CRCGV-02 Material and Equipment Specifications
Closed State & local contract opportunity Posted
- Solicitation number
- 69CRC-S2782
- State
- Nevada
- Responses due
Opportunity facts
- Jurisdictions
- NIGP code
Opportunity details come from nevadaepro.com. Updated .
About this opportunity
The state and local contracting opportunity is for the provision of manufacturer-designed structural steel framework for mounting and connecting all equipment at substation sites in Clark County and the Fish Springs CDP in Nevada. The Colorado River Commission of Nevada (CRCNV) is seeking bids to design, manufacture, assemble, test, ship, and provide ancillary services for the procurement of this structural steel framework, which will be used to support the electrical equipment and infrastructure at the Garnet Valley Water System - 2920 Substation project. The required materials and equipment are detailed in the attached technical drawings and specifications, which outline the specific configurations, dimensions, and arrangements for the substation components. Bids are due by May 13, 2024, and the anticipated final acceptance date for all equipment is October 1, 2025. The CRCNV may award the contract in part to multiple bidders, and the successful contractor will be required to provide a performance bond.
The contract opportunity does not appear to include any set-aside designations or restrictions on the types of organizations that can respond. The materials and equipment must meet the technical specifications outlined in the attachments, which include requirements for seismic, wind, and ice loading. No incumbent vendors or current contractors are specifically listed, and the available documents do not provide details on possible award values or budget ranges for the project.
Opportunity text
The structures for substations shall consist of manufacturer designed structural steel frame-work for mounting and connecting all equipment in accordance with attached drawings. Items supplied by others are given for information purposes only. Structures shall be provided as shown on the drawings. Arrangement of all circuits and static masts shall be as shown on the plans.
Files
| File | Type | Posted |
|---|---|---|
| 33 72 73 - MATERIAL AND EQUIPMENT SPECIFICATIONS.pdf | ||
| Quote Instructions.pdf | ||
| Drawing_3533s-18-E-E53.pdf | ||
| Drawing_3533s-18-E-E50.pdf | ||
| Drawing_3533s-18-E-E52.pdf | ||
| Drawing_3533s-18-E-E54.pdf | ||
| CRCGV-02_Material and Equipment_Bid Contract.docx | DOCX document | |
| Drawing_3533s-18-E-E161.pdf | ||
| DRAWINGS~2.pdf | ||
| Drawing_3533s-18-E-E51.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity