Chandler-Gilbert Community College Bradshaw Hall - Design Professional Services (A&E)
Open State & local contract opportunity Posted
- Solicitation number
- RFP 3631-6
- State
- Arizona
- Responses due
Opportunity facts
- Jurisdiction
- NIGP codes
- 90607 Architect Services, Professional
- 90740 Engineering Services, Non-Licensed (Not Otherwise Classified)
- 90927 Building Construction, Educational
- 911 Construction And Utilities, Higher Education
- 91815 Architectural Consulting
- 91831 Construction Consulting
- 91842 Engineering Consulting
- 92533 Engineer Services, Professional
- UNSPSC codes
- 72121406 School building construction service
- 95121905 Language laboratory
- 95121907 Meteorological station
- 95121901 Polytechnic school
- 95121903 Lecture theater
- 95121900 Educational and research buildings and structures
- 95121911 High school
- 95121904 Library
- 95121908 Research or testing facility
- 95121910 Junior high or middle school
Opportunity details come from maricopa.bonfirehub.com. Updated .
About this opportunity
The Maricopa Community College District, on behalf of Chandler-Gilbert Community College Pecos Campus, is soliciting design professional services (Architecture & Engineering) for renovation and expansion of Bradshaw Hall, with proposals due November 4, 2026.
The project involves renovation and expansion of the existing Bradshaw building to approximately 80,000 square feet, including modern building systems, enhanced student services infrastructure, and systems replacement. The scope includes either expanded site footprint or second-story addition. The District will deliver the project using Construction Manager @ Risk (CMAR) method; the CMAR will be procured through a separate RFP process following completion of design services.
No estimated contract value, contract term, evaluation criteria, or pre-proposal meeting date is identified in the source.
Opportunity text
The Maricopa Community College District, on behalf of Chandler-Gilber Community College, Pecos Campus, wishes to renovate and expand the existing Bradshaw building to provide approximately 80,000 square-foot with a modern building, enhanced student services, and systems infrastructure replacement. It also involves adding square footage either through and expanded site footprint, or a second story. The Bradshaw Building Renovation will be constructed using CMAR (Construction Manager @ Risk) delivery method. The CMAR will also be obtained through the Request for Proposal (RFP) procurement process, shortly after Design Services for Architectural and Engineering.
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity