City of Homerville Street Resurfacing
Closed State & local contract opportunity Posted
- Solicitation number
- PE-63250-NONST-2027-000000004
- State
- Georgia
- Responses due
Opportunity facts
- Jurisdiction
- NIGP codes
- Point of contact
-
- Amanda Case swaadmin@turnipseed.com (770) 333-0700
Opportunity details come from ssl.doas.state.ga.us. Updated .
About this opportunity
City of Homerville is requesting bids on street resurfacing across four road segments — Reddick Street, McConnell Road, Mitchell Lane, and McGlashin Circle — with proposals due September 29, 2026. The work spans patching, full-depth reclamation, overlay with recycled asphalt concrete (12.5 mm Superpave), bituminous tack coat, restriping, traffic control, and related appurtenances across Clayton County, Georgia.
Part A (Reddick Street) calls for patching and overlay with 816 tons of recycled asphalt concrete and 989 gallons of bituminous tack coat. Part B (McConnell Road) includes 1,134 square yards of 8-inch graded aggregate base course, overlay with 94 tons of recycled asphalt concrete, and 117 gallons of bituminous tack coat. Part C (Mitchell Lane) comprises 912 square yards of 10-inch full-depth reclamation with 100 tons of cement, 101 gallons of bituminous tack coat, and adjustment of 2 manholes to grade. Part D (McGlashin Circle) involves patching, overlay with 85 tons of recycled asphalt concrete, and 109 gallons of bituminous tack coat. All four segments share the same DOT Project Identification number 0020461.
The contractor must achieve substantial completion within 150 consecutive calendar days and final completion within 180 days. The work includes furnishing all materials, equipment, and labor.
Opportunity text
The work to be done consists of furnishing all materials, equipment and labor for the construction of: PART A ¿ REDDICK STREET ¿ D.O.T. P.I. # 0020461 The project will consist of patching, overlay with 816 tons of recycled asphalt concrete 12.5 mm Superpave, 989 gallons of bitum tack coat, restriping, traffic control, and appurtenances. PART B ¿ MCCONNELL ROAD ¿ D.O.T. P.I. # 0020461 The project will consist of patching, 1134 square yards of 8¿ graded aggregate base course, overlay with 94 tons of recycled asphalt concrete 12.5 mm Superpave, 117 gallons of bitum tack coat, traffic control, restriping, and appurtenances. PART C ¿ MITCHELL LANE ¿ D.O.T. P.I. # 0020461 The project will consist of 912 square yards of 10¿ full depth reclamation with 100 tons cement, 101 gallons of bitum tack coat, restriping, traffic control, adjusting 2 manholes to grade, and appurtenances. PART D ¿ MCGLASHIN CIRCLE D.O.T. P.I. # 0020461 The project will consist of patching, overlay with 85 tons of recycled asphalt concrete 12.5 mm Superpave, 109 gallons of bitum tack coat, restriping, traffic control, and appurtenances. Time allotted for construction is 150 consecutive calendar days for substantial completion and 180 days for final completion.