(3) Cherry Ave Sewer Traffic Control_07.10.26.pdf
PDF 7 MB Posted
- Solicitation number
- UD-26-361
- Issued by
- Los Angeles County, California
About this file
Cherry Avenue Sewer Improvement Project - Traffic Control Plans
This document is a Traffic Control Plan (TCP) set submitted by DRP Engineering, Inc. on behalf of the Long Beach Public Utilities Department for the Cherry Avenue Sewer Improvement Project in Long Beach, California. The project encompasses comprehensive traffic control measures for sewer construction activities along Cherry Avenue and Anaheim Street, organized into multiple stages (Stages 1-20) with alternative routing options. The construction is scheduled to occur Monday through Friday from 8:30 AM to 3:30 PM, with work duration estimated at eight hours per stage. The plans include detailed stage-by-stage traffic control configurations, detour routes, temporary signage requirements, and pedestrian/bicycle accommodation strategies. Traffic control plans feature temporary lane closures, traffic diversions, and coordination requirements with multiple city agencies including the City's Traffic Operations Division, Long Beach Transit, Long Beach Police Department, and the Public Works Department.
Key specifications include mandatory notification requirements to various city departments and agencies at least five working days in advance of construction activities and detours. The contractor must install temporary "No Parking" signs 48-72 hours prior to work commencement and maintain minimum five-foot clearance from open excavations and two-foot clearance from vertical obstructions. Speed limits are established at 30 MPH for Anaheim Street and 25 MPH for Cherry Avenue during construction. All traffic signals must remain operational with coordination and approval required from the City Engineer. The project includes accommodation for school zone notifications, pedestrian access compliance with ADA requirements, and bicycle facility maintenance. The General Manager, B. Anatole Falagán, approved the plans, with project management and engineering oversight provided by DRP Engineering under drawing file number SC-0512.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUBMITTED BY:
DRP Engineering, INC.
PROJECT MANAGER:
DATE
LONG BEACH PUBLIC UTILITIES DEPARTMENT
LONG BEACH, CALIFORNIA
TRAFFIC CONTROL PLANS FOR THE CONSTRUCTION OF
CHERRY AVENUE SEWER
IMPROVEMENT PROJECT
DRAWING / FILE NUMBER:
SC-0512
FAMIS PROJECT: FAMIS PROJECT:
MUNIS PROJECT: MUNIS PROJECT:
XXXXXX
XXXXXXXXX
CHERRY AVE SEWER
IMPROVEMENT PROJECT
DIRECTOR OF ENGINEERING / CHIEF ENGINEER
MANAGER OF ENGINEERING
APPROVED
RECOMMENDED
DEPARTMENT DATE
BY CK'D.
CITY ENG.
VERIZON
EDISON CO.
LB ENERGY
FIRE
INPUT BY
AS-BUILT BY
POSTED GIS
CONSTRUCTED BY
GIS TILE
SPEC. NO
SECTION MAP
SERVICE ATLAS PAGE
GATE VALVES REC.
1"= 40'
SCALE
N/A
CONTRACT NO.
CHECKED BY
DESIGNED BY
DATE
DATE
CORRECTED BY
DATE
DATE
DATE
DATE
DATE MAR/26
VARIOUS
DESCRIPTION
DATE
REV.
DATE
DATE
B. ANATOLE FALAGÁN
GENERAL MANAGER
LONG BEACH PUBLIC
UTILITIES DEPARTMENT
DN
CDR MAR/26
N/A
1111 Corporate Center Dr, Suite 303 Monterey Park, CA 91754
XX-XX-XX
SAIK-CHOON POH R.C.E. 69223
GENERAL MANAGER
B. ANATOLE FALAGÁN
WD-06-26
JULY 2026
G-001
COVER SHEET
LEGEND :
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
GENERAL NOTES:
IT IS THE RESPONSIBILITY OF THE CONTRACTOR PERFORMING WORK ON A PUBLIC STREET TO INSTALL AND MAINTAIN THE
TRAFFIC DEVICES DURING THE CONSTRUCTION.
ALL SIGNS, DELINEATORS, BARRICADES, ETC. AND THEIR INSTALLATION SHALL CONFORM TO THE CALIFORNIA MANUAL ON
UNIFORM TRAFFIC CONTROL DEVICES (CA MUTCD LATEST EDITION) AND / OR THE LATEST EDITION OF THE CITY OF LONG BEACH
STANDARD TRAFFIC CONTROL PLANS.
ALL DELINEATORS SHALL BE EQUIPPED WITH REFLECTIVE BAND AT NIGHTTIME.
IN THE INTEREST OF SAFETY, THE CITY PUBLIC WORKS DEPARTMENT RESERVES THE RIGHT TO OBSERVE THESE TRAFFIC
CONTROL PLANS IN USE AND TO MAKE ANY NECESSARY CHANGES AS FIELD CONDITIONS WARRANT. ANY CHANGES SHALL
SUPERSEDE THE TRAFFIC CONTROL PLANS.
ALL TRAFFIC CONTROL DEVICES, STRIPES, MARKINGS, LEGENDS AND RAISED PAVEMENT MARKERS SHALL CONFORM TO
CAMUTCD LATEST EDITION AND LONG BEACH STANDARD PLANS (MOST RECENT EDITION).
THE CONTRACTOR MUST MAINTAIN A MINIMUM OF ONE TRAVEL LANE IN EACH DIRECTION. ALL TURNING MOVEMENTS SHALL BE
MAINTAINED WHENEVER POSSIBLE AS WELL. WHEN THE NUMBER OF LANES IS REDUCED TO LESS THAN A SINGLE LANE IN EACH
DIRECTION, THE CONTRACTOR SHALL BE REQUIRED TO ASSIGN A FLAGGER TO DIRECT TRAFFIC ALWAYS DURING
CONSTRUCTION ACTIVITIES.
TO PROVIDE ACCURATE MESSAGING TO ALL WHOM TRAVERSE THE WORK ZONE, ALL TRAFFIC CONTROL DEVICES SHALL BE
MAINTAINED IN THEIR PROPER POSITION AT ALL TIMES, AND SHALL BE REPAIRED, REPLACED, OR CLEANED AS NECESSARY TO
PRESERVE THEIR APPEARANCE AND CONTINUITY.
ALL TEMPORARY TRAFFIC CONTROL DEVICES SHALL BE REMOVED FOLLOWING COMPLETION OF EACH CONSTRUCTION STAGE
AND THE CONTRACTOR, UPON COMPLETION OF THE CONSTRUCTION ACTIVITIES, SHALL RESTORE THE ROADWAY AND ALL ITS
ELEMENTS TO THE PRIOR CONDITIONS.
THE CONTRACTOR SHALL BE RESPONSIBLE TO COVER, OR REMOVE ALL CONFLICTING SIGNS THAT MAY BE IMPACTED BY THE
CONSTRUCTION ACTIVITIES OR TRAFFIC CONTROL SET-UP.
THE CONTRACTOR SHALL BE RESPONSIBLE TO RETURN ALL ROADWAYS TO FULL TRAFFIC OPERATIONS BY PLATING OR
BACKFILLING THE EXCAVATION, WHEN CONSTRUCTION IS NOT BEING PERFORMED.
EGRESS AND INGRESS OF ABUTTING DRIVEWAYS AND MINOR STREET INTERSECTIONS SHALL BE MAINTAINED ALWAYS DURING
CONSTRUCTION ACTIVITIES.
PARKING MAY BE PROHIBITED, AS NEEDED, BY POSTING APPROVED TEMPORARY "NO PARKING" SIGNS DEFINING THE TIME AND
DATE OF ANY SUCH RESTRICTION AT LEAST 48 HOURS PRIOR TO THE START OF CONSTRUCTION. SIGN SPACING SHALL BE 40
FEET MAXIMUM AND 4 FEET ABOVE GROUND. "NO PARKING" SIGNS ARE AVAILABLE FOR PURCHASE FROM THE 2ND FLOOR
PERMIT CENTER AT THE TIME OF PICKING UP THE PERMIT. ANY TIME AFTER THE PERMIT IS ISSUED THE PERMIT MUST BE SHOWN
ALONG WITH THE APPROVED SET OF PLANS TO THE CITY FOR PURCHASE OF THE "NO PARKING" SIGNS.
THE CONTRACTOR SHALL BE RESPONSIBLE TO NOTIFY 72 HOURS PRIOR TO THE START OF CONSTRUCTION, TO ALL BUSINESSES
AND RESIDENTS IMPACTED BY CONSTRUCTION ACTIVITIES.
THE CONTRACTOR SHALL BE RESPONSIBLE TO CONDUCT CONSTRUCTION ACTIVITIES IN SUCH A MANNER TO MINIMIZE
INCONVENIENCE TO PROPERTY OWNERS WITHIN THE VICINITY OF THE CONSTRUCTION WORK, OR ANY OTHER ENTITIES THAT
MAY BE IMPACTED BY CONSTRUCTION ACTIVITIES IN THE IMMEDIATE VICINITY.
ALL TRAFFIC PAVEMENT MARKINGS, REFLECTIVE PAVEMENT MARKERS, AND TRAFFIC SIGNS SHALL BE REPLACED PRIOR TO
OPENING ANY LANE TO TRAFFIC. IF TEMPORARY MARKINGS ARE USED, THEY MUST BE PROPERLY MAINTAINED AND INSPECTED
DAILY (MONDAY THRU FRIDAY) BY THE CONTRACTOR UNTIL THE PERMANENT MARKINGS ARE INSTALLED. ALL TEMPORARY
MARKINGS SHALL BE REFLECTORIZED.
THE CONTRACTOR SHALL BE RESPONSIBLE TO REPLACE EXISTING VEHICLE LOOP DETECTORS OBLITERATED BY THE
CONSTRUCTION IN A PROMPT MANNER. LOOP DETECTOR REPLACEMENT SHALL BE ACCOMPLISHED PER CITY OF LONG BEACH
STANDARDS AND MUST BE COORDINATED WITH CITY TRAFFIC OPERATIONS. FOR TEMPORARY DETECTION AND / OR TEMPORARY
TRAFFIC SIGN TIMING, PLANS MAY BE REQUIRED FOR CONSTRUCTION ACTIVITIES. ANY DEVIATIONS FROM THIS REQUIREMENT
MUST BE APPROVED BY THE CITY TRAFFIC ENGINEER.
ANY WORK AFFECTING PUBLIC BUS STOPS MUST BE COORDINATED WITH LONG BEACH TRANSIT. CONTACT RODNEY LAMPKIN AT
(562) 843-7594 AT LEAST 48 HOURS PRIOR TO WORK.
SHEET INDEX
SHT NO. DESCRIPTION
1 COVER SHEET
2 GENERAL NOTES
3 VICINITY MAPS
4 ANAHEIM ST-STAGE 1 & 2
5 ANAHEIM ST-STAGE 3 & 3A
6 ANAHEIM ST-STAGE 4
7 ANAHEIM ST-STAGE 5
8 CHERRY AVE-STAGE 6 & 7
9 CHERRY AVE-STAGE 8 & 9
10 CHERRY AVE-STAGE 10 & 11
11 CHERRY AVE-STAGE 11A
12 CHERRY AVE-STAGE 12
13 CHERRY AVE-STAGE 13
14 CHERRY AVE-STAGE 14 & 15
15 CHERRY AVE-STAGE 16 & 17
16 CHERRY AVE-STAGE 18 & 19
CHERRY AVE-ALTERNATIVE (A)
CHERRY AVE-ALTERNATIVE (B)
NEW LATERAL INSTALLATION -
ALTERNATIVE OPTION 1
CHERRY AVE-STAGE 20A, 20B, 20C, 20D,
20E, 20F, 20G, 20H, 20I, & 20J
NEW LATERAL INSTALLATION -
ALTERNATIVE OPTION 1
CHERRY AVE-TYPICAL DETAIL B1 & B2
21 DETOUR PLAN 1 OF 2
22 DETOUR PLAN 2 OF 2
DRAWING / FILE NUMBER:
SC-0512
FAMIS PROJECT: FAMIS PROJECT:
MUNIS PROJECT: MUNIS PROJECT:
XXXXXX
XXXXXXXXX
CHERRY AVE SEWER
IMPROVEMENT PROJECT
DIRECTOR OF ENGINEERING / CHIEF ENGINEER
MANAGER OF ENGINEERING
APPROVED
RECOMMENDED
DEPARTMENT DATE
BY CK'D.
CITY ENG.
VERIZON
EDISON CO.
LB ENERGY
FIRE
INPUT BY
AS-BUILT BY
POSTED GIS
CONSTRUCTED BY
GIS TILE
SPEC. NO
SECTION MAP
SERVICE ATLAS PAGE
GATE VALVES REC.
1"= 40'
SCALE
N/A
CONTRACT NO.
CHECKED BY
DESIGNED BY
DATE
DATE
CORRECTED BY
DATE
DATE
DATE
DATE
DATE MAR/26
VARIOUS
DESCRIPTION
DATE
REV.
DATE
DATE
B. ANATOLE FALAGÁN
GENERAL MANAGER
LONG BEACH PUBLIC
UTILITIES DEPARTMENT
DN
CDR MAR/26
N/A
1111 Corporate Center Dr, Suite 303 Monterey Park, CA 91754
XX-XX-XX
GENERAL NOTES
G-002
18. IF CONSTRUCTION AREA IS WITHIN A SCHOOL ZONE, THE CONTRACTOR SHALL NOTIFY STEVE BUI, TRANSPORTATION DIRECTOR
OF LBUSD AT (562) 426-6176, 48 HOURS PRIOR TO START OF WORK.
IF CONSTRUCTION AREA IS WITHIN A PEDESTRIAN SCHOOL CROSSING, THE CONTRACTOR SHALL NOTIFY TAINE REED, CROSSING
GUARD SUPERVISOR OF PUBLIC WORKS AT (562) 570-7240, 48 HOURS PRIOR TO START OF WORK.
ALLEYS MAY BE CLOSED TO THROUGH TRAFFIC DURING WORKING HOURS, BUT THE CONTRACTOR SHALL BE REQUIRED TO
MAINTAIN LOCAL ACCESS ALWAYS.
THE CONTRACTOR SHALL BE RESPONSIBLE TO MAINTAIN EXISTING PEDESTRIAN ACCESS OR ESTABLISH DETOUR ROUTE. IF
PEDESTRIAN WALKWAY CANNOT BE PROVIDED, SIDEWALK CLOSURE SHALL BE PER THE CITY'S PEDESTRIAN ACCESS DURING
CONSTRUCTION PROJECTS STANDARDS. ALL PEDESTRIAN PATHS OF TRAVEL AROUND WORK ZONES SHALL BE ACCESSIBLE AND
COMPLIANT WITH FEDERAL, CALIFORNIA AND LOCAL LAWS, INCLUDING ADA ACCESSIBILITY. TEMPORARY SIGNS MAY NOT BE
PLACED IN A MANNER THAT ENCROACHES ON OPEN ADA PATHS OF TRAVEL.
THE CONTRACTOR SHALL BE RESPONSIBLE TO MAINTAIN NORMAL ACCESS TO ALL BICYCLE FACILITIES WHENEVER POSSIBLE. IF
NORMAL ACCESS IS NOT ACHIEVABLE, THE CONTRACTOR SHALL BE REQUIRED TO PROVIDE AN ALTERNATE ROUTE FOR
BICYCLISTS AND CLOSE THE BICYCLE FACILITY PER LATEST CA MUTCD OR CITY OF LONG BEACH STANDARD TRAFFIC CONTROL
PLANS.
WORK HOURS: 8:30 AM - 3:30 PM (DAY WORK) PER CITY OF LONG BEACH APPROVAL. WORK SHALL BE PERFORMED MONDAY
THROUGH FRIDAY, EXCLUDING WEEKENDS AND HOLIDAYS.
THE FOLLOWING AGENCIES SHALL BE NOTIFIED AT LEAST FIVE WORKING DAYS IN ADVANCE OF ANY DETOUR AND / OR
CONSTRUCTION ACTIVITIES:
LONG BEACH UTILITY DEPARTMENT - (562) 570-2300
CITY OF LONG BEACH PUBLIC WORKS DEPARTMENT - (562) 570-6383
CITY OF LONG BEACH POLICE DEPARTMENT - (562) 570-7260
CONTRACTOR SHALL POST "SYMBOL UNEVEN LANES," "STEEL PLATES AHEAD," OR "BUMP" SIGNS FOR PAVEMENT SURFACE
DISRUPTIONS OF 1/2 INCH OR GREATER. PAVEMENT DISRUPTIONS OF 1 INCH OR GREATER SHALL HAVE BEVELED EDGE OF FOUR
(4) HORIZONTAL TO ONE (1) VERTICAL ALONG THE SHOULDER AND MINIMUM TEN (10) HORIZONTAL TO ONE (1) VERTICAL WITHIN
TRAVEL WAY. ALL RAMP TRANSITIONS SHALL BE APPROVED BY THE CITY.
CONTRACTOR SHALL INSTALL "CAUTION STEEL PLATES AHEAD" AND / OR "ROUGH ROAD" SIGNS IN ADVANCE OF STEEL PLATE
BRIDGING.
CONTRACTOR SHALL COVER ALL EXITING SPEED LIMIT SIGNS AND REPLACE WITH C17(CA)(25) MPH ROAD WORK SPEED LIMIT
SIGN DURING CONSTRUCTION.
PLACE ADDITIONAL "LANE CLOSED" (C30) SIGNS AT 150-FOOT INTERVALS THROUGHOUT EXTENDED WORK AREAS IN EACH LANE
THAT IS CLOSED. INSTALL "OPEN TRENCH" (C27) SIGNS WHENEVER AN OPEN EXCAVATION AREA EXISTS ADJACENT TO THE
TRAVELED WAY.
ALL ADVANCED WARNING SIGNS SHALL BE EQUIPPED WITH FLAGS DURING DAYTIME WORKING HOURS AND WITH WARNING
LIGHTS AT NIGHT.
ALL TRAFFIC LANES SHALL HAVE A MINIMUM OF 5 FEET CLEARANCE FROM OPEN EXCAVATIONS AND A MINIMUM OF 2 FEET FROM
VERTICAL OBSTRUCTIONS.
TRAFFIC SIGNALS SHALL REMAIN IN OPERATION AT ALL TIMES. CONFLICTING TRAFFIC SIGNAL INDICATIONS SHALL BE COVERED
AND SIGNAL OPERATION DURING EACH CONSTRUCTION PHASE SHALL BE COORDINATED WITH AND APPROVED BY THE CITY
ENGINEER. CONTACT THE CITY'S TRAFFIC OPERATIONS DIVISION 48 HOURS PRIOR TO THE START OF WORK AT (562) 570-3264.
SHARE THE ROAD SIGNS SHALL BE PROMINENTLY DISPLAYED AT MULTIPLE LOCATIONS DURING CONSTRUCTION.
CONTRACTOR SHALL POST "BUSINESS OPEN DURING CONSTRUCTION" SIGNAGE IN THE VICINITY OF ALL BUSINESSES IMPACTED
BY CONSTRUCTION ACTIVITIES.
14.
15.
16.
17.
19.
20.
22.
23.
24.
25.
26.
27.
28.
29.
30.
31.
32.
33.
DRAWING / FILE NUMBER:
SC-0512
FAMIS PROJECT: FAMIS PROJECT:
MUNIS PROJECT: MUNIS PROJECT:
XXXXXX
XXXXXXXXX
CHERRY AVE SEWER
IMPROVEMENT PROJECT
DIRECTOR OF ENGINEERING / CHIEF ENGINEER
MANAGER OF ENGINEERING
APPROVED
RECOMMENDED
DEPARTMENT DATE
BY CK'D.
CITY ENG.
VERIZON
EDISON CO.
LB ENERGY
FIRE
INPUT BY
AS-BUILT BY
POSTED GIS
CONSTRUCTED BY
GIS TILE
SPEC. NO
SECTION MAP
SERVICE ATLAS PAGE
GATE VALVES REC.
1"= 40'
SCALE
N/A
CONTRACT NO.
CHECKED BY
DESIGNED BY
DATE
DATE
CORRECTED BY
DATE
DATE
DATE
DATE
DATE MAR/26
VARIOUS
DESCRIPTION
DATE
REV.
DATE
DATE
B. ANATOLE FALAGÁN
GENERAL MANAGER
LONG BEACH PUBLIC
UTILITIES DEPARTMENT
DN
CDR MAR/26
N/A
1111 Corporate Center Dr, Suite 303 Monterey Park, CA 91754
XX-XX-XX
VICINITY MAPS
WORK HOURS:
MONDAY TO FRIDAY 8:30 A.M. TO 3:30 P.M.
INSTALL TEMPORARY NO PARKING SIGNS 48-72 HOURS
PRIOR TO COMMENCING WORK (IF REQUIRED)
ESTIMATED DURATION OF EACH STAGE IS 8 HOURS
CONTACT THE CITY'S TRAFFIC OPERATIONS DIVISION
48 HOURS TO THE START OF WORK TO NOTIFY AND
COORDINATE IMPACTS TO TRAFFIC SIGNALS.
(562) 570-3264
VICINITY MAP
VICINITY MAP
G-003
FAMIS PROJECT: FAMIS PROJECT:
MUNIS PROJECT: MUNIS PROJECT:
XXXXXX
XXXXXXXXX
CHERRY AVE SEWER
IMPROVEMENT PROJECT
DIRECTOR OF ENGINEERING / CHIEF ENGINEER
MANAGER OF ENGINEERING
APPROVED
RECOMMENDED
DEPARTMENT DATE
BY CK'D.
CITY ENG.
VERIZON
EDISON CO.
LB ENERGY
FIRE
INPUT BY
AS-BUILT BY
POSTED GIS
CONSTRUCTED BY
GIS TILE
SPEC. NO
SECTION MAP
SERVICE ATLAS PAGE
GATE VALVES REC.
1"= 40'
SCALE
N/A
CONTRACT NO.
CHECKED BY
DESIGNED BY
DATE
DATE
CORRECTED BY
DATE
DATE
DATE
DATE
DATE MAR/26
VARIOUS
DESCRIPTION
DATE
REV.
DATE
DATE
B. ANATOLE FALAGÁN
GENERAL MANAGER
LONG BEACH PUBLIC
UTILITIES DEPARTMENT
DN
CDR MAR/26
N/A
1111 Corporate Center Dr, Suite 303 Monterey Park, CA 91754
XX-XX-XX
TRAFFIC CONTROL PLANS
ANAHEIM STREET-STAGE 1 & 2
T-001
ANAHEIM ST - STAGE 2
LEGEND :
A N
A H
E I M
S
T R
E E
T
ROSE AVENUE
GARDENIA AVENUE
A N
A H
E
R
E E
T
GARDENIA AVENUE
A N
A H
E
R
E E
T
ROSE AVE
A N
A H
E
R
E E
T
CHERRY AVENUEGARDENIA AVENUE
CHERRY AVENUEGARDENIA AVENUE
ROSE AVENUE
NOTES :
ANAHEIM ST - STAGE 1
CONTACT LONG BEACH TRANSIT AT
(562) 591-2301 72 HOURS PRIOR TO
START OF WORK FOR TEMPORARY
RELOCATION OF BUS STOP
FAMIS PROJECT: FAMIS PROJECT:
MUNIS PROJECT: MUNIS PROJECT:
XXXXXX
XXXXXXXXX
CHERRY AVE SEWER
IMPROVEMENT PROJECT
DIRECTOR OF ENGINEERING / CHIEF ENGINEER
MANAGER OF ENGINEERING
APPROVED
RECOMMENDED
DEPARTMENT DATE
BY CK'D.
CITY ENG.
VERIZON
EDISON CO.
LB ENERGY
FIRE
INPUT BY
AS-BUILT BY
POSTED GIS
CONSTRUCTED BY
GIS TILE
SPEC. NO
SECTION MAP
SERVICE ATLAS PAGE
GATE VALVES REC.
1"= 40'
SCALE
N/A
CONTRACT NO.
CHECKED BY
DESIGNED BY
DATE
DATE
CORRECTED BY
DATE
DATE
DATE
DATE
DATE MAR/26
VARIOUS
DESCRIPTION
DATE
REV.
DATE
DATE
B. ANATOLE FALAGÁN
GENERAL MANAGER
LONG BEACH PUBLIC
UTILITIES DEPARTMENT
DN
CDR MAR/26
N/A
1111 Corporate Center Dr, Suite 303 Monterey Park, CA 91754
XX-XX-XX
TRAFFIC CONTROL PLANS
ANAHEIM STREET-STAGE 3 & 3A
T-002
LEGEND :
ANAHEIM ST - STAGE 3
GARDENIA AVENUE CHERRY AVENUE ST LOUISE AVENUE
CHERRY AVENUEGARDENIA AVENUE ST LOUISE AVENUE
A N
A H
E
R
E E
T
A N
A H
E
R
E E
T
CONTACT LONG BEACH TRANSIT AT
(562) 591-2301 72 HOURS PRIOR TO
START OF WORK FOR TEMPORARY
RELOCATION OF BUS STOP
GARDENIA AVENUE
CHERRY AVENUEGARDENIA AVENUE
A N
A H
E
R
E E
T
A N
A H
E
R
E E
T
ANAHEIM ST - STAGE 3A
CHERRY AVENUE
NOTES :
FAMIS PROJECT: FAMIS PROJECT:
MUNIS PROJECT: MUNIS PROJECT:
XXXXXX
XXXXXXXXX
CHERRY AVE SEWER
IMPROVEMENT PROJECT
DIRECTOR OF ENGINEERING / CHIEF ENGINEER
MANAGER OF ENGINEERING
APPROVED
RECOMMENDED
DEPARTMENT DATE
BY CK'D.
CITY ENG.
VERIZON
EDISON CO.
LB ENERGY
FIRE
INPUT BY
AS-BUILT BY
POSTED GIS
CONSTRUCTED BY
GIS TILE
SPEC. NO
SECTION MAP
SERVICE ATLAS PAGE
GATE VALVES REC.
1"= 40'
SCALE
N/A
CONTRACT NO.
CHECKED BY
DESIGNED BY
DATE
DATE
CORRECTED BY
DATE
DATE
DATE
DATE
DATE MAR/26
VARIOUS
DESCRIPTION
DATE
REV.
DATE
DATE
B. ANATOLE FALAGÁN
GENERAL MANAGER
LONG BEACH PUBLIC
UTILITIES DEPARTMENT
DN
CDR MAR/26
N/A
1111 Corporate Center Dr, Suite 303 Monterey Park, CA 91754
XX-XX-XX
TRAFFIC CONTROL PLANS
ANAHEIM STREET-STAGE 4
T-003
LEGEND :
NOTES :
CONTACT LONG BEACH TRANSIT AT
(562) 591-2301 72 HOURS PRIOR TO
START OF WORK FOR TEMPORARY
RELOCATION OF BUS STOP
A N
A H
E
R
E E
T
A N
A H
E
R
E E
T
CHERRY AVENUE
CHERRY AVENUE
ST LOUIS AVENUE
ST LOUIS AVENUE
GARDENIA AVENUE
GARDENIA AVE
ANAHEIM ST - STAGE 4
FAMIS PROJECT: FAMIS PROJECT:
MUNIS PROJECT: MUNIS PROJECT:
XXXXXX
XXXXXXXXX
CHERRY AVE SEWER
IMPROVEMENT PROJECT
DIRECTOR OF ENGINEERING / CHIEF ENGINEER
MANAGER OF ENGINEERING
APPROVED
RECOMMENDED
DEPARTMENT DATE
BY CK'D.
CITY ENG.
VERIZON
EDISON CO.
LB ENERGY
FIRE
INPUT BY
AS-BUILT BY
POSTED GIS
CONSTRUCTED BY
GIS TILE
SPEC. NO
SECTION MAP
SERVICE ATLAS PAGE
GATE VALVES REC.
1"= 40'
SCALE
N/A
CONTRACT NO.
CHECKED BY
DESIGNED BY
DATE
DATE
CORRECTED BY
DATE
DATE
DATE
DATE
DATE MAR/26
VARIOUS
DESCRIPTION
DATE
REV.
DATE
DATE
B. ANATOLE FALAGÁN
GENERAL MANAGER
LONG BEACH PUBLIC
UTILITIES DEPARTMENT
DN
CDR MAR/26
N/A
1111 Corporate Center Dr, Suite 303 Monterey Park, CA 91754
XX-XX-XX
TRAFFIC CONTROL PLANS
ANAHEIM STREET-STAGE 5
T-004
LEGEND :
NOTES :
CONTACT LONG BEACH TRANSIT AT
(562) 591-2301 72 HOURS PRIOR TO
START OF WORK FOR TEMPORARY
RELOCATION OF BUS STOP
A N
A H
E
R
E E
T
A N
A H
E
R
E E
T
CHERRY AVENUE
CHERRY AVENUE
GARDENIA AVENUE
GARDENIA AVE
ANAHEIM ST - STAGE 5
FAMIS PROJECT: FAMIS PROJECT:
MUNIS PROJECT: MUNIS PROJECT:
XXXXXX
XXXXXXXXX
CHERRY AVE SEWER
IMPROVEMENT PROJECT
DIRECTOR OF ENGINEERING / CHIEF ENGINEER
MANAGER OF ENGINEERING
APPROVED
RECOMMENDED
DEPARTMENT DATE
BY CK'D.
CITY ENG.
VERIZON
EDISON CO.
LB ENERGY
FIRE
INPUT BY
AS-BUILT BY
POSTED GIS
CONSTRUCTED BY
GIS TILE
SPEC. NO
SECTION MAP
SERVICE ATLAS PAGE
GATE VALVES REC.
1"= 40'
SCALE
N/A
CONTRACT NO.
CHECKED BY
DESIGNED BY
DATE
DATE
CORRECTED BY
DATE
DATE
DATE
DATE
DATE MAR/26
VARIOUS
DESCRIPTION
DATE
REV.
DATE
DATE
B. ANATOLE FALAGÁN
GENERAL MANAGER
LONG BEACH PUBLIC
UTILITIES DEPARTMENT
DN
CDR MAR/26
N/A
1111 Corporate Center Dr, Suite 303 Monterey Park, CA 91754
XX-XX-XX
TRAFFIC CONTROL PLANS
CHERRY AVE-STAGE 6 & 7
T-005
CHERRY AVENUE - STAGE 7
LEGEND :
CONTACT LONG BEACH TRANSIT AT
(562) 591-2301 72 HOURS PRIOR TO
START OF WORK FOR TEMPORARY
RELOCATION OF BUS STOP
ANAHEIM STREET
ANAHEIM STREET
C H
E R
R Y
A
V E
N U
E
C H
E R
E
N U
E
C H
E R
E
N U
E
C H
E R
E
N U
E
CHERRY AVE - STAGE 6
FAMIS PROJECT: FAMIS PROJECT:
MUNIS PROJECT: MUNIS PROJECT:
XXXXXX
XXXXXXXXX
CHERRY AVE SEWER
IMPROVEMENT PROJECT
DIRECTOR OF ENGINEERING / CHIEF ENGINEER
MANAGER OF ENGINEERING
APPROVED
RECOMMENDED
DEPARTMENT DATE
BY CK'D.
CITY ENG.
VERIZON
EDISON CO.
LB ENERGY
FIRE
INPUT BY
AS-BUILT BY
POSTED GIS
CONSTRUCTED BY
GIS TILE
SPEC. NO
SECTION MAP
SERVICE ATLAS PAGE
GATE VALVES REC.
1"= 40'
SCALE
N/A
CONTRACT NO.
CHECKED BY
DESIGNED BY
DATE
DATE
CORRECTED BY
DATE
DATE
DATE
DATE
DATE MAR/26
VARIOUS
DESCRIPTION
DATE
REV.
DATE
DATE
B. ANATOLE FALAGÁN
GENERAL MANAGER
LONG BEACH PUBLIC
UTILITIES DEPARTMENT
DN
CDR MAR/26
N/A
1111 Corporate Center Dr, Suite 303 Monterey Park, CA 91754
XX-XX-XX
TRAFFIC CONTROL PLANS
CHERRY AVE-STAGE 8 & 9
T-006
CHERRY AVENUE - STAGE 8
LEGEND :
C H
E R
E
N U
E
C H
E R
E
N U
E
C H
E R
E
N U
E
C H
E R
E
N U
E
CHERRY AVENUE - STAGE 9
�6�&�����˘����
FAMIS PROJECT: FAMIS PROJECT:
MUNIS PROJECT: MUNIS PROJECT:
XXXXXX
XXXXXXXXX
�&�+�(�5�5�<���$�9�(���6�(�:�(�5 �,�0�3�5�2�9�(�0�(�1�7���3�5�2�-�(�&�7
DIRECTOR OF ENGINEERING / CHIEF ENGINEER
MANAGER OF ENGINEERING
APPROVED
RECOMMENDED
DEPARTMENT DATE
BY CK'D.
CITY ENG.
VERIZON
EDISON CO.
LB ENERGY
FIRE
INPUT BY
AS-BUILT BY
POSTED GIS
CONSTRUCTED BY
GIS TILE
SPEC. NO
SECTION MAP
SERVICE ATLAS PAGE
GATE VALVES REC.
1"= 40'
SCALE
N/A
CONTRACT NO.
CHECKED BY
DESIGNED BY
DATE
DATE
CORRECTED BY
DATE
DATE
DATE
DATE
DATE MAR/26
VARIOUS
DESCRIPTION
DATE
REV.
DATE
DATE
B. ANATOLE FALAGÁN
GENERAL MANAGER
LONG BEACH PUBLIC
UTILITIES DEPARTMENT
DN
CDR MAR/26
N/A
1111 Corporate Center Dr, Suite 303 Monterey Park, CA 91754
XX-XX-XX
�7�5�$�)�)�,�&���&�2�1�7�5�2�/���3�/�$�1�6 �&�+�(�5�5�<���$�9�(���6�7�$�*�(��������� ������
�7�������ˆ
CHERRY AVENUE - STAGE 10
LEGEND :
CONTACT LONG BEACH TRANSIT AT
(562) 591-2301 72 HOURS PRIOR TO
START OF WORK FOR TEMPORARY
RELOCATION OF BUS STOP
C H
E R
E
N U
E
C H
E R
E
N U
E
C H
E R
E
N U
E
C H
E R
E
N U
E
10TH STREET
10TH STREET
CHERRY AVENUE - STAGE 11
FAMIS PROJECT: FAMIS PROJECT:
MUNIS PROJECT: MUNIS PROJECT:
XXXXXX
XXXXXXXXX
CHERRY AVE SEWER
IMPROVEMENT PROJECT
DIRECTOR OF ENGINEERING / CHIEF ENGINEER
MANAGER OF ENGINEERING
APPROVED
RECOMMENDED
DEPARTMENT DATE
BY CK'D.
CITY ENG.
VERIZON
EDISON CO.
LB ENERGY
FIRE
INPUT BY
AS-BUILT BY
POSTED GIS
CONSTRUCTED BY
GIS TILE
SPEC. NO
SECTION MAP
SERVICE ATLAS PAGE
GATE VALVES REC.
1"= 40'
SCALE
N/A
CONTRACT NO.
CHECKED BY
DESIGNED BY
DATE
DATE
CORRECTED BY
DATE
DATE
DATE
DATE
DATE MAR/26
VARIOUS
DESCRIPTION
DATE
REV.
DATE
DATE
B. ANATOLE FALAGÁN
GENERAL MANAGER
LONG BEACH PUBLIC
UTILITIES DEPARTMENT
DN
CDR MAR/26
N/A
1111 Corporate Center Dr, Suite 303 Monterey Park, CA 91754
XX-XX-XX
TRAFFIC CONTROL PLANS
CHERRY AVE-STAGE 11A
T-008
LEGEND :
C H
E R
E
N U
E
C H
E R
E
N U
E
10TH STREET
10TH STREET
CHERRY AVENUE - STAGE 11A
FAMIS PROJECT: FAMIS PROJECT:
MUNIS PROJECT: MUNIS PROJECT:
XXXXXX
XXXXXXXXX
CHERRY AVE SEWER
IMPROVEMENT PROJECT
DIRECTOR OF ENGINEERING / CHIEF ENGINEER
MANAGER OF ENGINEERING
APPROVED
RECOMMENDED
DEPARTMENT DATE
BY CK'D.
CITY ENG.
VERIZON
EDISON CO.
LB ENERGY
FIRE
INPUT BY
AS-BUILT BY
POSTED GIS
CONSTRUCTED BY
GIS TILE
SPEC. NO
SECTION MAP
SERVICE ATLAS PAGE
GATE VALVES REC.
1"= 40'
SCALE
N/A
CONTRACT NO.
CHECKED BY
DESIGNED BY
DATE
DATE
CORRECTED BY
DATE
DATE
DATE
DATE
DATE MAR/26
VARIOUS
DESCRIPTION
DATE
REV.
DATE
DATE
B. ANATOLE FALAGÁN
GENERAL MANAGER
LONG BEACH PUBLIC
UTILITIES DEPARTMENT
DN
CDR MAR/26
N/A
1111 Corporate Center Dr, Suite 303 Monterey Park, CA 91754
XX-XX-XX
TRAFFIC CONTROL PLANS
CHERRY AVE-STAGE 12
T-009
LEGEND :
CONTACT LONG BEACH TRANSIT AT
(562) 591-2301 72 HOURS PRIOR TO
START OF WORK FOR TEMPORARY
RELOCATION OF BUS STOP
C H
E R
E
N U
E
C H
E R
E
N U
E
10TH STREET
10TH STREET
NOTES :
L O
U
E
N U
E
U
E
N U
CHERRY AVENUE - STAGE 12
FAMIS PROJECT: FAMIS PROJECT:
MUNIS PROJECT: MUNIS PROJECT:
XXXXXX
XXXXXXXXX
CHERRY AVE SEWER
IMPROVEMENT PROJECT
DIRECTOR OF ENGINEERING / CHIEF ENGINEER
MANAGER OF ENGINEERING
APPROVED
RECOMMENDED
DEPARTMENT DATE
BY CK'D.
CITY ENG.
VERIZON
EDISON CO.
LB ENERGY
FIRE
INPUT BY
AS-BUILT BY
POSTED GIS
CONSTRUCTED BY
GIS TILE
SPEC. NO
SECTION MAP
SERVICE ATLAS PAGE
GATE VALVES REC.
1"= 40'
SCALE
N/A
CONTRACT NO.
CHECKED BY
DESIGNED BY
DATE
DATE
CORRECTED BY
DATE
DATE
DATE
DATE
DATE MAR/26
VARIOUS
DESCRIPTION
DATE
REV.
DATE
DATE
B. ANATOLE FALAGÁN
GENERAL MANAGER
LONG BEACH PUBLIC
UTILITIES DEPARTMENT
DN
CDR MAR/26
N/A
1111 Corporate Center Dr, Suite 303 Monterey Park, CA 91754
XX-XX-XX
TRAFFIC CONTROL PLANS
CHERRY AVE-STAGE 13
T-010
LEGEND :
C H
E R
E
N U
E
C H
E R
E
N U
E
10TH STREET
10TH STREET
U
E
N U
E
U
E
N U
CHERRY AVENUE - STAGE 13
FAMIS PROJECT: FAMIS PROJECT:
MUNIS PROJECT: MUNIS PROJECT:
XXXXXX
XXXXXXXXX
CHERRY AVE SEWER
IMPROVEMENT PROJECT
DIRECTOR OF ENGINEERING / CHIEF ENGINEER
MANAGER OF ENGINEERING
APPROVED
RECOMMENDED
DEPARTMENT DATE
BY CK'D.
CITY ENG.
VERIZON
EDISON CO.
LB ENERGY
FIRE
INPUT BY
AS-BUILT BY
POSTED GIS
CONSTRUCTED BY
GIS TILE
SPEC. NO
SECTION MAP
SERVICE ATLAS PAGE
GATE VALVES REC.
1"= 40'
SCALE
N/A
CONTRACT NO.
CHECKED BY
DESIGNED BY
DATE
DATE
CORRECTED BY
DATE
DATE
DATE
DATE
DATE MAR/26
VARIOUS
DESCRIPTION
DATE
REV.
DATE
DATE
B. ANATOLE FALAGÁN
GENERAL MANAGER
LONG BEACH PUBLIC
UTILITIES DEPARTMENT
DN
CDR MAR/26
N/A
1111 Corporate Center Dr, Suite 303 Monterey Park, CA 91754
XX-XX-XX
TRAFFIC CONTROL PLANS
CHERRY AVE-STAGE 14 & 15
T-011
CHERRY AVENUE - STAGE 14
LEGEND :
C H
E R
E
N U
E
C H
E R
E
N U
E
C H
E R
E
N U
E
C H
E R
E
N U
E
10TH STREET
10TH STREET
8TH STREET
8TH STREET
CHERRY AVENUE - STAGE 15
FAMIS PROJECT: FAMIS PROJECT:
MUNIS PROJECT: MUNIS PROJECT:
XXXXXX
XXXXXXXXX
CHERRY AVE SEWER
IMPROVEMENT PROJECT
DIRECTOR OF ENGINEERING / CHIEF ENGINEER
MANAGER OF ENGINEERING
APPROVED
RECOMMENDED
DEPARTMENT DATE
BY CK'D.
CITY ENG.
VERIZON
EDISON CO.
LB ENERGY
FIRE
INPUT BY
AS-BUILT BY
POSTED GIS
CONSTRUCTED BY
GIS TILE
SPEC. NO
SECTION MAP
SERVICE ATLAS PAGE
GATE VALVES REC.
1"= 40'
SCALE
N/A
CONTRACT NO.
CHECKED BY
DESIGNED BY
DATE
DATE
CORRECTED BY
DATE
DATE
DATE
DATE
DATE MAR/26
VARIOUS
DESCRIPTION
DATE
REV.
DATE
DATE
B. ANATOLE FALAGÁN
GENERAL MANAGER
LONG BEACH PUBLIC
UTILITIES DEPARTMENT
DN
CDR MAR/26
N/A
1111 Corporate Center Dr, Suite 303 Monterey Park, CA 91754
XX-XX-XX
TRAFFIC CONTROL PLANS
CHERRY AVE-STAGE 16 & 17
T-012
LEGEND :
C H
E R
E
N U
E
C H
E R
E
N U
E
C H
E R
E
N U
E
C H
E R
E
N U
E
8TH STREET
8TH STREET
8TH STREET
8TH STREET
CHERRY AVENUE - STAGE 16
CHERRY AVENUE - STAGE 17
FAMIS PROJECT: FAMIS PROJECT:
MUNIS PROJECT: MUNIS PROJECT:
XXXXXX
XXXXXXXXX
CHERRY AVE SEWER
IMPROVEMENT PROJECT
DIRECTOR OF ENGINEERING / CHIEF ENGINEER
MANAGER OF ENGINEERING
APPROVED
RECOMMENDED
DEPARTMENT DATE
BY CK'D.
CITY ENG.
VERIZON
EDISON CO.
LB ENERGY
FIRE
INPUT BY
AS-BUILT BY
POSTED GIS
CONSTRUCTED BY
GIS TILE
SPEC. NO
SECTION MAP
SERVICE ATLAS PAGE
GATE VALVES REC.
1"= 40'
SCALE
N/A
CONTRACT NO.
CHECKED BY
DESIGNED BY
DATE
DATE
CORRECTED BY
DATE
DATE
DATE
DATE
DATE MAR/26
VARIOUS
DESCRIPTION
DATE
REV.
DATE
DATE
B. ANATOLE FALAGÁN
GENERAL MANAGER
LONG BEACH PUBLIC
UTILITIES DEPARTMENT
DN
CDR MAR/26
N/A
1111 Corporate Center Dr, Suite 303 Monterey Park, CA 91754
XX-XX-XX
TRAFFIC CONTROL PLANS
CHERRY AVE-STAGE 18 & 19
T-013
LEGEND :
C H
E R
E
N U
E
C H
E R
E
N U
E
C H
E R
E
N U
E
8TH STREET
8TH STREET
7TH STREET
7TH STREET
CHERRY AVENUE - STAGE 18
CHERRY AVENUE - STAGE 19
FAMIS PROJECT: FAMIS PROJECT:
MUNIS PROJECT: MUNIS PROJECT:
XXXXXX
XXXXXXXXX
CHERRY AVE SEWER
IMPROVEMENT PROJECT
DIRECTOR OF ENGINEERING / CHIEF ENGINEER
MANAGER OF ENGINEERING
APPROVED
RECOMMENDED
DEPARTMENT DATE
BY CK'D.
CITY ENG.
VERIZON
EDISON CO.
LB ENERGY
FIRE
INPUT BY
AS-BUILT BY
POSTED GIS
CONSTRUCTED BY
GIS TILE
SPEC. NO
SECTION MAP
SERVICE ATLAS PAGE
GATE VALVES REC.
1"= 40'
SCALE
N/A
CONTRACT NO.
CHECKED BY
DESIGNED BY
DATE
DATE
CORRECTED BY
DATE
DATE
DATE
DATE
DATE MAR/26
VARIOUS
DESCRIPTION
DATE
REV.
DATE
DATE
B. ANATOLE FALAGÁN
GENERAL MANAGER
LONG BEACH PUBLIC
UTILITIES DEPARTMENT
DN
CDR MAR/26
N/A
1111 Corporate Center Dr, Suite 303 Monterey Park, CA 91754
XX-XX-XX
TRAFFIC CONTROL PLANS
CHERRY AVE-ALTERNATIVE (A)
T-014
LEGEND :
ANAHEIM STREET
ANAHEIM STREET
C H
E R
E
N U
E
C H
E R
E
N U
E
10TH STREET
10TH STREET
M A
T C
H L
I N
E
S
B
L
O W
M A
T C
H L
I N
E
S
B O
V E
NOTES :
CHERRY AVENUE - ALTERNATIVE (A)
APPLICABLE TO STAGES 6, 7, 8, 9, 10 & 11
FAMIS PROJECT: FAMIS PROJECT:
MUNIS PROJECT: MUNIS PROJECT:
XXXXXX
XXXXXXXXX
CHERRY AVE SEWER
IMPROVEMENT PROJECT
DIRECTOR OF ENGINEERING / CHIEF ENGINEER
MANAGER OF ENGINEERING
APPROVED
RECOMMENDED
DEPARTMENT DATE
BY CK'D.
CITY ENG.
VERIZON
EDISON CO.
LB ENERGY
FIRE
INPUT BY
AS-BUILT BY
POSTED GIS
CONSTRUCTED BY
GIS TILE
SPEC. NO
SECTION MAP
SERVICE ATLAS PAGE
GATE VALVES REC.
1"= 40'
SCALE
N/A
CONTRACT NO.
CHECKED BY
DESIGNED BY
DATE
DATE
CORRECTED BY
DATE
DATE
DATE
DATE
DATE MAR/26
VARIOUS
DESCRIPTION
DATE
REV.
DATE
DATE
B. ANATOLE FALAGÁN
GENERAL MANAGER
LONG BEACH PUBLIC
UTILITIES DEPARTMENT
DN
CDR MAR/26
N/A
1111 Corporate Center Dr, Suite 303 Monterey Park, CA 91754
XX-XX-XX
TRAFFIC CONTROL PLANS
CHERRY AVE-ALTERNATIVE (B)
T-015
LEGEND :
C H
E R
E
N U
E
C H
E R
E
N U
E
NOTES :
CHERRY AVENUE - ALTERNATIVE (B)
APPLICABLE TO STAGES 6, 7, 8, 9, 10 & 11
FAMIS PROJECT: FAMIS PROJECT:
MUNIS PROJECT: MUNIS PROJECT:
XXXXXX
XXXXXXXXX
CHERRY AVE SEWER
IMPROVEMENT PROJECT
DIRECTOR OF ENGINEERING / CHIEF ENGINEER
MANAGER OF ENGINEERING
APPROVED
RECOMMENDED
DEPARTMENT DATE
BY CK'D.
CITY ENG.
VERIZON
EDISON CO.
LB ENERGY
FIRE
INPUT BY
AS-BUILT BY
POSTED GIS
CONSTRUCTED BY
GIS TILE
SPEC. NO
SECTION MAP
SERVICE ATLAS PAGE
GATE VALVES REC.
1"= 40'
SCALE
N/A
CONTRACT NO.
CHECKED BY
DESIGNED BY
DATE
DATE
CORRECTED BY
DATE
DATE
DATE
DATE
DATE MAR/26
VARIOUS
DESCRIPTION
DATE
REV.
DATE
DATE
B. ANATOLE FALAGÁN
GENERAL MANAGER
LONG BEACH PUBLIC
UTILITIES DEPARTMENT
DN
CDR MAR/26
N/A
1111 Corporate Center Dr, Suite 303 Monterey Park, CA 91754
XX-XX-XX
TRAFFIC CONTROL PLANS
NEW LATERAL INSTALLATION - ALTERNATIVE OPTION 1
CHERRY AVE-STAGE 20A, B, C, D, E, F, G, H, I, & 20J
T-016
C H
E R
E
N U
E
C H
E R
E
N U
E
LEGEND :
ANAHEIM ST
ANAHEIM ST
CHERRY AVENUE - TYPICAL DETAIL "A"
C H
E R
E
N U
E
C H
E R
E
N U
E
NOTES :
S E
E
T
P
G
H T
10TH STREET
10TH STREET
CHERRY AVENUE - NEW LATERAL
OVERVIEW PLAN
(ANAHEIM STREET TO ALLEY)
8TH STREET
8TH STREET
ALLEY
ALLEY
S E
E
M
I D
D
F T
C H
E R
E
N U
E
CHERRY AVE - STAGE 20A, 20B, 20C, 20D & 20E
CHERRY AVE - STAGE 20F, 20G, 20H, 20I & 20J
FAMIS PROJECT: FAMIS PROJECT:
MUNIS PROJECT: MUNIS PROJECT:
XXXXXX
XXXXXXXXX
CHERRY AVE SEWER
IMPROVEMENT PROJECT
DIRECTOR OF ENGINEERING / CHIEF ENGINEER
MANAGER OF ENGINEERING
APPROVED
RECOMMENDED
DEPARTMENT DATE
BY CK'D.
CITY ENG.
VERIZON
EDISON CO.
LB ENERGY
FIRE
INPUT BY
AS-BUILT BY
POSTED GIS
CONSTRUCTED BY
GIS TILE
SPEC. NO
SECTION MAP
SERVICE ATLAS PAGE
GATE VALVES REC.
1"= 40'
SCALE
N/A
CONTRACT NO.
CHECKED BY
DESIGNED BY
DATE
DATE
CORRECTED BY
DATE
DATE
DATE
DATE
DATE MAR/26
VARIOUS
DESCRIPTION
DATE
REV.
DATE
DATE
B. ANATOLE FALAGÁN
GENERAL MANAGER
LONG BEACH PUBLIC
UTILITIES DEPARTMENT
DN
CDR MAR/26
N/A
1111 Corporate Center Dr, Suite 303 Monterey Park, CA 91754
XX-XX-XX
TRAFFIC CONTROL PLANS
NEW LATERAL INSTALLATION - ALTERNATIVE OPTION 2
CHERRY AVE-TYPICAL DETAIL B1 & B2
T-017
LEGEND :
CHERRY AVENUE - TYPICAL DETAIL "B2"
C H
E R
E
N U
E
C H
E R
E
N U
E
NOTES :
CHERRY AVENUE - TYPICAL DETAIL "B1"
C H
E R
E
N U
E
C H
E R
E
N U
FAMIS PROJECT: FAMIS PROJECT:
MUNIS PROJECT: MUNIS PROJECT:
XXXXXX
XXXXXXXXX
CHERRY AVE SEWER
IMPROVEMENT PROJECT
DIRECTOR OF ENGINEERING / CHIEF ENGINEER
MANAGER OF ENGINEERING
APPROVED
RECOMMENDED
DEPARTMENT DATE
BY CK'D.
CITY ENG.
VERIZON
EDISON CO.
LB ENERGY
FIRE
INPUT BY
AS-BUILT BY
POSTED GIS
CONSTRUCTED BY
GIS TILE
SPEC. NO
SECTION MAP
SERVICE ATLAS PAGE
GATE VALVES REC.
1"= 40'
SCALE
N/A
CONTRACT NO.
CHECKED BY
DESIGNED BY
DATE
DATE
CORRECTED BY
DATE
DATE
DATE
DATE
DATE MAR/26
VARIOUS
DESCRIPTION
DATE
REV.
DATE
DATE
B. ANATOLE FALAGÁN
GENERAL MANAGER
LONG BEACH PUBLIC
UTILITIES DEPARTMENT
DN
CDR MAR/26
N/A
1111 Corporate Center Dr, Suite 303 Monterey Park, CA 91754
XX-XX-XX
DETOUR PLANS 1 OR 2
LEGEND :STAGE 1 DETOUR
STAGE 4 DETOUR
STAGE 2 DETOUR
STAGE 5 DETOUR
T-021
LEGEND :LEGEND :
FAMIS PROJECT: FAMIS PROJECT:
MUNIS PROJECT: MUNIS PROJECT:
XXXXXX
XXXXXXXXX
CHERRY AVE SEWER
IMPROVEMENT PROJECT
DIRECTOR OF ENGINEERING / CHIEF ENGINEER
MANAGER OF ENGINEERING
APPROVED
RECOMMENDED
DEPARTMENT DATE
BY CK'D.
CITY ENG.
VERIZON
EDISON CO.
LB ENERGY
FIRE
INPUT BY
AS-BUILT BY
POSTED GIS
CONSTRUCTED BY
GIS TILE
SPEC. NO
SECTION MAP
SERVICE ATLAS PAGE
GATE VALVES REC.
1"= 40'
SCALE
N/A
CONTRACT NO.
CHECKED BY
DESIGNED BY
DATE
DATE
CORRECTED BY
DATE
DATE
DATE
DATE
DATE MAR/26
VARIOUS
DESCRIPTION
DATE
REV.
DATE
DATE
B. ANATOLE FALAGÁN
GENERAL MANAGER
LONG BEACH PUBLIC
UTILITIES DEPARTMENT
DN
CDR MAR/26
N/A
1111 Corporate Center Dr, Suite 303 Monterey Park, CA 91754
XX-XX-XX
LEGEND :STAGE 11A DETOUR
STAGE 12 DETOUR
DETOUR PLANS 2 OR 2
T-022
LEGEND :
STAGE 16 DETOUR
| SHEET_7_TCP 4-C-1 |
| Sheets and Views |
| C-1 |
| SHEET_8_TCP 5-C-1 |
| Sheets and Views |
| C-1 |
| SHEET_9_TCP 6-C-1 |
| Sheets and Views |
| C-1 |
| SHEET_10_TCP 7-C-1 |
| Sheets and Views |
| C-1 |
| SHEET_11_TCP 8-C-1 |
| Sheets and Views |
| C-1 |
| SHEET_12_TCP 9-C-1 |
| Sheets and Views |
| C-1 |
| SHEET_13_TCP 10-C-1 |
| Sheets and Views |
| C-1 |
| SHEET_14_TCP 11-C-1 |
| Sheets and Views |
| C-1 |
| SHEET_15_TCP 12-C-1 |
| Sheets and Views |
| C-1 |
| SHEET_16_TCP 13-C-1 |
| Sheets and Views |
| C-1 |
| SHEET_17_TCP 14-C-1 |
| Sheets and Views |
| C-1 |
| SHEET_18_TCP 15-C-1 |
| Sheets and Views |
| C-1 |
| SHEET_19_TCP 16-C-1 |
| Sheets and Views |
| C-1 |
| SHEET_20_TCP 17-C-1 |
| Sheets and Views |
| C-1 |
| SHEET_21 DETOUR 1_TCP 18-DETOUR1 |
| Sheets and Views |
| DETOUR1 |
| SHEET_22_DETOUR 2_TCP 19-DETOUR 3 |
| Sheets and Views |
| DETOUR 3 |
| SHEET_6_TCP 3-C-1.pdf |
| Sheets and Views |
| C-1 |
| SHEET_5_TCP 2-C-1.pdf |
| Sheets and Views |
| C-1 |
| SHEET_4_TCP 1-C-1.pdf |
| Sheets and Views |
| C-1 |
| 03-G03-G3.pdf |
| Sheets and Views |
| G3 |
| 02-G02-G2.pdf |
| Sheets and Views |
| G2 |
| 01-G01-G1.pdf |
| Sheets and Views |
| G1 |
File details come from the government source that posted it. Updated .