About this opportunity
The Town of Simsbury, Connecticut is soliciting sealed bids for construction of the Curtiss Park Trail under Bid No. E26-01 (State Project No. 128-158), with bids due and opening November 24, 2026 at 2:00 p.m. Eligibility requires Connecticut Department of Transportation contractor prequalification, which Addendum No. 1 confirmed applies rather than DAS prequalification. The project is federally aided (Federal Aid Project No. 0315(001)) and funded through the Transportation Alternatives Program administered by CT DOT.
The scope covers approximately 3,000 linear feet of bituminous concrete multi-use trail along the north side of Tariffville Road, crossing an existing sidewalk on the Tariffville Road bridge over the Farmington River, and ending at Curtiss/Pattison Parks, with a boardwalk section within and adjacent to riparian wetlands. Addendum No. 1 adds clearing and grubbing, a temporary waste stockpile area, concrete sidewalks and ramps, stone curbing, metal beam guardrail, a pervious paver walkway, removable bollards, erosion and sedimentation controls, and landscape plantings. Addendum No. 3, the most recent amendment, increased Earth Excavation (Item 0202000) to 1,172 cubic yards and Disposal of Controlled Materials (Item 0202315A) to 1,710 tons, and bidders must use the revised Bid Form. Disposal is limited to CT DOT-approved facilities, and all surplus material, including topsoil, is treated as Controlled Material. The bid form lists approximately 80 line items. Bidders must furnish bid surety, performance and payment bonds, insurance, labor and DBE documentation, and certifications. The DBE participation goal is zero percent (0%), and contractors must comply with prevailing wage and nondiscrimination requirements.
The Town will award to the lowest responsive and responsible bidder. Contract execution is scheduled for December 8, 2026, with work commencing April 1, 2027, substantial completion by October 28, 2027, and final completion by November 5, 2027. Addendum No. 2 closed bid-process questions, and the non-mandatory virtual site visit was scheduled for October 27, 2026.
Opportunity text
The project will include the construction of approximately 3,000 linear feet bituminous concrete multi-use trail which will run along the north side of Tariffville Road, over an existing sidewalk on the Tariffville Road bridge crossing the Farmington River, to Curtiss/Pattison Parks. A boardwalk section will be constructed within and adjacent to wetlands within the Farmington River riparian corridor.