Check Off sheet ITB~17.pdf
PDF 100 KB Posted
- Attached to
- CCCF Dayroom Curtain Wall Water Intrusion
- Solicitation number
- S-29100-00017624
- Issued by
- Oregon
About this file
Summary Unable to Complete
The file provided (Check Off sheet ITB17.pdf) cannot be accessed or reviewed in this response. While the filename and related contract opportunity details are visible in the metadata, the actual content of the PDF document was not included in the materials provided. To deliver an accurate summary following your specifications, the full text or image content of the Check Off sheet ITB17.pdf file is required.
Please provide the document contents so a comprehensive summary can be prepared addressing the contract specifications, bidding requirements, pricing terms, and other relevant details.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 17624 ITB_GTC_SGC_SPECS.pdf | ||
| 17624 PLANS.pdf | ||
| SOW.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bidder reminders check off sheet
INFORMATION TO BE SUBMITTED WITH THE BID: The items listed below in this section shall be submitted or the Bid shall be found to be non‐responsive. The following shall be submitted prior to Closing:
Exhibit 1- Pricing Submittal Section.
Section D- Bid Security Requirements
Section G- Construction Contractors Board (CCB) Registration Requirements; Asbestos Abatement Licensing Requirements, & Joint Venture ‐ Partnership Declaration, Section H- Addenda Acknowledgement.
Section I- Responsibility Inquiry & Contractor References; ESB Utilization.
Attachment D- Bidder References
Section K- Residency Information.
Section O- Signature of Bidder's Duly Authorized Representative.
Any Addenda (If required).
Section F- First Tier Subcontractor Disclosure Form. Or within two (2) working hours after the Closing.
File details come from the government source that posted it. Updated .