This document comprises the contract specifications and bidding requirements for the Bergen County Utilities Authority (BCUA) Control Building Sidewalk and Structural Slab Replacement Project (Contract C224) located at the Little Ferry Treatment Plant in New Jersey. The project involves repair of structural slabs at four existing entrances to the control building, construction of new concrete sidewalk and vertical curb, parking lot striping, and installation of entrance vestibule enclosures with card readers and canopies. Additional scope includes architectural entrance improvements, electrical modifications, security and access-control upgrades, automatic door operators, intercom systems, and associated testing and commissioning. Key bid items include mobilization and demobilization, selective demolition, full-depth slab repair (285 square feet estimated), partial-depth slab repairs (62 square feet horizontal and 30 square feet overhead), concrete sidewalk construction (80 square yards at 6 inches thick and 5 square yards at 4 inches thick), concrete vertical curb (70 linear feet), concrete steps with handrails, ADA signage, detectable warning surfaces, and pavement markings. A pre-bid meeting is scheduled for November 20, 2026, from 10:00 AM to 11:30 AM. Sealed bids are due electronically by December 11, 2026, at 2:00 PM through the Euna E-Procurement platform. All prospective bidders must submit bids electronically; physical certified checks are permitted but must also be submitted at the BCUA Division of Purchasing office in Little Ferry, New Jersey. The contract term is not specified in the provided excerpts, though general conditions indicate a two-year guarantee period for labor and materials from substantial completion.
Bid bonds in the amount of ten percent of the total bid price (not to exceed $20,000) are required, along with a Consent of Surety certificate confirming the surety's willingness to provide a 100 percent performance and payment bond. The successful bidder must furnish a two-year maintenance bond equal to 100 percent of the final contract price. Payment will be made on a lump sum and unit price basis following monthly certification of work by the owner and engineer, with applications due by the first Friday of each month. The contractor must maintain an updated Critical Path Method (CPM) schedule with each payment application. The project is funded solely through BCUA bond proceeds with no federal or state financing. All work must comply with New Jersey Prevailing Wage Act requirements, and contractors must be registered under the Public Works Contractors Registration Act. Contractors and subcontractors must submit Experience Modification Rating (EMR) data for the five previous years. The Authority reserves the right to award items separately to the lowest responsible bidder or on a total bid basis. All standard procurement requirements apply, including non-discrimination, EEO/affirmative action compliance, Americans with Disabilities Act requirements, and compliance with New Jersey's Workplace Accountability in Labor List (WALL) provisions.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bergen County Utilities Authority Bergen County, New Jersey
298 Mehrhof Rd, Little Ferry, NJ 07643
Contract Documents and Specifications for the
BERGEN COUNTY UTILITIES AUTHORITY
CONTROL BUILDING SIDEWALK AND
STRUCTURAL SLAB REPLACEMENT PROJECT
Contract C224
SEPTEMBER 24, 2026
COMMISSIONERS
RONALD PHILLIPS .........................................................................CHAIRMAN
LOUIS J. DELISIO .................................................................VICE CHAIRMAN
BRUCE BONAVENTURO......................................................COMMISSIONER
DAVID BORZOTTA................................................................COMMISSIONER
MATTHEW CAPILLI .............................................................COMMISSIONER
BRYAN J. DRUMGOOLE ......................................................COMMISSIONER
DANIEL GUMBLE ..................................................................COMMISSIONER
DIANE T. TESTA.....................................................................COMMISSIONER
JON WARMS............................................................................COMMISSIONER
CONOR GORMAN...........................................................BOARD SECRETARY
PREPARED BY:
YASSEEN SAAD, P.E.
Professional Engineer
New Jersey License No. 57522
NEA File No.: BCUAPRV22.010
34 PARK AVENUE, LYNDHURST, NJ 07071
Digitally signed by Yasseen Saad Date: 2026.11.10 10:36:59-05'00'
THIS PAGE INTENTIONALLY LEFT BLANK
Bergen County Utilities Authority 09/24/2026 TABLE OF CONTENTS
Contract C224 00 00 02 - 1
TABLE OF CONTENTS
DIVISION 00 - BIDDING AND CONTRACTING REQUIREMENTS
A. PROJECT DETAILS / IMPORTANT EVENTS
1. Project Description
2. Bid Schedule
B. SUPPORTING DOCUMENTATION
1. 00 10 00 - Notice to Bidders [PDF]
2. 00 20 00 - Qualification Statement [PDF]
3. 00 30 00 - General Requirements 9.19.2025 [PDF]
4. 00 40 00 - Supplemental Requirements [PDF]
5. 00 41 00 - Bid Item Key and Acceptance [PDF] with the following exhibits:
A. Acknowledgment of Receipt of Changes to Bid Documents
C. Affirmative Action Certification (Construction Contracts)
D. Bidder's Affidavit
E. Prevailing Wage Affidavit
6. 00 50 00 - C224 Construction Agreement [PDF] with the following exhibits:
A. Notice to Bidders
B. New Jersey Business Registration Certificate
C. Mandatory Equal Employment Opportunity Language
D. Americans with Disabilities Act of 1990
E. New Jersey Performance and Payment Bond
F. Maintenance Bond
H. Equipment Manufacturer's Certificate of Installation, Testing, and Instruction
I. Contractor's Certification of Completion
J. Contractor's Affidavit of Payment of Debts and Claims
K. Contractor's Affidavit of Release of Liens
L. Contractor's Final Waiver of Lien
M. Non-Collusion Affidavit
N. Sample Notice to Proceed
O. Certification of Acceptance of Work by Owner/Engineer
7. 00 51 03 - Federal Non-Debarment Certification [PDF]
8. 00 51 04 - Mandatory Affirmative Action Language Exhibit B [PDF]
9. 00 51 06 - NJ Prevailing Wage Certification [PDF]
10. 00 51 10 - Consent of Surety [PDF]
11. 00 51 11 - Bid Document Submission Checklist [PDF]
12. 00 51 13 - Statement of Ownership Disclosure [PDF]
13. 00 51 18 - Disclosure of Election Contributions [PDF]
14. 00 51 19 - American Products Certification [PDF]
15. 00 51 20 - NJ PWCR Certificate of Prime Contractor Template [PDF]
16. 00 61 40 - Bid Bond [PDF]
17. 00 61 41 - Surety Disclosure Statement and Certification [PDF]
18. 00 80 10 - BCUA General Conditions [PDF]
19. 00 80 20 - BCUA Supplementary Conditions [PDF]
20. BCUA C224 Final Drawings - Bid Set [PDF]
21. BCUA C224 Division 01 Specifications [PDF]
22. BCUA C224 Final Technical Specifications [PDF]
23. NJ Prevailing Wage Determination [EUNA]
Bergen County Utilities Authority 09/24/2026 Contract C224 00 10 00 – 1
Erick G. Martinez, QPA Purchasing Manager
N O T I C E T O B I D D E R S
A N O T I C E I S H E R E B Y G I V E N that sealed Bid Packets will be received by the BERGEN COUNTY UTILITIES AUTHORITY (AUTHORITY) on December 11, 2026 at 2:00 PM prevailing time electronically to the Authority through the Euna E-Procurement platform accessible via www.BergenBids.com in accordance with N.J.A.C. 5:34-5.5(a)(1). Bidding Documents shall be obtained using the Euna E-Procurement platform accessible via www.bcua.org/procurement-opportunities. These documents are available at no cost. Neither the Owner nor the Engineer will be responsible for Bidding Documents, including any addenda, obtained from other sources.
All bids will be opened electronically, and all bids shall be publicly unsealed and the names of all bidders and the price of their respective bids or proposals shall be verbally announced in public by the Authority once the submission deadline has passed and no bids shall be received after the time designated in the advertisement in accordance with N.J.S.A. 40A:11-23b. Furthermore within 24 hours of the opening all bid responses will be available for download on the e-procurement portal.
CONTRACT C224 - BERGEN COUNTY UTILITIES AUTHORITY CONTROL BUILDING
SIDEWALK AND STRUCTURAL SLAB REPLACEMENT PROJECT
The Project Scope generally consists of the repair of the various structural slabs located at four (4) existing entrances to the Bergen County Utilities Authority Little Ferry Treatment Plant Control Building, along with ancillary improvements that include the construction of new concrete sidewalk, concrete vertical curb, and parking lot striping, and the installation of entrance vestibule enclosures with card readers and canopies. The Project scope also includes architectural entrance improvements, electrical and security/access-control modifications, automatic door operators, new and relocated intercom stations, a new separate intercom master station at the Administration Building, associated card readers, power, cabling, programming, testing, and related improvements required for a complete and functional installation.
Bidders shall submit with the bid an electronic bid bond or electronic copy of a bid bond in the amount of ten percent (10%) of the total price bid, but not in excess of $20,000.00, payable unconditionally to the Bergen County Utilities Authority, along with a Certificate (Consent of Surety) with Power of Attorney for the full amount of the bid price from a Surety Company authorized to do business in the State of New Jersey and said Surety will furnish a consolidated Performance and Payment Bond in amounts of 100% of the successful Bidder’s contract. If the Bidder is to submit a certified check or cashier check: (1) the bidder shall include an image of the check upon submission of their bids through the electronic platform in accordance with NJAC 5:34-5.3(f)(1); and (2) the physical check shall be sealed upon submission to the Authority and clearly marked as part of the bidders response in accordance with NJAC 5:34-5.3(f)(2) at the following address no later than the time stated above; BCUA Division of Purchasing, Foot of Mehrhof Road, P.O. Box 9 Little Ferry, NJ 07643 — ALL OTHER DOCUMENTS MUST BE
SUBMITTED ELECTRONICALLY.
UTILITIES AUTHORITY
Box 9, Foot of Mehrhof Road, Little Ferry, New Jersey 07643
Direct: (201) 807-5822 Email: emartinez@bcua.org
Contract C224 00 10 00 – 2
The successful Bidder shall also furnish, upon acceptance of the Work, a two (2) year Maintenance Bond in the amount of 100% of the final Contract Price, as required by SC-5.01.E of the Supplementary Conditions.
CONDITIONAL BONDS SHALL BE REJECTED
In accordance with N.J.A.C. 5:34-5.3(e), any addenda will be transmitted to the Bidders through the Euna E-Procurement platform in lieu of the method of delivery otherwise required under New Jersey law including N.J.S.A. 40A:11-23.
Bidders shall comply with the requirements of N.J.S.A. 10:5-31 et seq. and N.J.A.C. 17:27 et seq.
which includes requirement regarding affirmative action.
Bidders shall comply with the “Prevailing Wage Act” N.J.S.A. 34:11-56.25 et seq., and the Public Works Contractor Registration Act, N.J.S.A. 34:11-56.48 et seq.
All applicable surety bonds required in connection with the advertisement and award of building contracts or sub-agreements must be written by a surety company listed on the Federal Treasury List (Department Circular 570—Surety Companies Acceptable on Federal Bonds), incorporated herein by reference. Any business whose name appears on the WALL (Workplace Accountability in Labor List) is prohibited from public contracting under N.J.S.A. 34:1A-1.16, the law establishing the WALL - Division of Employer Accounts | The WALL (Workplace Accountability in Labor List).
Bidders shall submit an Experience Modification Rating (EMR) for the five (5) previous years with their bid. The EMR shall be on letterhead from the Bidder’s Insurance Agent or from the Bidder’s Insurance Advisory Organization (NCCI or state specific).
There shall be a pre-bid meeting for all Prospective Bidders on November 20, 2026 from 10:00 AM to 11:30 AM prevailing time at the Authority’s Administrative Building. Although not mandatory, it is STRONGLY RECOMMENDED that all Prospective Bidders attend the pre-bid meeting. Failure to attend the pre-bid meeting does not relieve the bidder of any obligations or requirements. Any individuals visiting the site must bring their own personal protection equipment (“PPE”) which must include, at a minimum, hardhats, safety vest, safety boots, and gloves. The BCUA will not provide PPE.
In accordance with N.J.A.C. 5:34-5.3(c), all questions and requests for information shall be submitted exclusively through the Q&A module of the Euna E-Procurement platform no later than November 27, 2026 at 12:00 PM prevailing time.
Sealed bids for this project are being solicited through a fair and open process in accordance with N.J.S.A. 19:44A-20.4 et seq.
By Order of the Bergen County Utilities Authority Erick Martinez, QPA Purchasing Manager
Publication Date: November 10, 2026
Contract C224 00 20 00 - 1
SECTION 00 20 00
BIDDER�S QUALIFICATIONS STATEMENT
THE INFORMATION SUPPLIED IN THIS DOCUMENT IS CONFIDENTIAL TO THE EXTENT
PERMITTED BY LAWS AND REGULATIONS
N.J.S.A. 40A:11-26, and N.J.S.A. 40A:11-27 allow the Authority to establish a standard questionnaire for all bidders. Including the following information in such statements and questionnaires shall be standardized for like classes of goods or services to be submitted to prospective bidders who may be required to respond to questions under oath. The statement or answer shall disclose fully the financial ability, adequacy of plant and equipment, organization and prior experience of the prospective bidder, and such other pertinent and material facts as may be required.
The Contractor submitting the Bid shall have performed a minimum of two (2) projects of similar scope to this project within the past five (5) years. The Contractor shall submit evidence with the bid, satisfactory to the Authority, of experience in construction of projects of similar type and size. Such evidence shall include submitted plans, full disclosure of significant problems encountered (including accidents involving injury or property damage), evidence of proper completion and release, and persons to contact regarding the previous work. Further, all terms here are meant to be gender neutral.
The undersigned offers the following information relative to the facilities, ability and financial resources available for the fulfillment of the contract if such be awarded to him.
1. SUBMITTED BY:
Official Name of Firm:
Address:
2. SUBMITTED TO:
3. SUBMITTED FOR:
Owner:
Project Name:
TYPE OF WORK:
Contract C224 00 20 00 - 2
4. CONTRACTOR'S CONTACT INFORMATION
Contact Person:
Title:
Phone:
Email:
Unique Entity ID (UEI) (if any):
NAICS Number:
5. AFFILIATED COMPANIES:
Name:
6. TYPE OF ORGANIZATION:
SOLE PROPRIETORSHIP
Name of Owner:
Doing Business As:
Date of Organization:
PARTNERSHIP
Date of Organization:
Type of Partnership:
Name of General Partner(s):
Contract C224 00 20 00 - 3
CORPORATION
State of Organization:
Date of Organization:
Executive Officers:
- President:
- Vice President(s):
- Treasurer:
- Secretary:
LIMITED LIABILITY COMPANY
State of Organization:
Date of Organization:
Members:
JOINT VENTURE
Sate of Organization:
Date of Organization:
Form of Organization:
Joint Venture Managing Partner
- Name:
- Address:
Contract C224 00 20 00 - 4
Joint Venture Managing Partner
Joint Venture Managing Partner
7. LICENSING
Jurisdiction:
Type of License:
License Number:
Jurisdiction:
Type of License:
License Number:
8. CERTIFICATIONS CERTIFIED BY:
Disadvantage Business Enterprise:
Minority Business Enterprise:
Woman Owned Enterprise:
Small Business Enterprise:
Other ( ):
9. BONDING INFORMATION
Bonding Company:
Contract C224 00 20 00 - 5
Bonding Agent:
Contact Name:
Phone:
Aggregate Bonding Capacity:
Available Bonding Capacity as of date of this submittal:
10. FINANCIAL INFORMATION
Financial Institution:
Account Manager:
Phone:
INCLUDE AS AN ATTACHMENT AN AUDITED BALANCE SHEET FOR EACH OF THE
LAST 3 YEARS
11. CONSTRUCTION EXPERIENCE:
Current Experience:
List on Schedule A all similar scope of work uncompleted projects currently under contract
(If Joint Venture list each participant's projects separately).
Previous Experience:
List on Schedule B all projects completed within the last 5 Years (If Joint Venture list each participant's projects separately).
Has firm listed in Section 1 ever failed to complete a construction contract awarded to it?
YES NO
Contract C224 00 20 00 - 6
If YES, attach as an Attachment details including project owner's contact information.
Has any corporate officer, partner, joint venture participant, or proprietor ever failed to complete a construction contract awarded to them in their name or when acting as a principal of another entity?
YES NO
If YES, attach as an Attachment details including Project Owner's contact information.
Are there any judgments, claims, disputes or litigation pending or outstanding involving the firm listed in Section 1 or any of its officers (or any of its partners if a partnership or any of the individual entities if a joint venture)?
YES NO
If YES, attach as an Attachment details including Project Owner's contact information.
12. SAFETY PROGRAM:
Name of Contractor's Safety Officer:
Include the following as attachments:
Provide as an Attachment Contractor's (and Contractor's proposed Subcontractors and
Suppliers furnishing or performing Work having a value in excess of 10 percent of the total amount of the Bid) OSHA Form 300A - Summary of Occupational Injuries and Illnesses for each of the past 5 years. When requested by Owner or Engineer after receipt of Bids, promptly submit OSHA Form 300 � Log of Work-Related Injuries and Illnesses, for each of the past 5 years.
Provide as an Attachment Contractor's (and Contractor's proposed Subcontractors and
Suppliers furnishing or performing Work having a value in excess of 10 percent of the total amount of the Bid) list of all OSHA Citations & Notifications of Penalty (monetary or other) received within the last 5 years (indicate disposition as applicable) - IF NONE SO STATE.
Provide as an Attachment Contractor's (and Contractor's proposed Subcontractors and
Suppliers furnishing or performing Work having a value in excess of 10 percent of the total amount of the Bid) list of all safety citations or violations under any state all received within the last five years (indicate disposition as applicable) - IF NONE SO STATE.
Provide the following for the firm listed in Section V (and for each proposed Subcontractor furnishing or performing Work having a value in excess of 10 percent of the total amount of the Bid) the following (attach additional sheets as necessary):
Workers' compensation Experience Modification Rate (EMR) for the five (5) previous years, as required by the Notice to Bidders:
YEAR EMR
Contract C224 00 20 00 - 7
YEAR EMR
YEAR EMR
YEAR EMR
YEAR EMR
Total Recordable Frequency Rate (TRFR) for the last 5 years:
YEAR TRFR
YEAR TRFR
YEAR TRFR
YEAR TRFR
YEAR TRFR
Total number of man-hours worked for the last 5 Years:
YEAR TOTAL NUMBER OF MAN-HOURS
YEAR TOTAL NUMBER OF MAN-HOURS
YEAR TOTAL NUMBER OF MAN-HOURS
YEAR TOTAL NUMBER OF MAN-HOURS
YEAR TOTAL NUMBER OF MAN-HOURS
Provide Contractor's (and Contractor's proposed Subcontractors and Suppliers furnishing or performing Work having a value in excess of 10 percent of the total amount of the Bid) Days
Away From Work, Days of Restricted Work Activity or Job Transfer (DART) incidence rate for the particular industry or type of Work to be performed by Contractor and each of
Contractor's proposed Subcontractors and Suppliers) for the last 5 years:
YEAR DART
YEAR DART
YEAR DART
YEAR DART
YEAR DART
13. EQUIPMENT:
MAJOR EQUIPMENT:
List on Schedule C all pieces of major equipment available for use on Owner's Project. To the extent that the undersigned is not the actual owner or lessee of any such equipment, attached hereto is a statement showing the source from which the equipment will be obtained together with a certificate from the owner or person in control of the equipment granting to the undersigned the control of the equipment required during such time as may be necessary for the completion of that portion of the contract for which the equipment is required and necessary.
Contract C224 00 20 00 - 8
I HEREBY CERTIFY THAT THE INFORMATION SUBMITTED HEREWITH, INCLUDING ANY ATTACHMENTS, IS
TRUE TO THE BEST OF MY KNOWLEDGE AND BELIEF AND THAT I OWN, LEASE OR CONTROL ALL THE
NECESSARY EQUIPMENT REQUIRED BY THE PLANS, SPECIFICATIONS, AND ADVERTISEMENTS UNDER
WHICH BIDS ARE ASKED FOR.
NAME OF ORGANIZATION:
BY:
TITLE:
DATED:
NOTARY ATTEST:
SUBSCRIBED AND SWORN TO BEFORE ME
THIS DAY OF , 20___
NOTARY PUBLIC - STATE OF
MY COMMISSION EXPIRES:
REQUIRED ATTACHMENTS
1. Schedule A (Current Experience).
2. Schedule B (Previous Experience).
3. Schedule C (Major Equipment).
4. Audited balance sheet for each of the last 3 years for firm named in Section 1.
5. Evidence of authority for individuals listed in Section 7 to bind organization to an agreement.
6. Resumes of officers and key individuals (including Safety Officer) of firm named in Section 1.
7. Required safety program submittals listed in Section 12.
8. Additional items as pertinent.
Contract C224 00 20 00 - 9
++ THIS PAGE IS PURPOSELY LEFT BLANK ++
SCHEDULE A
CURRENT EXPERIENCE
Project Name Owner's Contact Person Design Engineer Contract Date Type of Work Status Cost of Work
Name:
Address:
Telephone:
Name:
Company:
Telephone:
Name:
Address:
Telephone:
Name:
Company:
Telephone:
Name:
Address:
Telephone:
Name:
Company:
Telephone:
Name:
Address:
Telephone:
Name:
Company:
Telephone:
Name:
Address:
Telephone:
Name:
Company:
Telephone:
Name:
Address:
Telephone:
Name:
Company:
Telephone:
Name:
Address:
Telephone:
Name:
Company:
Telephone:
SCHEDULE B
PREVIOUS EXPERIENCE (Include ALL Projects Completed within last 5 years) Project Name Owner's Contact Person Design Engineer Contract Date Type of Work Status Cost of Work
Name:
Address:
Telephone:
Name:
Company:
Telephone:
Name:
Address:
Telephone:
Name:
Company:
Telephone:
Name:
Address:
Telephone:
Name:
Company:
Telephone:
Name:
Address:
Telephone:
Name:
Company:
Telephone:
Name:
Address:
Telephone:
Name:
Company:
Telephone:
Name:
Address:
Telephone:
Name:
Company:
Telephone:
Name:
Address:
Telephone:
Name:
SCHEDULE B
PREVIOUS EXPERIENCE (Include ALL Projects Completed within last 5 years) Project Name Owner's Contact Person Design Engineer Contract Date Type of Work Status Cost of Work
Name:
Address:
Telephone:
Name:
Company:
Telephone:
Name:
Address:
Telephone:
Name:
Company:
Telephone:
Name:
Address:
Telephone:
Name:
Company:
Telephone:
Name:
Address:
Telephone:
Name:
Company:
Telephone:
Name:
Address:
Telephone:
Name:
Company:
Telephone:
Name:
Address:
Telephone:
Name:
Company:
Telephone:
Name:
Address:
Telephone:
Name:
SCHEDULE C - LIST OF MAJOR EQUIPMENT AVAILABLE
ITEM PURCHASE DATE CONDITION ACQUIRED VALUE
+ + END OF QUALIFICATIONS STATEMENT + +
Contract C224 00 30 00 - 1
SECTION 00 30 00
General Requirements
Bergen County Utilities Authority
Please review the general requirements which apply to all procurements issued on this system.
Failure to agree to the terms may be cause for rejection of your submission.
1.1.1
1. BRAND NAMES, STANDARDS OF QUALITY, PATENTS (N.J.A.C. 5:34-9.2(c) and
N.J.S.A. 40A:11-13)
A. Only manufactured and farm products of the United States, wherever available, shall be used on this contract in accordance with prevailing Statutes.
B. Brand names and/or descriptions used in this bid are to acquaint bidders with the type of commodity desired and will be used as a standard by which alternate or competitive materials offered will be judged. Competitive items must better than or equal to the standard described and be of the same quality of work. Variations between materials described and the materials offered are to be fully explained by the bidder on a separate sheet and submitted with the proposal form.
Vendor's literature will not suffice in explaining exceptions to these specifications. In the absence of any changes by the bidder, it will be presumed and required that materials as described in the proposal be delivered.
C. It is the responsibility of the bidder to demonstrate the equivalency of item(s) offered
D. The contractor shall hold and save harmless the Local Unit, its officers, agents, servants, and employees, from the liability of any nature and kind for on account of the use of any copyrighted or copyrighted composition, secret process, patented or unpatented invention or article furnished or used in the performance of this contract.
E. Wherever practical and economical to the Local Unit, it is desired that recycled or recyclable products be provided. Please indicate when recycled products are being offered.
1.1.2
Contract C224 00 30 00 - 2
AWARD OF BID
A. The Local Unit reserves the right to accept or reject any or all bids, to waive minor identified irregularities and technicalities, and to award in whole or in part to the lowest responsible bidder, as allowed under applicable laws. Without limiting the generality of the foregoing, any bid which is incomplete, obscure, or irregular shall be rejected, any bid having erasures or corrections in the price sheet may be rejected; any bid in which unit prices are omitted, or in which unit/total prices are unbalanced, may be rejected; any bid accompanied by any insufficient or irregular certified check, cashier's check or bid bond may be rejected.
B. The Local Unit further reserves the right to award each item separately to the lowest responsible bidder meeting specifications or to make an award based on the total bid to the bidder whose total sum is the low bid meeting the specifications, whichever in the awarding authorities' opinion is in the best interest of the Local Unit. Without limiting the generality of the foregoing, the Local Unit reserves the right to award a contract based on either option that may be described in the bid proposal or based on any combination thereof.
C. The Local Unit reserves the right to award equal or tie bids at the Local Unit's discretion to any one of the tie bidders.
D. Should the bidder, to whom the contract is awarded, fail to enter into a contract, the Local Unit may then, at its option, accept the bid of the next lowest responsible bidder.
E. The effective period of this contract will be two years unless otherwise noted in the specifications. Continuation of the terms of this contract beyond the fiscal year is contingent on availability of funds in the following year's budget. In the event of unavailability of such funds, the Local Unit reserves the right to cancel this contract.
F. Government entities are not private business/consumer clients; therefore, separate company agreements will not be honored. Terms of the specifications/bid package prevail unless otherwise noted by the vendor as exceptions at the time of proposal.
G. In the case of default by the bidder or contractor, the Local Unit may procure the articles or services from other sources and hold the bidder or contractor responsible for any excess costs occasioned thereby.
1.1.3
NON-DISCRIMINATION
A. There shall be no discrimination against any employee engaged in the work required to produce the commodities covered by any contract resulting from this bid, or against any applicant to such employment because of race, religion, sex, national origin, creed, color, ancestry, age, marital status, affectional or sexual orientation, familial status, liability for service in the Armed Forces of the Unites States, or nationality. This provision shall include, but not be limited to the following: employment upgrading, demotion, transfer, recruitment or recruitment
Contract C224 00 30 00 - 3 advertising, layoff or termination, rates of pay or other forms of compensation, and selection for training, including apprenticeship. The contractor shall insert a similar provision in all subcontracts for services to be covered by any contract resulting from this bid.
1.1.4
MANDATORY EEO/AFFIRMATIVE ACTION EVIDENCE
A. No firm may be issued a contract unless they comply with the EEO/AFFIRMATIVE ACTION REGULATIONS of N.J.S.A. 10:5-31 et seq. and N.J.A.C. 17:27 et seq. as amended from time to time, and the AMERICANS WITH DISABILITIES ACT 42 U.S.C. 12101.
B. Procurement, Professional and Service Contracts
I. ALL successful vendors must submit prior to an award of the contract one of the following:
1. A photocopy of their Federal Letter of Affirmative Action Plan Approval, or
2. A photocopy of their State Certificate of Employee Information Report, or
3. A photocopy of completed Affirmative Action Employee Information Report; AA302 �
Available online at www.state.nj.us/treasury/contract_compliance
C. Construction Contracts
I. All successful contractors must submit prior to signing of the contracts an Initial Project Manning Report (AA201-available online at www.state.nj.us/treasury/contract_compliance for any contract award that meets or exceeds the bidding threshold.
II. All successful contractors must submit a copy of the Monthly Project Workforce Re-port, Form AA-202 (http://www.state.nj.us/treasury/contract_compliance/pdf/pa.pdf Attachment 8) once a month thereafter for the duration of the contract to the Dept. of LWD and to the Public Agency Compliance Officer within the Division of Purchasing.
1.1.5
NEW JERSEY RIGHT TO KNOW (NJRTK)
A. All direct use containers shall bear a label indicating the chemical name(s) and Chemical Abstracts Service number(s) of all hazardous substances in the container, and all other substances which are among the five most predominant substances in the container, or their trade secret registry number(s). (N.J.A.C. 8:59-5.1 et seq.) or adhere to the requirements of The Globally Harmonized System of Classification and Labeling of Chemicals (GHS) and the US Occupational Safety and Health Administration (OSHA) Hazard Communication Standard (HCS) as outlined in the Federal Register / Vol. 77, No. 58 / Monday, March 26, 2012 / Rules and Regulations as adopted in final rule by DEPARTMENT OF LABOR, Occupational Safety and Health Administration, 29 CFR Parts 1910, 1915, and 1926, {Docket No. OSHA-H022K- 2006-0062, (formerly Docket No. H022K)}, RIN 1218-AC20, Hazard Communication.
Contract C224 00 30 00 - 4
1.1.6
ACQUISITION, MERGE, SALE AND/OR TRANSFER OF BUSINESS, ETC
A. It is understood by all parties that if, during the life of the contract, the contractor disposes of his/her business concern by acquisition, merger, sale and/or transfer or by any means convey his/her interest(s) to another party, all obligations are transferred to that new party. In this event, the new owner(s) of the contractor will be required to submit, when required, a performance bond in the amount of the open balance of the contract.
1.1.7
PAYMENT
A. Payment will be made after a properly executed Authority voucher has been received and formally approved on the voucher list by the local unit governing body at its subsequent regular meeting. The voucher will be certified correct by the department/division head who received the goods or services. Payment shall be made pursuant to N.J.S.A 2A:30A-1.
1.1.8
TERMINATION
A. DEFAULT - Non-performance of the Contractor in terms of the specifications and/or the terms and conditions of this Agreement shall be an Event of Default and the basis for termination of the contract by the Authority. The Authority may terminate the contract upon 30 days' written notice to the Contractor. The Authority shall not pay for any services and/or materials which are unsatisfactory. Upon receipt of such termination notice, the Contractor shall be allowed seven (7) calendar days to cure the Default. This, however, shall in no way be construed as negating the basis for termination for non-performance.
B. UNCONDITIONAL TERMINATION FOR CONVENIENCE - The Authority may terminate the resultant contact for convenience by providing sixty (60) calendar days advance notice to the contractor.
C. FINANCIAL STATUS OF CONTRACTOR - If the Contractor should be adjudged bankrupt or should make a general assignment for the benefit of its creditors, or if a receiver should be appointed on account of its insolvency, the Authority may terminate this contract and shall give the Contractor fifteen (15) calendar days' written notice. Upon receipt of such termination notice, the Contractor shall be allowed seven (7) calendar days to cure such events.
1.1.9
INDEMNIFICATION
Contract C224 00 30 00 - 5
A. The Contractor agrees to indemnify, defend and save harmless the local unit, its officers, agents and employees, hereinafter referred to as indemnitees, from all suits, including attorneys' fees and costs of litigation, actions, loss, damage, expense, cost of claims, of any character or on account of any act, claim or amount arising or recovered under Workers Compensation law, or arising out of failure of the Contractor or those acting under Contractor to conform to any statutes, ordinances, regulations, law or court decree. It is the intent of the parties to this contract that the indemnitees shall, in all instances, except for loss or damage resulting from the sole negligence of the indemnitee, be indemnified against all liability, loss or damage of any nature whatsoever.
1.1.10
ADDITIONS / DELETIONS OF SERVICE
A. The local unit reserves the right to add and/or delete services to this contract. Should a service requirement be deleted, payment to the Contractor will be reduced proportionally to the amount of service deleted in accordance with the bid price. Should additional services be required, payment to the Contractor will be increased proportionally to the amount of service added in accordance with the bid price subject to adequate and properly authorized appropriation of funds.
1.1.11
Vendor's literature and/or pricing sheets will not be accepted in lieu of completing the proposal blank(s) set forth in these specifications, unless specified or called for by the technical specification.
1.1.12
SPECIFICATIONS
A. Any prospective bidder who wishes to challenge a bid specification shall file such challenges in writing with the contracting agent no less than three business days prior to the opening of the bids. Challenges filed after that time shall be considered void and having no impact on the contracting unit or the award of contract.
1.1.13
OWNERSHIP OF MATERIAL
A. The owner shall retain all of its rights and interest in any and all documents and property both hard copy and digital furnished by the owner to the contractor for the purpose of assisting the Contractor in its response to this bid and/or in its performance of this contract. All such items shall be returned immediately to the owner at the expiration or termination of the contract or completion of any related services, pursuant thereto, whichever comes first. None of the documents and/or property shall, without the written consent of the owner, be disclosed to others
Contract C224 00 30 00 - 6 or used by the contractor or permitted by the contractor to be used by their parties at any time except in the performance of the resulting contract.
B. Ownership of all data, materials and documentation originated and prepared for the owner pursuant to this contract shall belong exclusively to the owner. All data, reports, computerized information, programs and materials related to this project shall be delivered to and become the property of the owner upon completion of the project. The contractor shall not have the right to use, sell, or disclose the total of the interim or final work products, or make available to third parties, without the prior written consent of the owner. All information supplied to the owner may be required to be supplied on CD-ROM or equivalent media compatible with the owner's computer operating system, windows based, Microsoft Office Suite 2000 or later.
1.1.14
AMENDMENTS TO N.J.S.A. 2C:21-33 et. seq. "TRUTH IN CONTRACTING"
A. New provisions of law govern false claims and representations. It is a serious crime for a vendor to knowingly submit a false claim and/or knowingly make material misrepresentations.
There are enhanced penalties for areas of false claims, bid rigging and bribery, gratuities and gifts, and conflicts of interest. Please consult the statutes for further information.
1.1.15
"PAY TO PLAY" NOTICE OF DISCLOSURE REQUIREMENT � PL 2005, Chapter 271, Section 3 Reporting (NJSA 19:44A � 20.27)
A. Any business entity that has received $50,000 or more in contracts from government entities in a calendar year is required to file an annual disclosure report with ELEC. The instructions and form are available on the ELEC website.
B. Annual Disclosures require submission by March 30th of each year covering contracts and contributions for the prior calendar year.
C. At minimum, a list of all business entities that file an annual disclosure report will be listed on ELEC's website at www.elec.state.nj.us.
D. If you have any questions please contact ELEC at: 1-888-313-ELEC(3532) or 609-292-8700
1.1.16
NON-ALLOCATION OF FUNDING TERMINATION
A. Each fiscal year's payment obligation of the Owner is conditioned upon the availability of Owner funds appropriated or allocated for the payment of such an obligation. If funds are not allocated and available for the continuance of any services performed by the Contractor hereunder, whether in whole or in part, the Owner at the end of any particular fiscal year may
Contract C224 00 30 00 - 7 terminate said contract. The Owner will notify the Contractor in writing immediately of any services that will be affected by a shortage of appropriated funds. This provision shall not be construed so as to permit the Owner to terminate this Agreement or any service thereunder, during the term, merely in order to acquire identical services from a third party contractor.
1.1.17
NON-PAYMENT OF PENALTIES AND INTEREST ON OVERDUE BILLS
A. Public funds may be used to pay only for goods delivered or services rendered. The Local Unit will not pay penalties and/or interest on overdue bills. No employee is authorized to sign a letter of credit or any other document that represents a legal commitment on the part of the Local Unit to pay additional fees, penalties, or interests.
1.1.18
FIRM FIXED CONTRACT
A. This is a firm fixed contract, prices firm, FOB local unit's locations. No price escalation is authorized under this contact without written confirmation by the contracting agent. The vendor shall, at the local unit's request, void the contract and permit the Local Unit to solicit open market pricing should the imposition of any price increase or surcharge become necessary by the vendor.
1.1.19
HIPAA (If Applicable)
A. Both parties agree to comply with all requirements of the Federal Health Insurance Portability and Accountability Act of 1996 ("HIPAA"), as may be amended from time to time, and the corresponding HIPAA regulations for the confidentiality and security of medical information.
B. The Contractor shall:
I. Not use or disclose protected health information other than as permitted or required by law.
II. Use appropriate safeguards to protect the confidentiality of the information.
III. Report any use or disclosure not permitted.
C. The contractor, by execution of the contract, shall thereby indemnify and hold the Authority harmless from any and all liabilities, claims, actions, costs and penalties which may be incurred as the result of the failure of the contractor to comply with the requirements of the Health Insurance Portability and Accountability Act (HIPAA) or any other statute or case law protecting the privacy of persons using its services.
Contract C224 00 30 00 - 8
1.1.20
PUBLIC EMERGENCY
A. In the event of a Public Emergency declared at the Local, State or Federal Level, if the local unit opts to extend terms and conditions of this bid, the contractor agrees to extend the terms and conditions of this bid, whether existing, expiring or expired no longer than six months, for the goods and/or services described under this bid for the duration of the emergency. In the event the original contractor cannot meet this requirement, the local unit may solicit the goods and/or services from any other bidder to this Bid.
1.1.21
N.J.A.C. 17:44-2.2 AUTHORITY TO AUDIT OR REVIEW CONTRACT RECORDS
A. Relevant records of private vendors or other persons entering into contracts with covered entities are subject to audit or review by the Office of the State Comptroller pursuant to N.J.S.A.
52:15C-14(d)
B. The successful bidder shall maintain all documentation related to products, transactions, or services under this contract for a period of five years from the date of final payment. Such records shall be made available to the New Jersey Office of the State Comptroller upon request.
1.1.22
New Jersey Sales Tax
A. In submission of this Bid, the Bidder certifies that the total Bid set forth, does not include any New Jersey Sales Tax. The Bidder further certifies that in the event the bidder is the successful Bidder, he will only apply for an exemption for materials or supplies to be used in connection with his Bid.
B. Contractor's Exemption Purchase Certification, Form, ST-13, issued by the State of New Jersey, Division of Taxation, Sales Tax Bureau shall be completed and presented to his suppliers for materials on this project only. Every local unit utilizing this system is exempted from sales and use tax.
1.1.23
P.L. 2018, c.9 (S104): Diane B. Allen Equal Pay Act, effective July 1, 2018, modifies the current law including the Law Against Discrimination (LAD) to strengthen protections against employment discrimination and promote equal pay for all groups protected under the LAD.
Pursuant to the law, any employer, regardless of the location of the employer, who enters into a contract with a public body to provide qualifying services to the public body shall provide a report to the Commissioner of Labor and Workforce Development of information regarding the compensation and hours worked by employees categorized by gender, race, ethnicity, and job
Contract C224 00 30 00 - 9 category. Any employer, regardless of the location of the employer, who enters into a contract with a public body to perform any public work for the public body shall provide to the commissioner, through certified payroll records, information regarding the gender, race, job title, occupational category, and rate of total compensation of every employee of the employer employed in the State in connection with the contract. Evidence of filing shall be required at time of contracting.
1.1.24
INTERPRETATIONS AND ADDENDA
A. The bidder understands and agrees that its bid is submitted on the basis of the specifications prepared by the Soliciting Local Unit. The bidder accepts the obligation to become familiar with these specifications.
B. Bidders are expected to examine the specifications and related documents with care and observe all their requirements. Ambiguities, errors or omissions noted by bidders should be promptly reported in writing to the Purchasing Agent. In the event the bidder fails to notify the Soliciting Local Unit of such ambiguities, errors or omissions, the bidder shall be bound by the bid.
C. No oral interpretation of the meaning of the specifications will be made to any bidder. Every request for an interpretation must be received at least ten (10) days prior to the date fixed for the opening of the bids. Any and all such interpretations and any supplemental instructions will be in the form of written addenda to the specifications, and will be distributed to all prospective bidders, in accordance with Statute. All addenda so issued shall become part of the contract documents, and shall be acknowledged by the bidder in the bid. The Soliciting Local Unit's interpretations or corrections thereof shall be final.
D. If the amount shown in words and its equivalent figures do not agree, the written words shall be binding. Ditto marks are not considered writing or printing and shall not be used.
E. In the event that there is a discrepancy between the unit prices and the extended totals, the unit prices shall prevail. In the event there is an error of the summation of the extended totals, the computation by the Soliciting Local Unit of the extended totals shall govern.
1.1.25
I have read the following:
AMERICANS WITH DISABILITIES ACT OF 1990
Equal Opportunity for Individuals with Disability
The contractor and the Bergen County Utilities Authority, (hereafter "owner") do hereby agree that the provisions of Title 11 of the Americans With Disabilities Act of 1990 (the ""Act"") (42
Contract C224 00 30 00 - 10
U.S.C. S121 01 et seq.), which prohibits discrimination on the basis of disability by public entities in all services, programs, and activities provided or made available by public entities, and the rules and regulations promulgated pursuant there unto, are made a part of this contract. In providing any aid, benefit, or service on behalf of the owner pursuant to this contract, the contractor agrees that the performance shall be in strict compliance with the Act. In the event that the contractor, its agents, servants, employees, or subcontractors violate or are alleged to have violated the Act during the performance of this contract, the contractor shall defend the owner in any action or administrative proceeding commenced pursuant to this Act. The contractor shall indemnify, protect, and save harmless the owner, its agents, servants, and employees from and against any and all suits, claims, losses, demands, or damages, of whatever kind or nature arising out of or claimed to arise out of the alleged violation. The contractor shall, at its own expense, appear, defend, and pay any and all charges for legal services and any and all costs and other expenses arising from such action or administrative proceeding or incurred in connection therewith. In any and all complaints brought pursuant to the owner's grievance procedure, the contractor agrees to abide by any decision of the owner which is rendered pursuant to said grievance procedure. If any action or administrative proceeding results in an award of damages against the owner, or if the owner incurs any expense to cure a violation of the ADA which has been brought pursuant to its grievance procedure, the contractor shall satisfy and discharge the same at its own expense.
The owner shall, as soon as practicable after a claim has been made against it, give written notice thereof to the contractor along with full and complete particulars of the claim, If any action or administrative proceeding is brought against the owner or any of its agents, servants, and employees, the owner shall expeditiously forward or have forwarded to the contractor every demand, complaint, notice, summons, pleading, or other process received by the owner or its representatives.
It is expressly agreed and understood that any approval by the owner of the services provided by the contractor pursuant to this contract will not relieve the contractor of the obligation to comply with the Act and to defend, indemnify, protect, and save harmless the owner pursuant to this paragraph.
It is further agreed and understood that the owner assumes no obligation to indemnify or save harmless the contractor, its agents, servants, employees and subcontractors for any claim which may arise out of their performance of this Agreement. Furthermore, the contractor expressly understands and agrees that the provisions of this indemnification clause shall in no way limit the contractor's obligations assumed in this Agreement, nor shall they be construed to relieve the contractor from any liability, nor preclude the owner from taking any other actions available to it under any other provisions of the Agreement or otherwise at law.
1.1.26
BID SECURITY
The following provisions, shall be applicable to this bid and be made a part of the bidding documents.
Contract C224 00 30 00 - 11
A. BID GUARANTEE
I. Bidder shall submit with the bid a certified check, cashier's check or bid bond in the amount of ten percent (10%) of the total price bid, but not in excess of $20,000, payable unconditionally to the Bergen County Utilities Authority.
II. When submitting a Bid Bond, it shall contain Power of Attorney for full amount of Bid Bond from a surety company authorized to do business in the State of New Jersey and acceptable to the Authority.
III. The check or bond of the unsuccessful bidder(s) shall be returned as prescribed by law. The check or bond of the bidder to whom the contract is awarded shall be retained until a contract is executed and the required performance bond or other security is submitted.
IV. The check or bond of the successful bidder shall be forfeited if the bidder fails to enter into a contract pursuant to statute. Failure to submit required guarantee shall be cause for rejection of the bid.
1.1.27
CONSENT OF SURETY
I. Bidder shall submit with the bid Certificate (Consent of Surety) with Power of Attorney for full amount of bid price from a Surety Company authorized to do business in the State of New Jersey and acceptable to the Authority stating that it will provide said bidder with a Performance Bond in the full amount of the bid. This certificate shall be obtained in order to confirm that the bidder to whom the contract is awarded will furnish Performance and Payment bonds from a surety company as defined in N.J.S.A. 2A:44-143 & 144, on behalf of said bidder, any or all subcontractors or by each respective subcontractor or by any combination thereof which results in performance security equal to the total amount of the contract, pursuant to statute. Conditional bonds only covering the difference between the winning bid and the next lowest bid shall be rejected.
II. Failure to submit this shall be cause for rejection of the bid.
III. The State of New Jersey has published a consolidated listing of acceptable companies to provide payment and/or performance bonds on public works http://www.state.nj.us/dobi/division_insurance/surety.htm
1.1.28
PERFORMANCE BOND
I. Successful bidder shall simultaneously with the delivery of the executed contract, submit an executed bond in the amount of one hundred percent (100%) of the awarded contract amount of the bid as security for the faithful performance of this contract.
Contract C224 00 30 00 - 12
1.1.29
NEW JERSEY PREVAILING WAGE ACT
A. Pursuant to NJSA 34:11-56.25 et seq., contractors on projects for public work shall adhere to all requirements of the New Jersey Prevailing Wage Act. The contractor shall be required to submit a certified payroll record to the owner within ten (10) days of the payment of the wages.
The contractor is also responsible for obtaining and submitting all subcontractors' certified payroll records within the aforementioned time period. The contractor shall submit said certified payrolls in the form set forth in NJAC 12:60-6.1(c). It is the contractor's responsibility to obtain any additional copies of the certified payroll form to be submitted by contacting the New Jersey Department of Labor and Workforce Development, Division of Workplace Standards. Additional information is available at http://lwd.dol.state.nj.us/labor/wagehour/wagerate/pwr_construction.html
B. To the extent allowable by law the soliciting Local Unit, its agents and employees may at any time conduct an interview with any employee of the Contractor or the Contractors Subcontractors to ensure compliance that employees are being paid not less than the prevailing wage rate for their classification. Furthermore, no worker shall be paid less than the prevailing wage for services on this contract, and if the contractor or subcontractor are found to have paid any worker less than the prevailing wage the Authority has the right to terminate the contract or sub contract and seek damages.
C. As of July 1st 2019 the NJ Prevailing Wage Threshold is $16,263.00 for a Municipal Government and $2,000 for all other units of government including Counties, Authorities, Schools and more.
1.1.30
THE PUBLIC WORKS CONTRACTORS REGISTRATION ACT
A. NJSA 34:11-56.48 et seq. requires that a general or prime contractor and any listed subcontractors named in the contractor's bid proposal shall be registered at the time the bid proposal is submitted. After bid proposals are received and prior to award of contract, the successful contractor shall submit a copy of the contractor's certification along with those of all listed subcontractors. All non-listed subcontractors and lower tier sub-subcontractors shall be registered prior to starting work on the project. It is the general contractor's responsibility that all non-listed sub-contractors at any tier have their certificate prior to starting work on the job.
B. Under the law a "contractor" is "a person, partnership, association, joint stock company, trust, corporation or other legal business entity or successor thereof who enters into a contract" which is subject to the provisions of the New Jersey Prevailing Wage Act (NJSA 34:11-56.25 et seq.).
It applies to contractors based in New Jersey or in another state.
C. The law defines "public works projects" as contract for "public work" as defined in the Prevailing Wage statute (NJSA 34:11-56.25(5)). The term means:
Contract C224 00 30 00 - 13
I. "Construction, reconstruction,…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .