About this file

This is a Bid Notice and Specification document issued by the City of Ukiah, Department of Public Works in Mendocino County, California for the Capital Pavement Program: Preservation and Overlay project (Specification No. 26-01). The project encompasses grinding and paving work at three locations within Ukiah: Talmage Road from State Street east to the Great Redwood Trail, Waugh Lane from Talmage Road north approximately 740 feet, and Mendocino Place from Mendocino Drive to the end of the cul-de-sac. Work includes complete surface grinding down 3 inches and placing 3-inch asphalt concrete overlay over existing pavement, installation of a new 6-inch domestic water main with related service connections, installation of ADA-compliant ramps at multiple intersections, and modifications to and installation of new storm drain infrastructure. All roadway grinding and paving on Talmage Road must be completed during nighttime hours to minimize business disruption. The engineer's estimate includes 43 line items totaling quantities such as 72,020 square feet of cold plane asphalt, 1,378 tons of hot mix asphalt, 1,123 linear feet of traffic stripes, and various drainage and utility components. Sealed proposals must be received at the Office of the City Clerk, 300 Seminary Avenue, Ukiah, California by 2:00 p.m. on Tuesday, June 23, 2026. Work must be completed within 50 working days from the notice to proceed. The contract will be awarded to the lowest responsive bid by a responsible bidder within 30 days of bid opening.

The contractor must submit a bid guaranty equal to 10 percent of the total bid amount via certified check or bond, which will be forfeited if the bidder fails to execute the contract within 15 days of award notification. Liquidated damages are assessed at $500 per calendar day for delays beyond the 50 working day completion schedule. The successful contractor must obtain and maintain a valid City of Ukiah Business License and comply with prevailing wage requirements as determined by the California Department of Industrial Relations. All contractors and subcontractors must be registered with the Department of Industrial Relations pursuant to Labor Code Section 1725.5, with limited exceptions. The contractor shall furnish a faithful performance bond equal to 100 percent of the total contract price, a material and labor bond of at least 50 percent of the contract price, and a defective material and workmanship bond of 5 percent of the final contract price effective for one year post-completion. Insurance requirements include general liability of $2,000,000 per occurrence, automobile liability of $2,000,000 per accident, employer's liability of $1,000,000 per accident, and course of construction coverage at completed project value. The City of Ukiah has implemented Disadvantaged Business Enterprise (DBE) goals for this project and reserves the right to reject any or all bids and waive irregularities that do not provide bidders with competitive advantage. Plans and specifications are available on the City's website at www.cityofukiah.com/purchasing, and inquiries must be directed to Myles Fisette, Purchasing Manager at (707) 463-6225 or mfisette@cityofukiah.com.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CITY OF UKIAH

MENDOCINO COUNTY, CALIFORNIA

CITY COUNCIL:

SUSAN SHER – MAYOR

JUAN OROZCO – VICE MAYOR

HEATHER CRISS – COUNCIL MEMBER

MARI RODIN – COUNCIL MEMBER

DOUGLAS CRANE – COUNCIL MEMBER

SAGE SANGIACOMO – CITY MANAGER

TIM ERIKSEN – DIRECTOR OF PUBLIC WORKS / CITY ENGINEER

KRISTINE LAWLER – CITY CLERK

R. ALLEN CARTER – CITY TREASURER

CITY OF UKIAH

DEPARTMENT OF PUBLIC WORKS

MAY 2026

C3PO PROJECT iii Spec No.26-01

TABLE OF CONTENTS

PAGE

NOTICE TO BIDDERS

INSTRUCTIONS TO BIDDERS

GENERAL CONDITIONS

SECTION 1. PROPOSAL REQUIREMENTS AND GENERAL CONDITIONS

1-01. Definitions 1-02. Examinations of Plans, Special Provisions and Site of Work 1-03. Proposal 1-04. Withdrawal of Bids 1-05. Public Opening of Bids 1-06. Bid Guaranty 1-07. Qualification of Bidders 1-08. Disqualification of Bidders 1-09. Identification of Subcontractors 1-10. General Provisions of the Standard Specifications 1-11. Addenda

SECTION 2. AWARD AND EXECUTION OF CONTRACT

2-01. Award of Contract 2-02. Return of Proposal Guaranties 2-03. Execution of Contract

SECTION 3. SCOPE AND INTENT OF CONTRACT

3-01. Effect of Inspection and Payments 3-02. Effect of Extension of Time 3-03. Extra Work 3-04. Assignment of Contract 3-05. Subcontractors 3-06. Interpretation of Special Provisions and Drawings 3-07. Addenda 3-08. Liability of City Officials 3-09. Dispute Resolution

SECTION 4. BONDS

4-01. Faithful Performance Bond 4-02. Material and Labor Bond 4-03. Defective Material and Workmanship Bond 4-04. Notification of Surety Companies

SECTION 5. INSURANCE REQUIREMENTS FOR CONTRACTORS

5-01. Minimum Scope of Insurance 5-02. Minimum Limits of Insurance 5-03. Deductibles and Self-Insured Retentions 5-04. Other Insurance Provisions 5-05. Acceptability of Insurers 5-06. Verification of Coverage 5-07. Subcontractors

SECTION 6. RESPONSIBILITIES AND RIGHTS OF CONTRACTOR

6-01. Legal Address of Contractor

C3PO PROJECT iv Spec No.26-01

6-02. Office of Contractor at Site 6-03. Attention to Work 6-04. Liability of Contractor 6-05. Protection of Persons and Property 6-06. Protection of City Against Patent Claims 6-07. Protection of Contractor's Work Property 6-08. Regulations and Permits 6-09. Construction Utilities 6-10. Approval of Contractor's Plans 6-11. Suggestions to the Contractor 6-12. Termination of Unsatisfactory Subcontracts 6-13. Preservation of Stakes and Marks 6-14. Assistance to Engineer 6-15. Removal of Condemned Materials and Structures 6-16. Proof of Compliance with Contract 6-17. Errors and Omissions 6-18. Cooperation 6-19. Right of Contractor to Stop Work 6-20. Hiring and Dismissal of Employees 6-21. Wage Rates 6-22. Cleaning Up 6-23. Guaranty

SECTION 7. RESPONSIBILITIES AND RIGHTS OF CITY

7-01. Authority of the Engineer 7-02. Inspection 7-03. Surveys 7-04. Rights-of-Way 7-05. Retention of Imperfect Work 7-06. Changes in the Work 7-07. Additional Drawings by City 7-08. Additional and Emergency Protection 7-09. Suspension of Work 7-10. Right of City to Terminate Contract 7-11. Use of Completed Portions

SECTION 8. WORKMANSHIP, MATERIALS AND EQUIPMENT

8-01. General Quality 8-02. Quality in Absence of Detailed Specifications 8-03. Materials and Equipment Specified by Name 8-04. Source of Materials 8-05. Storage of Materials 8-06. Drawings, Samples and Tests

SECTION 9. PROSECUTION OF WORK

9-01. Equipment and Methods 9-02. Time of Completion 9-03. Avoidable Delays 9-04. Unavoidable Delays 9-05. Notice of Delays 9-06. Extension of Time 9-07. Unfavorable Weather and Other Conditions 9-08. Saturday, Sunday, Holiday and Night Work 9-09. Hours of Labor

SECTION 10. PAYMENT

C3PO PROJECT v Spec No.26-01

10-01. Certification by Engineer 10-02. Progress Estimates and Payment 10-03. Substitution of Securities 10-04. Acceptance 10-05. Final Estimate and Payment 10-06. Delay Payments 10-07. Extra Work and Work Omitted 10-08. Compensation for Extra Work or Work Omitted 10-09. Compensation to the City for Extension of Time 10-10. Liquidated Damages for Delay

SECTION 11. MISCELLANEOUS

11-01. Notice 11-02. Computation of Time 11-03 Claims Procedure Required by Public Contract Code Section 9204 11-04. Litigation and Forum Selection 11-05. Waiver

TECHNICAL SPECIFICATIONS

SECTION 12. GENERAL INFORMATION

12-01. Location and Scope of Work 12-02. Arrangement of Technical Specifications 12-03. Arrangement of Plans 12-04. Business Licenses 12-05. Permits 12-06. Standard Specifications and Standard Plans 12-07. Temporary Facilities 12-08. Public Convenience and Safety 12-09. Maintaining Traffic 12-10. Stream Pollution 12-11. Warranties 12-12. Utilities 12-13. Dust Control 12-14. Noise Control 12-15. Watering 12-16. Preconstruction Conference 12-17. Progress Schedule 12-18. Progress Meetings 12-19. Safety Requirements 12-20. Public Notification

SECTION 13. CONSTRUCTION DETAILS

Standard Plan List Organization

DIVISION I GENERAL PROVISIONS

1 General 2 Bidding 3 Contract Award and Execution 4 Scope of Work 5 Control of Work 6 Control of Materials 7 Legal Relations and Responsibility to the Public 8 Prosecution and Progress 9 Payment

C3PO PROJECT vi Spec No.26-01

DIVISION II GENERAL CONSTRUCTION

10 General 11 Welding 12 Temporary Traffic Control 13 Water Pollution Control 14 Environmental Stewardship 15 Existing Facilities 16 Temporary Facilities

DIVISION III EARTHWORK AND LANDSCAPE

17 General 18 Dust Palliative 19 Earthwork 20 Landscape 21 Erosion Control 22 Finishing Roadway

DIVISION IV SUBBASES AND BASES

23 General 24 Stabilized Soils 25 Aggregate Subbases 26 Aggregate Bases 27 Cement Treated Bases 28 Concrete Bases 29 Treated Permeable Bases 30 Reclaimed Pavement 31 Reserved 32 Reserved 33 Reserved 34 Reserved 35 Reserved

DIVISION V SURFACINGS AND PAVEMENTS

36 General 37 Bituminous Seals 38 Reserved 39 Asphalt Concrete 40 Concrete Pavement 41 Existing Concrete Pavement 42 Groove and Grind Concrete 43 Reserved 44 Reserved

DIVISION VI STRUCTURES

45 General 46 Ground Anchors and Soil Nails 47 Earth Retaining Systems 48 Temporary Structures 49 Piling 50 Prestressing Concrete 51 Concrete Structures 52 Reinforcement 53 Shotcrete 54 Waterproofing

C3PO PROJECT vii Spec No.26-01

55 Steel Structures 56 Overhead Sign Structures, Standards, and Poles 57 Wood and Plastic Lumber Structures 58 Sound Walls 59 Structural Steel Coatings 60 Existing Structures

DIVISION VII DRAINAGE

61 General 62 Reserved 63 Reserved 64 Plastic Pipe 65 Concrete Pipe 66 Corrugated Metal Pipe 67 Structural Plate Culverts 68 Subsurface Drains 69 Overside Drains 70 Miscellaneous Drainage Facilities 71 Existing Drainage Facilities

DIVISION VIII MISCELLANEOUS CONSTRUCTION

72 Slope Protection 73 Concrete Curbs and Sidewalks 74 Pumping Equipment and Controls 75 Miscellaneous Metals 76 Wells 77 Local Infrastructure 78 Incidental Construction 79 Reserved 80 Fences

DIVISION IX TRAFFIC CONTROL FACILITIES

81 Miscellaneous Traffic Control Devices 82 Signs and Markers 83 Railings and Barriers 84 Markings 85 Reserved

DIVISION X ELECTRICAL WORK

86 General 87 Electrical Systems 88 Reserved

DIVISION XI MATERIALS

89 Aggregate 90 Concrete 91 Paint 92 Asphalt Binders 93 Reserved 94 Asphaltic Emulsions 95 Epoxy 96 Geosynthetics 97 Reserved 98 Reserved

C3PO PROJECT viii Spec No.26-01

DIVISION XII BUILDING CONSTRUCTION

99 Building Construction

SECTION 14. EXCLUSIONS FROM GENERAL CONDITIONS

14-01. Provisions to be Excluded from General Conditions

SECTION 15. AMENDMENTS TO GENERAL CONDITIONS

15-01. Provisions of General Conditions to be Amended

CERTIFICATES AND DOCUMENTS

BID SUBMITTAL CHECKLIST

PROPOSAL

BIDDING SCHEDULE

FAIR EMPLOYMENT PRACTICES CERTIFICATION

WORKER'S COMPENSATION CERTIFICATE

CERTIFICATE OF NONDISCRIMINATION IN EMPLOYMENT

LIST OF PROPOSED SUBCONTRACTORS

STATEMENT OF EXPERIENCE OF BIDDER

SIGNATURE OF BIDDER

BIDDER'S BOND

NON-COLLUSION AFFIDAVIT

AGREEMENT

INDEMNIFICATION AGREEMENT

EXAMPLE BOND FORMS

DIRECTIONS FOR PREPARATION OF PERFORMANCE AND MATERIAL AND LABOR BOND

DEFECTIVE MATERIAL AND WORKMANSHIP (MAINTENANCE) BOND

INSURANCE CERTIFICATES AND ENDORSEMENT FORMS

APPENDICES:

CAPTIAL PAVEMENT PROGRAM: PRESERVATION AND OVERLAY PLANS AND SPECIFICATIONS

C3PO PROJECT ix Spec No.26-01

CITY OF UKIAH, MENDOCINO COUNTY, CALIFORNIA

NOTICE TO BIDDERS FOR

CAPITAL PAVEMENT PROGRAM: PRESERVATION AND OVERLAY

SPECIFICATION NO. 26-01

NOTICE IS HEREBY GIVEN that sealed standard proposals for CAPITAL PAVEMENT PROGRAM:

PRESERVATION AND OVERLAYPROJECT will be received at the Office of the City Clerk, Ukiah Civic Center, 300 Seminary Avenue, Ukiah California until 2:00 p.m. on Tuesday, June 23, 2026, at which time, or as soon thereafter as possible, they will be publicly opened and read. Bids shall be addressed to the City Clerk and shall be endorsed “CAPITAL PAVEMENT PROGRAM: PRESERVATION AND OVERLAYPROJECT.” Bids are required for the entire work described herein. No fax bids will be accepted.

ENGINEER'S ESTIMATE OF QUANTITIES

ITEM# DESCRIPTION UNIT QUANTITY

1 Mobilization, Demobilization and Final Cleanup LS 1 2 Traffic Control LS 1 3 Construction Survey LS 1 4 Remove Concrete (Curb and Gutter) LF 215 5 Remove Concrete (Sidewalk and Ramps) SF 1036 6 Cold Plane Asphalt 3" SF 72020 7 Conform Grind SF 3123 8 Adjust Valve/Cleanout EA 21 9 Adjust Manhole EA 13

10 Hot Mix Asphalt TON 1378 11 Minor Concrete (Curb and Gutter) LF 264 12 Minor Concrete (Driveway) SF 393 13 Minor Concrete (Sidewalk) SF 985 14 Minor Concrete (Curb Ramp) EA 4 15 Minor Concrete (Cobble-Non-Walkable Surface) SF 187 16 Class 2 Aggregate Base (Sidewalk Only) CY 56 17 Domestic Water Main (6-Inch, PC235) LF 415 18 Domestic Water Service (1-Inch) Meter (3/4-Inch) EA 8 19 Fire Hydrant and Lateral Assembly (4-Inch) EA 1 20 Tie-In Existing 4" & 6" Water Main EA 2 21 Pothole Existing Utilities LS 1 22 Abandonment of Existing Water Main LS 1 23 Storm Drain Curb Inlet EA 1 24 Storm Drain Manhole (48-Inch) EA 1 25 Remove & Replace Storm Drain Pipe (18-Inch ADA N12) LF 530 26 Modify Existing Storm Drain Manhole EA 2 27 Remove Existing Drainage Inlet LS 1 28 Remove Existing Storm Drain Manhole EA 2 29 Traffic Stripe (Detail 22) LF 1123 30 Traffic Stripe (Detail 39) LF 1514 31 Traffic Stripe (Detail 39A) LF 117 32 Traffic Stripe (Detail 38) LF 88 33 Thermoplastic Stripe (4-Inch White) LF 845 34 Thermoplastic Crosswalk (White) SF 149 35 Thermoplastic Pavement Marker (Bike & Arrow) EA 6 36 Thermoplastic Pavement Marker (Sharrow) EA 2

C3PO PROJECT x Spec No.26-01

ITEM# DESCRIPTION UNIT QUANTITY

37 Thermoplastic Pavement Marker (Green Bike Lane) SF 100 38 Thermoplastic Pavement Marker (Type IV Arrow) EA 4 39 Thermoplastic Pavement Marker (Parking Tee) SF 24 40 Thermoplastic Pavement Marker (STOP - White) SF 44 41 Remove/Replace Sign Post EA 3 42 Fire Hydrant Retroreflective Marker EA 2 43 Asphalt Concrete 9-inch Digout CY 60

Plans and Special Provisions may be inspected and/or copies obtained from the City’s website at www.cityofukiah.com/purchasing. No bid will be considered unless it is made on the forms furnished by the City and is made in accordance with the details of the Special Provisions. Each bidder must be licensed as required by law. Further information regarding the work or these specifications can be obtained by calling Myles Fisette, Purchasing Manager at (707) 463-6225 or by email at mfisette@cityofukiah.com.

The City Council reserves the right to reject any or all bids and to determine which proposal is, in its opinion, the lowest responsive bid by a responsible bidder and which it deems in the best interest of the City to accept. The City Council also reserves the right, but not the obligation, to waive any irregularity or failure to strictly comply with the bidding requirements, that the City determines in the reasonable exercise of its discretion does not provide the bidder with a competitive advantage over other bidders.

No contractor or subcontractor may be listed on a bid proposal for a public works unless registered with the Department of Industrial Relations (“DIR”) pursuant to Labor Code section 1725.5 except as allowed. under Labor Code section 1771.1(a). The prime contractor shall be responsible for posting job site notices as prescribed by regulation. This project is subject to compliance monitoring and enforcement by the DIR.

The City of Ukiah affirms that in any contract entered into pursuant to this advertisement, Disadvantaged Business Enterprises (DBE) will be afforded full opportunity to submit bids in response to this invitation. Bidders are advised that the City of Ukiah is implementing DBE goals for this Project.

Pursuant to provisions of Section 1770, including amendments thereof, of the Labor Code of the State of California, the Director of the Department of Industrial Relations, State of California, has ascertained the general prevailing rate of wages for straight time, overtime, Saturdays, Sundays and Holidays including employer payment for health and welfare, vacation, pension and similar purposes. Copies of the General Prevailing Wage Determination (applicable to the work), for the locality in which the work is to be done are available on the Internet at web address: http://www.dir.ca.gov/DLSR/PWD/.

The prime contractor for the work herein shall possess a current, valid State of California, Class A (General Engineering) Contractor's License. Pursuant to California Public Contract Code §22300, this contract includes provisions that allow substitutions of certain types of securities in lieu of the City withholding a portion of the partial payments due the Contractor to insure performance under this contract.

By order of the City Council, City of Ukiah, County of Mendocino, State of California

Dated:________________________ ________________________________________ Kristine Lawler, City Clerk, City of Ukiah, California

PUBLISH ONE TIME: May 21, 2026

5/14/26 mailto:mfisette@cityofukiah.com

C3PO Project 1 Spec No.26-01

INSTRUCTIONS TO BIDDERS

CAPITAL PAVEMENT PROGRAM: PRESERVATION AND OVERLAY shall be performed in accordance with the Plans and Special Provisions therefor adopted, to which special reference is hereby made.

Each bidder must supply all the information required by the bid documents and Special Provisions.

Minority business enterprises will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color or national origin in consideration for an award of any contract entered into pursuant to this advertisement. Women will be afforded equal opportunity in all areas of employment. However, the employment of women shall not diminish the standards or requirements for the employment of minorities.

All proposals or bids shall be accompanied by a cashier's check or certified check payable to the order of the City of Ukiah amounting to 10 percent of the bid, or by a bond in said amount and signed by the bidder and a corporate surety, payable to said City. Said check shall be forfeited, or said bond shall become payable to said City in case the bidder depositing the same does not, within fifteen (15) days after written notice that the contract has been awarded to him: (a) enter into a contract with the City and (b) furnish certificates of insurance and endorsements, a bond of faithful performance and a payment bond as described in the Special Provisions.

No bidder shall withdraw his or her bid for a period of thirty (30) calendar days after the date set by the City for the opening thereof.

The Contractor and any subcontractors shall each possess a valid City of Ukiah Business License prior to the start of any work.

The Contractor shall furnish a project schedule to the Engineer prior to the start of any work and start work as scheduled.

The work is to be completed within fifty (50) working days. The Contractor will pay to the City the sum of five hundred ($500.00) dollars per day for each and every calendar day delay beyond the time prescribed.

The staff shall notify a bidder by telephone, email or fax, if it intends to recommend the rejection of the bidder’s bid. Any bid protest must be filed with the City Clerk not more than five calendar days following the bid opening, or 2 calendar days following notice that staff is recommending the rejection of a bid. If any such timely written protest is filed, all bidders shall be provided a copy of the protest within 2 calendar days of its receipt, which may be delivered to the bidders as an email attachment or by fax. All such bidders may file with the City Manager a written objection or other response to the protest.

All objections or responses filed not more than 5 days after receipt of the written protest will be presented to the City Council at its next regular meeting occurring not less than 12 calendar days following the bid opening. The City Council will resolve the bid protest at that meeting based on the written protest, any staff recommendation and all timely written objections and responses. In accordance with the Brown Act, any person may address the City Council on this item during the meeting. The City Council action on the protest shall represent a final decision by the City on the protest.

C3PO Project 2 Spec No.26-01

Examination of Site, Drawings, Etc.

Each bidder shall visit the site of the proposed work and fully acquaint himself with local conditions, construction and labor required so that he or she may fully understand the facilities, difficulties and restrictions attending the execution of the work under the Contract. The failure of any bidder to receive or examine any form, instrument, addendum, or other document, or to visit the site and acquaint himself with conditions there existing, shall in no way relieve the bidder from any obligation with respect to his or her proposal or to the contract. The drawings for the work show conditions as they are supposed or believed by the Engineer to exist; but, it is neither intended nor shall it be inferred that the conditions as shown thereon constitute a representation by the Engineer, the City or its officers that such conditions are actually existent, nor shall the City, the Engineer or any of their officers or representatives be liable for any loss sustained by the Contractor as a result of a variance between the conditions shown on the drawings and the conditions actually revealed during the progress of the work or otherwise.

The bidder's attention is directed to the possible existence of obstructions and public improvements within the limits of the work or adjacent thereto, which may or may not be shown on the Drawings. Any bid shall take into consideration that conditions may exist underground or otherwise that are not known to the City or easily detected during a site inspection that could impact the time or cost of completing the project. The City expects the bids to anticipate such conditions so that it can know for budgeting and other purposes the total cost to complete the project before accepting a bid and undertaking the legal obligation to construct the project. In awarding the contract the City relies on the contractor’s representation that its bid anticipates differing site conditions and the additional time or cost that such conditions may necessitate.

The bidder shall investigate to his or her satisfaction the conditions to be encountered, the character, quality and quantities of work to be performed and materials to be furnished and the requirements of the Plans, Special Provisions, Standard Specifications, Standard Plans, and Contract Documents. The submission of a proposal shall be considered conclusive evidence that the bidder has made such examination and has accepted the project workplace as a safe workplace to perform the work of the Contract.

Bidder Inquiries and Questions

Inquiries and questions must be submitted in writing via email to the following designated contact person:

Myles Fisette, Purchasing Manager

Email: mfisette@cityofukiah.com

The City reserves the right to not respond to inquiries or questions submitted within 3 business days of the bid opening.

Location of the Work

The work to be performed is located on Talmage Road, Waugh Lane and Mendocino Place. All work performed is within the City of Ukiah.

mailto:mfisette@cityofukiah.com

C3PO Project 3 Spec No.26-01

GENERAL CONDITIONS

SECTION 1. PROPOSAL REQUIREMENTS AND GENERAL CONDITIONS

1-01. Definitions. Whenever any word or expression defined in this section, or pronoun used in its stead, occurs in these contract documents, it shall have and is mutually understood to have the meaning given:

a. "City of Ukiah" or "City" shall mean the City of Ukiah, Mendocino County, California, acting through its City Council or any other board, body, official or officials to which or to whom the power belonging to the Council shall by virtue of any act or acts, hereafter pass or be held to appertain.

b. "Engineer" shall mean the Engineer duly and officially appointed by the City to supervise and direct the work of construction under this contract, acting personally or through agents or assistants duly authorized by him, such agents or assistants acting within the scope of the particular duties entrusted to them.

c. "Inspector" shall mean the engineering or technical inspector or inspectors duly authorized or appointed by the Engineer, limited to the particular duties entrusted to him or her or them.

d. "Contractor" shall mean the party entering into contract with the City of Ukiah for the performance of work covered by this contract and his or her authorized agents or legal representatives.

e. "Date of signing of contract" or words equivalent thereto, shall mean the date upon which this contract, with the signature of the Contractor affixed, together with the prescribed bonds, shall be or shall have been delivered to the City or its duly authorized representatives.

f. "Day" or "days", unless herein otherwise expressly defined, shall mean a calendar day or days of twenty-four hours each.

g. "The work" shall mean and include all the work specified, indicated, shown or contemplated in the contract to construct the improvement, including all alterations, amendments or extensions thereto made by contract change order or other written orders of the Engineer.

h. "Contract drawings", "drawings", "plans" shall mean and include 1) all drawings or plans which may have been prepared by or on behalf of the City, as a basis for proposals, when duly signed and made a part of this contract by incorporation or reference, 2) all drawings submitted in pursuance of the terms of this contract by the successful bidder with his or her proposal and by the Contractor to the City if and when approved by the Engineer and 3) all drawings submitted by the Engineer to the Contractor during the progress of the work as provided for herein.

i. Where "as shown", "as indicated", "as detailed" or words of similar import are used, it shall be understood that reference to the drawings accompanying these Special Provisions is made unless stated otherwise.

Where "as directed", "as permitted", "approved" or words of similar import are used, it shall be understood that the direction, requirements, permission, approval or acceptance of the Engineer is intended unless stated otherwise.

As used herein, "provide" or "install" shall be understood to mean "provide or install complete in place", that is, "furnish and install". "Shall" is mandatory; "may" is permissive.

1-02. Examination of Plans, Special Provisions and Site of Work. The bidder shall examine carefully the Proposal, Plans, Special Provisions, Contract forms and the site of the work contemplated therefor. It will be assumed that the bidder has investigated to his or her satisfaction the conditions to be encountered and the character, quality and requirements of all Plans, Special Provisions, Standard Specifications, and Standard Plans involved.

1-03. Proposal. Bids shall be made on the blank forms prepared by the City. All bids shall give the prices bid, both in writing and in figures and shall be signed by the bidder or his or her authorized representative, with his or

C3PO Project 4 Spec No.26-01 her address. If the bid is made by an individual or partner, his or her name and the post office address of his or her business or partnership, along with his or her signature or the signature of one or more partners must be shown; if made by a corporation, the bid shall show the name of the state under the laws of which the corporation is chartered, the name of the corporation and the title of the person who signs on behalf of the corporation.

Each proposal shall be enclosed in a sealed envelope, endorsed as specified in the notice to bidders. Bidders are warned against making erasures or alterations of any kind and proposals which contain omissions, erasures, conditions, alterations, additions not called for, additional proposals or irregularities of any kind may be rejected.

1-04. Withdrawal of Bids. Any bid may be withdrawn at any time prior to the hour fixed in the notice to bidders for the openings of bids, provided that a request in writing, executed by the bidder or his or her duly authorized representative, for the withdrawal of such bid is filed with the City. The withdrawal of a bid will not prejudice the right of a bidder to file a new bid.

1-05. Public Opening of Bids. Bids will be opened and read publicly at the time and place indicated in the notice to bidders. Bidders or their agents are invited to be present.

1-06. Bid Guaranty. Each bid must be accompanied by a certified check, cashier's check or bidder's bond executed by an admitted surety insurer, payable to the order of the City of Ukiah in an amount not less than 10 percent of the bid as a guarantee that the bidder will enter into a contract, if awarded the work.

1-07. Qualification of Bidders. No contractor or subcontractor may be listed on a bid proposal for a public works project (submitted on or after March 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)]. No contractor or subcontractor may be awarded a contract for public work on a public works project (awarded on or after April 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5. The prime contractor shall be responsible for posting job site notices as prescribed by regulation. This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations.

Each bidder shall be licensed under the provisions of Chapter 9, Division 3 of the Business and Professions Code and shall be skilled and regularly engaged in the general class or type of work called for under this contract. A statement setting forth this experience and business standing shall be submitted by each bidder on the form provided herewith. It is the intention of the City to award a contract only to a bidder who furnishes satisfactory evidence that he or she has the requisite experience and ability and that he or she has sufficient capital, facilities and equipment to enable him or her to prosecute the work successfully and promptly within the time and in the manner agreed.

In determining the degree of responsibility to be credited to a bidder, the City may weigh evidence that the bidder or his or her personnel charged with the responsibility in the work, has performed satisfactorily other contracts of like nature and magnitude or comparable difficulty at similar rates of progress.

1-08. Disqualification of Bidders. More than one bid from an individual business, partnership, corporation or association, under the same or different names, will not be considered. Reasonable grounds for believing that any bidder is financially interested in more than one bid for the work will cause the rejection of all bids in which he or she is so interested. If there is reason to believe that collusion exists among the bidders, none of the participants in such collusion will be considered. Bids in which the prices obviously are unbalanced may be rejected.

1-09. Identification of Subcontractors. All bids shall comply with the Subletting and Subcontracting Fair Practices Act (Public Contract Code Section 4100 and following) and shall set forth:

(a) The name and the location of the place of business of each subcontractor who will perform work or labor, or render service to the prime contractor in or about the construction of the work, or to a subcontractor licensed by the State of California who, under subcontract to the prime contractor, specially fabricates and installs a portion of the work according to detailed drawings contained in the plans and Special Provisions, in an amount in excess of one-half of 1 percent of the prime contractor's total bid.

(b) The portion of the work which will be done by each such subcontractor. The prime contractor shall list only one subcontractor for each such portion defined by the prime contractor in his or her bid.

C3PO Project 5 Spec No.26-01

1-10. General Provisions of the Standard Specifications. All provisions of the General Provisions, Sections 1 through 11, of the Standard Specifications, shall be applicable to the contract except as modified by these Special Provisions. The Standard Specifications are set forth in Section 12-06 of these Special Provisions.

1-11. Addenda. If it becomes necessary to revise any part of these plans and specifications after they have been released, the City will issue an addendum containing the revision. All addenda will be posted on the City’s website at www.cityofukiah.com/purchasing with the rest of the bid documents. Anyone who intends to submit a bid in response to this Request for Bid must check the website frequently for any posted addenda. Anyone submitting a bid will be deemed to have seen and agreed to be bound by the posted addenda.

SECTION 2. AWARD AND EXECUTION OF CONTRACT

2-01. Award of Contract. Award of the contract, if it be awarded, will be to the lowest responsible bidder whose bid complies with all the specified requirements. The award, if made, will be made within thirty (30) days after opening of the bids. The City reserves the right to reject any and all bids and to waive any irregularity in the proposal not pertaining to cost.

2-02. Return of Proposal Guaranties. All bid guaranties will be held until the contract has been fully executed, after which they will be returned upon request to the respective bidders whose bids they accompany.

2-03. Execution of Contract. The contract agreement shall be executed in duplicate by the successful bidder and returned, together with the contract bonds, insurance certificates and endorsements, within fifteen (15) days after written notice of the award of the contract. After execution by the City; one copy shall be filed with the City and one copy shall be returned to the Contractor. If the bidder fails or refuses to enter into the contract agreement within the required time, then the bid guaranty accompanying the bid shall be forfeited to the City.

SECTION 3. SCOPE AND INTENT OF CONTRACT

3-01. Effect of Inspection and Payments. Neither the inspection by the Engineer or an inspector, nor any order, measurement or approved modification, nor certificate or payment of money, nor acceptance of any part or whole of the work, nor any extension of time, nor any possession by the City or its agents, shall operate as a waiver of any provision of this contract or of any power reserved therein to the City, or of any right to damages thereunder;

nor shall any breach of this contract be held to be a waiver of any subsequent breach. All remedies shall be construed as cumulative.

3-02. Effect of Extension of Time. The granting of any extension of time on account of delays which, in the judgement of the City, are avoidable delays shall in no way operate as a waiver on the part of the City of its rights under this contract.

3-03. Extra Work. If extra work orders are given in accordance with provisions of this contract, such work shall be considered a part hereof and shall be subject to each and all of its terms and requirements.

3-04. Assignment of Contract. The contract may be assigned or sublet in whole or in part only upon the written consent of the City acting through its authorized agents. Consent will not be given to any proposed assignment which would relieve the original contractor or its surety of their responsibilities under the contract nor will the Engineer consent to any assignment of a part of the work under the contract.

3-05. Subcontractors. The Contractor shall be as fully responsible for the acts and omissions of his or her subcontractors and of persons either directly or indirectly employed by them, as he or she is for the acts and omissions of persons directly employed by him.

The Contractor shall cause appropriate provisions to be inserted in all subcontracts relative to the work to bind subcontractors to the terms of this Contract which are applicable to the work of subcontractors.

Nothing contained in this contract shall be construed to create or shall be relied upon to create any contractual relationship between any subcontractor and the City and no action may be brought by any subcontractor against the City based on this contract.

http://www.cityofukiah.com/purchasing

C3PO Project 6 Spec No.26-01

3-06. Interpretation of Special Provisions and Drawings. The Special Provisions and the Contract Drawings are intended to be explanatory of each other. Any work indicated in the Contract Drawings and not in the Special Provisions, or vice versa, is to be executed as if indicated in both. In case of a discrepancy or conflict between the Technical Specifications and Contract Plans, the Technical Specifications shall govern. All work shown on the Contract Drawings, the dimensions of which are not figured, shall be accurately followed to the scale to which the drawings are made, but figured dimensions are in all cases to be followed, where given, though they differ from scaled measurements. Large scale drawings shall be followed in preference to small scale drawings. Should it appear that the work to be done, or any of the matters relative thereto, are not sufficiently detailed or explained in these contract documents, including the contract drawings, the Contractor shall apply to the Engineer for such further explanations as may be necessary and shall conform thereto as part of this contract, so far as may be consistent with the terms of this contract. In the event of any doubt or questions arising respecting the true meaning of the Special Provisions, reference shall be made to the Engineer and his or her decision thereon shall be final. If the Contractor believes that a clarification or interpretation justifies an increase in the contract price or contract time, the Contractor must comply with the written notice provisions of Sections 9-05 and 10-07 of these Special Provisions. Contractor’s attention is directed to Section 12-06 of the Technical Specifications regarding the Standard Specifications and Standard Plans.

3-07. Addenda. If it becomes necessary to revise any part of these plans and specifications after they have been released, the City will issue an addendum containing the revision. All addenda will be posted on the City’s website at www.cityofukiah.com/purchasing with the rest of the bid documents. Anyone who intends to submit a bid in response to this Request for Bid much check the website frequently for any posted addenda. Anyone submitting a bid will be deemed to have seen and agreed to be bound by the posted addenda.

3-08. Liability of City Officials. No city official, nor the Engineer, nor any authorized assistant of any of them, shall be personally responsible for any liability arising under this contract.

3-09. Dispute Resolution. Claims of $375,000 or less by the Contractor that arise under this Contract are subject to the mandatory dispute resolutions provisions in Public Contract Code Sections 20104-20104.6.

SECTION 4. BONDS

4-01. Faithful Performance Bond. As a part of the execution of this contract, the Contractor shall furnish a bond of a surety company or other securities providing equivalent protection such as cash, letter of credit, or certificates of deposit, acceptable to the City, conditioned upon the faithful performance of all covenants and stipulations under this contract. The amount of the bond shall be 100 percent of the total contract price, as this sum is set forth in the agreement.

4-02. Material and Labor Bond. As a part of the execution of this contract, the Contractor shall furnish a bond of a surety company or other securities providing equivalent protection such as cash, letter of credit or certificates of deposit acceptable to the City in a sum not less than 50 percent of the total contract price, as this sum is set forth in the agreement for the payment in full of all persons, companies or corporations who perform labor upon or furnish materials to be used in the work under this contract, in accordance with the provisions of Sections 3247 through 3252 inclusive of the Civil Code of the State of California and any acts amendatory thereof.

4-03. Defective Material and Workmanship Bond. As a condition precedent to the completion of this contract, the Contractor shall furnish a bond of a surety company acceptable to the City in an amount not less than 5 percent (5%) of the final contract price, to hold good for a period of one (1) year after the completion and acceptance of the work, to protect the City against the results of defective materials, workmanship and equipment during that time. This bond shall be delivered to the City before the final payment under this contract will be made.

4-04. Notification of Surety Companies. The surety companies shall familiarize themselves with all of the conditions and provisions of this contract and they waive the right of special notification of any change or modification of this contract or of extension of time, or decreased or increased work, or of the cancellation of the contract, or of any other act or acts by the City or its authorized agents, under the terms of this contract; and failure to so notify the aforesaid surety companies of changes shall in no way relieve the surety companies of their obligation under this contract.

http://www.cityofukiah.com/purchasing

C3PO Project 7 Spec No.26-01

SECTION 5. INSURANCE REQUIREMENTS FOR CONTRACTORS

(WITH CONSTRUCTION RISKS)

Contractor shall procure and maintain for the duration of the contract insurance against claims for injuries to persons or damages to property which may arise from or in connection with the performance of the work hereunder by the Contractor, his or her agents, representatives, employees or subcontractors.

5-01. Minimum Scope of Insurance

Coverage shall be at least as broad as:

1. Insurance Services Office Commercial Liability Coverage (occurrence form CG 0001).

2. Insurance Services Office form number CA 0001 (Ed. 1/87) covering Automobile Liability, code 1 (any auto).

3. Worker's Compensation insurance as required by the State of California and Employer's Liability

Insurance.

4. Course of Construction insurance covering for “all risks” of loss.

5-02. Minimum Limits of Insurance

Contractor shall maintain limits no less than:

1. General Liability: $2,000,000 per occurrence for bodily injury, personal injury and property damage including operations, products and completed operations. If Commercial General Liability Insurance or other form with a general aggregate limit is used, either the general aggregate limit shall apply separately to this project/location or the general aggregate limit shall be twice the required occurrence limit.

2. Automobile Liability: $2,000,000 per accident for bodily injury and property damage.

3. Employer's Liability: $1,000,000 per accident for bodily injury and property damage.

4. Course of Construction: Completed value of the project with no co-insurance penalty provisions.

5-03. Deductibles and Self-insured Retentions. Any deductibles or self-insured retentions must be declared to and approved by the City. At the option of the City, either: the insurer shall reduce or eliminate such deductibles or self-insured retentions as respects the City, its officers, officials, employees and volunteers; or the Contractor shall provide a financial guarantee satisfactory to the City guaranteeing payment of losses and related investigations, claim administration and defense expenses.

5-04. Other Insurance Provisions

The general liability and automobile liability policies are to contain, or be endorsed to contain, the following provisions:

1. The City, its officers, officials, employees and volunteers are to be covered as Additional Insured with respect to liability arising out of automobiles owned, leased, hired or borrowed by or on behalf of the contractor; and with respect to liability arising out of work or operations performed by or on behalf of the Contractor including materials, parts or equipment furnished in connection with such work or operations.

General liability coverage can be provided in the form of an endorsement to the Contractor's insurance, or as a separate owner's policy.

2. The workers’ compensation policy is to be endorsed with a waiver of subrogation. The insurance company, in its endorsement, agrees to waive all rights of subrogation against the City, its officers, officials, employees and volunteers for losses paid under the terms of this policy which arises from the work performed by the named insured for the City.

3. For any claims related to this project, the Contractor's insurance coverage shall be primary insurance as respects the City, its officers, officials, employees or volunteers. Any insurance or self-insurance

C3PO Project 8 Spec No.26-01 maintained by the City, its officers, officials, employees or volunteers shall be excess of the Contractor's insurance and shall not contribute with it.

4. Each insurance policy required by this clause shall be endorsed to state that coverage shall not be canceled by either party, except after thirty (30) days' prior written notice by certified mail, return receipt requested, has been given to the City.

5. Coverage shall not extend to any indemnity coverage for the active negligence of the additional insured in any case where an agreement to indemnify the additional insured would be invalid under Subdivision (b) of Section 2782 of Civil Code.

6. Course of Construction policies shall contain the following provisions:

a.) The City shall be named as loss payee.

b.) The insurer shall waive all rights of subrogation against the City.

5-05. Acceptability of Insurers

Insurance is to be placed with insurers with a current A.M. Best's rating of no less than the following:

A++ VII A- VIII

A+ VII B++ X

A VII B+ X

5-06. Verification of Coverage. Contractor shall furnish the City with original certificates and amendatory endorsements effecting coverage required by this clause. The endorsements shall be on forms provided by the City or on other than the City's forms, provided those endorsements or policies conform to the requirements. All certificates and endorsements are to be received within 15 days from written notice of contract award, and the work shall not commence until the certificates and endorsements have been approved by the City. The City reserves the right to require complete certified copies of all required insurance policies, including endorsements affecting the coverage required by these Special Provisions at any time.

5-07. Subcontractors. Contractor shall include all subcontractors as insureds under its policies or shall furnish separate certificates and endorsements for each subcontractor. All coverages for subcontractors shall be subject to all of the requirements stated herein.

SECTION 6. RESPONSIBILITIES AND RIGHTS OF CONTRACTOR

6-01. Legal Address of Contractor. Both the address given in the proposal and the Contractor's office in the vicinity of the work are hereby designated as places to either of which drawings, samples, notices, letters or other articles or communications to the Contractor may be mailed or delivered. The delivery at either of these places of any such thing from the City or its agents to the Contractor shall be deemed sufficient service thereof upon the Contractor and the date of such service shall be the date of such delivery. The address named in the proposal may be changed at any time by notice in writing from the Contractor to the City. Nothing herein contained shall be deemed to preclude or render inoperative the service of any drawing, sample, notice, letter or other article or communication to or upon the Contractor personally.

6-02. Office of Contractor at Site. During the performance of this contract, the Contractor shall maintain a suitable office at the site of the work which shall be the headquarters of a representative authorized to receive drawings and any such thing given to the said representatives or delivered at the Contractor's office at the site of work in his or her absence shall be deemed to have been given to the Contractor.

6-03. Attention to Work. The Contractor shall give his or her personal attention to and shall supervise the work to the end that it shall be prosecuted faithfully and when he or she is not personally present on the work, he or she shall at all reasonable times be represented by a competent superintendent or foreman who shall receive and obey all instructions or orders given under this contract and who shall have full authority to execute the same and to supply materials, tools and labor without delay and who shall be the legal representative of the Contractor. The Contractor shall be liable for the faithful observance of any instructions delivered to him or her or to his or her authorized representative.

C3PO Project 9 Spec No.26-01

6-04. Liability of Contractor. The Contractor shall do all of the work and furnish all labor, materials, tools and appliances, except as otherwise herein expressly stipulated, necessary or proper for performing and completing the work herein required in the manner and within the time herein specified. The mention of any specific duty or liability imposed upon the Contractor shall not be construed as a limitation or restriction of any general liability or duty imposed upon the Contractor by this contract, said reference to any specific duty or liability being made herein merely for the purpose of explanation.

The right of general supervision by the City shall not make the Contractor an agent of the City and the liability of the Contractor for all damages to persons or to public or private property, arising from the Contractor's execution of the work, shall not be lessened because of such general supervision.

Until the completion and final acceptance by the City of all the work under and implied by this contract, the work shall be under the Contractor's responsible care and charge. The Contractor shall rebuild, repair, restore and make good all injuries, damages, re-erections and repairs, occasioned or rendered necessary by causes of any nature whatsoever, excepting only acts of God and none other, to all or any portions of the work, except as otherwise stipulated.

To the fullest extent permitted by law, Contractor shall indemnify and hold harmless the City and its officers, directors, agents and employees from and against all claims, damages, losses and expenses including but not limited to attorneys' fees, costs of suit, expert witness fees and expenses and fees and costs of any necessary private investigators arising out of or resulting from the performance of the work, provided that any such claim, damage, loss or expense (1) is attributable to bodily injury, sickness, disease or death, or to injury to or destruction of tangible property, other than the work itself, including the loss of use resulting therefrom and (2) is caused in whole or in part by any act or omission of the Contractor, any subcontractor, or anyone directly or indirectly employed by any of them, or anyone for whose acts any of them may be liable, regardless of whether or not it is caused in part by a party indemnified hereunder, or by the negligence or omission of a party indemnified herein.

In any and all claims against the City or any of its agents or employees by any employee of the Contractor, any subcontractor, anyone directly or indirectly employed by any of them, or anyone for whose acts any of them may be liable, the indemnification obligation shall not be limited in any way by any limitation on the amount or type of damages, compensation or benefits payable by or for the Contractor or any subcontractor under workers' or workmen's compensation acts, disability benefit acts, or other employee benefit acts. The obligation to indemnify shall extend to and include acts of the indemnified party which may be negligent or omissions which may cause negligence.

The City shall have the right to estimate the amount of such damage and to cause the City to pay the same and the amount so paid for such damage shall be deducted from the money due the Contractor under this contract; or the whole or so much of the money due or to become due the Contractor under this contract as may be considered necessary by the City, shall be retained by the City until such suits or claims for damages shall have been settled or otherwise disposed of and satisfactory evidence to that effect furnished to the City.

6-05. Protection of Persons and Property. The Contractor shall furnish such watchman, guards, fences, warning signs, walks and lights as shall be necessary and shall take all other necessary precautions to prevent damage or injury to persons or property.

All property line fences and improvements in the vicinity of the work shall be protected by the Contractor and, if they are injured or destroyed, they and any other property injured by the Contractor, his or her employees or agents, shall be restored to a condition as good as when he or she entered upon the work.

6-06. Protection of City Against Patent Claims.

This is the start of the file's text. The full file is on GovTribe.