112T37CM_-_Addendum_3_-_Updated_to_Post_Mile.pdf
PDF 865 KB Posted
- Solicitation number
- 112T37CM
- Issued by
- San Diego County, San Diego City, California
About this file
This Addendum No. 3, issued by the California Department of Transportation (Caltrans) Division of Procurement and Contracts on November 18, 2026, provides clarification to the Request for Qualifications (RFQ) for Contract No. 112T37CM related to the I-5/I-805 Express Lanes Corridor Project. The project seeks a Construction Manager/General Contractor (CMGC) to provide design and construction services for a regional Express Lanes corridor on Interstate 5 and Interstate 805 in San Diego County. The scope of work encompasses roadway and electrical improvements on I-805 from East Palomar Street to the 5/805 Junction (post miles 4.4 to 23.9) and on I-5 from the 5/805 Junction to Harbor Drive (post miles 30.6 to 54.6), with a total project extent of 28.87 miles. Project responsibilities include maintaining high-volume traffic during construction, coordinating with other concurrent projects and eight nearby cities, managing utility and regulatory agency coordination, and implementing traffic safety measures, sign structures, lighting systems, fiber optic infrastructure, tolling equipment pads, and hazardous waste removal. The addendum, dated November 6, 2026, is specifically intended to update the post mile documentation in the original RFQ Notice dated November 16, 2026.
The file does not contain information regarding pricing terms, set-asides, incumbents, funding sources, contract duration, or renewal options. Interested parties are directed to contact Alma Cortez at alma.cortez@dot.ca.gov for questions concerning this addendum, with all other terms and conditions of the original RFQ Notice remaining unchanged.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 112T37CM_RFQ_Form_H_Template.docx | DOCX document | |
| 112T37CM_Link_To_A4_Additional_Project_Documentation.docx | DOCX document | |
| 112T37CM_Final_RFQ_.pdf | ||
| 112T37CM_RFQ_Forms_A_to_G.docx | DOCX document | |
| 112T37CM_-_Addendum_1_-_Updated_Link_to_A4_Addtl_Proj_Docs.pdf | ||
| 112T37CM_-_Addendum_2_-_Updated_Link_to_A4_Addtl_Proj_Docs.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
“Improving lives and communities through transportation.”
DIVISION OF PROCUREMENT AND CONTRACTS
1727 30TH STREET, MS–65 | SACRAMENTO, CA 95816
(916) 227-6000 | TTY 711
www.dot.ca.gov
November 18, 2026
REQUEST FOR QUALIFICATIONS (RFQ) NOTICE NUMBER 112T37CM
ADDENDUM NO. 3
CMGC - 112T37CM D11 I-5/I-805 Express Lanes Corridor Project
The purpose of this addendum is to provide an updated document to the RFQ post mile for the D11 I-5/I-805 Express Lanes Corridor Project 112T37CM – RFQ Advertisement. Please see the attached for clarification.
All other terms and conditions of the original RFQ Notice dated 11/16/2026, are unchanged.
Please contact Alma Cortez at alma.cortez@dot.ca.gov for questions concerning this addendum.
http://www.dot.ca.gov/ mailto:alma.cortez@dot.ca.gov
STATE OF CALIFORNIA
DEPARTMENT OF TRANSPORTATION
REQUEST FOR QUALIFICATIONS
I-5/I-805 EXPRESS LANES CORRIDOR PROJECT
CONSTRUCTION MANAGER/GENERAL
CONTRACTOR SERVICES
FOR DESIGN AND CONSTRUCTION ON STATE HIGHWAY IN
THE COUNTY OF SAN DIEGO
On I-805 from East Palomar Street to Junction 5/805 Separation
On I-5 from Junction 5/805 to Harbor Drive
CONTRACT NO. 112T37CM
11-SD-805-PM 4.4 to 23.9
11-SD-5- PM 30.6 to 54.6
Project ID 1124000106
Dated: 11/06/2026
28.87
Department of Transportation I-5/I-805 Express Lanes Corridor Project Request for Qualifications Contract No.: 112T37CM
Project ID: 1124000106
Project Description, Project Status, and Construction Manager Responsibilities A-1
A1 Project Description
The Project will construct the required roadway and electrical elements to prepare for the implementation of a regional Express Lanes corridor on Interstate 5 and Interstate 805 in coordination with SANDAG’s TSI vendor contract.
The Project is expected to include the following scope:
a. Maintenance of high-volume traffic on I-5 and I-805 and local roads during construction.
b. Coordination with other construction projects within the corridor.
c. Coordination with the nearby Cities of San Diego, Chula Vista, National City, Del Mar, Solano Beach, Encinitas, Carlsbad, and Oceanside. Coordination with private and public Utilities, regulatory agencies, and property owners will also be required.
d. Compliance with necessary environmental permits and authorizations, including noise permits from local agencies (if necessary), National Pollutant Discharge Elimination System (NPDES) permit, etc.
e. New median overhead sign structures and bridge mounted sign structures
f. Replacement of existing sign panels on existing sign structures
g. Pavement striping
h. Traffic Safety items include concrete barriers, barrier transitions, and guardrail systems
i. Median drainage improvements
j. Modification of existing lighting, electrical, fiber optic, and camera systems
k. New lighting, electrical, fiber optic, camera, and changeable message sign systems.
l. Minor paving for maintenance vehicle pullouts (MVP) at roadside tolling equipment locations. Concrete pads for future tolling equipment are anticipated.
m. Hazardous Waste removal (aerially deposited lead)
The Project will include the following work packages with each having unique features:
Work Package 1:
On I-805, from East Palomar Street DAR to Market Street (PM 4.4 to PM12.9) and from SR-52 to the 5/805 merge (PM 21.5 to 28.7). This work package will modernize existing HOV lanes to Express Lanes. This work package will require minimal paving and earthwork and will utilize an existing fiber optic system. This work package will require significant median barrier, median drainage, and new overhead sign structure work.
28.87