Cherry Avenue Sewer Improvement Project (SC-0512)
Closed State & local contract opportunity Posted
- Solicitation number
- UD-26-361
- State
- California
- Responses due
Opportunity facts
- Jurisdiction
- NIGP codes
- 55029 Markers, Survey And Right-Of-Way
- 91244 Excavation Services
- 91345 Construction, Sewer And Storm Drain
- 91356 Construction, Utility/Underground Projects
- 91360 Construction, Water System/Plants, Main And Service Line
- 91381 Maintenance And Repair, Sewer And Storm Drain (Including Removal)
- 91395 Paving/Resurfacing, Highway And Road
- 92630 Contaminated Soil Services
- 96880 Traffic Sign Installation And/Or Removal Services
- 96884 Traffic Control Services (To Include Placement And Removal Of Control Devices)
- UNSPSC codes
- 72141504 Timber removal service
- 72141126 Underground utilities construction service
- 72121505 Waste water and sewage treatment plant construction service
- 72154028 Sign installation and maintenance service
- 72141503 Rock removal service
- 73151801 Sheeting services
- 72141110 Oil and gas branch line construction service
- 95121641 Pumping station
- 95121810 Irrigation and flood control waterworks
- 72141505 Earthmoving service
Show all 29
- 73151802 Slitting services
- 72103305 Drain laying service
- 72141120 Sewer line construction service
- 95121800 Utility buildings and structures
- 72141112 Natural gas compressor station construction service
- 95121803 Nuclear power station
- 95121802 Substation
- 95121801 Radar station
- 72121504 Waste disposal plant construction service
- 72141121 Water main construction service
- 72141125 Pumping station construction service
- 95121805 Well
- 95121804 Water tower
- 78142214 Airport and passenger terminals simulation modelling (airside and landside)
- 72141123 Manhole construction service
- 72141111 Gas main construction service
- 72141114 Pipeline wrapping service
- 72141113 Oil and gas pipeline construction service
- 95121811 Aquaduct or other water supply conduit, except pipeline
- Point of contact
-
- Fernando Eggleston fernando.eggleston@lbwater.org (562) 570-2329
Opportunity details come from longbeachbuys.buyspeed.com. Updated .
About this opportunity
The City of Long Beach Public Utilities Department is requesting bids on the Cherry Avenue Sewer Improvement Project (SC-0512), with bids due October 14, 2026. The work consists of installing approximately 3,100 linear feet of vitrified clay pipe (VCP) or high-density polyethylene (HDPE) sewer line, constructing 12 new 48-inch sewer maintenance holes and one new 60-inch drop sewer maintenance hole, and removing or abandoning existing sewer infrastructure. The scope also includes dewatering, sewer flow bypassing, post-construction video inspection, pavement removal and replacement, trenching, backfilling, and compacting.
Work is performed across multiple segments along Cherry Avenue, East Anaheim Street, and Gardenia Avenue in Long Beach, with sewer main diameters ranging from 8 to 18 inches. The project requires compliance with Los Angeles County Sanitation Districts standard specifications and amendments. Contractors must coordinate with multiple utility providers including Southern California Edison, Verizon, AT&T, MCI, and Spectrum; obtain permits from the City of Long Beach and Cal-OSHA; and complete mandatory pre-construction conferences. Work hours are 7:00 a.m. to 4:00 p.m. on weekdays, with a minimum one-lane operation requirement maintained during construction.
Traffic control is staged across 20 stages with construction scheduled Monday through Friday from 8:30 a.m. to 3:30 p.m., approximately eight hours per stage. Contractors must provide five working days' advance notice to city departments and install temporary "No Parking" signs 48–72 hours before work commencement. Speed limits are 30 MPH on Anaheim Street and 25 MPH on Cherry Avenue during construction. The plans were approved September 15, 2026, with engineering oversight provided by DRP Engineering, Inc. under Project Manager Saik-Choon Poh. All sewer lines are specified as extra-strength VCP unless otherwise noted, with flexible joints required within 18 inches of LACSD manhole connections.
Opportunity text
The Work consists of the installation of around 3,100 linear feet of vitrified clay pipe (VCP) or high density polyethylene (HDPE) sewer line along with 12 new 48-inch sewer maintenance holes and 1 new 60-inch drop sewer maintenance hole. The Work also includes removal and replacement or abandonment of existing sewer lines and manholes. Also included are dewatering, sewer flow bypassing, post-construction video inspection, pavement removal and replacement, trenching, backfilling and compacting.