This is an Addendum No. 1 to Bid No. E26-01 for State Project No. 128-158, issued by the Department of Public Works for the Town of Simsbury, Connecticut, involving the Curtiss Park Multi-Use Trail project with Federal Aid Project No. 0315(001). The addendum addresses eleven questions and answers clarifying specifications and drawings for the construction of a multi-use trail connecting from Hopmeadow Street (Route 10) to Curtiss and Pattison Parks via Tariffville Road (Route 315). Key project components include clearing and grubbing, earth and rock excavation, construction of a temporary waste stockpile area, installation of bituminous concrete trail surface, concrete sidewalks and ramps, stone curbing, metal beam guardrail, bridge attachment elements, pervious paver walkway, removable bollards, signage, pavement markings, erosion and sedimentation control systems, and landscape plantings. The bid proposal includes estimated quantities across multiple line items, ranging from 1 lump sum for the waste stockpile area construction to 4,125 square yards for topsoil furnishing and placement, with quantities specified for approximately 60 distinct construction items. The addendum, dated November 4, 2026, provides revised bid proposal forms and updated contract drawings to clarify specifications and address bidder inquiries regarding material specifications, dimensions, design requirements, and billing units.
The addendum clarifies several critical pricing and specification issues, including changing the billing unit for Disposal of Controlled Materials from cubic yards to tons to reflect actual disposal facility tracking methods, confirming that Connecticut Department of Transportation (CT DOT) contractor prequalification is required rather than DAS prequalification, and specifying that disposal must utilize only CT DOT-approved facilities listed in the project specifications. Material specifications were revised to require 12-inch reinforced concrete culvert pipe and ends instead of polyethylene alternatives, and the waste stockpile area was clarified as requiring only a single surrounding of concrete blocks rather than an internal dividing row. The addendum confirms that gates are not required at the waste stockpile area opening, with alternative security measures to be considered by the Town. Additionally, a fixed estimate of $108,000 for Municipal Police Officer traffic control services was clarified to reflect a single estimate rather than a quantity multiplier, and the bid proposal form for item 0970006 was revised accordingly. No incumbent contractor, set-asides, or specific funding sources are identified in this addendum, which serves primarily as a clarification document to the original October 2026 bid solicitation.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF PUBLIC WORKS
Bid No. 26-01 Curtiss Park Trail State Project #0128-0158
Addendum No. 1 Federal Aid Project #0315(001)
November 3, 2026 Page 1
Addendum No. 1
DATE: November 4, 2026
RE: Bid No. E26-01
State Project No. 128-158
Federal Aid Project #0315(001)
Curtiss Park Multi-Use Trail
Simsbury, Connecticut
The following information is hereby made to the contract drawings and specifications for State
Project 128-158 Curtiss Park Multi-Use Trail, Federal Aid Project No. 0315(001) dated October
2026. This Addendum No. 1 includes questions and answers to the bid solicitation for the above-referenced project:
Questions and Answers
Q1: For the Waste Stockpile Area shown on drawings 14 and 15. The dimension shown on drawing
14 is 72’ x 70’. Is that the dimension of the asphalt and everything is built inside that? Or is that the interior dimension required inside the blocks after the area is constructed.
R1: The Waste Stockpile Area (WSA) of 72’ x 70’ is an approximate size and configuration. This
WSA size and configuration may vary slightly due to field conditions but is approximated in the area identified on new Sheet 14-1.A1. Sheet 14 shall be replaced with Sheet 14-1.A1 and is included in this addendum.
Q2: Section B-B on drawing 15 leads me to believe a row of mafia blocks will be required down the center sort of creating 2 separate stockpiles? Is that the intention? As it will add the need for approximately 65 – 70 additional blocks? Or is just one sufficient?
R2: One single surrounding of concrete blocks surrounding the WSA shall be utilized. An additional row within the WSA as depicted on Section B-B on Sheet 15 is not required. Sheet 15 has been revised and is included in this addendum.
Q3: On page 15 it calls for gates. Are gates and fencing really required at the opening to this? If so, we’d probably need to span the opening with fence and have 2 – 24’ wide swing gates?
November 4, 2026 Page 2
R3: The gate is not required as part of the WSA. Alternative measures to secure the area will be considered by the Town. Specification 0101128A – Securing, Construction, and Dismantling of a Waste Stockpile and Treatment Area has been revised and is included with this addendum.
Q4: On the bid form page 5. Item 0970006 Trafficperson (Municipal Police Officer) has estimated quantity of $108,000 and unit cost of $108,000 with total of $108,000. I believe the estimated quantity should be 1 estimate. Unit cost $108,000 and total $108,000.
R4: The bid proposal form has been revised, and replacement pages are included with this addendum.
Q5: The bid documents specifically request a DAS Contractor Prequalification Certificate. Can you confirm that DAS prequalification is sufficient to bid and be awarded this project, and that
CTDOT contractor prequalification is not required?
R5: CT DOT contractor prequalification is required. All references to DAS prequalification shall be modified to CT DOT prequalification. Page 6 of the Bid Proposal has been revised and the replacement page is included with this addendum.
Q6: Is there an engineer/office estimate for this project?
R6: An estimate is not currently publicly available. Estimated quantities for all estimated items are provided in the bid proposal form.
Q7: Bid form calls for 12” Polyethylene Culvert End and drawings call for 12” CCP. Can this material be HDPE (High Density Polyethylene) or should it be concrete or other?
R7: Item #0651686 – 12” Polyethylene Culvert End and Item #0686230.12 – 12” High Density
Polyethylene Pipe 0’-10’ Deep shall be deleted and replaced with Item #0652009 – 12” R.C.
Culvert End and Item #0686000.12 – 12” R.C. Pipe – 0’-10’ Deep. The bid proposal form along with Sheet 04.A1 and Sheet 22.A1 have been revised and are included with this addendum.
Q8: On drawing 23 where new guardrail attaches to existing bridge, does the contractor need to install new concrete attachment to existing bridge or will new guardrail simple attach to existing bridge.
R8: The proposed R-B 350 Bridge Attachment Vertical Shape Parapet shall be installed onto the existing bridge parapet. No new concrete attachment is anticipated. If the existing threaded rods are unable to be reused, new threaded rods will have to be drilled and anchored.
Q9: Bid form has 340 SY Bituminous Concrete Driveway (Commercial), with no detail? Should this be
3” depth? 1½” binder, 1½” top? Please clarify.
R9: Sheet HW-922_01 identifies the section for Bituminous Concrete Driveway (Commercial) and has been included with this addendum. The Highway Standard Sheet Index has been revised and is also included with this addendum.
Q10: Item No. 0202315A Disposal of Controlled Materials has a bid unit of CY. This material is weighed and tracked by the ton. Can this bid unit be changed to the ton to reflect how it is tracked at the disposal facilities?
November 4, 2026 Page 3
R10: Item No. 0202315A Disposal of Controlled Materials has been revised to a pay unit of Ton in the bid proposal form and is included with this addendum.
Q11: Item #0202315A – Disposal of Controlled Materials – Can we use other CTDOT approved disposal facilities other than the ones listed in the specifications?
R11: No, other CTDOT approved disposal facilities shall not be used for this project. The
Specification for Item 0202315A supplies a list of all CT DOT approved disposal facilities for the project soils.
THIS ENDS ADDENDUM NO. 1
Bid No. E26-01 State Project #0128-0158
Federal Aid Project #0315(001)
0101128A Securing, Construction, and Dismantling of a Waste Stockpile and Treatment Area at________________________________________ dollars and________________________________________ cents per lump sum.
1 LS ________________ ________________________________
0107090A CTDOT Boundary Marker (Survey Monument) at________________________________________ dollars and________________________________________ cents per each.
1 EA ________________ ________________________________
0201001A Clearing and Grubbing at________________________________________ dollars and________________________________________ cents per lump sum.
1 LS ________________ ________________________________
0202000 Earth Excavation at________________________________________ dollars and________________________________________ cents per cubic yard.
710 CY ________________ ________________________________
0202100 Rock Excavation at________________________________________ dollars and________________________________________ cents per cubic yard.
40 CY ________________ ________________________________
0202315A Disposal of Controlled Materials at________________________________________ dollars and________________________________________ cents per ton.
960 TON ________________ ________________________________
0202452A Test Pit at________________________________________ dollars and________________________________________ cents per each.
3 EA ________________ ________________________________
0202512 Cut Concrete Sidewalk at________________________________________ dollars and________________________________________ cents per linear foot.
50 LF ________________ ________________________________
0202529 Cut Bituminous Concrete Pavement at________________________________________ dollars and________________________________________ cents per linear foot.
1025 LF ________________ ________________________________
0202909A Archaeologist at________________________________________ dollars and________________________________________ cents per day.
10 DAY ________________ ________________________________
0202910A Herpetologist at________________________________________ dollars and________________________________________ cents per hour.
80 HR. ________________ ________________________________
0203000 Structure Excavation - Earth (Complete) at________________________________________ dollars and________________________________________ cents per cubic yard.
20 CY ________________ ________________________________
BID PROPOSAL FORM
TOWN OF SIMSBURY
CURTISS PARK CONNECTION MULTI-USE TRAIL PROJECT
STATE PROJECT #0128-0158
The Contractor shall provide unit prices for the following items which may be associated with the Base Bid.
ITEM NO. DESCRIPTION AND WRITTEN UNIT PRICE
ESTIMATED
QUANTITY
UNIT COST ($) TOTAL COST ($)
FEDERAL AID PROJECT #0315(001)
BF-1 Addendum No. 1
Federal Aid Project #0315(001)
ITEM NO. DESCRIPTION AND WRITTEN UNIT PRICE
ESTIMATED
QUANTITY
UNIT COST ($) TOTAL COST ($)
0203100 Structure Excavation Rock (Complete) at________________________________________ dollars and________________________________________ cents per cubic yard.
5 CY ________________ ________________________________
0204401A Handling Water (Site No. 1) at________________________________________ dollars and________________________________________ cents per lump sum.
1 LS ________________ ________________________________
0207000 Borrow at________________________________________ dollars and________________________________________ cents per cubic yard.
100 CY ________________ ________________________________
0209001 Formation of Subgrade at________________________________________ dollars and________________________________________ cents per square yard.
2500 SY ________________ ________________________________
0210821A Water Pollution Control at TWELVE THOUSAND dollars and ZERO cents per estimate.
12000 Est. $1 $12,000
0211000 Anti-Tracking Pad at________________________________________ dollars and________________________________________ cents per square yard.
50 SY ________________ ________________________________
0212000 Subbase at________________________________________ dollars and________________________________________ cents per cubic yard.
550 CY ________________ ________________________________
0219001 Sedimentation Control System at________________________________________ dollars and________________________________________ cents per linear foot.
3000 LF ________________ ________________________________
0219011A Sedimentation Control System at Catch Basin at________________________________________ dollars and________________________________________ cents per each.
2 EA ________________ ________________________________
0304002 Processed Aggregate Base at________________________________________ dollars and________________________________________ cents per cubic yard.
450 CY ________________ ________________________________
0305001 Processed Aggregate at________________________________________ dollars and________________________________________ cents per cubic yard.
35 CY ________________ ________________________________
0406005A Pavement Repair at________________________________________ dollars and________________________________________ cents per square yard.
50 SY ________________ ________________________________
0406172 HMA S0.375 at________________________________________ dollars and________________________________________ cents per ton.
400 TON ________________ ________________________________
BF-2 Addendum No. 1
Federal Aid Project #0315(001)
ITEM NO. DESCRIPTION AND WRITTEN UNIT PRICE
ESTIMATED
QUANTITY
UNIT COST ($) TOTAL COST ($)
0406238 Non-Tracking Asphalt Tack Coat at________________________________________ dollars and________________________________________ cents per gallon.
250 Gal ________________ ________________________________
0406303 Sawing and Sealing Joints at________________________________________ dollars and________________________________________ cents per linear foot.
170 LF ________________ ________________________________
0406999A Asphalt Adjustment Cost at TWO THOUSAND FIVE HUNDRED dollars and ZERO cents per estimate.
2500 Est. $1 $2,500
0506703A Stone Steps at________________________________________ dollars and________________________________________ cents per lump sum.
1 LS ________________ ________________________________
0601064 Abutment and Wall Concrete at________________________________________ dollars and________________________________________ cents per cubic yard.
10 CY ________________ ________________________________
0602030 Deformed Steel Bars - Galvanized at________________________________________ dollars and________________________________________ cents per pound.
1250 LBS ________________ ________________________________
0652009 12" R.C. Culvert End at________________________________________ dollars and________________________________________ cents per each.
1 EA ________________ ________________________________
0686000.12 12'' R.C. Pipe - 0' - 10' Deep at________________________________________ dollars and________________________________________ cents per linear foot.
33 LF ________________ ________________________________
0702102A Helical Pile with a Direct Inline Electronic Torque Meter at________________________________________ dollars and________________________________________ cents per linear foot.
1320 LF ________________ ________________________________
0813001 5" Granite Stone Curbing at________________________________________ dollars and________________________________________ cents per linear foot.
50 LF ________________ ________________________________
0813011 5" Granite Curved Stone Curbing at________________________________________ dollars and________________________________________ cents per linear foot.
75 LF ________________ ________________________________
0813451 Granite Stone Transition Curbing at________________________________________ dollars and________________________________________ cents per linear foot.
25 LF ________________ ________________________________
BF-3 Addendum No. 1
Federal Aid Project #0315(001)
ITEM NO. DESCRIPTION AND WRITTEN UNIT PRICE
ESTIMATED
QUANTITY
UNIT COST ($) TOTAL COST ($)
0815001 Bituminous Concrete Lip Curbing at________________________________________ dollars and________________________________________ cents per linear foot.
375 LF ________________ ________________________________
0901006A Removable Bollard at________________________________________ dollars and________________________________________ cents per each.
1 EA ________________ ________________________________
0910025 Metal Beam Rail Terminal Element at________________________________________ dollars and________________________________________ cents per each.
2 EA ________________ ________________________________
0910173 R-B 350 Bridge Attachment Vertical Shape Parapet at________________________________________ dollars and________________________________________ cents per each.
1 EA ________________ ________________________________
0910300 Metal Beam Rail (R-B Mash) at________________________________________ dollars and________________________________________ cents per linear foot.
375 LF ________________ ________________________________
0912503 Remove Metal Beam Rail at________________________________________ dollars and________________________________________ cents per linear foot.
460 LF ________________ ________________________________
0921001 Concrete Sidewalk at________________________________________ dollars and________________________________________ cents per square foot.
1525 SF ________________ ________________________________
0921005 Concrete Sidewalk Ramp at________________________________________ dollars and________________________________________ cents per square foot.
725 SF ________________ ________________________________
0921043A Pervious Paver Walkway at________________________________________ dollars and________________________________________ cents per square foot.
825 SF ________________ ________________________________
0921048 Detectable Warning Surface at________________________________________ dollars and________________________________________ cents per square foot.
100 SF ________________ ________________________________
0922106A Boardwalk (Site No. 1) at________________________________________ dollars and________________________________________ cents per lump sum.
1 LS ________________ ________________________________
0922500 Bituminous Concrete Driveway (Commerical) at________________________________________ dollars and________________________________________ cents per square yard.
340 SY ________________ ________________________________
0944000 Furnishing and Placing Topsoil at________________________________________ dollars and________________________________________ cents per square yard.
4125 SY ________________ ________________________________
BF-4 Addendum No. 1
Federal Aid Project #0315(001)
ITEM NO. DESCRIPTION AND WRITTEN UNIT PRICE
ESTIMATED
QUANTITY
UNIT COST ($) TOTAL COST ($)
0949310A Nyssa Sylvatica, Black Gum, 1 1/2" CAL. B.B.
at________________________________________ dollars and________________________________________ cents per each.
4 EA ________________ ________________________________
0949799A Plantanus Occidentalis, London Plane Tree, 1 1/2" CAL. B.B.
at________________________________________ dollars and________________________________________ cents per each.
4 EA ________________ ________________________________
0949862A Acer Saccharinum, Silver Maple, 1 1/2" CAL. B.B.
at________________________________________ dollars and________________________________________ cents per each.
5 EA ________________ ________________________________
0949606A Root Barrier at________________________________________ dollars and________________________________________ cents per linear foot.
400 LF ________________ ________________________________
0950013 Erosion Control Matting at________________________________________ dollars and________________________________________ cents per square yard.
480 SY ________________ ________________________________
0950019A Turf Establishment - Lawn at________________________________________ dollars and________________________________________ cents per square yard.
1525 SY ________________ ________________________________
0950040A Conservation Seeding for Slopes at________________________________________ dollars and________________________________________ cents per square yard.
3000 SY ________________ ________________________________
0950041A New England Wetmix for Wetland Restoration at________________________________________ dollars and________________________________________ cents per square yard.
100 SY ________________ ________________________________
0969060 Construction Field Office (Small) at________________________________________ dollars and________________________________________ cents per month.
7 MO ________________ ________________________________
0970006 Trafficperson (Municipal Police Officer) at ONE HUNDRED EIGHT THOUSAND dollars and ZERO cents per estimate.
108000 Est. $1 $108,000
0970007 Trafficperson (Uniformed Flagger) at________________________________________ dollars and________________________________________ cents per hour.
1200 HR. ________________ ________________________________
0971001A Maintenance and Protection of Traffic at________________________________________ dollars and________________________________________ cents per lump sum.
1 LS ________________ ________________________________
0975002 Mobilization and Project Closeout at________________________________________ dollars and________________________________________ cents per lump sum.
1 LS ________________ ________________________________
BF-5 Addendum No. 1
Federal Aid Project #0315(001)
ITEM NO. DESCRIPTION AND WRITTEN UNIT PRICE
ESTIMATED
QUANTITY
UNIT COST ($) TOTAL COST ($)
0976002 Barricade Warning Lights - High Intensity at________________________________________ dollars and________________________________________ cents per day.
2100 DAY ________________ ________________________________
0978002 Traffic Drum at________________________________________ dollars and________________________________________ cents per each.
35 EA ________________ ________________________________
0979003 Construction Barricade Type III at________________________________________ dollars and________________________________________ cents per each.
10 EA ________________ ________________________________
0980001 Construction Staking at________________________________________ dollars and________________________________________ cents per lump sum.
1 LS ________________ ________________________________
0981100 42" Traffic Cone at________________________________________ dollars and________________________________________ cents per each.
35 EA ________________ ________________________________
1117111A Rectangular Rapid Flashing Beacon (RRFB) Type B at________________________________________ dollars and________________________________________ cents per each.
2 EA ________________ ________________________________
1206023A Removal and Relocation of Existing Signs at________________________________________ dollars and________________________________________ cents per lump sum.
1 LS ________________ ________________________________
1208931A Sign Face - Sheet Aluminum (Type IX Retroreflective Sheeting) at________________________________________ dollars and________________________________________ cents per square foot.
20 SF ________________ ________________________________
1208937A Sign Face - Sheet Aluminum (Type XI Retroreflective Sheeting) at________________________________________ dollars and________________________________________ cents per square foot.
90 SF ________________ ________________________________
1210105 Epoxy Resin Pavement Markings, Symbols and Legends at________________________________________ dollars and________________________________________ cents per square foot.
150 SF ________________ ________________________________
1211001 Removal of Pavement Markings at________________________________________ dollars and________________________________________ cents per square foot.
3 SF ________________ ________________________________
1220027A Construction Signs at________________________________________ dollars and________________________________________ cents per square foot.
75 SF ________________ ________________________________
1302061A Adjust Gate Box (Water) at________________________________________ dollars and________________________________________ cents per each.
3 EA ________________ ________________________________
BF-6 Addendum No. 1
Federal Aid Project #0315(001)
ITEM NO. DESCRIPTION AND WRITTEN UNIT PRICE
ESTIMATED
QUANTITY
UNIT COST ($) TOTAL COST ($)
TOTAL OF ALL PROJECT BASE BID ITEMS: $__________________________________________
WRITTEN _________________________________________________________________ DOLLARS
AND __________________________________________________________________ CENTS
BF-7 Addendum No. 1
Federal Aid Project #0315(001)
CURTISS PARK CONNECTION MULTI-USE TRAIL BID PROPOSAL
Addendum No. 1
The following addenda for this contract were received:
Addendum Number Date
Dated at _______________________________________, ___________________________
(Town) (State)
This ____________ day of ________________, 20___
Signed
(Bidder)
By: _____________________________
Business Address:
NOTE:
Bidder is reminded that in addition to completing and signing the above proposal and bid form, he/she shall also complete and return with the bid:
• Disclosures
• Legal Status Form
• Bid Security
• Non-Collusion Affidavit
• Bidder Qualifications
• Simsbury Hold Harmless and Indemnification Agreement
• Connecticut Department of Transportation (CT DOT) Contractor Prequalification
Certificate
Rev. Date 07/14/26
ITEM #0101128A
ADDENDUM NO. 1
ITEM #0101128A - SECURING, CONSTRUCTION, AND DISMANTLING OF A
WASTE STOCKPILE AND TREATMENT AREA
Description
Work included under this item consists of the Contractor’s requirements for construction of the temporary Waste Stockpile Area (WSA). The work includes construction of a soil containment area with associated improvements as indicated on the Contract Drawings, maintenance of the WSA, and final dismantling of the WSA. All Controlled Materials excavated during construction activities shall be stockpiled in the WSA. The WSA shall be located as shown on the Contract Drawings.
Materials
Membrane used for covering soil stockpiles shall be low or medium density polyethylene, with a thickness of 10 mils.
Sandbags used to secure polyethylene sheeting soil covers shall have a minimum weight of 30 pounds each.
Bituminous Concrete shall conform to Section 4.06 of the Specifications.
Hay bales shall conform to the requirements of Section 2.19.02 of the Specifications.
Anti-tracking pads (stabilized construction entrances) shall be installed and maintained in accordance with the latest edition of the Connecticut Guidelines for Soil Erosion and Sediment Control and all applicable CTDOT Standard Specifications and contract requirements. The construction entrance shall be maintained in an effective condition to prevent tracking of sediment onto public roadways.
Precast concrete blocks for bin walls shall measure 72” x 36” x 24” and shall be constructed of reinforced Portland concrete cement with a minimum compressive strength of 3,000 psi.
Construction Methods
The WSA shall be constructed at the location specified herein and as shown on the Contract Drawings. The WSA shall comprise an approximate area of 5,000 square feet;
however, the specific configuration shall be based upon available space, and will be directed by the Engineer.
Construction of the WSA shall be completed prior to the initiation of construction activities generating Controlled Materials.
ADDENDUM NO. 1
The Contractor shall confine construction activities to those areas required for installation of the WSA. Keep adjacent roadways and work areas clear and available to vehicular traffic at all times. Do not use roadways for the staging or storage of materials or equipment unless directed by the Engineer.
The Contractor is responsible for the maintenance and protection of all utilities potentially affected during WSA construction. The Contractor shall locate and mark all existing utilities potentially affected prior to initiating construction activities.
The Contractor is responsible for the maintenance of all components of the WSA throughout the project. The Contractor shall repair or replace any damaged element of the WSA including, but not limited to, polyethylene sheeting or sand bags.
Prior to construction of the WSA, the Contractor shall submit a Working Drawing to the
Engineer detailing the proposed WSA layout, dimensions, grades, containment measures, erosion and sedimentation controls, access provisions, and temporary structures. No work associated with the WSA shall commence until the Working Drawing has been reviewed by the Engineer.
All costs associated with preparation and submission of the Working Drawing shall be included in the lump sum item bid price.
WSA Abandonment
Following the removal of all stockpiled material, soil residue shall be removed from all surfaces of the WSA as directed by the Engineer. This operation shall be accomplished using dry methods such as shovels, brooms, mechanical sweepers, or a combination thereof. Residual soil shall be disposed of as Controlled Materials.
Following the removal of all residual Controlled Materials, the Contractor shall dismantle the WSA. During dismantling the Contractor shall remove all materials such as polyethylene sheeting, sandbags, hay bales, bituminous concrete runoff barriers, anti-tracking pad, and the bituminous concrete lip curbing as shown on the Contract Drawings. Materials shall be disposed of by the Contractor as solid waste in accordance with the Standard Specifications and all applicable federal, state, and local regulations. The bituminous concrete pavement surface shall remain.
Method of Measurement
This work shall be measured as a contract lump sum cost to secure, construct, maintain, decontaminate, and dismantle the WSA.
Basis of Payment
The work shall be paid for at the contract lump sum price for “Securing, Construction, and Dismantling of a Waste Stockpile and Treatment Area”, which price shall include all
ADDENDUM NO. 1
materials, tools, labor, equipment, permits, and work needed to prepare, construct, maintain, abandon, decontaminate, and dismantle the WSA and dispose of construction materials.
The cost of preparing and submitting Working Drawings, including any required engineering analysis or design calculations, shall be included in the lump sum price bid for this item, and no separate payment will be made.
PAY ITEM PAY UNIT
Securing, Construction and Dismantling LS of a Waste Stockpile and Treatment Area
0-10-20-30-40-50
2:1 12:1
6:1
30:1
0 100-10
12:1 7:1
DATE
PROJECT NO.
DESIGNED
SCALE
DRAWN CHECKED
JULY 14, 2026
0128-0158
N.T.S.
M
IS
C
EL
LA
N
EO
U
S D
ET
A
IL
S
SI
M
SB
U
R Y, C O
N N
EC
TI
C U
T
C U
R
TI
SS
P
A R
K C
O N
N
EC
TI
O
N , M
U
LT
I-U
SE
T R
A
IL
FR
O
M H
O
PM
EA
D
O W
S T
(R T.
) T
O C
U R
TI
SS
A N
D P
A
TT
IS
O
N P
A R
K S
TA
R
IF
FV
IL
LE
R O
A D
(C T
R O
U
TE
D
ES
C R
IP
TI
O N
B Y
D A
TE
COPYRIGHT, SLR INTERNATIONAL CORPORATION - 2022
DP SG KB
1.
5"
1.
5"
BITUMINOUS CONCRETE TRAIL
NOT TO SCALE
8"
2 %
NOTES
1. ROOT CONTROL SYSTEM (ROOT BARRIER) INSTALLED TO A
DEPTH OF 12" AT ALL LOCATIONS. REFER TO ROOT BARRIER
LIMITS TABLE ON THIS SHEET FOR INSTALLATION LIMITS.
2. SEE TYPICAL CROSS SECTIONS FOR TRAIL WIDTH.
ROOT CONTROL SYSTEM
INSTALLED PER SPECIAL
PROVISION - ITEM 0949606A AND
ROOT BARRIER LIMIT TABLE
(TYP. BOTH SIDES OF TRAIL)
SUBBASE
COMPACTED SUBGRADE
HMA S0.375 (DESIGN LEVEL 2)
HMA S0.375 (DESIGN LEVEL 2)
PROCESSED AGGREGATE BASE6"
ROOT BARRIER LIMITS TABLE
BEGIN STATION END STATION
131+48 134+73 135+08 135+75
PAVEMENT REPAIR
NOT TO SCALE
EXISTING ROADWAY BASE
4" HMA S0.5
(TWO EQUAL LIFTS)
5" HMA S1.0
EXISTING BITUMINOUS
CONCRETE PAVEMENT
12" PROCESSED AGGREGATE BASE
CUT BITUMINOUS CONCRETE
PAVEMENT (TYP.)
NON-TRACKING ASPHALT
TACK COAT (TYP.)
EXISTING COMPACTED
SUBGRADE
1'
PROPOSED CURB
2'
SEAL JOINT AND APPLY TACK COAT
ALONG VERTICAL SURFACE
SHEET NO.
04.A1
DRAWING NO.
MDS-1
PROPOSED GRADE
4'
4' MIN.
STACKED FLAT NATURAL STONES
4' MIN. LENGTH
12" LAYER OF CRUSHED GRAVEL
18 - 24"
8"
STONE WALK AND STEPS
NOT TO SCALE
EMBED BOULDERS INTO PROPOSED BANK AND
STACK TO FORM STEPS TO TOP OF BANK
ELEV. 141.0
ELEV.
145.0
ELEV. 143.0
EDGE OF WATER
ELEV. 140.0
SENSITIVE AREAS SIGN
NOT TO SCALE
24" SQUARE
GUIDE SIGN COLORS:
LEGEND - BLACK
BACKGROUND - YELLOW (RETROREFLECTIVE)
NOTES:
1. CONTRACTOR TO SUBMIT A SIGN SUBMITTAL FOR REVIEW
2. TO BE PAID FOR UNDER SIGN FACE - SHEET ALUMINUM
(TYPE XI RETROREFLECTIVE SHEETING)
D
A
A
G
H
G
H
WHEN FLOODED TURN AROUND DON'T DROWN
J J
K K
L L
D
D
D
D
F
E
E
E
E
M
FLOOD SIGN
NOT TO SCALE
A B C D E F G H J K L M 1.875"6.094"5.125"12.625"7.75"4.922"2.062"2.438"3.390"0.75"0.5"30"
WARNING SIGN COLORS:
LEGEND - BLACK
BACKGROUND - YELLOW (RETROREFLECTIVE)
NOTE: TO BE PAID FOR UNDER SIGN FACE - SHEET
ALUMINUM (TYPE XI RETROREFLECTIVE SHEETING)
R
EA
LT
Y D
RI
VE
CH
ES
H
IR
E, C
T
3.
1.
SL
RC
O N
SU
LT
IN
G
.C O
M
ORDINARY HIGH
WATERLINE (OHW)
ELEV. 142.0
8" RISER STEP/SLAB
NOTES:
1. SET UNITS IN RUNNING BOND PATTERN
PERPENDICULAR TO DIRECTION OF PATH.
PRECAST CONCRETE UNIT PAVERS.
PAVER STYLE: AQUA-BRIC WITH BOSTON
COLONIAL OUTSIDE SOLDIER COURSE, OR EQUAL
COLOR: QUARRY BLEND
MANUFACTURE: IDEAL CONCRETE BLOCK
COMPANY, INC.
FINISHED GRADE
EDGE RESTRAINT AS MANUFACTURED BY
UNILOCK OR EQUIVALENT
95% COMPACTED SUBGRADE
1/8" JOINT HANDTIGHT WITH 3/8" CRUSHED
STONE ECO GRADED FILTRATION SAND
OR ASTM #8 CLEAN GRADED STONE.
ASTM #57, 3/4 " CRUSHED STONE
(OPEN GRADED)
3/8" CRUSHED STONE ECO GRADED FILTRATION
SAND OR ASTM #8 CLEAN GRADED STONE.
PERVIOUS PAVER
WALKWAY
NOT TO SCALE
1 12" - 2" 2 3/8"
3'
8'
(TYPICAL) WIDTH VARIES
SEE LAYOUT PLAN
3'
FILTER FABRIC
(TO BE PLACED BETWEEN THE EXISTING
SOIL AND THE GRAVEL MATERIAL)
5"
REMOVABLE BOLLARD
N.T.S.
POWDER COATED
STAINLESS STEEL
BOLLARD
COLOR: YELLOW
FOUNDATION -SEE
DETAIL THIS SHEET STAINLESS STEEL EMBEDMENT
SLEEVE
FLAT METAL TOP
FINISHED GRADE
BITUMINOUS CONCRETE TRAIL
SEE SPECIFICATION
FOR BOLLARD
MANUFACTURER
AND MODEL
NUMBER
REMOVABLE BOLLARD FOUNDATION
N.T.S.
PIER ELEVATION SECTION
NOTE:
1. ALL CONCRETE, SLEEVE,
REBAR, GRAVEL, DRAIN PIPE,
SONO-TUBE AND ANY OTHER
REQUIRED MATERIAL FOR
FOUNDATION IS PAID FOR
UNDER PRICE OF REMOVABLE
BOLLARD.
USE 16" DIAMETER
SONOTUBE IF NEEDED
TO AVOID CAVE IN AT
TOP
ROUND POST ANCHOR
SLEEVE BY
MANUFACTURER
CLASS PCC03360
CONCRETE PIER AT NOTED
DIAMETER & HEIGHT
6 EA. - #4 VERTICAL
REBAR AT 42" LENGTH
PVC DRAIN PIPE
LENGTH AS REQ.
DIAMETER TO MATCH
BOLLARD I.D.
#3 REBAR HOOP TIES
AT THE NOTED
DIAMTER MINUS 4
INCHES AS SHOWN
TWO AT TOP & BOTTOM
& 12 INCH SPACING
3 INCHES MIN. THICK
NO. 6 CRUSHED STONE
48"
18"
3" MIN.
REMOVABLE BOLLARD
PAVEMENT MARKINGS AT BOLLARD
N.T.S.
4" PAINTED YELLOW LINE (EPOXY RESIN)
5'-6"
12" C.C.P. CULVERT END
NOT TO SCALE
NOTES:
1. GRADING SHOWN IS APPROXIMATE. CONTRACTOR TO REFINE GRADING TO ENSURE
STORMWATER DRAINS TOWARDS CULVERT END.
2. SEE CTDOT STANDARD DETAIL SHEET HWY-686_02B FOR ADDITIONAL DETAILS.
SECTION
ELEVATION
CULVERT END
BITUMINOUS CONCRETE TRAIL
12" C.C.P.
EXISTING GROUND
PROPOSED GRADE
CULVERT END
EXISTING
GROUND
PROPOSED
GRADE
ROUTE 315
12" R.C.
12" R.C. PIPE - O'-10' DEEP
12" R.C.
R.C.
NOTES:
1.
A
D D
EN
D
U M
N O
. 1 M
SM
/0 2/
ADDENDUM NO. 1
W
OL
CO
TT
R
OA
D
70'
N/F
TOWN OF SIMSBURY
56 WOLCOTT ROAD
SIMSBURY, CT 06070
WSA LOCATION
CONSTRUCTION VEHICLES
ENTERING/EXITING LOCATION
N/F
JAMES BEDNARSKI JOSHUA
50 WOLCOTT ROAD
SIMSBURY, CT 06070
N/F
1530 ANTS LLC
133 HOLCOMB STREET
SIMSBURY CT 06070
N/F
TOWN OF SIMSBURY
68 WOLCOTT ROAD
SIMSBURY, CT 06070
ANTI-TRACKING PAD
(SEE CTDOT STANDARD SHEET HW-211_01)
6" BITUMINOUS CONCRETE LIP CURBING
STOCKPILED CONTROL MATERIAL
2' X 3' X 6' PRECAST CONCRETE BLOCK (TYP.)
DATE
PROJECT NO.
DESIGNED
SCALE
DRAWN CHECKED
0128-0158
1" = 20'
W A
ST
E
ST
O
C K
PI
LE
A R
EA
(W
SA
) D
ET
A
IL
S
SI
M
SB
U
R Y, C O
N N
EC
TI
C U
T
C U
R
TI
SS
P
A R
K C
O N
N
EC
TI
O
N , M
U
LT
I-U
SE
T R
A
IL
FR
O
M H
O
PM
EA
D
O W
S T
(R T.
) T
O C
U R
TI
SS
A N
D P
A
TT
IS
O
N P
A R
K S
TA
R
IF
FV
IL
LE
R O
A D
(C T
R O
U
TE
D
ES
C R
IP
TI
O N
B Y
D A
TE
COPYRIGHT, SLR INTERNATIONAL CORPORATION - 2022
MSM TBC MSM
SHEET NO.
14-1.A1
DRAWING NO.
ENV-1
R
EA
LT
Y D
RI
VE
CH
ES
H
IR
E, C
T
3.
1.
SL
RC
O N
SU
LT
IN
G
.C O
M
S
W
N
E
0' 10' 20'
0 1/2" 1"
NOVEMBER 11, 2026
1.
A
D D
EN
D
U M
N O
. 1 M
SM
/0 2/
DATE
PROJECT NO.
DESIGNED
SCALE
DRAWN CHECKED
0128-0158
N.T.S.
W A
ST
E
ST
O
C K
PI
LE
A R
EA
(W
SA
) D
ET
A
IL
S
SI
M
SB
U
R Y, C O
N N
EC
TI
C U
T
C U
R
TI
SS
P
A R
K C
O N
N
EC
TI
O
N , M
U
LT
I-U
SE
T R
A
IL
FR
O
M H
O
PM
EA
D
O W
S T
(R T.
) T
O C
U R
TI
SS
A N
D P
A
TT
IS
O
N P
A R
K S
TA
R
IF
FV
IL
LE
R O
A D
(C T
R O
U
TE
D
ES
C R
IP
TI
O N
B Y
D A
TE
M
SM
/0 2/
COPYRIGHT, SLR INTERNATIONAL CORPORATION - 2022
MSM TBC MSM
SHEET NO.
15.A1
DRAWING NO.
ENV-2
R
EA
LT
Y D
RI
VE
CH
ES
H
IR
E, C
T
3.
1.
SL
RC
O N
SU
LT
IN
G
.C O
M
JULY 14, 2026
1.
A
D D
EN
D
U M
N O
. 1
Benchmark Drillhole in Concrete Pad
Elev.=173.09
CL&P
HELT CO
996EC37
SNET
Pole No #
Wood Post
CL&P
Bit D riv ew ay
Existing Building
Old Well Tavern
Existing Building
Bi t
D ri ve w ay
Bush (Typ)
Farm ington Canal
H eritage Trail
Fa rm in gt on Ca na l
Heri tag e Trail
N/F James Hudson
N/F State of
Connecticut
N /F
S im sb ur y La nd in g Co nd om in iu m A ss oc ia tio n, I nc
N/F Jennifer J. Krystowski
N/F Stardust, LLC
40.5'
8.8'
Drainage Easement In favor of
State of Connecticut
Conc Sidewalk
30" RCP
INV.=150.3
CCB
T.G.=156.40
INV.=151.8(SE)
12" RCP
CCB
T.G.=160.98
INV.=156.1(NE)
DCCB
T.G.=161.10
INV.=155.5(SW)
INV.=149.4(NE)
" R
CP
15" R
CP
15" RCP
INV.=149.5
N/F David C. Paguette
Conc Wall w/Metal Railing
Conc Wall w/Metal Railing
Conc Wall
12" Spruce 8" Spruce
16" Spruce 14" Spruce (Dead)
16" Spruce
FA
RM
IN
G
TO
N
RI
VE
R
Conc Head Wall
Bit Parking
Lot
Conc
Grass
Grass
Grass
Grass
Grass
Grass
Grass
Grass
Grass
Wood RR Tie
Sign
G ra ss
FA
R M
IN
G
TO
N
R
IV
ER
.4
CONTROL POINT 9
CONTROL POINT 8
Benchmark Drill Hole in Conc.
Elev.=157.78
CCB
T.F.=158.25 Inv.=153.3(S)
CCB
T.F.=171.20 Inv.=166.9(W) Inv.=160.2(S)
CLCB
T.F.=172.46
Inv.=169.2(E)
15" SLCPP
30" RCP
Inv.=150.87
15" SLCPP
Inv.=152.44
12" FES
14" Maple
6"
15" 18" Twin
12"
12"
15" Twin
Hand Held
Head Wall
Head Wall
R C P
SAN MH
T.F.=173.07
Inv.=163.3(N) Inv.=163.3(S)
SAN MH
T.F.=172.38 Inv.=167.1(E) Inv.=166.5(W)
EDGE OF WATER
INT. NO. 128-237
6" PVC
(APPROXIMATE)
6" PVC
(APPROXIMATE)
6" PVC
(APPROXIMATE)
1000 GAL.-SEPTIC TANK
(APPROXIMATE
LOCATION)
1500 GAL. GREASE TRAP
4" PVC (APPROXIMATE)
4" C
.I . P
IP
E
(A
PP
RO
XI
M
AT
E)
6" P
VC
(A
PP
RO
XI
M
AT
E)
48" FORCE MAIN
(APPROXIMATE)
Wood Post
Benchmark Drillhole in Concrete Pad
Elev.=173.09
CL&P
HELT CO
996EC37
SNET
Pole No #
Wood Post
CL&P
Bit D riv ew ay
Existing Building
Old Well Tavern
Existing Building
Bi t
D ri ve w ay
Bush (Typ)
Farm ington Canal
H eritage Trail
Fa rm in gt on Ca na l
Heri tag e Trail
N/F James Hudson
N/F State of
Connecticut
N /F
S im sb ur y La nd in g Co nd om in iu m A ss oc ia tio n, I nc
N/F Jennifer J. Krystowski
N/F Stardust, LLC
40.5'
8.8'
Drainage Easement In favor of
State of Connecticut
Conc Sidewalk
30" RCP
INV.=150.3
CCB
T.G.=156.40
INV.=151.8(SE)
12" RCP
CCB
T.G.=160.98
INV.=156.1(NE)
DCCB
T.G.=161.10
INV.=155.5(SW)
INV.=149.4(NE)
" R
CP
15" R
CP
15" RCP
INV.=149.5
N/F David C. Paguette
Conc Wall w/Metal Railing
Conc Wall w/Metal Railing
Conc Wall
12" Spruce 8" Spruce
16" Spruce 14" Spruce (Dead)
16" Spruce
FA
RM
IN
G
TO
N
RI
VE
R
Conc Head Wall
Bit Parking
Lot
Conc
Grass
Grass
Grass
Grass
Grass
Grass
Grass
Grass
Grass
Wood RR Tie
Sign
G ra ss
FA
R M
IN
G
TO
N
R
IV
ER
.4
CONTROL POINT 9
CONTROL POINT 8
Benchmark Drill Hole in Conc.
Elev.=157.78
CCB
T.F.=158.25 Inv.=153.3(S)
CCB
T.F.=171.20 Inv.=166.9(W) Inv.=160.2(S)
CLCB
T.F.=172.46
Inv.=169.2(E)
15" SLCPP
30" RCP
Inv.=150.87
15" SLCPP
Inv.=152.44
12" FES
14" Maple
6"
15" 18" Twin
12"
12"
15" Twin
Hand Held
Head Wall
Head Wall
R C P
SAN MH
T.F.=173.07
Inv.=163.3(N) Inv.=163.3(S)
SAN MH
T.F.=172.38 Inv.=167.1(E) Inv.=166.5(W)
EDGE OF WATER
INT. NO. 128-237
6" PVC
(APPROXIMATE)
6" PVC
(APPROXIMATE)
6" PVC
(APPROXIMATE)
1000 GAL.-SEPTIC TANK
(APPROXIMATE
LOCATION)
1500 GAL. GREASE TRAP
4" PVC (APPROXIMATE)
4" C
.I . P
IP
E
(A
PP
RO
XI
M
AT
E)
6" P
VC
(A
PP
RO
XI
M
AT
E)
48" FORCE MAIN
(APPROXIMATE)
Wood Post
112+00
113+00
114+00
115+00
116+00
117+00
118+00
119+00
120+00
121+00
122+00
F
F
F
F
F
F
C
C
C
F
C
F
EXISTING FARMINGTON CANAL HERITAGE TRAIL
(EAST COAST GREENWAY)
EXISTING FARMINGTON
CANAL HERITAGE TRAIL
(EAST COAST GREENWAY)
10' WIDE TRAIL, (TYP.)
R25'
SIDEWALK RAMP, TYPE 16
MATCH EXISTING CONCRETE SIDEWALK
REMOVE EXISTING RAMP
R3'
RESET TELEPHONE MANHOLE (BY OTHERS)
(CONTRACTOR WILL BE RESPONSIBLE FOR
COORDINATION WITH UTILITY COMPANY)
REMOVE EXISTING TIMBER LANDSCAPE BED AND LIGHT
PROPOSED EASEMENT
PAVEMENT REMOVAL
RESET TELEPHONE MANHOLE
(BY OTHERS)
SAWCUT PAVEMENT, (TYP.)
REMOVE SIGN
NO NET FILL PERMITTED IN
THE FEMA FLOODWAY, (TYP.)
4" TOP SOIL AND TURF ESTABLISHMENT - LAWN
SEDIMENTATION CONTROL SYSTEM (TYP.)
SEDIMENT CONTROL
DEVICE AT CB, (TYP.)
TURF ESTABLISHMENT ALONG THE
LENGTH OF THE TRAIL
REMOVE WOOD POST
UTILITY POLE SNET 4347 TO BE
RELOCATED BY OTHERS
BEGIN BITUMINOUS CONCRETE LIP CURB
BEGIN BITUMINOUS CONCRETE LIP CURB
END BITUMINOUS CONCRETE LIP CURB
BEGIN BITUMINOUS CONCRETE LIP CURB
BEGIN BITUMINOUS CONCRETE LIP CURB
END BITUMINOUS CONCRETE
LIP CURBING AT EXISTING CB
SIDEWALK RAMP, TYPE 16
TURF ESTABLISHMENT - LAWN (TYP.)
+ 35.6
+ 79.8
CONCRETE SIDEWALK
REMOVE EXISTING
12" SLCPP AND
FLARED END
INSTALL 33 LF OF 12"
C.C.P. AND 12" C.C.P.
CULVERT END INV.= 169.4
(SEE MDS-1)
+ 40.5
+ 07.3
+ 00.5
REMOVE AND RELOCATE
"NO MOTOR VEHICLE" SIGN
(31-1727)
100'
UPLAND REVIEW
AREA
100'
UPLAND REVIEW AREA
0'
U
PL
AN
D
R
EV
IE
W
A
RE
A
24'
24'6.
4'
8'
8'
.9
8'
.2
31-1727
PROTECT EXISTING PED. SIGN
AND BUTTON TO REMAIN
BEGIN
INSTALL NEW 31-0552
AND 31-5004
END
51-1354 51-1356
31-1727 51-1354 51-1355
12" STOP BAR
4'
BAR TYPE CROSSWALK
(8' WIDE X 24" SPACE X 16" BARS)
31-1727
41-1392CYCLISTS
DISMOUNT
R20'
12" STOP
BAR
R7'
.3
.2
R3'
R12' R12'
R14' 35.4'
G
G
V
H J V
PROPOSED EASEMENT
R=175'
4.
5'
5.
1'
4.
6'
6.
6'
5'
5.
2'
END BITUMINOUS
CONCRETE LIP CURBING
BEGIN BITUMINOUS
CONCRETE LIP CURBING
END BITUMINOUS CONCRETE LIP CURB
BEGIN BITUMINOUS CONCRETE LIP CURBING
BEGIN BITUMINOUS CONCRETE LIP CURBING
END BITUMINOUS
CONCRETE LIP CURBING
ADJUST GATE BOX
(WATER)
END BITUMINOUS CONCRETE LIP CURBING
END BITUMINOUS CONCRETE LIP CURB
H O
PM
EA
D O
W S
TR
EE
T (R
O U
TE
0)
(I N
T N
O
8-
7)
ST
J
O H
N S
P
LA
C E
TARIFFVILLE ROAD (ROUTE 315)
BITUMINOUS CONCRETE DRIVEWAY
(COMMERCIAL) (TYP.)
BITUMINOUS CONCRETE DRIVEWAY
(COMMERCIAL) (TYP.)
BITUMINOUS CONCRETE DRIVEWAY
(COMMERCIAL) (TYP.)
REMOVE PLANTER
RELOCATE SIGN
RELOCATE SIGN
REMOVE EXISTING STOP SIGN
.3
7.
7'
REMOVE WOOD POST
PATH
NARROWS 41-1490
8'
+ 27.1
INV.=166.9 (N)
R27'
REMOVABLE BOLLARD
12" WHITE STOP BAR
4" PAINTED YELLOW LINE
(SEE DETAIL ON MDS-1)
31-0532
R12'
31-1177
AND 31-1188
(BACK TO BACK)
31-1119
31-0552 AND 31-1119 (BACK TO BACK)
DO NOT
ENTER
DO NOT
ENTER
ONE WAY
ONE WAY
WHITE PAVEMENT MARKING ARROW (TYP.)
Z
R.C.PIPE
R.C.
H O
PM
EA
D O
W S
TR
EE
T
RO
U
TE
0)
Fa rm in gt on Ca na l
Heri tag e Trail
Grass
CCB
T.F.=171.20 Inv.=166.9(W) Inv.=160.2(S)
CLCB
T.F.=172.46
Inv.=169.2(E)
15" SLCPP
12" FES
Hand Held
18" RCP
SAN MH
T.F.=173.07
Inv.=163.3(N) Inv.=163.3(S)
6" PVC
(APPROXIMATE)
6" PVC
(APPROXIMATE)
H O
PM
EA
D O
W S
TR
EE
T
RO
U
TE
0)
Fa rm in gt on Ca na l
Heri tag e Trail
Grass
CCB
T.F.=171.20 Inv.=166.9(W) Inv.=160.2(S)
CLCB
T.F.=172.46
Inv.=169.2(E)
15" SLCPP
12" FES
Hand Held
18" RCP
SAN MH
T.F.=173.07
Inv.=163.3(N) Inv.=163.3(S)
6" PVC
(APPROXIMATE)
6" PVC
(APPROXIMATE)
F
F
C
C
C
F
F
R=175'
H O
PM
EA
D O
W S
TR
EE
T
RO
U
TE
0)
(I N
T N
O
8-
7)
R.C.
R.C.
DATE
PROJECT NO.
DESIGNED
SCALE
DRAWN CHECKED
S
W
N
E
JULY 14, 2026
0128-0158
1"=40'
LA
YO
U T
PL
A
N
SI
M
SB
U
R Y, C O
N N
EC
TI
C U
T
C U
R
TI
SS
P
A R
K C
O N
N
EC
TI
O
N , M
U
LT
I-U
SE
T R
A
IL
FR
O
M H
O
PM
EA
D
O W
S T
(R T.
) T
O C
U R
TI
SS
A N
D P
A
TT
IS
O
N P
A R
K S
TA
R
IF
FV
IL
LE
R O
A D
(C T
R O
U
TE
D
ES
C R
IP
TI
O N
B Y
D A
TE
0' 20' 40'
0 1/2" 1"
COPYRIGHT, SLR INTERNATIONAL CORPORATION - 2022
M A
TC
H
LI
N
E
LA
-2
DP SG KB
SHEET NO.
22.A1
DRAWING NO.
LA-1
CURTISS PARK CONNECTION MULTI-USE TRAIL HEAD
1"=20'
SAWCUT
LEGEND
BITUMINOUS CONCRETE
TRAIL
BITUMINOUS CONCRETE
DRIVEWAY (COMMERCIAL)
SEDIMENT CONTROL
AT CATCH BASIN
SEDIMENT CONTROL
FILTER FENCE
CUT/FILL LINE
C
F
LIMITS OF CLEARING
TREE REMOVAL
CONCRETE SIDEWALK
R
EA
LT
Y D
RI
VE
CH
ES
H
IR
E, C
T
3.
1.
SL
RC
O N
SU
LT
IN
G
.C O
M
SCHEDULE OF RIGHTS AND EASEMENTS
G RIGHT TO GRADE REQUIRED
H RIGHT TO RECONSTRUCT DRIVEWAY REQUIRED
J RIGHT TO INSTALL SEDIMENTATION CONTROL SYSTEM REQUIRED
V EASEMENT TO CONSTRUCT AND MAINTAIN BITUMINOUS CONCRETE TRAIL REQUIRED
Z RIGHT TO INSTALL SIGNAGE AND PAVEMENT MARKINGS REQUIRED
END
PATH
NARROWSCYCLISTS
DISMOUNT
BEGIN
SIGN NUMBER
COLOR
BACKGROUND
COPY
SIGN
DIMENSION
WIDTH, IN
HEIGHT, IN
MOUNTING
LEGEND
YELLOW
BLACK
18" 18"
STEEL POST
41-1490
GREEN
WHITE
24" 18"
STEEL POST
51-1354
GREEN
WHITE
24" 6"
STEEL POST
51-1355 51-1356
WHITE
24" 6"
STEEL POST
GREENRED
WHITE
30" 30"
STEEL POST
31-0552 41-1392
YELLOW
BLACK
30" 30"
STEEL POST
WHITE
BLACK
24" 24"
STEEL POST
31-1727
SENSITIVE
STAY ON
AREAS
AHEAD
TRAIL
BLACK
24" 24"
STEEL POST
YELLOW
BLACK
30" 30"
STEEL POST
YELLOW
41-4828 41-6126
BLACK
30" 30"
STEEL POST
FLUOR YEL/GRN
BLACK
24" 12"
STEEL POST
FLUOR YEL/GRN
TEST PIT
RED
WHITE
30" 30"
STEEL POST
31-0552 41-1392
WHITE
BLACK
36" 12"
STEEL POST
WHITE
BLACK
36" 12"
STEEL POST
31-1727
DO NOT
ENTER
ONE WAY ONE WAY
ADDENDUM NO. 1
M
SM
/0
2/
1.
A D
D
EN
D U
M N
O . 1
TITLESHEET NO.
SHEET NO. TITLE
**REVISED OR ADDED
DATE**
APPROVAL
DATE**
APPROVAL
*ONLY STANDARD SHEETS MARKED WITH AN " " ARE IN THIS PROJECT #
HW-918_01c THREE CABLE GUIDERAIL (I-BEAM POSTS) SHEET 3 11-08-22
HW-918_01b THREE CABLE GUIDERAIL (I-BEAM POSTS) SHEET 2 11-08-22
HW-918_01a THREE CABLE GUIDERAIL (I-BEAM POSTS) SHEET 1 11-08-22
HW-913_01a CHAIN LINK FENCE 11-08-22
HW-910_19c METAL BEAM RAIL (MODIFIED TYPE R-I) SYSTEMS 2 AND 3 11-08-22
HW-910_19b METAL BEAM RAIL (MODIFIED TYPE R-I) AND END ANCHORAGE TYPE II 10-17-24
HW-910_20 MASH W-BEAM HARDWARE 10-17-24
HW-910_21 METAL BEAM RAIL ( R-B MASH ) GUIDERAIL 01-05-24
HW-910_22 METAL BEAM RAIL ( MD-B MASH) GUIDERAIL 11-08-22
HW-910_24 METAL BEAM RAIL SPAN SECTION TYPES II AND III 11-08-22
HW-910_25a METAL BEAM RAIL TRANSITION 350 TO MASH 10-17-24
HW-910_19a METAL BEAM RAIL (MODIFIED TYPE R-I) AND END ANCHORAGE TYPE I 10-17-24
HW-1800_01 GRADING PLAN FOR IMPACT ATTENUATION SYSTEMS (FLARED AND TANGENTIAL) 10-17-24
HW-913_01b CHAIN LINK FENCE HARDWARE 11-08-22
HW-913_02 CHAIN LINK FENCE GATES 11-08-22
HW-949_01a LANDSCAPE PLANTING 11-09-22
HW-949_01b TREE STAKING 11-02-22
HW-910_13a THRIE-BEAM METAL BEAM RAIL HARDWARE 11-08-22
HW-910_13b THRIE-BEAM TRANSITIONS 11-08-22
HW-910_14a THRIE-BEAM 350 BRIDGE ATTACHMENT 11-08-22
HW-910_14b THRIE-BEAM 350 GUIDERAIL TRANSITION TO R-B 350 GUIDERAIL 11-08-22
HW-910_15 MD-B 350 MEDIAN BARRIER SAFETY SHAPE ATTACHMENT TYPE I 11-08-22
HW-910_16 MD-B 350 MEDIAN BARRIER SAFETY SHAPE ATTACHMENT TYPE II 11-08-22
HW-910_12d MERRITT PARKWAY MEDIAN GUIDERAIL AND END ANCHOR 10-17-24
HW-910_12c MERRITT PARKWAY GUIDERAIL TRAILING END ATTACHMENTS 11-02-22
HW-1800 02 GRADING PLAN FOR IMPACT ATTENUATION SYSTEMS (MEDIAN/GORE) 10-17-24
HW-910 09a MISCELLANEOUS GUIDERAIL TRANSITIONS SHEET 1 11-08-22
HW-910 09b MISCELLANEOUS GUIDERAIL TRANSITIONS SHEET 2 11-08-22
HW-910 10 METAL BEAM RAIL 8" x 6" BOX BEAM 11-08-22
HW-910 11 CURVED GUIDERAIL TREATMENT DETAIL 11-08-22
HW-910_12a MERRITT PARKWAY GUIDERAIL LEADING END ATTACHMENTS AND SYSTEMS 2&3 11-08-22
HW-910_12b MERRITT PARKWAY GUIDERAIL HARDWARE DETAILS 11-08-22
HW-910_18 METAL BEAM RAIL (TYPE MD-I) GUIDERAIL 11-08-22
HW-910_23 METAL BEAM RAIL (R-B MASH) HALF & QUARTER POST SPACING GUIDERAIL 11-08-22
HW-910_07 R-B 350 BRIDGE ATTACHMENT VERTICAL SHAPE PARAPET 11-08-22
HW-910_06 R-B 350 BRIDGE ATTACHMENT SAFETY SHAPE PARAPET 11-08-22
HW-910_05 METAL BEAM RAIL R-B 350 SPAN TYPE I, II, III SECTIONS 11-08-22
HW-910_04 METAL BEAM RAIL (TYPE R-B 350) SYSTEMS 5, 5A, & 6 11-08-22
HW-910_03 METAL BEAM RAIL (TYPE MD-B 350) GUIDERAIL 11-08-22
HW-910_02 METAL BEAM RAIL (TYPE R-B 350) GUIDERAIL 11-08-22
HW-910_01 W-BEAM METAL BEAM RAIL HARDWARE 11-08-22
HW-911_06a METAL BEAM RAIL (6 x 6 BO -BEAM) END ANCHORAGE TYPE I - HARDWARE
HW-911_03 ANCHOR IN EARTH CUT SLOPE & ANCHOR IN ROCK CUT SLOPE 01-05-24
HW-911_02 MD-B END ANCHORAGE TYPE I 10-17-24
HW-911_01 R-B END ANCHORAGE TYPE I AND II 10-17-24
HW-910_27 THRIE-BEAM ATTACHMENT 11-08-22
HW-910_26 THRIE-BEAM ATTACHMENT HARDWARE 11-08-22
HW-910_17 R-B TERMINAL SECTION 11-08-22
HW-921_01 CONCRETE SIDEWALKS 11-08-22
HW-910_29 THRIE-BEAM BRIDGE ATTACHMENT TRAILING END 02-02-24
HW-924_01 CONCRETE DRIVEWAY RAMPS 10-17-24
HW-930_01 OBJECT MARKER ( MAINTENANCE ) 10-17-24
HW-910_25b METAL BEAM RAIL MEDIAN APPLICATION TRANSITION 350 TO MASH GUIDERAIL 01-05-24
STANDARD SHEET TITLE: STANDARD SHEET NO.:SIGNATURE BLOCK:
HIGHWAY STANDARD SHEET INDEX
NOT TO SCALE
NEWINGTON, CT 06111
2800 BERLIN TURNPIKE
OFFICE OF ENGINEERING
STANDARD SHEET
CTDOT
TRANSPORTATION
DEPARTMENT OF
CONNECTICUT
HW-922_01 BITUMINOUS CONCRETE SIDEWALK AND BITUMINOUS CONCRETE DRIVEWAY 11-08-22
HW-910_30a RE
HW-910_30b METAL BEAM RAIL (6 X 6 BOX-BEAM) GUIDERAIL
HW-911_06b METAL BEAM RAIL (6 x 6 BOX-BEAM) END ANCHORAGE TYPE I
HW-911_05 MERRITT PARKWAY GUIDERAIL END ANCHORS 11-08-22
sollmimj Typewritten Text sollmimj Typewritten Text sollmimj Typewritten Text sollmimj Text Box 01-28-25 sollmimj Text Box 01-28-25 sollmimj Text Box 01-28-25 sollmimj Text Box 01-28-25 sollmimj Text Box
METAL BEAM RAIL (6 X 6 BOX BEAM) GUIDERAIL - HARDWARE
dgannon Typewritten Text
ADDENDUM NO. 1
dgannon Typewritten Text dgannon Polygon dgannon Typewritten Text
| 128-158 - Sheet Replacements_Addendum No. 1.pdf |
| 2026-11-02 - ADDENDUM NO.1 Plans |
| 04 MDS-1 |
| 14 ENV-1 |
| 15 ENV-2 |
| 22 LA-1 |
HW-0922_01
| Check Box1: Off |
| Check Box2: Off |
| Check Box3: Off |
| Check Box4: Off |
| Check Box5: Off |
| Check Box6: Off |
| Check Box7: Off |
| Check Box8: Off |
| Check Box9: Yes |
| Check Box10: Off |
| Check Box11: Off |
| Check Box12: Off |
| Check Box13: Yes |
| Check Box14: Off |
| Check Box15: Off |
| Check Box16: Off |
| Check Box17: Off |
| Check Box18: Off |
| Check Box19: Off |
| Check Box20: Off |
| Check Box21: Off |
| Check Box22: Off |
| Check Box23: Off |
| Check Box24: Yes |
| Check Box25: Off |
| Check Box26: Off |
| Check Box27: Off |
| Check Box28: Off |
| Check Box29: Yes |
| Check Box30: Yes |
| Check Box31: Off |
| Check Box32: Off |
| Check Box33: Off |
| Check Box34: Yes |
| Check Box35: Off |
| Check Box36: Off |
| Check Box37: Off |
| Check Box38: Off |
| Check Box39: Off |
| Check Box40: Off |
| Check Box41: Off |
| Check Box42: Off |
| Check Box43: Off |
| Check Box44: Off |
| Check Box45: Off |
| Check Box46: Off |
| Check Box47: Off |
| Check Box48: Off |
| Check Box49: Off |
| Check Box50: Off |
| Check Box51: Yes |
| Check Box52: Yes |
| Check Box53: Yes |
| Check Box54: Off |
| Check Box55: Off |
| Check Box56: Off |
| Check Box57: Off |
| Check Box58: Off |
| Text1: 0128-0158 |
File details come from the government source that posted it. Updated .