DEP#1 to Main Substation Electric Circuit
Closed State & local contract opportunity Posted
- Solicitation number
- 49979815
- State
- Georgia
- Responses due
Opportunity facts
- Jurisdiction
- NIGP codes
- UNSPSC codes
- 72121300 Automotive garage and service station construction services
- 72121400 Specialized public building construction services
- 72111004 Patio and deck construction and repair service
- 72121302 Automotive service station construction service
- 95121502 Parking structure
- 95121710 Rescue service station
- 95121517 Crematorium
- 72153101 Bowling alley installation service
- 95121513 Bank
- 95121610 Tramway platform
Show all 28
- 72151522 Electrical luminary service
- 72121301 Automotive garage construction service
- 72121404 Post office construction service
- 72121407 Mausoleum construction service
- 95121809 Movable weir
- 95121812 Floating structure
- 95121512 Waterside leisure facility
- 95121808 Oil or gas platform
- 95121609 Tramway depot
- 95121709 Coastguard building
- 95121713 Prehistoric monument
- 95121510 Garden
- 95121708 Lifeboat station
- 95121707 Mountain rescue building
- 76111602 Air duct cleaning
- 72151500 Electrical system services
- 72151524 Industrial electrical service
- 72151501 Lighting installation services
- Point of contact
-
- Melissa Chiz mchiz87@uga.edu (706) 542-0965
Opportunity details come from ssl.doas.state.ga.us. Updated .
About this opportunity
The Board of Regents of the University System of Georgia is seeking sealed bids from State of Georgia Licensed Electrical Utility Contractors for the construction of an electric circuit connecting District Energy Plant #1 (Building No. 0741) to the Main Substation at the University of Georgia in Athens, Georgia. The project requires the design and installation of electrical infrastructure to facilitate power distribution from the energy plant to the main substation. Bidders must be State of Georgia licensed electrical utility contractors and are required to attend a mandatory Pre-Bid Conference and Walk-thru scheduled for May 27, 2014, from 1:30 p.m. to 3:00 p.m. at the District Energy Plant location (185 South Newton Street, Athens, GA 30602). Sealed bids must be physically time-stamped and submitted by 2:00 p.m. Legally Prevailing Time on June 12, 2014, in Room #301 of the University of Georgia Procurement Office, Business Services Building, 424 East Broad Street, Athens, Georgia 30602. Bidding documents are available free of charge through the Georgia Procurement Registry website, and all project addenda will be posted exclusively on that platform. The project completion deadline is December 12, 2014. Prospective bidders may contact Mike Jewell, Project Superintendent, at (706) 255-4911 or via email at steven53@uga.edu for additional information.
The procurement documents do not specify particular set-asides for disadvantaged enterprises or restrictions on bidder eligibility beyond the requirement for State of Georgia licensure as an electrical utility contractor. No incumbent vendors, current contractors, or specific existing infrastructure integration requirements are identified in the bid announcement. The contract notice does not include a stated award value or budget range for this project.
Opportunity text
Addendum Two added 6/5/14. Bid date remains the same. Addendum One added 5/29/14. Bid date remains the same. The Board of Regents of the University System of Georgia, Owner, will receive sealed bids from State of Georgia Licensed Electrical Utility Contractors in Room #301, University of Georgia, Procurement Office, Business Services Building, 424 East Broad Street, Athens, Georgia 30602. Bids must be physically time stamped and turned in by 2:00pm Legally Prevailing Time in Athens, Georgia on June 12, 2014 for the construction of District Energy Plant #1 (Bldg. No. 0741) to Main Substation Electric Circuit for the University of Georgia located in Athens, Georgia. At the time and place noted above, the bids will be publicly opened and announced. Bidding documents may also be obtained, free of charge, at the Georgia Procurement Registry website: http://ssl.doas.state.ga.us/PRSapp/PR_index.jsp . All Addenda for this project will be located exclusively on the Georgia Procurement Registry. Bidders are cautioned that acquisition of Bidding Documents through any other source is not advisable. Acquisition of Bidding Documents from unauthorized sources places the bidder at risk of receiving incomplete or inaccurate information upon which to base a bid. There will be a Pre-Bid Conference and Walk-thru held on May 27, 2014 at 1:30-3:00pm, at the District Energy Plant #1 (Bldg. No. 0741, located at: 185 South Newton St., Athens, GA 30602. Please contact Mike Jewell, Project Superintendent at (706) 255 4911 or via E-mail at steven53@uga.edu. Attendance at this conference is MANDATORY for any Contractor intending to bid on this project. Others may attend if they so desire. Completion by December 12, 2014
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity