Office of Emergency - Mobile Communications Platform (Trailer)
Closed State & local contract opportunity
- Solicitation number
- 2024-RFP-0458
- State
- California
- Responses due
Opportunity facts
- Jurisdiction
- NIGP codes
- 073 Trailers
- 07308 Trailers, With Enclosed Refrigeration Unit
- 07314 Trailers, Specialty, Enclosed, Tag-Along
- 07315 Trailers, Specialty, Frame, Tag-Along
- 07360 Trailers, Various Types (Not Otherwise Listed)
- 99894 Vehicles, Including Automobiles, Trucks, Trailers, Vans, Motor Homes, Motorcycles And Scooters, Etc. (See 998-20 For Buses), Sale Of Surplus And Obsolete Items
- UNSPSC codes
- Points of contact
-
- Antonio Watson awatson@cityofpasadena.net (626) 744-8382
- Maria Cojocari cojocarim@saccounty.gov (916) 876-6363
Opportunity details come from procurement.opengov.com. Updated .
About this opportunity
The City of Pasadena is seeking engineering design services for the Brookside Park Stormwater Capture Project, a comprehensive water management initiative targeting pollutant reduction in the Arroyo Seco and Los Angeles River watersheds. The procurement involves professional services to design a stormwater capture system that will divert dry weather and stormwater flows from the historic Seco Street drain to an 11 acre-feet subsurface infiltration unit located beneath an existing parking lot at 360 N Arroyo Boulevard. Key project deliverables include designing secondary treatment best management practices such as bioretention cells, enhanced tree canopy, and vegetated bioswales, with the ultimate goal of capturing, treating, and recharging over 300 acre-feet to the Raymond Basin. The project's drainage area covers approximately 1,166 acres predominantly within Pasadena, and requires careful design considerations accounting for potential historical materials and debris. Proposals are due by 2:00 pm on August 5, 2024, with a mandatory pre-proposal meeting scheduled for July 17, 2024. Evaluation criteria include project approach (40%), experience and references (20%), organization and qualification of key personnel (20%), proposed schedule (10%), and local business preferences (5% each), with a contract term initially set for three years and an optional one-year extension.
The solicitation does not explicitly specify set-aside designations for disadvantaged enterprises, though standard city forms suggest commitment to equal employment opportunities and non-discriminatory practices. The project is funded through the Los Angeles County Flood Control District's Safe, Clean Water Program, utilizing Regional Infrastructure Funds for environmental planning, permitting, and professional design services. While no incumbent vendors are mentioned, the pre-proposal meeting attendance report indicates significant interest from multiple engineering and consulting firms, including Tetratech, Kimley-Horn, Psomas, and others. The contract will be awarded through a competitive selection process, with the City evaluating proposals to select a consultant that can help achieve water quality compliance targets and improve water resiliency through nature-based solutions. Though a specific budget range is not directly stated, the project's scope and complexity suggest a substantial investment in professional engineering services, with the ultimate goal of developing a sophisticated stormwater management infrastructure that serves both environmental and community needs.
Opportunity text
2 versions
Update #2 · Latest ·
The County of Sacramento, Office of Emergency Services is seeking proposals for the procurement of a Mobile Communications Platform (trailer) to support our emergency response and public safety operations. This RFP outlines the specifications and requirements for the communications trailer.
We will consider already built trailers, provided any necessary modifications to meet our requirements align with the project timeline and budget. The finished trailer must be delivered by February 3, 2025. Please note that this is a grant-funded project (Federal Emergency Management Agency aka FEMA), and the budget cannot exceed $88,650.
Update #1 ·
The City of Pasadena is leading the development of the Brookside Park Stormwater Capture Project (Project) to continue the regional scale progress to achieve pollutant load reductions for Bacteria and other priority pollutants in the Arroyo Seco and downstream Los Angeles River. This project proposes to divert dry weather and stormwater flows from the historic Seco Street drain to an 11 acre feet subsurface infiltration unit below an existing parking lot for capture, treatment and recharge to the Raymond Basin. The site is on public property owned by the City of Pasadena and is located within the Arroyo Seco subwatershed and the larger Upper Los Angeles River watershed. The drainage area for the project is approximately 1166 acres which is mostly within the City of Pasadena. Secondary treatment best management practices (BMPs) will include bioretention cells, enhanced tree canopy, and vegetated bioswales.
This project proposes to divert dry weather and stormwater flows from the historic Seco Street drain to an 11 acre feet subsurface infiltration unit below an existing parking lot for capture, treatment and over 300 acre feet of recharge to the Raymond Basin. The site is on public property owned by the City of Pasadena and is located within the Arroyo Seco subwatershed and the larger Upper Los Angeles River watershed. The drainage area for the project is approximately 1166 acres which is mostly within the City of Pasadena. Secondary treatment best management practices (BMPs) will include bioretention cells, enhanced tree canopy, and vegetated bioswales.
The project location, located at 360 N Arroyo Boulevard, is a 475,820 SF parcel that abuts Brookside Park to the east, Rose Bowl stadium to the north, and the Arroyo Seco waterway to the east. It is currently used as a parking lot that is utilized by the City, Rose Bowl, Rose Bowl Aquatics Center, Kidspace, and the community for parking and recreational uses. The parking lot and the adjacent parcels were formally part of the Arroyo floodplain prior to the development of the Rose Bowl and park amenities; therefore materials, debris and deposits may be found in the subgrade that are consistent with these origins and must be considered during the project's design and constructability considerations.
Files
Show all 15
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity