Control Building Sidewalk And Structural Slab Replacement Project

Open State & local contract opportunity Posted

Solicitation number
BCUA -26-C224
State
New Jersey
Responses due

Opportunity facts

Jurisdiction

Opportunity details come from constructionbidsource.com. Updated .

About this opportunity

Bergen County Utilities Authority is soliciting sealed bids for the Control Building Sidewalk and Structural Slab Replacement Project (Contract C224) at its Little Ferry Treatment Plant in Little Ferry, New Jersey, with a pre-bid meeting scheduled for November 20, 2026 from 10:00 to 11:30 AM and bids due December 11, 2026 at 2:00 PM. Bidders must comply with New Jersey Prevailing Wage Act requirements and be registered under the Public Works Contractors Registration Act.

The scope covers repair of structural slabs at four existing entrances to the Control Building, plus new concrete sidewalk and vertical curb, parking lot striping, and entrance vestibule enclosures with card readers and canopies. Additional work includes architectural entrance improvements, electrical and security/access-control modifications, automatic door operators, new and relocated intercom stations, and a new intercom master station at the Administration Building, with programming, testing, and commissioning. Key bid items include full- and partial-depth slab repairs, concrete sidewalk and curb, concrete steps with handrails, ADA signage, detectable warning surfaces, and pavement markings.

The project is funded solely through BCUA bond proceeds, with no federal or state financing. Payment is on a lump sum and unit price basis, following monthly certification of work by the owner and engineer, with applications due by the first Friday of each month and an updated Critical Path Method schedule submitted with each application. The contractor must provide a two-year guarantee on labor and materials from substantial completion and a two-year maintenance bond equal to 100 percent of the final contract price. Bidders must submit a bid bond of 10 percent of the total bid price, not to exceed $20,000, along with a Consent of Surety confirming the surety will provide a 100 percent performance and payment bond. Contractors and subcontractors must submit Experience Modification Rating data for the five previous years.

The Authority reserves the right to award items separately to the lowest responsible bidder or on a total bid basis. Bids must be submitted electronically through the Euna E-Procurement platform. Physical certified checks are permitted but must also be delivered to the BCUA Division of Purchasing office in Little Ferry. Compliance with non-discrimination, EEO/affirmative action, ADA, and New Jersey Workplace Accountability in Labor List provisions applies.

Opportunity text

The Project Scope generally consists of the repair of the various structural slabs located at four (4) existing entrances to the Bergen County Utilities Authority Little Ferry Treatment Plant Control Building, along with ancillary improvements that include the construction of new concrete sidewalk, concrete vertical curb, parking lot striping, and the installation of entrance vestibule enclosures with card readers and canopies. The Project scope also includes architectural entrance improvements, electrical and security/access-control modifications, automatic door operators, new and relocated intercom stations, a new separate intercom master station at the Administration Building, associated card readers, power, cabling, programming, testing, and related improvements required for a complete and functional installation.

Files

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for State & Local Contractors