About this opportunity

The City of Ukiah is requesting sealed bids for the Capital Pavement Program: Preservation and Overlay project (Specification No. 26-01), with proposals due June 23, 2026 at 2:00 p.m., and Disadvantaged Business Enterprise (DBE) goals apply to this procurement.

The scope encompasses grinding and paving at three locations within Ukiah: Talmage Road from State Street east to the Great Redwood Trail; Waugh Lane from Talmage Road north approximately 740 feet; and Mendocino Place from Mendocino Drive to the end of the cul-de-sac. All work involves complete surface grinding down 3 inches and placement of a 3-inch asphalt concrete overlay over existing pavement. The project also requires installation of a new 6-inch domestic water main with related service connections, ADA-compliant ramps at multiple intersections, and modifications to existing and installation of new storm drain infrastructure. All roadway grinding and paving on Talmage Road must be completed during nighttime hours to minimize business disruption. The engineer's estimate spans 43 line items totaling 72,020 square feet of cold-plane asphalt, 1,378 tons of hot-mix asphalt, 1,123 linear feet of traffic stripes, and associated drainage and utility components.

Work must be completed within 50 working days from notice to proceed; liquidated damages of $500 per calendar day apply for delays beyond this schedule. All contractors and subcontractors must be registered with the California Department of Industrial Relations under Labor Code Section 1725.5, with limited exceptions, and prevailing wage requirements apply. The successful bidder must obtain and maintain a City of Ukiah Business License. A bid guaranty of 10 percent of the total bid amount (certified check or bond) is required; failure to execute within 15 days of award forfeits the guaranty. The contractor must furnish a faithful performance bond equal to 100 percent of contract price, a material and labor bond of at least 50 percent of contract price, and a defective material and workmanship bond of 5 percent of final contract price effective for one year post-completion. Insurance requirements include general liability of $2 million per occurrence, automobile liability of $2 million per accident, and employer's liability of $1 million per accident. Questions should be directed to Myles Fisette, Purchasing Manager, at (707) 463-6225 or mfisette@cityofukiah.com.

Opportunity text

12 versions

Update #12 · Latest ·

The City of Ridgecrest is requesting informal sealed bids from qualified contractors to remove all structures down to the foundation and properly dispose of all junk, trash, debris, discarded furniture, appliances, and other abandoned materials from the property. The work includes all structures down to the foundation and materials located within the property boundaries and any materials outside the fence line (if present) extending to adjacent curbs, streets, alleys, or non-dedicated easements, as directed by the Code Enforcement Officer

Update #11 ·

Construction of the Dresser Recharge Facility, Structures, and Pipeline Project, including site preparation and earthwork, clearing and grading, concrete structures, pipeline installation and appurtenances, slide gates, well facility improvements, well discharge piping, electrical and controls, site fencing, testing, startup, and other associated site improvements as shown in the plans and specifications

Update #10 ·

The City of Goleta is soliciting bids for the Cathedral Oaks Crib Wall Repair Project - Phase I. The project involves pavement rehabilitation including hot mix asphalt (HMA) removal and replacement, cold planing, crack sealing and slurry seal, curb ramp reconstruction, installation of detectable warning surfaces, pavement striping and markings, and related work. The work is located on Calle Real and Winchester Canyon Road in Goleta, California. The project includes a base bid and an allowance for winterization. The contract will be awarded based on the lowest total of the base bid plus the allowance.

Update #9 ·

The Project includes, without limitation, furnishing all necessary labor, materials, equipment, and other incidental and appurtenant Work necessary to satisfactorily complete the Project, as more specifically described in the Contract Documents. This Work will be performed in strict conformance with the Contract Documents, permits from regulatory agencies with jurisdiction, and applicable regulations. The quantity of Work to be performed and materials to be furnished are approximations only, being given as a basis for the comparison of Bids. Actual quantities of Work to be performed may vary at the discretion of the Agency Engineer.

Update #8 ·

To provide as-needed painting services.

Update #7 ·

The major components of this work consist of, but are not limited to, construction of the pedestrian bridge with piles, pile caps, columns, column caps, precast concrete girders, approach structure and ramp, abutments, helical ramp, landscaping and irrigation, and lighting, as well as relocation of light poles and coordination of existing utility relocations and other miscellaneous items of work. Temporary work consists of providing traffic control features. See Parts F and G for additional details. The project consists of the construction of the La Verne Pedestrian Bridge located in the City of La Verne, County of Los Angeles, crossing over Arrow Highway and the Southern California Regional Rail Authority (SCRRA) tracks (which is also used by the Union Pacific Railroad, Los Angeles Subdivision). The site is located south of State Route 66 (SR66) and east of State Route 57 (SR-57), in the San Gabriel Subdivision Arrow Highway Crossing Mile Post 30.15. The pedestrian bridge will start approximately 290 ft. east of the intersection of Fairplex Drive and Arrow Highway on the north side of Arrow Highway on the Metro Foothill Gold Line (Line A) La Verne Station plaza. It will continue east and cross south over Arrow Highway and the SCRRA tracks approximately 880 ft. east of the intersection noted before, terminating at the Fairplex property approximately 125 ft. east of the centerline of the tracks. The project also includes working within the SCRRA right-of-way at the grade crossing.

Update #6 ·

This Overlay The Contractor will furnish all labor, materials, equipment, tools, incidentals, permits, services, and construction required to complete the work which includes: providing temporary traffic control, erosion, sedimentation and pollution control; removing existing pavement by wedge grind, existing pavement markers, existing traffic striping and pavement markings by grinding; disposing and/or grinding recycling of all removed and excess materials; handling and disposing of any and all hazardous materials; repairing and filling existing pavement cracks, potholes and boils; leveling low/depressed areas of existing pavement; raising existing utility covers to finish grade; clearing loose sand dirt, debris, and other contaminants from existing pavement; applying asphalt binder tack coat and sealant; installing geosynthetic pavement fabric; placing and compacting 1.5" Type A HMA pavement Overlay with 1/2" max aggregate size, and replacing thermoplastic traffic striping and pavement markings, and pavement markers.

Update #5 ·

The major components of this work consist of, but are not limited to, construction of the pedestrian bridge with piles, pile caps, columns, column caps, precast concrete girders, approach structure and ramp, abutments, helical ramp, landscaping and irrigation, and lighting, as well as relocation of light poles and coordination of existing utility relocations and other miscellaneous items of work. Temporary work consists of providing traffic control features. See Parts F and G for additional details

Update #4 ·

Grinding and paving in multiple locations. All work to be performed is within the City of Ukiah. Talmage Road from State Street east to the Great Redwood Trail: The work involves complete surface grinding down 3 and placing 3 AC overlay over existing asphalt concrete. ADA ramps will be installed at Talmage Road and Waugh Lane. All roadway grinding and paving on Talmage Road must be completed at night to avoid shutting down businesses during the day. Waugh Lane from Talmage Road north approximately 740: The work involves complete surface grinding down 3 and placing 3 AC overlay over existing asphalt concrete. Mendocino Place from Mendocino Drive to the end of the cul-de-sac: The work involves complete surface grinding down 3 and placing 3 AC overlay over existing asphalt concrete. Installation of new 6 water main and related services. ADA ramps will be installed at Mendocino Place and Mendocino Drive along with modifications to the existing storm drain and installation of new storm drain infrastructure

Update #3 ·

The City of Encinitas is accepting Proposals to select a Geotechnical Engineering firm to provide routine and as-needed geotechnical consultation and review services in support of City staff.

Update #2 ·

The City of Brea is seeking proposals from qualified proposers interested in providing citywide janitorial services located at Brea Community Center, Brea Civic Center, Senior Center, Pioneer Hall, Plunge, and Downtown Day Porter. These services will be provided on a scheduled basis as set forth in Exhibit A - Scope of Services. The objective of this Request for Proposals is to identify the most qualified proposer(s) to provide these services over the course of a three-year base term, with option of four (4) one-year per period extensions. However, the City reserves the right to make multiple awards if doing so serves the best interest of the City. Depending on the department needs, final contract terms, including compensation and length of the agreement are subject to negotiation and final City approval.

Update #1 ·

The City is seeking proposals from qualified Audio/Visual (AV) consultants to evaluate, design, and provide implementation support for upgrades to the City Council Chamber AV system.