CCCF Dayroom Curtain Wall Water Intrusion

Closed State & local contract opportunity Posted

Solicitation number
S-29100-00017624
State
Oregon
Responses due

Opportunity facts

NIGP code
UNSPSC codes
Show all 34
Point of contact

Opportunity details come from oregonbuys.gov. Updated .

About this opportunity

The Oregon Department of Corrections is requesting bids for dayroom curtain wall water intrusion repairs at Coffee Creek Correctional Facility (CCCF) in Wilsonville under ITB 17624, with bids due October 6, 2026, at 2:00 PM PST and a mandatory pre-bid conference on September 8, 2026, at 9:00 AM PST at the project site; failure to attend in their entirety will result in bid rejection as non-responsive.

Bidders must hold Construction Contractors Board registration and comply with Oregon prevailing wage rates effective July 5, 2026, and apprenticeship requirements mandating 12 percent of work hours be performed by registered apprentices. Performance and payment bonds equal to 100 percent of contract value and bid security of 10 percent of the total bid amount are required. Proof of insurance must be submitted within ten calendar days of intent-to-award notification.

The scope encompasses leak investigation and water testing; removal and replacement of failed sealants and installation of new joint sealant per DOC specifications; installation of new stainless steel flashing, fluid-applied waterproofing, and associated components at sill and jamb locations; removal and reinstallation of electrical equipment, outlet shrouds, call boxes, and cameras; removal and replacement of exterior concrete panels; installation of a trench drain system connected to existing storm drainage; replacement of damaged spandrel glass or insulated metal infill panels; and interior dayroom repairs including drywall, paint, and finish restoration. All work must be performed during DOC daytime work windows (6:30 AM to 2:30 PM) and is subject to DOC security and escort requirements, tool control procedures, and daily progress reporting.

The project estimate ranges from $175,000 to $285,000. Work must commence within ten calendar days of Notice to Proceed, with substantial completion required within 152 calendar days and final completion within 182 calendar days. Liquidated damages of $430 per calendar day apply for delays beyond substantial and final completion dates. No federal funding is used for this project.

Files

File Type Posted
17624 PLANS.pdf PDF
Check Off sheet ITB~17.pdf PDF
SOW.pdf PDF
17624 ITB_GTC_SGC_SPECS.pdf PDF