Check Off sheet ITB~17.pdf

PDF 100 KB Posted

Attached to
CCCF Dayroom Curtain Wall Water Intrusion
Solicitation number
S-29100-00017624
Issued by
Oregon

About this file

Summary Unable to Complete

The file provided (Check Off sheet ITB17.pdf) cannot be accessed or reviewed in this response. While the filename and related contract opportunity details are visible in the metadata, the actual content of the PDF document was not included in the materials provided. To deliver an accurate summary following your specifications, the full text or image content of the Check Off sheet ITB17.pdf file is required.

Please provide the document contents so a comprehensive summary can be prepared addressing the contract specifications, bidding requirements, pricing terms, and other relevant details.

View the file

Other files

File Type Posted
17624 ITB_GTC_SGC_SPECS.pdf PDF
17624 PLANS.pdf PDF
SOW.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bidder reminders check off sheet

INFORMATION TO BE SUBMITTED WITH THE BID: The items listed below in this section shall be submitted or the Bid shall be found to be non‐responsive. The following shall be submitted prior to Closing:

Exhibit 1- Pricing Submittal Section.

Section D- Bid Security Requirements

Section G- Construction Contractors Board (CCB) Registration Requirements; Asbestos Abatement Licensing Requirements, & Joint Venture ‐ Partnership Declaration, Section H- Addenda Acknowledgement.

Section I- Responsibility Inquiry & Contractor References; ESB Utilization.

Attachment D- Bidder References

Section K- Residency Information.

Section O- Signature of Bidder's Duly Authorized Representative.

Any Addenda (If required).

Section F- First Tier Subcontractor Disclosure Form. Or within two (2) working hours after the Closing.

File details come from the government source that posted it. Updated .