About this opportunity
California Department of Transportation (Caltrans) is soliciting Statements of Qualifications for Construction Manager/General Contractor services on the D11 I-5/I-805 Express Lanes Corridor Project under RFQ 112T37CM, with questions due December 16, 2026 and SOQs due January 11, 2027 at 3 p.m. Pacific Time. The federally funded project carries Disadvantaged Business Enterprise (DBE) goals that proposers must address through demonstrated aggressive Good Faith Efforts, and it is subject to Buy America, Build America Buy America Act (BABA), and Davis-Bacon requirements.
The work converts existing I-5 and I-805 high-occupancy vehicle lanes to high-occupancy toll Express Lanes across more than 40 miles, including pavement striping, signage, traffic safety elements, paving, electrical work, sign structures, lighting, fiber optic infrastructure, tolling equipment pads, and hazardous waste removal. The contractor must maintain high-volume traffic during construction and coordinate with SANDAG's TSI contract and eight cities. Place of performance runs along I-805 from East Palomar Street to the I-5/I-805 Junction (post miles 4.4 to 23.9) and along I-5 from that junction to Harbor Drive (post miles 30.6 to 54.6), with the RFQ attachments containing licensing requirements.
The contract has two parts. A Preconstruction Services Contract carries a not-to-exceed fee of $2.5 million at a 4% fee with 3% escalation, billed as reimbursement at specific rates and subject to state prevailing wage. A potential Construction Contract follows if an Agreed Price is reached, structured as a unit price contract with construction completion anticipated by May 2, 2031. The estimated cost is $386 million for construction capital and $1 million for right-of-way capital, in 2026 dollars. Performance and payment bonds must equal 100% and 50% of the agreed price, respectively, and insurance must include commercial general liability, auto liability, workers' compensation and employers liability, and pollution liability coverage.
Evaluation covers proposer and major participant experience and past performance, key personnel qualifications, project understanding and approach, legal structure, financial capacity, and safety program, with interviews contributing to final scoring. The Department anticipates a short list on February 10, 2027, interviews on February 17, 2027, and ranking determination on February 25, 2027, with award anticipated by March 18, 2027 and notice to proceed by April 9, 2027. Submissions go to the Division of Design in Sacramento, with one original marked "(Original)" and an electronic copy. Addendum No. 3 updates post mile documentation, and Addendum No. 2 provides an updated link to supplemental project documents. Questions go to Alma Cortez at alma.cortez@dot.ca.gov.
Opportunity text
112T37CM The Project is located in San Diego County on Interstate 805 in the Cities of San Diego, Chula Vista, and National City from East Palomar Street to the Junction I-5/I-805 Separation and on I-5 in the Cities of San Diego, Del Mar, Solana Beach, Encinitas, Carlsbad, and Oceanside from the Junction 5/805 Separation to Harbor Drive. The Project is a set of defined work packages that will modernize existing roadway infrastructure along the I-5 and I-805 corridors to create over 40 miles of continuous Express Lanes. The work packages will construct the necessary pavement striping, signage, traffic safety elements, paving, and electrical items in coordination with SANDAG's TSI contract. A more detailed description of the Project is contained in Appendix A. The estimated cost of this CMGC Project (in 2026 US dollars) is $386,000,000 for construction capital and $1,000,000 for Right of Way capital (including utility relocation). 2 - Procurement Schedule Final Date for Receipt of Proposers Questions - 12/16/2026 SOQ Due Date for Electronic and Hardcopy Submittal - 1/11/2027 Notice of Short List - 02/10/2027 Proposer Interviews - 02/17/2027 Anticipated Ranking Determination - 02/25/2027 4.2 Quantities, Due Date, Time, and Location: One original and an electronic submittal of the SOQ shall be provided. The original shall be identified on its front cover, in the upper right-hand corner as (Original). All SOQs shall be received by 3 p.m. Pacific Time on the day specified in Section 2.- Procurement Schedule, unless modified by Addenda: Please refer to the RFQ for goal requirement and attachments for licensing requirements for this contract. Please refer to the RFQ attachments for licensing requirements for this contract. Unfortunately, the Department does not have a plan holders list of available proposers, nor does it have a way of identifying companies or entities that may have downloaded the project documents for teaming purposes. It is the responsibility of the consultants/subs/vendors to identify teams that may be submitting an Statement of Qualification's. The Department will allow the use of text with font size smaller than 12-point for only charts, tables, exhibits, and other illustrative and graphical information. Addendum 1 - Updated Link to A4 Additional Project Combined Documents Addendum 2 - Updated Link to A4 Additional Project Combined Documents Addendum 3 - Updated to Post Mile
Files
| File | Type | Posted |
|---|---|---|
| 112T37CM_Final_RFQ_.pdf | ||
| 112T37CM_-_Addendum_3_-_Updated_to_Post_Mile.pdf | ||
| 112T37CM_-_Addendum_2_-_Updated_Link_to_A4_Addtl_Proj_Docs.pdf | ||
| 112T37CM_RFQ_Form_H_Template.docx | DOCX document | |
| 112T37CM_RFQ_Forms_A_to_G.docx | DOCX document | |
| 112T37CM_-_Addendum_1_-_Updated_Link_to_A4_Addtl_Proj_Docs.pdf | ||
| 112T37CM_Link_To_A4_Additional_Project_Documentation.docx | DOCX document |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity