Drawing_3533s-18-E-E53.pdf

PDF 958 KB Posted

Attached to
CRCGV-02 Material and Equipment Specifications
Solicitation number
69CRC-S2782
Issued by
Clark County, Fish Springs CDP, Nevada

About this file

This document appears to be a design submittal for a preliminary 60% design for the Garnet Valley Water System Apex 2920 Pumping Station Site Apex Substation Elevations, Sections C, D, E & F, a state and local contract opportunity in Nevada. The drawings provide details on the structural steel framework, equipment, and electrical circuits for the substation, with notes regarding materials provided by the owner, future switch structure, structure heights, and requirements for dampening cables and weep holes. The related state and local contract opportunity is for the material and equipment specifications for the substation structures, which must be provided as shown on the drawings.

The design submittal does not provide pricing terms, set-asides, incumbent information, funding details, or other salient commercial information. The document appears to be focused on the technical specifications and drawings for the substation rather than the commercial aspects of the contract opportunity.

View the file

Other files

File Type Posted
33 72 73 - MATERIAL AND EQUIPMENT SPECIFICATIONS.pdf PDF
Quote Instructions.pdf PDF
CRCGV-02_Material and Equipment_Bid Contract.docx DOCX document
Drawing_3533s-18-E-E161.pdf PDF
Drawing_3533s-18-E-E50.pdf PDF
Drawing_3533s-18-E-E52.pdf PDF
Drawing_3533s-18-E-E54.pdf PDF
DRAWINGS~2.pdf PDF
Drawing_3533s-18-E-E51.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION E

E51SCALE: 1/4" = 1'-0"

10'-0"

5' -0

5'

-0

8' -6

2'-0" 2'-0"3'-0" 3'-0"

AØ BØ CØ

556.5 AAC

(TYP.)

500 KCMIL

(TYP.)

SECTION F

E51SCALE: 1/4" = 1'-0"

8'-0"

1'-0" 1'-0"3'-0" 3'-0"

AØ BØ CØ

8' -0

4'

-3

2' -3

4'

-0

R10"

SECTION C

E51SCALE: 1/8" = 1'-0"

CØ

F

12'-0" 12'-0" 7'-0" 10'-0" 12'-0"12'-0"7'-0"

'-0

9'

-0

1'-6"

BØ

F

AØ

F

4" SPS

EX EX

CØ

F

1'-6"

BØ

F

AØ

F

SECTION D

E51SCALE: 1/8" = 1'-0"

10'-0"8'-0"

F

D E S O L C

4" SPS

12'-0" 13'-0"12'-0"13'-0"

9'-0" 9'-0"16'-0" 16'-0"

'-0

'-0

'-0

'-0

F

954 AAC

(TYP.)

AØBØCØ

954 AAC

(TYP.)

OPGW SPLICE

CAN F.S.

SECTION F

E51SCALE: 1/4" = 1'-0"

AØ BØ CØ

AØ BØ CØ

8'-0"

EX

36'-0"

CØ

ONLY

AØ

ONLY

SEE

NOTE 2

The information provided in this document is confidential, conceptual and subject to change. This document shall not be shared or dispersed without the written consent of SNWA.

SNWA makes no guarantee of the construction of any facilities shown herein and any use of the information contained or derived from this document will be at the sole risk of the receiving party.

D

ES

IG

N

S U

BM

IT

TA

L

- P R

EL

IM

IN

AR

Y

SU

BM

IT

TA

L

N O

T

FO

R C

O N

ST

R

U C

TI

O

N

S SLIP BUS CONNECTION

F FIXED BUS CONNECTION

E EXPANSION BUS CONNECTION

LEGEND

D R

AW

N

B Y:

C H

EC

KE

D B

Y:

R

EV

IS

IO

N S:

DRAWING/NUMBER

SHEET OF

COMMIT:

PROJECT:

SC

AL

E

VE

R

IF

Y

SC

AL

E 1/

1/

BA

R

R

EP

R

ES

EN

TS

O N

E

AN

D O

N E-

H

AL

F

IN

C H

ES

O

N O

R

IG

IN

AL

V

IA

A U

ST

I P

AR

KW

AY

S

U

IT

E

LA

S

VE

G

AS

N

EV

AD

A

(7

) 9

-6

3533S

010717

E53

R

AM

SI

N

A D

AM

Z

ZA

FA

R A

SH

R

AF

I

G

AR

N

ET

V

AL

LE

Y

W

AT

ER

S

YS

TE

M

AP

EX

PU

M

PI

N

G S

TA

TI

O N

S

IT

E

AP

EX

S U

BS

TA

TI

O

N

EL

EV

AT

IO

N

S

EC

TI

O

N S

C , D

, E

F

AS

S

HO

W

N

4 8 168

SCALE: 1/8"=1'-0"

4 8 168

SCALE: 1/8"=1'-0"

2 4 84

SCALE: 1/4"=1'-0"

2 4 84

SCALE: 1/4"=1'-0"

1. SEE WRITTEN SPECIFICATIONS FOR MATERIAL

PROVIDED BY OWNER AND MATERIAL PACKAGER.

2. INITIALLY, A THREE PHASE BUS SUPPORT WILL BE

PLACED ON THE SWITCH STRUCTURE TO SUPPORT BUS

WORK. FOR ULTIMATE BUILD OUT, THE BUS SUPPORTS

WILL BE REPLACED WITH A 230KV SWITCH.

3. STRUCTURE HEIGHTS MEASURED FROM BOTTOM OF

BASE PLATES.

4. DAMPENING CABLE TO BE INSTALLED IN HORIZONTAL

BUS LONGER THAN 8 FEET.

5. ALL HORIZONTAL RIGID BUS TO INCLUDE A 14" WEEP

HOLE AT MID-SPAN BETWEEN ALL BUS SUPPORTS.

NOTES:

6/30/24NOT F

OR

CO

NST

RU

CT

IO

N

1/16/24

File details come from the government source that posted it. Updated .