Bid No. E26-01 State Project No. 128-158 Curtiss Park Trail Addendum No. 3.pdf

PDF 561 KB Posted

Attached to
Curtiss Park Trail State Project No. 128-158
Solicitation number
39428a
Issued by
Hartford County, Connecticut

About this file

Addendum No. 3 to Bid No. E26-01 is an amendment to the contract documents for the Curtiss Park Multi-Use Trail project in Simsbury, Connecticut, issued by the Department of Public Works on November 19, 2026. The project, identified as State Project No. 128-158 and Federal Aid Project No. 0315(001), involves construction of a multi-use trail with associated infrastructure improvements including boardwalk, sidewalks, pervious paver walkways, stone curbing, landscaping, and site restoration. The addendum addresses bidder questions regarding material handling and sourcing and revises two critical bid item quantities: Earth Excavation (Item 0202000) increased to 1,172 cubic yards and Disposal of Controlled Materials (Item 0202315A) increased to 1,710 tons, reflecting previously unaccounted excavation quantities. Bidders must reference the revised Bid Form issued with this addendum for corrected quantities.

The addendum clarifies that all surplus material, including existing topsoil, must be handled as Controlled Material in accordance with contract specifications, with all associated costs for stripping, handling, transportation, and disposal included in applicable bid items. For boardwalk aluminum components, the owner and engineer make no representation regarding specific suppliers, stock lengths, or material waste; contractors are responsible for verifying material availability and accounting for all procurement, fabrication, cutting, fit-up, and normal waste costs in their bids. The bid proposal form lists approximately 80 line items spanning site preparation, excavation, drainage, concrete and asphalt work, landscaping, traffic control, and miscellaneous construction services, with estimated project duration of seven months based on the Construction Field Office line item.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF PUBLIC WORKS

Bid No. 26-01 Curtiss Park Trail State Project #0128-0158

Addendum No. 3 Federal Aid Project #0315(001)

November 19, 2026 Page 1

Addendum No. 1

DATE: November 19, 2026

RE: Bid No. E26-01

State Project No. 128-158

Federal Aid Project #0315(001)

Curtiss Park Multi-Use Trail

Simsbury, Connecticut

The following information is hereby made to the contract drawings and specifications for State

Project 128-158 Curtiss Park Multi-Use Trail, Federal Aid Project No. 0315(001) dated October

2026. This Addendum No. 3 includes questions and answers to the bid solicitation for the above-referenced project:

Questions and Answers

Q1: Is the existing topsoil along the trail considered a controlled material and required to be disposed of as such? Has the quantity of topsoil striping been included in the “Earth Excavation” bid item? Based on the areas of the trail, topsoil locations, and pervious pavers, the removal of the existing topsoil has not been included in the earth excavation item.

R1: All surplus material, including existing topsoil, that is removed from the project and not reused on-site shall be considered Controlled Material and handled in accordance with Item

No. 0202315A, Disposal of Controlled Materials. The Earth Excavation item includes removal of the existing topsoil layer within the limits of earth excavation. No separate payment will be made for topsoil stripping, whether within or outside the limits of excavation. Costs associated with stripping, handling, transportation, and disposal of surplus Controlled

Material shall be included in the applicable contract bid items.

Subsequent review of the quantity calculations identified that excavation associated with the proposed trail was not fully accounted for in the original estimate. As a result, the quantities for Item No. 0202000, Earth Excavation, and Item No. 0202315A, Disposal of Controlled

Materials, have been revised. The updated quantities are as follows:

• 0202000 – Earth Excavation: 1,172 CY

• 0202315A – Disposal of Controlled Materials: 1,710 Tons

Bidders shall refer to the revised Bid Form issued with Addendum No. 3 for the corrected quantities.

Bid No. 26-01 Curtiss Park Trail State Project #0128-0158

Addendum No. 3 Federal Aid Project #0315(001)

November 19, 2026 Page 2

Q2: The boardwalk details and specifications call out aluminum joists, beams, and railing components. During the design process was a source of materials investigated? If so, could a list of suppliers be provided? I have found that some of the elements of the design (2x6 joists) come in certain specific lengths that would then need to be cut down to the correct size adding a 25% to 30% waste which would increase the overall cost of the boardwalk.

R2: During the design phase, the feasibility of obtaining the specified aluminum structural members was evaluated; however, no specific supplier was designated, and no proprietary products are required. Bidders shall base their bids on commercially available aluminum members that satisfy the requirements of the contract documents. Contractors shall assume that aluminum joists, beams, railing components, and associated hardware are available through standard industry suppliers and fabricators. Members may require cutting, fabrication, splicing, or other modifications to achieve the dimensions shown on the plans. All costs associated with material procurement, fabrication, handling, cutting, fit-up, and normal waste shall be included in the applicable contract bid items. Contractors are responsible for verifying material availability, stock lengths, lead times, and suitability of their selected products and shall account for all associated costs in their bids. The Owner and Engineer make no representation regarding specific suppliers, stock lengths, fabrication capabilities, material yields, or quantities of waste.

THIS ENDS ADDENDUM NO. 3

Bid No. E26-01 State Project #0128-0158

Federal Aid Project #0315(001)

0101128A Securing, Construction, and Dismantling of a Waste Stockpile and Treatment Area at________________________________________ dollars and________________________________________ cents per lump sum.

1 LS ________________ ________________________________

0107090A CTDOT Boundary Marker (Survey Monument) at________________________________________ dollars and________________________________________ cents per each.

1 EA ________________ ________________________________

0201001A Clearing and Grubbing at________________________________________ dollars and________________________________________ cents per lump sum.

1 LS ________________ ________________________________

0202000 Earth Excavation at________________________________________ dollars and________________________________________ cents per cubic yard.

1172 CY ________________ ________________________________

0202100 Rock Excavation at________________________________________ dollars and________________________________________ cents per cubic yard.

40 CY ________________ ________________________________

0202315A Disposal of Controlled Materials at________________________________________ dollars and________________________________________ cents per ton.

1710 TON ________________ ________________________________

0202452A Test Pit at________________________________________ dollars and________________________________________ cents per each.

3 EA ________________ ________________________________

0202512 Cut Concrete Sidewalk at________________________________________ dollars and________________________________________ cents per linear foot.

50 LF ________________ ________________________________

0202529 Cut Bituminous Concrete Pavement at________________________________________ dollars and________________________________________ cents per linear foot.

1025 LF ________________ ________________________________

0202909A Archaeologist at________________________________________ dollars and________________________________________ cents per day.

10 DAY ________________ ________________________________

0202910A Herpetologist at________________________________________ dollars and________________________________________ cents per hour.

80 HR. ________________ ________________________________

0203000 Structure Excavation - Earth (Complete) at________________________________________ dollars and________________________________________ cents per cubic yard.

20 CY ________________ ________________________________

BID PROPOSAL FORM

TOWN OF SIMSBURY

CURTISS PARK CONNECTION MULTI-USE TRAIL PROJECT

STATE PROJECT #0128-0158

The Contractor shall provide unit prices for the following items which may be associated with the Base Bid.

ITEM NO. DESCRIPTION AND WRITTEN UNIT PRICE

ESTIMATED

QUANTITY

UNIT COST ($) TOTAL COST ($)

FEDERAL AID PROJECT #0315(001)

BF-1 Addendum No. 3

Federal Aid Project #0315(001)

ITEM NO. DESCRIPTION AND WRITTEN UNIT PRICE

ESTIMATED

QUANTITY

UNIT COST ($) TOTAL COST ($)

0203100 Structure Excavation Rock (Complete) at________________________________________ dollars and________________________________________ cents per cubic yard.

5 CY ________________ ________________________________

0204401A Handling Water (Site No. 1) at________________________________________ dollars and________________________________________ cents per lump sum.

1 LS ________________ ________________________________

0207000 Borrow at________________________________________ dollars and________________________________________ cents per cubic yard.

100 CY ________________ ________________________________

0209001 Formation of Subgrade at________________________________________ dollars and________________________________________ cents per square yard.

2500 SY ________________ ________________________________

0210821A Water Pollution Control at TWELVE THOUSAND dollars and ZERO cents per estimate.

12000 Est. $1 $12,000

0211000 Anti-Tracking Pad at________________________________________ dollars and________________________________________ cents per square yard.

50 SY ________________ ________________________________

0212000 Subbase at________________________________________ dollars and________________________________________ cents per cubic yard.

550 CY ________________ ________________________________

0219001 Sedimentation Control System at________________________________________ dollars and________________________________________ cents per linear foot.

3000 LF ________________ ________________________________

0219011A Sedimentation Control System at Catch Basin at________________________________________ dollars and________________________________________ cents per each.

2 EA ________________ ________________________________

0304002 Processed Aggregate Base at________________________________________ dollars and________________________________________ cents per cubic yard.

450 CY ________________ ________________________________

0305001 Processed Aggregate at________________________________________ dollars and________________________________________ cents per cubic yard.

35 CY ________________ ________________________________

0406005A Pavement Repair at________________________________________ dollars and________________________________________ cents per square yard.

50 SY ________________ ________________________________

0406172 HMA S0.375 at________________________________________ dollars and________________________________________ cents per ton.

400 TON ________________ ________________________________

BF-2 Addendum No. 3

Federal Aid Project #0315(001)

ITEM NO. DESCRIPTION AND WRITTEN UNIT PRICE

ESTIMATED

QUANTITY

UNIT COST ($) TOTAL COST ($)

0406238 Non-Tracking Asphalt Tack Coat at________________________________________ dollars and________________________________________ cents per gallon.

250 Gal ________________ ________________________________

0406303 Sawing and Sealing Joints at________________________________________ dollars and________________________________________ cents per linear foot.

170 LF ________________ ________________________________

0406999A Asphalt Adjustment Cost at TWO THOUSAND FIVE HUNDRED dollars and ZERO cents per estimate.

2500 Est. $1 $2,500

0506703A Stone Steps at________________________________________ dollars and________________________________________ cents per lump sum.

1 LS ________________ ________________________________

0601064 Abutment and Wall Concrete at________________________________________ dollars and________________________________________ cents per cubic yard.

10 CY ________________ ________________________________

0602030 Deformed Steel Bars - Galvanized at________________________________________ dollars and________________________________________ cents per pound.

1250 LBS ________________ ________________________________

0652009 12" R.C. Culvert End at________________________________________ dollars and________________________________________ cents per each.

1 EA ________________ ________________________________

0686000.12 12'' R.C. Pipe - 0' - 10' Deep at________________________________________ dollars and________________________________________ cents per linear foot.

33 LF ________________ ________________________________

0702102A Helical Pile with a Direct Inline Electronic Torque Meter at________________________________________ dollars and________________________________________ cents per linear foot.

1320 LF ________________ ________________________________

0813001 5" Granite Stone Curbing at________________________________________ dollars and________________________________________ cents per linear foot.

50 LF ________________ ________________________________

0813011 5" Granite Curved Stone Curbing at________________________________________ dollars and________________________________________ cents per linear foot.

75 LF ________________ ________________________________

0813451 Granite Stone Transition Curbing at________________________________________ dollars and________________________________________ cents per linear foot.

25 LF ________________ ________________________________

BF-3 Addendum No. 3

Federal Aid Project #0315(001)

ITEM NO. DESCRIPTION AND WRITTEN UNIT PRICE

ESTIMATED

QUANTITY

UNIT COST ($) TOTAL COST ($)

0815001 Bituminous Concrete Lip Curbing at________________________________________ dollars and________________________________________ cents per linear foot.

375 LF ________________ ________________________________

0901006A Removable Bollard at________________________________________ dollars and________________________________________ cents per each.

1 EA ________________ ________________________________

0910025 Metal Beam Rail Terminal Element at________________________________________ dollars and________________________________________ cents per each.

2 EA ________________ ________________________________

0910173 R-B 350 Bridge Attachment Vertical Shape Parapet at________________________________________ dollars and________________________________________ cents per each.

1 EA ________________ ________________________________

0910300 Metal Beam Rail (R-B Mash) at________________________________________ dollars and________________________________________ cents per linear foot.

375 LF ________________ ________________________________

0912503 Remove Metal Beam Rail at________________________________________ dollars and________________________________________ cents per linear foot.

460 LF ________________ ________________________________

0921001 Concrete Sidewalk at________________________________________ dollars and________________________________________ cents per square foot.

1525 SF ________________ ________________________________

0921005 Concrete Sidewalk Ramp at________________________________________ dollars and________________________________________ cents per square foot.

725 SF ________________ ________________________________

0921043A Pervious Paver Walkway at________________________________________ dollars and________________________________________ cents per square foot.

825 SF ________________ ________________________________

0921048 Detectable Warning Surface at________________________________________ dollars and________________________________________ cents per square foot.

100 SF ________________ ________________________________

0922106A Boardwalk (Site No. 1) at________________________________________ dollars and________________________________________ cents per lump sum.

1 LS ________________ ________________________________

0922500 Bituminous Concrete Driveway (Commerical) at________________________________________ dollars and________________________________________ cents per square yard.

340 SY ________________ ________________________________

0944000 Furnishing and Placing Topsoil at________________________________________ dollars and________________________________________ cents per square yard.

4125 SY ________________ ________________________________

BF-4 Addendum No. 3

Federal Aid Project #0315(001)

ITEM NO. DESCRIPTION AND WRITTEN UNIT PRICE

ESTIMATED

QUANTITY

UNIT COST ($) TOTAL COST ($)

0949310A Nyssa Sylvatica, Black Gum, 1 1/2" CAL. B.B.

at________________________________________ dollars and________________________________________ cents per each.

4 EA ________________ ________________________________

0949799A Plantanus Occidentalis, London Plane Tree, 1 1/2" CAL. B.B.

at________________________________________ dollars and________________________________________ cents per each.

4 EA ________________ ________________________________

0949862A Acer Saccharinum, Silver Maple, 1 1/2" CAL. B.B.

at________________________________________ dollars and________________________________________ cents per each.

5 EA ________________ ________________________________

0949606A Root Barrier at________________________________________ dollars and________________________________________ cents per linear foot.

400 LF ________________ ________________________________

0950013 Erosion Control Matting at________________________________________ dollars and________________________________________ cents per square yard.

480 SY ________________ ________________________________

0950019A Turf Establishment - Lawn at________________________________________ dollars and________________________________________ cents per square yard.

1525 SY ________________ ________________________________

0950040A Conservation Seeding for Slopes at________________________________________ dollars and________________________________________ cents per square yard.

3000 SY ________________ ________________________________

0950041A New England Wetmix for Wetland Restoration at________________________________________ dollars and________________________________________ cents per square yard.

100 SY ________________ ________________________________

0969060 Construction Field Office (Small) at________________________________________ dollars and________________________________________ cents per month.

7 MO ________________ ________________________________

0970006 Trafficperson (Municipal Police Officer) at ONE HUNDRED EIGHT THOUSAND dollars and ZERO cents per estimate.

108000 Est. $1 $108,000

0970007 Trafficperson (Uniformed Flagger) at________________________________________ dollars and________________________________________ cents per hour.

1200 HR. ________________ ________________________________

0971001A Maintenance and Protection of Traffic at________________________________________ dollars and________________________________________ cents per lump sum.

1 LS ________________ ________________________________

0975002 Mobilization and Project Closeout at________________________________________ dollars and________________________________________ cents per lump sum.

1 LS ________________ ________________________________

BF-5 Addendum No. 3

Federal Aid Project #0315(001)

ITEM NO. DESCRIPTION AND WRITTEN UNIT PRICE

ESTIMATED

QUANTITY

UNIT COST ($) TOTAL COST ($)

0976002 Barricade Warning Lights - High Intensity at________________________________________ dollars and________________________________________ cents per day.

2100 DAY ________________ ________________________________

0978002 Traffic Drum at________________________________________ dollars and________________________________________ cents per each.

35 EA ________________ ________________________________

0979003 Construction Barricade Type III at________________________________________ dollars and________________________________________ cents per each.

10 EA ________________ ________________________________

0980001 Construction Staking at________________________________________ dollars and________________________________________ cents per lump sum.

1 LS ________________ ________________________________

0981100 42" Traffic Cone at________________________________________ dollars and________________________________________ cents per each.

35 EA ________________ ________________________________

1117111A Rectangular Rapid Flashing Beacon (RRFB) Type B at________________________________________ dollars and________________________________________ cents per each.

2 EA ________________ ________________________________

1206023A Removal and Relocation of Existing Signs at________________________________________ dollars and________________________________________ cents per lump sum.

1 LS ________________ ________________________________

1208931A Sign Face - Sheet Aluminum (Type IX Retroreflective Sheeting) at________________________________________ dollars and________________________________________ cents per square foot.

20 SF ________________ ________________________________

1208937A Sign Face - Sheet Aluminum (Type XI Retroreflective Sheeting) at________________________________________ dollars and________________________________________ cents per square foot.

90 SF ________________ ________________________________

1210105 Epoxy Resin Pavement Markings, Symbols and Legends at________________________________________ dollars and________________________________________ cents per square foot.

150 SF ________________ ________________________________

1211001 Removal of Pavement Markings at________________________________________ dollars and________________________________________ cents per square foot.

3 SF ________________ ________________________________

1220027A Construction Signs at________________________________________ dollars and________________________________________ cents per square foot.

75 SF ________________ ________________________________

1302061A Adjust Gate Box (Water) at________________________________________ dollars and________________________________________ cents per each.

3 EA ________________ ________________________________

BF-6 Addendum No. 3

Federal Aid Project #0315(001)

ITEM NO. DESCRIPTION AND WRITTEN UNIT PRICE

ESTIMATED

QUANTITY

UNIT COST ($) TOTAL COST ($)

TOTAL OF ALL PROJECT BASE BID ITEMS: $__________________________________________

WRITTEN _________________________________________________________________ DOLLARS

AND __________________________________________________________________ CENTS

BF-7 Addendum No. 3

File details come from the government source that posted it. Updated .