MATERIALS SHALL BE

HANDLED, DISPOSED, AND USED IN ACCORDANCE WITH ALL LOCAL, STATE, AND

FEDERAL LAWS.

G-12 - THE MECHANICAL CONTRACTOR SHALL VERIFY MOTOR VOLTAGES WITH

THE ELECTRICAL DRAWING BEFORE ORDERING MOTORIZED EQUIPMENT AND

CONTROLS.

G-13 - C.F.M. LISTED IS ACTUAL AIR.

G-14 - SUPPLIERS SHALL REVIEW ALL DRAWINGS AND THE SPECIFICATIONS

PRIOR TO SUBMITTING PRICES TO THE CONTRACTOR. ALL QUESTIONS AND

DISCREPANCIES SHALL BE BROUGHT TO THE ENGINEERS ATTENTION PRIOR TO

BIDDING.

G-15 - CONTRACTOR SHALL THOROUGHLY REVIEW AND SIGN SUBMITTALS FOR

COMPLETENESS AND COMPLIANCE TO THE SPECIFICATIONS PRIOR TO

ENGINEERS REVIEW. SUPPLIERS SHALL HIGHLIGHT OR MARK ALL INFORMATION

REQUIRED TO SHOW COMPLIANCE TO THE SPECIFICATIONS. ALL REQUESTED

EXCEPTIONS TO THE SPECIFICATIONS, OR SCHEDULES SHALL BE CLEARLY

NOTED AND EXPLAINED. SUBMITTAL REVIEW AND ACCEPTANCE IS FOR DESIGN

CONCEPT ONLY, AND DOES NOT AT ANY TIME RELIEVE THE CONTRACTOR OF

RESPONSIBILITY TO MEET SPECIFICATIONS, CAPACITIES, OR DESIGN INTENT.

G-16 - ALL MECHANICAL SHALL BE INSTALLED AND CONFORM TO THE 2024

EDITION OF THE IMC AND IPC WITH UTAH ANNOTATIONS AND LOCAL AUTHORITY

REQUIREMENTS.

G-17 - THIS CONTRACTOR SHALL BE RESPONSIBLE FOR THE DRAINING DOWN

AND RE-FILLING OF ALL SYSTEMS NECESSARY TO COMPLETE THE WORK

OUTLINED BY THIS PROJECT. THIS INCLUDES PROVIDING THE REQUIRED

CHEMICAL TREATMENT WHEN RE-FILLING THE SYSTEM.

G-18 - ALL PIPING, MATERIALS, ETC. SHALL BE NEW AND DOMESTIC MADE

UNLESS SPECIFICALLY AUTHORIZED IN WRITING PRIOR TO BID.

G-19 - THIS CONTRACTOR SHALL CONTRACT WITH A DESIGN BUILD ELECTRICAL

CONTRACTOR FOR THE DESIGN AND CONSTRUCTION OF THE ELECTRICAL

PORTION OF THIS PROJECT. ELECTRICAL INSTALLATION AND DESIGN SHALL BE

PER 2023 NEC.

A L L I D

E A

S

D E

S

IG

N S

A

R R

A N

G E

M E

N T

S A

N D

P L A

N S

I N

D

IC

A T

E D

O R

R E

P R

E S

E N

T E

D B

Y T

H

IS

D R

A W

IN

G

A R

E O

W N

E D

B Y

A N

D T

H E

P R

O P

E R

T Y

O F

W H

W E

N G

IN

E

E R

IN

G

I N

C

A N

D W

E R

E C

R E

A T

E D

E

V O

L V

E D

A

N D

D E

V E

L O

P E

D F

O R

U S

E O

N A

N D

I N

C O

N N

E C

T

IO

N W

IT

H

T H

E S

P E

C

IF

IE

D

P R

O J E

C T

N

O N

E O

F T

H E

I D

E A

S

D E

S

IG

N S

A

R R

A N

G E

M E

N T

S O

R P

L A

N S

S H

A L L B

E U

S E

D B

Y O

R D

IS

C

L O

S E

D T

O A

N Y

P E

R S

O N

F

IR

M

O

R C

O R

P O

R A

T

IO

N F

O R

A N

Y P

U R

P O

S E

W H

A T

S O

E V

E R

W

IT

H O

U T

W R

IT

T

E N

C O

N S

E N

T O

F W

G

IN

E

E R

IN

G

I N

C

W R

IT

T

E N

D

IM

E N

S

IO

N S

O N

T H

E S

E D

R A

W

IN

G S

S H

A L L H

A V

E P

R E

C E

D E

N C

E O

V E

R S

C A

L E

D

IM

E N

S

IO

N S

C

O N

T R

A C

T O

R S

S H

A L L V

E R

IF

Y

A N

D B

E R

E S

P O

N S

IB

L E

F O

R A

L L D

IM

E

N S

IO

N

S A

N D

C O

N D

IT

IO

N S

O N

T H

E J

O B

A N

D T

H

IS

O F

F

IC

E M

U S

T B

E N

O T

IF

IE

D O

F A

N Y

V A

R

IA

T

IO

N F

R O

M T

H E

D

IM

E N

S

IO

N S

A N

D C

O N

D

IT

IO

N

S S

H O

W N

B Y

T H

E S

E D

R A

W

IN

G S

W

A R

N

IN

G

R E

P R

O D

U C

T

IO

N H

E R

E O

F I S

A C

R

IM

IN

A

L O

F F

E N

S E

U N

D E

R

U

.S .C

S

E C

U N

A U

T H

O R

IZ

E

D D

IS

C

L O

S U

R E

M A

Y C

O N

S T

IT

U

T E

T R

A

C R

E T

M

IS

A P

P R

O P

R

IA

T

IO

N I N

V

IO

L A

T

IO

N O

F I .C

.2 -2

-3 -1

E T

S

E Q

A

N D

O T

H E

R L

A W

S

1 2 3 4 5

D

C

B

A

1 2 3 4 5

D

C

B

A

CONSULTANTS

CODE REVIEW STAMP

PROJECT NAME & ADDRESS

MARK DATE REVISION

PROJECT MANAGER:

DRAWN BY:

CHECKED BY:

DATE:

WHW PROJECT NUMBER:

11/04/26STAFF

CL

11/04/2026

26072

CL

MECHANICAL LEGEND

AND GENERAL NOTES

MG001

SUU AFEC Air Handlers

DFCM#27052730

AMERICA FIRST EVENT CENTER, 351 W

CENTER ST, CEDAR CITY, UT 84720

DIVISION OF FACILITIES

CONSTRUCTION AND

MANAGEMENT

Jason Van Ausdal

11/24/2026

A L L I D

E A

S

D E

S

IG

N S

A

R R

A N

G E

M E

N T

S A

N D

P L A

N S

I N

D

IC

A T

E D

O R

R E

P R

E S

E N

T E

D B

Y T

H

IS

D R

A W

IN

G

A R

E O

W N

E D

B Y

A N

D T

H E

P R

O P

E R

T Y

O F

W H

W E

N G

IN

E

E R

IN

G

I N

C

A N

D W

E R

E C

R E

A T

E D

E

V O

L V

E D

A

N D

D E

V E

L O

P E

D F

O R

U S

E O

N A

N D

I N

C O

N N

E C

T

IO

N W

IT

H

T H

E S

P E

C

IF

IE

D

P R

O J E

C T

N

O N

E O

F T

H E

I D

E A

S

D E

S

IG

N S

A

R R

A N

G E

M E

N T

S O

R P

L A

N S

S H

A L L B

E U

S E

D B

Y O

R D

IS

C

L O

S E

D T

O A

N Y

P E

R S

O N

F

IR

M

O

R C

O R

P O

R A

T

IO

N F

O R

A N

Y P

U R

P O

S E

W H

A T

S O

E V

E R

W

IT

H O

U T

W R

IT

T

E N

C O

N S

E N

T O

F W

G

IN

E

E R

IN

G

I N

C

W R

IT

T

E N

D

IM

E N

S

IO

N S

O N

T H

E S

E D

R A

W

IN

G S

S H

A L L H

A V

E P

R E

C E

D E

N C

E O

V E

R S

C A

L E

D

IM

E N

S

IO

N S

C

O N

T R

A C

T O

R S

S H

A L L V

E R

IF

Y

A N

D B

E R

E S

P O

N S

IB

L E

F O

R A

L L D

IM

E

N S

IO

N

S A

N D

C O

N D

IT

IO

N S

O N

T H

E J

O B

A N

D T

H

IS

O F

F

IC

E M

U S

T B

E N

O T

IF

IE

D O

F A

N Y

V A

R

IA

T

IO

N F

R O

M T

H E

D

IM

E N

S

IO

N S

A N

D C

O N

D

IT

IO

N

S S

H O

W N

B Y

T H

E S

E D

R A

W

IN

G S

W

A R

N

IN

G

R E

P R

O D

U C

T

IO

N H

E R

E O

F I S

A C

R

IM

IN

A

L O

F F

E N

S E

U N

D E

R

U

.S .C

S

E C

U N

A U

T H

O R

IZ

E

D D

IS

C

L O

S U

R E

M A

Y C

O N

S T

IT

U

T E

T R

A

C R

E T

M

IS

A P

P R

O P

R

IA

T

IO

N I N

V

IO

L A

T

IO

N O

F I .C

.2 -2

-3 -1

E T

S

E Q

A

N D

O T

H E

R L

A W

S

1 2 3 4 5

D

C

B

A

1 2 3 4 5

D

C

B

A

CONSULTANTS

CODE REVIEW STAMP

PROJECT NAME & ADDRESS

MARK DATE REVISION

PROJECT MANAGER:

DRAWN BY:

CHECKED BY:

DATE:

WHW PROJECT NUMBER:

11/04/26Author

Checker

11/04/2026

26072

Designer

MECHANICAL

DEMOLITION ROOF PLAN

MD102

SUU AFEC Air Handlers

DFCM#27052730

AMERICA FIRST EVENT CENTER, 351 W

CENTER ST, CEDAR CITY, UT 847201/16" = 1'-0"

MECHANICAL DEMOLITION ROOF PLAN

SHEET NOTES

1 REMOVE AND REPLACE EXISTING RELIEF FAN IN THIS

APPROXIMATE LOCATION. REMOVE AND REPLACE

EXISTING EQUIPMENT CURB. REMOVE AND REPLACE

ALL EXISTING CONTROLS. FIELD VERIFY.

GENERAL NOTES

1. CONTRACTOR SHALL FIELD VERIFY EXISTING MECHANICAL AND

ARCHITECTURAL CONDITIONS, INCLUDING, BUT NOT LIMITED TO:

EXISTING ROUTING AND LOCATION OF DUCTWORK, PIPING,

ELECTRICAL, AND STRUCTURAL ELEMENTS. CONTRACTOR SHALL

FIELD VERIFY POTENTIAL CONFLICTS BETWEEN NEW MECHANICAL

ELEMENTS AND EXISTING CONDITIONS PRIOR TO BEGINNING

FABRICATION OR ORDERING EQUIPMENT.

2. PRIME CONTRACTOR SHALL PROVIDE ALL COORDINATION BETWEEN

SUB-TIER CONTRACTORS. THIS SHALL INCLUDE THE COORDINATION

BETWEEN SUB-TIER CONTRACTORS, SUB-TIER CONTRACTORS AND

FACILITIES, SUB-TIER CONTRACTORS AND ARCHITECT/ENGINEER.

3. ALL DEMOLISHED EQUIPMENT AND MATERIAL SHALL BE BROKEN

DOWN TO FIT THROUGH DESIGNATED PATHWAYS. FIELD VERIFY

EXACT SCOPE OF DEMOLITION AND REMOVAL PATH. CONTRACTOR

SHALL BE RESPONSIBLE TO REPAIR ANY DAMAGE TO BUILDING

DURING REMOVAL OF EQUIPMENT AND MATERIAL.

4. SOME EXISTING PIPING AND EXISTING DUCTWORK NOT SHOWN ON

THIS SHEET FOR CLARIFICATION. FIELD VERIFY EXISTING CONDITIONS

PRIOR TO BID.

5. COORDINATE WITH DFCM PROVIDED HAZMAT REPORT AND

ABATEMENT CONTRACTOR PRIOR TO ANY DEMOLITION.

6. CONTRACTOR SHALL MAKE PROVISIONS WITH A DESIGN BUILD

ELECTRICIAN TO VERIFY ELECTRICAL CONDITIONS. DESIGN BUILD

CONTRACTOR SHALL PROVIDE ANY NEW WIRING, CIRCUIT BREAKERS,

PANELS, SWITCH GEAR, AND ALL NECESSARY ELECTRICAL

ACCOMMODATIONS FOR ANY NEW OR RE-LOCATED MECHANICAL

EQUIPMENT. CONTRACTOR SHALL COORDINATE THE DEMOLITION AND

REMOVAL OF ANY ELECTRICAL ELEMENTS ASSOCIATED WITH

EXISTING MECHANICAL EQUIPMENT BEING REMOVED. ALL ABANDONED

PIPING AND WIRING SHALL BE REMOVED BACK TO PANEL UNLESS

OTHERWISE APPROVED. ELECTRICIAN SHALL FIELD VERIFY AND

CONFIRM ELECTRICAL SCOPE AND EXISTING CONDITIONS PRIOR TO

ANY DEMOLITION WORK AND ORDERING ANY NEW MECHANICAL

EQUIPMENT.

7. PROVIDE UPDATED GRAPHICS AND PROGRAMMING FOR ALL NEW

AND EXISTING TEMPERATURE CONTROLS AND MOTORIZED DAMPERS.

8. PROVIDE FULL TEST AND BALANCE REPORT OF ALL IMPACTED

SYSTEMS BY LICENSED AND APPROVED TEST AND BALANCE

CONTRACTOR.

9. ALL ROOFING MODIFICATIONS SHALL BE PERFORMED BY

WARRANTY HOLDING CONTRACTOR (AMERICAN FRONTIER ROOFING

435-479-5218) AND APPROVED BY DFCM ROOFING PROGRAM

DIRECTOR.

DIVISION OF FACILITIES

CONSTRUCTION AND

MANAGEMENT

Jason Van Ausdal

11/24/2026

ME301

A

G

C

A

TC

A

TC

A

TC

4"ø CHWR (E)

4"ø CHWS (E)

4"ø CHWR (E)

4"ø CHWS (E)

40"ø SA (E)

90"x42" (E)

32"x28" MPS (E)

32"ø MPS (E)

ME301

A

TC

6"ø CHWS (E)

6"ø CHWR (E) 6"ø HWR (E)

6"ø HWS (E)

100"x36" OA (E)

78"x30" (E)

104"x42" (E)

48"x30" (E)

26"x30" (E)

20"ø MPS (E)

6"ø CWS (E)

6"ø CWR (E)

3 18"ø EA (E)

100"x36" OA (E)

A

TC

48"x48" SA (E)

6"ø CHWS (E)

6"ø CHWR (E)

6"ø HWR (E)

6"ø HWS (E)

28"x22" EA (E)

E

XIS

TIN

G

O U

TS

ID

E A

IR

P

LE

N U M

ME301

ME301

A L L I D

E A

S

D E

S

IG

N S

A

R R

A N

G E

M E

N T

S A

N D

P L A

N S

I N

D

IC

A T

E D

O R

R E

P R

E S

E N

T E

D B

Y T

H

IS

D R

A W

IN

G

A R

E O

W N

E D

B Y

A N

D T

H E

P R

O P

E R

T Y

O F

W H

W E

N G

IN

E

E R

IN

G

I N

C

A N

D W

E R

E C

R E

A T

E D

E

V O

L V

E D

A

N D

D E

V E

L O

P E

D F

O R

U S

E O

N A

N D

I N

C O

N N

E C

T

IO

N W

IT

H

T H

E S

P E

C

IF

IE

D

P R

O J E

C T

N

O N

E O

F T

H E

I D

E A

S

D E

S

IG

N S

A

R R

A N

G E

M E

N T

S O

R P

L A

N S

S H

A L L B

E U

S E

D B

Y O

R D

IS

C

L O

S E

D T

O A

N Y

P E

R S

O N

F

IR

M

O

R C

O R

P O

R A

T

IO

N F

O R

A N

Y P

U R

P O

S E

W H

A T

S O

E V

E R

W

IT

H O

U T

W R

IT

T

E N

C O

N S

E N

T O

F W

G

IN

E

E R

IN

G

I N

C

W R

IT

T

E N

D

IM

E N

S

IO

N S

O N

T H

E S

E D

R A

W

IN

G S

S H

A L L H

A V

E P

R E

C E

D E

N C

E O

V E

R S

C A

L E

D

IM

E N

S

IO

N S

C

O N

T R

A C

T O

R S

S H

A L L V

E R

IF

Y

A N

D B

E R

E S

P O

N S

IB

L E

F O

R A

L L D

IM

E

N S

IO

N

S A

N D

C O

N D

IT

IO

N S

O N

T H

E J

O B

A N

D T

H

IS

O F

F

IC

E M

U S

T B

E N

O T

IF

IE

D O

F A

N Y

V A

R

IA

T

IO

N F

R O

M T

H E

D

IM

E N

S

IO

N S

A N

D C

O N

D

IT

IO

N

S S

H O

W N

B Y

T H

E S

E D

R A

W

IN

G S

W

A R

N

IN

G

R E

P R

O D

U C

T

IO

N H

E R

E O

F I S

A C

R

IM

IN

A

L O

F F

E N

S E

U N

D E

R

U

.S .C

S

E C

U N

A U

T H

O R

IZ

E

D D

IS

C

L O

S U

R E

M A

Y C

O N

S T

IT

U

T E

T R

A

C R

E T

M

IS

A P

P R

O P

R

IA

T

IO

N I N

V

IO

L A

T

IO

N O

F I .C

.2 -2

-3 -1

E T

S

E Q

A

N D

O T

H E

R L

A W

S

1 2 3 4 5

D

C

B

A

1 2 3 4 5

D

C

B

A

CONSULTANTS

CODE REVIEW STAMP

PROJECT NAME & ADDRESS

MARK DATE REVISION

PROJECT MANAGER:

DRAWN BY:

CHECKED BY:

DATE:

WHW PROJECT NUMBER:

11/04/26STAFF

CL

11/04/2026

26072

CL

LARGE SCALE

MECHANICAL

DEMOLITION FLOOR

PLANS

MD401

SUU AFEC Air Handlers

DFCM#27052730

AMERICA FIRST EVENT CENTER, 351 W

CENTER ST, CEDAR CITY, UT 84720

1/4" = 1'-0"

LEVEL 1 MECHANICAL DEMOLITION

FLOOR PLAN

SHEET NOTES

1 REMOVE EXISTING CHILLED WATER PIPING BACK TO

THIS APPROXIMATE LOCATION. FIELD VERIFY EXACT

ROUTING AND POINTS OF REMOVAL.

2 REMOVE EXISTING DUCTWORK BACK TO THIS

APPROXIMATE LOCATION. FIELD VERIFY EXACT

ROUTING AND POINTS OF REMOVAL.

3 REMOVE EXISTING AIR HANDLING UNIT IN THIS

APPROXIMATE LOCATION. REMOVE EXISTING COIL

PIPING, CONTROLS, DUCTWORK, AND ALL

ASSOCIATED ITEMS. COORDINATE WITH DESIGN

BUILD ELECTRICIAN TO REMOVE EXISTING

ELECTRICAL ACCOMMODATIONS BACK TO PANEL.

FIELD VERIFY.

4 REMOVE EXISTING PNEUMATIC CONTROL VALVE IN

THIS APPROXIMATE LOCATION. COORDINATE WITH

CONTROLS CONTRACTOR TO REMOVE ALL

PNEUMATIC TUBING BACK TO COMPRESSOR. FIELD

VERIFY.

5 EXISTING DUCTWORK IN THIS APPROXIMATE

LOCATION SHALL REMAIN.FIELD VERIFY.

6 EXISTING MECHANICAL PIPING IN THIS APPROXIMATE

LOCATION SHALL REMAIN.FIELD VERIFY.

7 REMOVE EXISTING DAMPER AND PNEUMATIC

ACTUATOR IN THIS APPROXIMATE LOCATION.

COORDINATE WITH CONTROLS CONTRACTOR TO

REMOVE ALL PNEUMATIC TUBING BACK TO

COMPRESSOR. FIELD VERIFY.

8 REMOVE EXISTING CHILLED WATER COIL PUMP IN

THIS APPROXIMATE LOCATION. COORDINATE WITH

DESIGN BUILD ELECTRICIAN TO REMOVE EXISTING

ELECTRICAL ACCOMMODATIONS BACK TO PANEL.

FIELD VERIFY.

9 REMOVE EXISTING CHILLED WATER SECTION IN

VERTICAL PIPING. THE INTENT IS TO REMOVE

ENOUGH PIPING TO INSTALL NEW ISOLATION

VALVES. FIELD VERIFY EXACT ROUTING AND POINTS

OF REMOVAL.

10 SEE SHEET ME301 FOR SECTION VIEW OF THIS

APPROXIMATE AREA.

4 3

N

KEY PLAN

GENERAL NOTES

1. CONTRACTOR SHALL FIELD VERIFY EXISTING

MECHANICAL AND ARCHITECTURAL CONDITIONS,

INCLUDING, BUT NOT LIMITED TO: EXISTING ROUTING

AND LOCATION OF DUCTWORK, PIPING, ELECTRICAL,

AND STRUCTURAL ELEMENTS. CONTRACTOR SHALL

FIELD VERIFY POTENTIAL CONFLICTS BETWEEN NEW

MECHANICAL ELEMENTS AND EXISTING CONDITIONS

PRIOR TO BEGINNING FABRICATION OR ORDERING

EQUIPMENT.

2. PRIME CONTRACTOR SHALL PROVIDE ALL

COORDINATION BETWEEN SUB-TIER CONTRACTORS.

THIS SHALL INCLUDE THE COORDINATION BETWEEN

SUB-TIER CONTRACTORS, SUB-TIER CONTRACTORS

AND FACILITIES, SUB-TIER CONTRACTORS AND

ARCHITECT/ENGINEER.

3. ALL DEMOLISHED EQUIPMENT AND MATERIAL SHALL

BE BROKEN DOWN TO FIT THROUGH DESIGNATED

PATHWAYS. FIELD VERIFY EXACT SCOPE OF

DEMOLITION AND REMOVAL PATH. CONTRACTOR SHALL

BE RESPONSIBLE TO REPAIR ANY DAMAGE TO

BUILDING DURING REMOVAL OF EQUIPMENT AND

MATERIAL.

4. SOME EXISTING PIPING AND EXISTING DUCTWORK

NOT SHOWN ON THIS SHEET FOR CLARIFICATION. FIELD

VERIFY EXISTING CONDITIONS PRIOR TO BID.

5. COORDINATE WITH DFCM PROVIDED HAZMAT REPORT

AND ABATEMENT CONTRACTOR PRIOR TO ANY

DEMOLITION.

6. CONTRACTOR SHALL MAKE PROVISIONS WITH A

DESIGN BUILD ELECTRICIAN TO VERIFY ELECTRICAL

CONDITIONS. DESIGN BUILD CONTRACTOR SHALL

PROVIDE ANY NEW WIRING, CIRCUIT BREAKERS,

PANELS, SWITCH GEAR, AND ALL NECESSARY

ELECTRICAL ACCOMMODATIONS FOR ANY NEW OR RE-

LOCATED MECHANICAL EQUIPMENT. CONTRACTOR

SHALL COORDINATE THE DEMOLITION AND REMOVAL OF

ANY ELECTRICAL ELEMENTS ASSOCIATED WITH

EXISTING MECHANICAL EQUIPMENT BEING REMOVED.

ALL ABANDONED PIPING AND WIRING SHALL BE

REMOVED BACK TO PANEL UNLESS OTHERWISE

APPROVED. ELECTRICIAN SHALL FIELD VERIFY AND

CONFIRM ELECTRICAL SCOPE AND EXISTING

CONDITIONS PRIOR TO ANY DEMOLITION WORK AND

ORDERING ANY NEW MECHANICAL EQUIPMENT.

7. PROVIDE UPDATED GRAPHICS AND PROGRAMMING

FOR ALL NEW AND EXISTING TEMPERATURE CONTROLS

AND MOTORIZED DAMPERS.

8. PROVIDE FULL TEST AND BALANCE REPORT OF ALL

IMPACTED SYSTEMS BY LICENSED AND APPROVED TEST

AND BALANCE CONTRACTOR.

9. ALL ROOFING MODIFICATIONS SHALL BE PERFORMED

BY WARRANTY HOLDING CONTRACTOR (AMERICAN

FRONTIER ROOFING 435-479-5218) AND APPROVED BY

DFCM ROOFING PROGRAM DIRECTOR.

DIVISION OF FACILITIES

CONSTRUCTION AND

MANAGEMENT

Jason Van Ausdal

11/24/2026

T

T

T

T

T

T

T

T

T T

T

T

T

T

TT

T

T

TT

T

T

T

T

T

T

T

T

D

B

VAV

VAV

VAV

VAV

VAV

VAV

VAV

VAV

VAV

VAV

VAV

VAV

VAV

VAV

VAV

VAV

VAV

VAV

VAV

VAV

VAV

VAV

VAV

VAV

VAV

VAV

VAV

VAV

VAV

VAV

EXIST

EXIST

EXIST

EXIST

EXIST

EXIST

EXIST

EXIST

EXIST

EXIST

EXIST

EXIST

EXIST

EXIST

EXIST

EXIST

D-13

EXIST

EXIST

EXIST

EXIST

EXIST

EXIST

EXIST

EXIST

EXIST

EXIST

EXIST

D-13

D-13

EXIST

EXIST

EXIST

EXIST

EXIST

EXIST

EXIST

EXIST

EXIST

EXIST

EXIST

EXIST

EXIST

EXIST

EXIST

EXIST

145 EXIST

EXIST

EXIST

EXIST

EXIST

EXIST

EXIST

EXIST

A L L I D

E A

S

D E

S

IG

N S

A

R R

A N

G E

M E

N T

S A

N D

P L A

N S

I N

D

IC

A T

E D

O R

R E

P R

E S

E N

T E

D B

Y T

H

IS

D R

A W

IN

G

A R

E O

W N

E D

B Y

A N

D T

H E

P R

O P

E R

T Y

O F

W H

W E

N G

IN

E

E R

IN

G

I N

C

A N

D W

E R

E C

R E

A T

E D

E

V O

L V

E D

A

N D

D E

V E

L O

P E

D F

O R

U S

E O

N A

N D

I N

C O

N N

E C

T

IO

N W

IT

H

T H

E S

P E

C

IF

IE

D

P R

O J E

C T

N

O N

E O

F T

H E

I D

E A

S

D E

S

IG

N S

A

R R

A N

G E

M E

N T

S O

R P

L A

N S

S H

A L L B

E U

S E

D B

Y O

R D

IS

C

L O

S E

D T

O A

N Y

P E

R S

O N

F

IR

M

O

R C

O R

P O

R A

T

IO

N F

O R

A N

Y P

U R

P O

S E

W H

A T

S O

E V

E R

W

IT

H O

U T

W R

IT

T

E N

C O

N S

E N

T O

F W

G

IN

E

E R

IN

G

I N

C

W R

IT

T

E N

D

IM

E N

S

IO

N S

O N

T H

E S

E D

R A

W

IN

G S

S H

A L L H

A V

E P

R E

C E

D E

N C

E O

V E

R S

C A

L E

D

IM

E N

S

IO

N S

C

O N

T R

A C

T O

R S

S H

A L L V

E R

IF

Y

A N

D B

E R

E S

P O

N S

IB

L E

F O

R A

L L D

IM

E

N S

IO

N

S A

N D

C O

N D

IT

IO

N S

O N

T H

E J

O B

A N

D T

H

IS

O F

F

IC

E M

U S

T B

E N

O T

IF

IE

D O

F A

N Y

V A

R

IA

T

IO

N F

R O

M T

H E

D

IM

E N

S

IO

N S

A N

D C

O N

D

IT

IO

N

S S

H O

W N

B Y

T H

E S

E D

R A

W

IN

G S

W

A R

N

IN

G

R E

P R

O D

U C

T

IO

N H

E R

E O

F I S

A C

R

IM

IN

A

L O

F F

E N

S E

U N

D E

R

U

.S .C

S

E C

U N

A U

T H

O R

IZ

E

D D

IS

C

L O

S U

R E

M A

Y C

O N

S T

IT

U

T E

T R

A

C R

E T

M

IS

A P

P R

O P

R

IA

T

IO

N I N

V

IO

L A

T

IO

N O

F I .C

.2 -2

-3 -1

E T

S

E Q

A

N D

O T

H E

R L

A W

S

1 2 3 4 5

D

C

B

A

1 2 3 4 5

D

C

B

A

CONSULTANTS

CODE REVIEW STAMP

PROJECT NAME & ADDRESS

MARK DATE REVISION

PROJECT MANAGER:

DRAWN BY:

CHECKED BY:

DATE:

WHW PROJECT NUMBER:

11/04/26Author

CL

11/04/2026

26072

Designer

MAIN LEVEL MECHANICAL

PLAN AREA C

ME101.1

SUU AFEC Air Handlers

DFCM#27052730

AMERICA FIRST EVENT CENTER, 351 W

CENTER ST, CEDAR CITY, UT 84720

3/32" = 1'-0"

MAIN LEVEL MECHANICAL PLAN AREAC

GENERAL NOTES

1. CONTRACTOR SHALL FIELD VERIFY EXISTING

MECHANICAL AND ARCHITECTURAL CONDITIONS,

INCLUDING, BUT NOT LIMITED TO: EXISTING ROUTING

AND LOCATION OF DUCTWORK, PIPING, ELECTRICAL,

AND STRUCTURAL ELEMENTS. CONTRACTOR SHALL

FIELD VERIFY POTENTIAL CONFLICTS BETWEEN NEW

MECHANICAL ELEMENTS AND EXISTING CONDITIONS

PRIOR TO BEGINNING FABRICATION OR ORDERING

EQUIPMENT.

2. PRIME CONTRACTOR SHALL PROVIDE ALL

COORDINATION BETWEEN SUB-TIER CONTRACTORS.

THIS SHALL INCLUDE THE COORDINATION BETWEEN

SUB-TIER CONTRACTORS, SUB-TIER CONTRACTORS

AND FACILITIES, SUB-TIER CONTRACTORS AND

ARCHITECT/ENGINEER.

3. SOME EXISTING PIPING AND EXISTING DUCTWORK

NOT SHOWN ON THIS SHEET FOR CLARIFICATION. FIELD

VERIFY EXISTING CONDITIONS PRIOR TO BID.

4. PROVIDE FULL TEST AND BALANCE REPORT OF ALL

IMPACTED SYSTEMS BY LICENSED AND APPROVED TEST

AND BALANCE CONTRACTOR. RE-BALANCE EXISTING

DIFFUSERS TO CFM SHOWN. RE-BALANCE EXISTING VAV

AIR FLOW, AND HEATING WATER FLOW RATE TO CFM

AND GPM SHOWN IN SCHEDULES.

SHEET NOTES

1 PROVIDE NEW DIFFERENTIAL PRESSURE SENSOR IN

THIS APPROXIMATE LOCATION. FIELD VERIFY.

PROVIDE ALL NEW CONTROLS AND TIE INTO

EXISTING BUILDING MANAGEMENT SYSTEM.

DIVISION OF FACILITIES

CONSTRUCTION AND

MANAGEMENT

Jason Van Ausdal

11/24/2026

VAV

VAV

VAV

VAV

4 VAV

VAV

VAV

VAV

VAV

VAV

VAV

VAV

VAV

VAV

VAV

VAV

VAV

D-14

D-14

D-14

D-14

D-13

D-13

D-13

D-13

D-13

D-13

D-13

D-14

D-14

D-13

D-13

D-13

D-13

D-13

D-13

D-13

D-14

EXIST

D-13

D-13

D-13

D-14

D-14

D-14

D-14

D-13

D-13

D-1

D-1

D-1

(TYP 3)(TYP 3)

(TYP 3) (TYP 3)

(TYP 3)

(TYP 3)

LSS-1

LSS-1

LSS-1

LSS-1

LSS-1

LSS-1

R-2

R-2

D-1

D-1

D-1

EXIST

EXIST

A L L I D

E A

S

D E

S

IG

N S

A

R R

A N

G E

M E

N T

S A

N D

P L A

N S

I N

D

IC

A T

E D

O R

R E

P R

E S

E N

T E

D B

Y T

H

IS

D R

A W

IN

G

A R

E O

W N

E D

B Y

A N

D T

H E

P R

O P

E R

T Y

O F

W H

W E

N G

IN

E

E R

IN

G

I N

C

A N

D W

E R

E C

R E

A T

E D

E

V O

L V

E D

A

N D

D E

V E

L O

P E

D F

O R

U S

E O

N A

N D

I N

C O

N N

E C

T

IO

N W

IT

H

T H

E S

P E

C

IF

IE

D

P R

O J E

C T

N

O N

E O

F T

H E

I D

E A

S

D E

S

IG

N S

A

R R

A N

G E

M E

N T

S O

R P

L A

N S

S H

A L L B

E U

S E

D B

Y O

R D

IS

C

L O

S E

D T

O A

N Y

P E

R S

O N

F

IR

M

O

R C

O R

P O

R A

T

IO

N F

O R

A N

Y P

U R

P O

S E

W H

A T

S O

E V

E R

W

IT

H O

U T

W R

IT

T

E N

C O

N S

E N

T O

F W

G

IN

E

E R

IN

G

I N

C

W R

IT

T

E N

D

IM

E N

S

IO

N S

O N

T H

E S

E D

R A

W

IN

G S

S H

A L L H

A V

E P

R E

C E

D E

N C

E O

V E

R S

C A

L E

D

IM

E N

S

IO

N S

C

O N

T R

A C

T O

R S

S H

A L L V

E R

IF

Y

A N

D B

E R

E S

P O

N S

IB

L E

F O

R A

L L D

IM

E

N S

IO

N

S A

N D

C O

N D

IT

IO

N S

O N

T H

E J

O B

A N

D T

H

IS

O F

F

IC

E M

U S

T B

E N

O T

IF

IE

D O

F A

N Y

V A

R

IA

T

IO

N F

R O

M T

H E

D

IM

E N

S

IO

N S

A N

D C

O N

D

IT

IO

N

S S

H O

W N

B Y

T H

E S

E D

R A

W

IN

G S

W

A R

N

IN

G

R E

P R

O D

U C

T

IO

N H

E R

E O

F I S

A C

R

IM

IN

A

L O

F F

E N

S E

U N

D E

R

U

.S .C

S

E C

U N

A U

T H

O R

IZ

E

D D

IS

C

L O

S U

R E

M A

Y C

O N

S T

IT

U

T E

T R

A

C R

E T

M

IS

A P

P R

O P

R

IA

T

IO

N I N

V

IO

L A

T

IO

N O

F I .C

.2 -2

-3 -1

E T

S

E Q

A

N D

O T

H E

R L

A W

S

1 2 3 4 5

D

C

B

A

1 2 3 4 5

D

C

B

A

CONSULTANTS

CODE REVIEW STAMP

PROJECT NAME & ADDRESS

MARK DATE REVISION

PROJECT MANAGER:

DRAWN BY:

CHECKED BY:

DATE:

WHW PROJECT NUMBER:

11/04/26Author

CL

11/04/2026

26072

Designer

MAIN LEVEL MECHANICAL

PLAN AREA D

ME101.2

SUU AFEC Air Handlers

DFCM#27052730

AMERICA FIRST EVENT CENTER, 351 W

CENTER ST, CEDAR CITY, UT 84720

3/32" = 1'-0"

MAIN LEVEL MECHANICAL PLAN AREA D

GENERAL NOTES

1. CONTRACTOR SHALL FIELD VERIFY EXISTING

MECHANICAL AND ARCHITECTURAL CONDITIONS,

INCLUDING, BUT NOT LIMITED TO: EXISTING ROUTING

AND LOCATION OF DUCTWORK, PIPING, ELECTRICAL,

AND STRUCTURAL ELEMENTS. CONTRACTOR SHALL

FIELD VERIFY POTENTIAL CONFLICTS BETWEEN NEW

MECHANICAL ELEMENTS AND EXISTING CONDITIONS

PRIOR TO BEGINNING FABRICATION OR ORDERING

EQUIPMENT.

2. PRIME CONTRACTOR SHALL PROVIDE ALL

COORDINATION BETWEEN SUB-TIER CONTRACTORS.

THIS SHALL INCLUDE THE COORDINATION BETWEEN

SUB-TIER CONTRACTORS, SUB-TIER CONTRACTORS

AND FACILITIES, SUB-TIER CONTRACTORS AND

ARCHITECT/ENGINEER.

3. SOME EXISTING PIPING AND EXISTING DUCTWORK

NOT SHOWN ON THIS SHEET FOR CLARIFICATION. FIELD

VERIFY EXISTING CONDITIONS PRIOR TO BID.

4. PROVIDE FULL TEST AND BALANCE REPORT OF ALL

IMPACTED SYSTEMS BY LICENSED AND APPROVED TEST

AND BALANCE CONTRACTOR. RE-BALANCE EXISTING

DIFFUSERS TO CFM SHOWN. RE-BALANCE EXISTING VAV

AIR FLOW, AND HEATING WATER FLOW RATE TO CFM

AND GPM SHOWN IN SCHEDULES.

SHEET NOTES

1 PROVIDE NEW DIFFERENTIAL PRESSURE SENSOR IN

THIS APPROXIMATE LOCATION. FIELD VERIFY.

PROVIDE ALL NEW CONTROLS AND TIE INTO

EXISTING BUILDING MANAGEMENT SYSTEM.

DIVISION OF FACILITIES

CONSTRUCTION AND

MANAGEMENT

Jason Van Ausdal

11/24/2026

A

G

C

ME301

32"ø MPS (E)

20"ø MPS (E)

A

TC

78"x30" O A

100"x36" OA (E)

90"x42" (E)

100"x24" RA

AHU

AHU

40"ø SA (E)

40"ø SA

52"x32" SA

18"ø EA (E)

28"x22" EA (E)

ME301

ATC

A

TC

86"x20" RA

78"x30" RA

90"x26" RA

"x

" O

A (E

A

TC

50"x30" RA

42"x36" RF

A

TC

ME301

40"x32" SA

A L L I D

E A

S

D E

S

IG

N S

A

R R

A N

G E

M E

N T

S A

N D

P L A

N S

I N

D

IC

A T

E D

O R

R E

P R

E S

E N

T E

D B

Y T

H

IS

D R

A W

IN

G

A R

E O

W N

E D

B Y

A N

D T

H E

P R

O P

E R

T Y

O F

W H

W E

N G

IN

E

E R

IN

G

I N

C

A N

D W

E R

E C

R E

A T

E D

E

V O

L V

E D

A

N D

D E

V E

L O

P E

D F

O R

U S

E O

N A

N D

I N

C O

N N

E C

T

IO

N W

IT

H

T H

E S

P E

C

IF

IE

D

P R

O J E

C T

N

O N

E O

F T

H E

I D

E A

S

D E

S

IG

N S

A

R R

A N

G E

M E

N T

S O

R P

L A

N S

S H

A L L B

E U

S E

D B

Y O

R D

IS

C

L O

S E

D T

O A

N Y

P E

R S

O N

F

IR

M

O

R C

O R

P O

R A

T

IO

N F

O R

A N

Y P

U R

P O

S E

W H

A T

S O

E V

E R

W

IT

H O

U T

W R

IT

T

E N

C O

N S

E N

T O

F W

G

IN

E

E R

IN

G

I N

C

W R

IT

T

E N

D

IM

E N

S

IO

N S

O N

T H

E S

E D

R A

W

IN

G S

S H

A L L H

A V

E P

R E

C E

D E

N C

E O

V E

R S

C A

L E

D

IM

E N

S

IO

N S

C

O N

T R

A C

T O

R S

S H

A L L V

E R

IF

Y

A N

D B

E R

E S

P O

N S

IB

L E

F O

R A

L L D

IM

E

N S

IO

N

S A

N D

C O

N D

IT

IO

N S

O N

T H

E J

O B

A N

D T

H

IS

O F

F

IC

E M

U S

T B

E N

O T

IF

IE

D O

F A

N Y

V A

R

IA

T

IO

N F

R O

M T

H E

D

IM

E N

S

IO

N S

A N

D C

O N

D

IT

IO

N

S S

H O

W N

B Y

T H

E S

E D

R A

W

IN

G S

W

A R

N

IN

G

R E

P R

O D

U C

T

IO

N H

E R

E O

F I S

A C

R

IM

IN

A

L O

F F

E N

S E

U N

D E

R

U

.S .C

S

E C

U N

A U

T H

O R

IZ

E

D D

IS

C

L O

S U

R E

M A

Y C

O N

S T

IT

U

T E

T R

A

C R

E T

M

IS

A P

P R

O P

R

IA

T

IO

N I N

V

IO

L A

T

IO

N O

F I .C

.2 -2

-3 -1

E T

S

E Q

A

N D

O T

H E

R L

A W

S

1 2 3 4 5

D

C

B

A

1 2 3 4 5

D

C

B

A

CONSULTANTS

CODE REVIEW STAMP

PROJECT NAME & ADDRESS

MARK DATE REVISION

PROJECT MANAGER:

DRAWN BY:

CHECKED BY:

DATE:

WHW PROJECT NUMBER:

11/04/26STAFF

CL

11/04/2026

26072

CL

MECHANICAL FLOOR

PLANS

ME401

SUU AFEC Air Handlers

DFCM#27052730

AMERICA FIRST EVENT CENTER, 351 W

CENTER ST, CEDAR CITY, UT 84720

1/4" = 1'-0"

LEVEL 1 MECHANICAL FLOOR PLAN

SHEET NOTES

1 TIE INTO EXISTING DUCTWORK IN THIS APPROXIMATE LOCATION.

FIELD VERIFY EXACT ROUTING AND POINTS OF CONNECTION.

2 PROVIDE NEW MODULAR AIR HANDLER IN THIS APPROXIMATE

LOCATION. BREAK DOWN AIR HANDLER TO FIT THROUGH

EXISTING 3'-0" X 7'-0" DOOR. OTHER OPTIONS: CONTRACTOR MAY

ELECT TO REMOVE AND REPLACE A SECTION OF ROOFING, OR

WALLS IF PREFERRED FOR MEANS AND METHODS INSTALLATION.

FIELD VERIFY. PROVIDE NEW HOUSEKEEPING PAD EXTENSION.

PROVIDE AIR HANDLER WITH SINGLE POINT POWER

CONNECTION. COORDINATE WITH DESIGN BUILD ELECTRICIAN TO

PROVIDE ALL NEW ELECTRICAL ACCOMMODATIONS, INCLUDING:

NEW WIRING, RACEWAYS, CONDUIT, BREAKERS, DISCONNECTS,

ETC. FOR A FULLY FUNCTIONING SYSTEM. COORDINATE WITH

CONTROLS CONTRACTOR TO PROVIDE NEW DDC CONTROLS

WIRING. TIE INTO EXISTING BUILDING MANAGEMENT SYSTEM.

3 PROVIDE NEW RETURN AIR MOTORIZED DDC

AUTODAMPER/ACTUATOR IN THIS APPROXIMATE LOCATION.

COORDINATE WITH CONTROLS CONTRACTOR TO PROVIDE NEW

CONTROLS WIRING. TIE INTO EXISTING BUILDING MANAGEMENT

SYSTEM. FIELD VERIFY.

4 PROVIDE NEW OUTSIDE AIR MOTORIZED DDC

AUTODAMPER/ACTUATOR IN THIS APPROXIMATE LOCATION.

COORDINATE WITH CONTROLS CONTRACTOR TO PROVIDE NEW

CONTROLS WIRING. TIE INTO EXISTING BUILDING MANAGEMENT

SYSTEM. FIELD VERIFY.

5 PROVIDE NEW RELIEF AIR MOTORIZED DDC

AUTODAMPER/ACTUATOR IN THIS APPROXIMATE LOCATION.

COORDINATE WITH CONTROLS CONTRACTOR TO PROVIDE NEW

CONTROLS WIRING. TIE INTO EXISTING BUILDING MANAGEMENT

SYSTEM. FIELD VERIFY.

6 PROVIDE NEW RELIEF AIR RISER TO ROOF MOUNTED RELIEF FAN

IN THIS APPROXIMATE LOCATION. FIELD VERIFY EXACT ROUTING.

SEE SHEET ME102 MECHANICAL ROOF PLAN FOR CONTINUATION.

7 RE-LOCATE EXISTING SPRINKLER PIPING IN THIS APPROXIMATE

LOCATION AND ANY OTHER LOCATIONS IN THIS ROOM AS

NEEDED TO ACCOMMODATE THE REMOVAL AND INSTALLATION

OF NEW DUCTWORK AND EQUIPMENT. FIELD VERIFY EXACT

ROUTING.

4 3

N

KEY PLAN

GENERAL NOTES

1. CONTRACTOR SHALL FIELD VERIFY EXISTING MECHANICAL AND

ARCHITECTURAL CONDITIONS, INCLUDING, BUT NOT LIMITED TO:

EXISTING ROUTING AND LOCATION OF DUCTWORK, PIPING, ELECTRICAL,

AND STRUCTURAL ELEMENTS. CONTRACTOR SHALL FIELD VERIFY

POTENTIAL CONFLICTS BETWEEN NEW MECHANICAL ELEMENTS AND

EXISTING CONDITIONS PRIOR TO BEGINNING FABRICATION OR

ORDERING EQUIPMENT.

2. PRIME CONTRACTOR SHALL PROVIDE ALL COORDINATION BETWEEN

SUB-TIER CONTRACTORS. THIS SHALL INCLUDE THE COORDINATION

BETWEEN SUB-TIER CONTRACTORS, SUB-TIER CONTRACTORS AND

FACILITIES, SUB-TIER CONTRACTORS AND ARCHITECT/ENGINEER.

3. ALL DEMOLISHED EQUIPMENT AND MATERIAL SHALL BE BROKEN

DOWN TO FIT THROUGH DESIGNATED PATHWAYS. FIELD VERIFY EXACT

SCOPE OF DEMOLITION AND REMOVAL PATH. CONTRACTOR SHALL BE

RESPONSIBLE TO REPAIR ANY DAMAGE TO BUILDING DURING REMOVAL

OF EQUIPMENT AND MATERIAL.

4. SOME EXISTING PIPING AND EXISTING DUCTWORK NOT SHOWN ON

THIS SHEET FOR CLARIFICATION. FIELD VERIFY EXISTING CONDITIONS

PRIOR TO BID.

5. COORDINATE WITH DFCM PROVIDED HAZMAT REPORT AND

ABATEMENT CONTRACTOR PRIOR TO ANY DEMOLITION.

6. CONTRACTOR SHALL MAKE PROVISIONS WITH A DESIGN BUILD

ELECTRICIAN TO VERIFY ELECTRICAL CONDITIONS. DESIGN BUILD

CONTRACTOR SHALL PROVIDE ANY NEW WIRING, CIRCUIT BREAKERS,

PANELS, SWITCH GEAR, AND ALL NECESSARY ELECTRICAL

ACCOMMODATIONS FOR ANY NEW OR RE-LOCATED MECHANICAL

EQUIPMENT. CONTRACTOR SHALL COORDINATE THE DEMOLITION AND

REMOVAL OF ANY ELECTRICAL ELEMENTS ASSOCIATED WITH EXISTING

MECHANICAL EQUIPMENT BEING REMOVED. ALL ABANDONED PIPING AND

WIRING SHALL BE REMOVED BACK TO PANEL UNLESS OTHERWISE

APPROVED. ELECTRICIAN SHALL FIELD VERIFY AND CONFIRM

ELECTRICAL SCOPE AND EXISTING CONDITIONS PRIOR TO ANY

DEMOLITION WORK AND ORDERING ANY NEW MECHANICAL EQUIPMENT.

7. PROVIDE UPDATED GRAPHICS AND PROGRAMMING FOR ALL NEW AND

EXISTING TEMPERATURE CONTROLS AND MOTORIZED DAMPERS.

8. PROVIDE FULL TEST AND BALANCE REPORT OF ALL IMPACTED

SYSTEMS BY LICENSED AND APPROVED TEST AND BALANCE

CONTRACTOR.

9. ALL ROOFING MODIFICATIONS SHALL BE PERFORMED BY WARRANTY

HOLDING CONTRACTOR (AMERICAN FRONTIER ROOFING 435-479-5218)

AND APPROVED BY DFCM ROOFING PROGRAM DIRECTOR.

DIVISION OF FACILITIES

CONSTRUCTION AND

MANAGEMENT

Jason Van Ausdal

11/24/2026

ME301

ATC ATC

ATC

MECH ROOM

0"

MECH ROOM

0' - 0"LOWER ROOF

-1' - 0"

10 11

MECH ROOM

0"

MECH ROOM

0' - 0"

ME301

ME301

MECH ROOM

0"

MECH ROOM

0' - 0"

A L L I D

E A

S

D E

S

IG

N S

A

R R

A N

G E

M E

N T

S A

N D

P L A

N S

I N

D

IC

A T

E D

O R

R E

P R

E S

E N

T E

D B

Y T

H

IS

D R

A W

IN

G

A R

E O

W N

E D

B Y

A N

D T

H E

P R

O P

E R

T Y

O F

W H

W E

N G

IN

E

E R

IN

G

I N

C

A N

D W

E R

E C

R E

A T

E D

E

V O

L V

E D

A

N D

D E

V E

L O

P E

D F

O R

U S

E O

N A

N D

I N

C O

N N

E C

T

IO

N W

IT

H

T H

E S

P E

C

IF

IE

D

P R

O J E

C T

N

O N

E O

F T

H E

I D

E A

S

D E

S

IG

N S

A

R R

A N

G E

M E

N T

S O

R P

L A

N S

S H

A L L B

E U

S E

D B

Y O

R D

IS

C

L O

S E

D T

O A

N Y

P E

R S

O N

F

IR

M

O

R C

O R

P O

R A

T

IO

N F

O R

A N

Y P

U R

P O

S E

W H

A T

S O

E V

E R

W

IT

H O

U T

W R

IT

T

E N

C O

N S

E N

T O

F W

G

IN

E

E R

IN

G

I N

C

W R

IT

T

E N

D

IM

E N

S

IO

N S

O N

T H

E S

E D

R A

W

IN

G S

S H

A L L H

A V

E P

R E

C E

D E

N C

E O

V E

R S

C A

L E

D

IM

E N

S

IO

N S

C

O N

T R

A C

T O

R S

S H

A L L V

E R

IF

Y

A N

D B

E R

E S

P O

N S

IB

L E

F O

R A

L L D

IM

E

N S

IO

N

S A

N D

C O

N D

IT

IO

N S

O N

T H

E J

O B

A N

D T

H

IS

O F

F

IC

E M

U S

T B

E N

O T

IF

IE

D O

F A

N Y

V A

R

IA

T

IO

N F

R O

M T

H E

D

IM

E N

S

IO

N S

A N

D C

O N

D

IT

IO

N

S S

H O

W N

B Y

T H

E S

E D

R A

W

IN

G S

W

A R

N

IN

G

R E

P R

O D

U C

T

IO

N H

E R

E O

F I S

A C

R

IM

IN

A

L O

F F

E N

S E

U N

D E

R

U

.S .C

S

E C

U N

A U

T H

O R

IZ

E

D D

IS

C

L O

S U

R E

M A

Y C

O N

S T

IT

U

T E

T R

A

C R

E T

M

IS

A P

P R

O P

R

IA

T

IO

N I N

V

IO

L A

T

IO

N O

F I .C

.2 -2

-3 -1

E T

S

E Q

A

N D

O T

H E

R L

A W

S

1 2 3 4 5

D

C

B

A

1 2 3 4 5

D

C

B

A

CONSULTANTS

CODE REVIEW STAMP

PROJECT NAME & ADDRESS

MARK DATE REVISION

PROJECT MANAGER:

DRAWN BY:

CHECKED BY:

DATE:

WHW PROJECT NUMBER:

11/04/26STAFF

CL

11/04/2026

26072

CL

MECHANICAL SECTIONS

ME301

SUU AFEC Air Handlers

DFCM#27052730

AMERICA FIRST EVENT CENTER, 351 W

CENTER ST, CEDAR CITY, UT 84720

SHEET NOTES

1/4" = 1'-0"

MECHANICAL ROOM DEMOLITION

SECTION VIEW

1/4" = 1'-0"

MECHANICAL ROOM NEW SECTION

VIEW

1/4" = 1'-0"

AH-7 SECTION VIEW

1/4" = 1'-0"

AH-8 SECTION VIEW

DIVISION OF FACILITIES

CONSTRUCTION AND

MANAGEMENT

Jason Van Ausdal

11/24/2026

1/

2" W

ID

E

R U N N E R

2"

2"

12"C .C

.M

AX.

2"

12"C.C.MAX.

PIPE HANGER DETAIL

C4

SINGLE THICKNESS TURNING VANE DETAIL

A4

DUCT STRAP HANGER DETAIL

A1

SEISMIC SWAY BRACING DETAILS

C1

DUCT LINER DETAIL

B1

B4

COOLING COIL CONDENSATE DRAIN DETAIL

DUCT HANGER DETAIL

A3

B3

IN-LINE PUMP DETAIL

CLEVIS HANGER

SINGLE HORIZONTAL RUN

WITHOUT INSULATION

CLEVIS HANGER

NOTE:

PROVIDE WITH VAPOR BARRIER

ON CHILLED WATER AND

DOMESTIC COLD WATER PIPING

HANGER

BOLT UNISTRUT TO EXISTING

WALL AND CONCRETE USING

EXPANSION ANCHOR BOLTS

MOUNT PIPING TO UNISTRUT

CALCIUM SILICATE

BLOCK

PROVIDE PIPE CLAMPS

WITH BOLTS AND NUTS

16 GA. ZINC COATED SHEET STEEL

SHIELD AT LEAST 12" LONG (TYP)

CALCIUM SILICATE

BLOCK

INSULATION WITH OR WITHOUT

VAPOR BARRIER

ATTACH TO ROOM

OVERHEAD STRUCTURE

SPRING TYPE ISOLATOR

FOR INSTALLATION NEAR

HOT WATER PUMPS

ATTACH TO EXISTING

CEILING

HANGER ROD

HEAVY DUTY

CLEVIS HANGER

PIPE

HANGER ROD

HEAVY DUTY

CLEVIS HANGER

SUPPORT NUT

LOCKING NUT

INSULATION

LOCKING NUT

SUPPORT NUT

PIPE

16 GAGE ZINC COATED

SHEET STEEL SHIELD

AT LEAST 12" LONG.

CALCIUM SILICATE BLOCK

F L O

W

A

IR

SCALE: NONE

LEADING AND

TRAILING

EDGE TO BE PARALLEL

WITH SIDE OF DUCT.

SINGLE THICKNESS

TURNING VANES

1" LONG MINIMUM

TRAILING EDGE

#10 x 3/4" SELF

TAPPING CADMIUM PLATED

SHEET METAL SCREWS TO

ANCHOR STRAPS TO DUCT.

ALL STRAPS TO BE TIGHT

AGAINST DUCT AND SUPPORT

MEMBERS. (TYPICAL)

SCALE: NONE

1"

1" x 18 GAUGE STRAP

HANGERS AT 8'-0"

SPACING.

1" x 18 GAUGE STRAP

HANGERS AT 8'-0"

SPACING.

NO POP RIVETS

ALLOWED

NOTES:

1. SEE SPECIFICATIONS FOR

SEISMIC RESTRAINT

REQUIREMENTS.

ATTACH SECURELY TO

STRUCTURE.

SCALE: NONE

45°

45° 45°

INSULATION WITH

OR WITHOUT

VAPOR BARRIER

CALCIUM SILICATE

BLOCK TYPICAL

PIPE

16 GA. ZINC COATED

SHEET STEEL SHIELD

AT LEAST 12" LONG.

HEAVY DUTY

CLEVIS HANGER

LOCKING NUT

SUPPORT NUT

HANGER ROD, ATTACH

TO OVERHEAD

STRUCTURE

CONNECT TO

STRUCTURE

HANGER

ROD

16 GA. ZINC COATED

SHEET STEEL SADDLE

AT LEAST 12" LONG.

HANGER ROD

VAPOR

BARRIER

INSULATION

PIPE

CONNECT TO

STRUCTURE

CONNECT TO

STRUCTURE

HANGER ROD, ATTACH

TO OVERHEAD

STRUCTURE

SUPPORT NUT

LOCKING NUT

HEAVY DUTY

CLEVIS HANGER

INSULATION WITH

OR WITHOUT

VAPOR BARRIER

MAX. 1/4" SLACK.

PULL HAND TIGHT

PRE-STRECHED, COLOR

CODED CERTIFIED BREAK

STRENGTH CABLE (2) CABLES

PER RESTRAINT PACKAGE

PIPE

16 GA. ZINC COATED

SHEET STEEL SHIELD

AT LEAST 12" LONG.

CALCIUM SILICATE

BLOCK TYPICAL

GRIP NAILS SHALL BE

INSTALLED BY AIR

HAMMER OR BY

AUTOMATIC FASTENER

EQUIPMENT.

INSULATED PINS, FASTENERS

OR GRIP NAILS.

SCALE: NONE

METAL FASTENERS

ENDS OF LINER SHALL BE

BUTTED FIRMLY TOGETHER.

ALL JOINTS, SEAMS, AND

TEARS SHALL BE COATED W/

ADHESIVE DURING

INSTALLATION.

MINIMUM OF 1-1/2" LINER.

SEE SPECIFICATION FOR

INSULATION REQUIREMENT

SHEET METAL

DUCT

TOP AND BOTTOM

SECTIONS OF LINER

SHALL OVERLAP THE

SIDES

DUCTLINER

ONE INCH THICK 1-1/2 LB

DENSITY FIBERGLASS.ALL ENDS OF LINER TO

BE COATED W/ ADHESIVE

NOT MORE THAN 2"

FROM EDGE OF LINER.

SCALE: NONE

DUCT

DUCT

SCALE: NONE

ANGLE IRON SUPPORT

SEE TABLE FOR SIZE

2x2 ANGLE

BRACKET

3/8"∅ BOLT

THREADED ROD

SIZE PER TABLE

THREADED ROD

SIZE PER TABLE

2x2 ANGLE

BRACKET

BOTTOM OF TRUSS

OR BEAM CHORD

BOTTOM OF TRUSS CHORD

INSULATION

SCALE: NONE

CHECK VALVE

BALANCING VALVE

CHWR OUT CHWR IN

BUTTERFLY VALVE

(TYPICAL)

PIPE HANGER

(TYPICAL)

PRESSURE GAUGE

ON INLET AND ON

OUTLET. (TYPICAL)

S E

C R

E T

M

IS

A P

P R

O P

R

IA

T

IO

N I N

V

IO

L A

T

IO

N O

F I .C

.2

-2 -3

-1

E T

S

E Q

A

N D

O T

H E

R L

A W

S

1 2 3 4 5

D

C

B

A

1 2 3 4 5

D

C

B

A

CONSULTANTS

CODE REVIEW STAMP

PROJECT NAME & ADDRESS

MARK DATE REVISION

PROJECT MANAGER:

DRAWN BY:

CHECKED BY:

DATE:

WHW PROJECT NUMBER:

Author

Checker

Issue Date

26072

Designer

MECHANICAL

DETAILS

ME501

SUU AFEC Air Handlers

733 W 9000 S

SANDY, UT 84070

3" MIN.

1/2"

1/

2" W

ID

E

R U N N E R

2"

2"

12"C .C

.M

AX.

2"

12"C.C.MAX.

PIPE HANGER DETAIL

C4

SINGLE THICKNESS TURNING VANE DETAIL

C4

DUCT STRAP HANGER DETAIL

A1

SEISMIC SWAY BRACING DETAILS

C1

DUCT LINER DETAIL

B1

B4

COOLING COIL CONDENSATE DRAIN DETAIL

CLEVIS HANGER

SINGLE HORIZONTAL RUN

WITHOUT INSULATION

CLEVIS HANGER

NOTE:

PROVIDE WITH VAPOR BARRIER

ON CHILLED WATER AND

DOMESTIC COLD WATER PIPING

HANGER

BOLT UNISTRUT TO EXISTING

WALL AND CONCRETE USING

EXPANSION ANCHOR BOLTS

MOUNT PIPING TO UNISTRUT

CALCIUM SILICATE

BLOCK

PROVIDE PIPE CLAMPS

WITH BOLTS AND NUTS

16 GA. ZINC COATED SHEET STEEL

SHIELD AT LEAST 12" LONG (TYP)

CALCIUM SILICATE

BLOCK

INSULATION WITH OR WITHOUT

VAPOR BARRIER

ATTACH TO ROOM

OVERHEAD STRUCTURE

SPRING TYPE ISOLATOR

FOR INSTALLATION NEAR

HOT WATER PUMPS

ATTACH TO EXISTING

CEILING

HANGER ROD

HEAVY DUTY

CLEVIS HANGER

PIPE

HANGER ROD

HEAVY DUTY

CLEVIS HANGER

SUPPORT NUT

LOCKING NUT

INSULATION

LOCKING NUT

SUPPORT NUT

PIPE

16 GAGE ZINC COATED

SHEET STEEL SHIELD

AT LEAST 12" LONG.

CALCIUM SILICATE BLOCK

F L O

W

A

IR

SCALE: NONE

LEADING AND

TRAILING

EDGE TO BE PARALLEL

WITH SIDE OF DUCT.

SINGLE THICKNESS

TURNING VANES

1" LONG MINIMUM

TRAILING EDGE

#10 x 3/4" SELF

TAPPING CADMIUM PLATED

SHEET METAL SCREWS TO

ANCHOR STRAPS TO DUCT.

ALL STRAPS TO BE TIGHT

AGAINST DUCT AND SUPPORT

MEMBERS. (TYPICAL)

SCALE: NONE

1"

1" x 18 GAUGE STRAP

HANGERS AT 8'-0"

SPACING.

1" x 18 GAUGE STRAP

HANGERS AT 8'-0"

SPACING.

NO POP RIVETS

ALLOWED

NOTES:

1. SEE SPECIFICATIONS FOR

SEISMIC RESTRAINT

REQUIREMENTS.

ATTACH SECURELY TO

STRUCTURE.

SCALE: NONE

45°

45° 45°

INSULATION WITH

OR WITHOUT

VAPOR BARRIER

CALCIUM SILICATE

BLOCK TYPICAL

PIPE

16 GA. ZINC COATED

SHEET STEEL SHIELD

AT LEAST 12" LONG.

HEAVY DUTY

CLEVIS HANGER

LOCKING NUT

SUPPORT NUT

HANGER ROD, ATTACH

TO OVERHEAD

STRUCTURE

CONNECT TO

STRUCTURE

HANGER

ROD

16 GA. ZINC COATED

SHEET STEEL SADDLE

AT LEAST 12" LONG.

HANGER ROD

VAPOR

BARRIER

INSULATION

PIPE

CONNECT TO

STRUCTURE

CONNECT TO

STRUCTURE

HANGER ROD, ATTACH

TO OVERHEAD

STRUCTURE

SUPPORT NUT

LOCKING NUT

HEAVY DUTY

CLEVIS HANGER

INSULATION WITH

OR WITHOUT

VAPOR BARRIER

MAX. 1/4" SLACK.

PULL HAND TIGHT

PRE-STRECHED, COLOR

CODED CERTIFIED BREAK

STRENGTH CABLE (2) CABLES

PER RESTRAINT PACKAGE

PIPE

16 GA. ZINC COATED

SHEET STEEL SHIELD

AT LEAST 12" LONG.

CALCIUM SILICATE

BLOCK TYPICAL

GRIP NAILS SHALL BE

INSTALLED BY AIR

HAMMER OR BY

AUTOMATIC FASTENER

EQUIPMENT.

INSULATED PINS, FASTENERS

OR GRIP NAILS.

SCALE: NONE

METAL FASTENERS

ENDS OF LINER SHALL BE

BUTTED FIRMLY TOGETHER.

ALL JOINTS, SEAMS, AND

TEARS SHALL BE COATED W/

ADHESIVE DURING

INSTALLATION.

MINIMUM OF 1-1/2" LINER.

SEE SPECIFICATION FOR

INSULATION REQUIREMENT

SHEET METAL

DUCT

TOP AND BOTTOM

SECTIONS OF LINER

SHALL OVERLAP THE

SIDES

DUCTLINER

ONE INCH THICK 1-1/2 LB

DENSITY FIBERGLASS.ALL ENDS OF LINER TO

BE COATED W/ ADHESIVE

NOT MORE THAN 2"

FROM EDGE OF LINER.

SCALE: NONE

DX COOLING

COIL

CAPPED

CLEANOUT

(TYPICAL)

VACUUM BREAKER OPEN

TO ATMOSPHERE

TO DRAIN.

SLOPE AT

1/4"/FT.

A L L I D

E A

S

D E

S

IG

N S

A

R R

A N

G E

M E

N T

S A

N D

P L A

N S

I N

D

IC

A T

E D

O R

R E

P R

E S

E N

T E

D B

Y T

H

IS

D R

A W

IN

G

A R

E O

W N

E D

B Y

A N

D T

H E

P R

O P

E R

T Y

O F

W H

W E

N G

IN

E

E R

IN

G

I N

C

A N

D W

E R

E C

R E

A T

E D

E

V O

L V

E D

A

N D

D E

V E

L O

P E

D F

O R

U S

E O

N A

N D

I N

C O

N N

E C

T

IO

N W

IT

H

T H

E S

P E

C

IF

IE

D

P R

O J E

C T

N

O N

E O

F T

H E

I D

E A

S

D E

S

IG

N S

A

R R

A N

G E

M E

N T

S O

R P

L A

N S

S H

A L L B

E U

S E

D B

Y O

R D

IS

C

L O

S E

D T

O A

N Y

P E

R S

O N

F

IR

M

O

R C

O R

P O

R A

T

IO

N F

O R

A N

Y P

U R

P O

S E

W H

A T

S O

E V

E R

W

IT

H O

U T

W R

IT

T

E N

C O

N S

E N

T O

F W

G

IN

E

E R

IN

G

I N

C

W R

IT

T

E N

D

IM

E N

S

IO

N S

O N

T H

E S

E D

R A

W

IN

G S

S H

A L L H

A V

E P

R E

C E

D E

N C

E O

V E

R S

C A

L E

D

IM

E N

S

IO

N S

C

O N

T R

A C

T O

R S

S H

A L L V

E R

IF

Y

A N

D B

E R

E S

P O

N S

IB

L E

F O

R A

L L D

IM

E

N S

IO

N

S A

N D

C O

N D

IT

IO

N S

O N

T H

E J

O B

A N

D T

H

IS

O F

F

IC

E M

U S

T B

E N

O T

IF

IE

D O

F A

N Y

V A

R

IA

T

IO

N F

R O

M T

H E

D

IM

E N

S

IO

N S

A N

D C

O N

D

IT

IO

N

S S

H O

W N

B Y

T H

E S

E D

R A

W

IN

G S

W

A R

N

IN

G

R E

P R

O D

U C

T

IO

N H

E R

E O

F I S

A C

R

IM

IN

A

L O

F F

E N

S E

U N

D E

R

U

.S .C

S

E C

U N

A U

T H

O R

IZ

E

D D

IS

C

L O

S U

R E

M A

Y C

O N

S T

IT

U

T E

T R

A

C R

E T

M

IS

A P

P R

O P

R

IA

T

IO

N I N

V

IO

L A

T

IO

N O

F I .C

.2 -2

-3 -1

E T

S

E Q

A

N D

O T

H E

R L

A W

S

1 2 3 4 5

D

C

B

A

1 2 3 4 5

D

C

B

A

CONSULTANTS

CODE REVIEW STAMP

PROJECT NAME & ADDRESS

MARK DATE REVISION

PROJECT MANAGER:

DRAWN BY:

CHECKED BY:

DATE:

WHW PROJECT NUMBER:

11/04/26STAFF

CL

11/04/2026

26072

CL

MECHANICAL DETAILS

ME501

SUU AFEC Air Handlers

DFCM#27052730

AMERICA FIRST EVENT CENTER, 351 W

CENTER ST, CEDAR CITY, UT 84720

DIVISION OF FACILITIES

CONSTRUCTION AND

MANAGEMENT

Jason Van Ausdal

11/24/2026

6 2

6 2

6 2

M

IN

(R

O O

F S

U R

F A

C E

T O

F A

S T

E N

E R

S

N A

IL

E

R S

S

H

IM

S T

O M

A T

C H

IN

S

U L A

T

IO

N D

E P

T H

M

IN

T

O T

O P

O F

C U

R B

18"

MIN.

(CURB TO

PENETRATION

TYP.)

M

COIL WITH CIRC. PUMP

C1

C3

ROOF MOUNTED EXHAUST FAN DETAIL

HOUSEKEEPING PAD

B4

AIR HANDLING UNIT DETAILC4

EQUIPMENT CURB

A2

SIZE CONTROL VALVE FOR 3 PSI PRESSURE

DROP.

BALANCE BYPASS FLOW TO 50% OF COIL

FLOW DURING FULL BYPASS.

CHWS

CHWR

PROVIDE ISOLATION VALVES AS SHOWN.

(TYPICAL)

COIL CIRC. PUMP

1/2" AIR VENT AND COIL DRAINS. (TYP.)3/4"

SCALE: NONE

PROVIDE VENTED P-TRAP

TO DRAIN

3/4"

1/2" AIR VENT AND COIL DRAINS. (TYP.)

PROVIDE VENTED P-TRAP

TO DRAIN

3/4"

SCALE: NONE

DUCT AS REQUIRED. SEE

PLANS

WOOD ROOF CURB

SUPPORT BY MECH. CONT.

EQUAL TO INSULATION

THICKNESS

PRE-FABRICATED ROOF

CURB WOOD NAILER

ROOF MOUNTED EXHAUST

FAN OR VENT

1/4" THICK SPONGE

RUBBER GASKET ALL

AROUND

ANCHOR HOOD TO

CURB

ROOF MEMBRANE

NOTE:

MECHANICAL EQUIPMENT TO

SET LEVEL. ORDER CURB TO

COMPENSATE FOR ROOF SLOPE

ROOF DECK

FRAMING AROUND OPENING

GRAVITY DAMPER

SCALE: NONE

6" MIN.

-1

/2

NOTE:

PAD DIMENSION SHALL EXTEND 6"

BEYOND EQUIPMENT BASES IN ALL

DIRECTIONS.

#4 DOWELS EPOXY GROUTED

INTO EXISTING CONCRETE FLOOR

AT 24" O.C. 4" FROM EDGE (TYP.)

NEW HOUSEKEEPING PAD

PAD SHALL BE LEVEL AS

POSSIBLE FOR THE

PLACEMENT OF NEW

EQUIPMENT

#4 BARS AT 12"

O.C. BOTH WAYS

NEW HOUSEKEEPING PADS

SHALL BE 4" THICK OR MEET

HEIGHT OF EXISTING PAD.

EXISTING CONCRETE FLOOR

DIMENSION IS DEPENDENT ON

EXISTING FLOOR DEPTH. NEW

DOWELS SHALL FIT A MINIMUM OF

2/3 RD'S INTO SLAB.

EPOXY PAINT EQUIPMENT PAD

PRIOR TO PLACING NEW EQUIPMENT

SCALE: NONE

FAN SECTION MIXING BOX

/ FILTER BOX

FLEX

CONN.

RETURN AIR

MOUNT ON

VIBRATION

ISOLATORS

4" HOUSE KEEPING

PAD BY GENERAL

CONTRACTOR

COOLING COIL

MODULE

ROOF DECK -

VARIES BY PROJECT

RIGID

INSULATION -

VARIES BY

PROJECT

ROOFING MEMBRANE -

VARIES BY PROJECT

SEAM PLATE AND

FASTENERS AT 12" O.C.

- FASTEN INTO STUDS

FULLY ADHERED

MEMBRANE - RUN

MEMBRANE OVER TOP OF

CURB AS SHOWN AND NAIL

OFF AT 6" O.C. ON INSIDE

OF CURB

DUCTED MECHANICAL EQUIPMENT

(EQUIPMENT VARIES) - FASTEN TO SIDE OF

CURB W/ MIN. OF 2 HIGH-DOMED, CAPPED,

GASKETED FASTENERS PER SIDE - NOTE THAT

NON-DUCTED MECHANICAL EQUIPMENT SHALL

USE THE "ELEVATED EQUIPMENT PLATFORM"

DETAIL IN LIEU OF THIS CURB DETAIL

NOTE THAT IS CURB CONSTRUCTION IS EXISTING, THE

CONTRACTOR IS RESPONSIBLE FOR MODIFYING / RAISING

THE CURB AS REQUIRED TO ACHIEVE THE MIN. DIMENSIONS

INDICATED (FROM THE FINISHED ROOF SURFACE TO

FASTENERS AND TOP OF CURB) - IN SUCH CASES, LICENSED

MECHANICAL & ELECTRICAL CONTRACTORS MUST PERFORM

ALL REQUIRED CHANGES TO MECHANICAL EQUIPMENT / LINE

SETS/ ELECTRICAL WIRING & CONNECTIONS ETC.

NOTE: CURB MUST BE

CONSTRUCTED SO TOP IS LEVEL

NOTE: ALL GAPS BETWEEN DUCT

& CURB ARE TO BE FILLED IN

WITH INSULATION THAT IS

EQUIVALENT TO THE R-VALUE OF

THE ROOF SYSTEM

PRESERVATIVE TREATED

2X FRAMING / SHIMS

FLEXIBLE ELECTRICAL LINES ARE TO ENTER

BUILDIN…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .