BL036-24, H-22 (Lake Wellbrook), H-25 (Dew Lake), and H-3 (Haynes Pond 3) Dams Outlet Works Rehabili
Awarded State & local contract opportunity Posted
- Solicitation number
- PE-77023-NONST-2024-000000122
- State
- Georgia
- Responses due
Opportunity facts
- Jurisdiction
- NIGP codes
- 12041 Gates, Safety, Marine
- 28536 Gates, Electric (Including Card Readers, Etc.)
- 91115 C.i.p., Construction/Rehabilitation, Other Than Buildings
- 91116 C.i.p., Construction/Rehabilitation, Buildings
- 91313 Construction, Bridge And Drawbridge (Includes Reconstruction/Rehabilitation)
- 92523 Dam Engineering
- 93637 Gates, Electric (Card Reader, Etc.) Maintenance And Repair
- 95939 Dam And Levee Construction, Maintenance, Management And Repair
- UNSPSC codes
Opportunity details come from ssl.doas.state.ga.us. Updated .
About this opportunity
Paragraph 1:
Gwinnett County, Georgia is seeking competitive sealed bids from qualified contractors for a major maintenance project on the outlet control structures and principal spillways at three Natural Resources Conservation Service (NRCS) dams. The project entails in-kind replacements or repairs to extend the service life of multiple dam features, including low-level drain gates, reservoir level maintenance gates, concrete repairs, and spillway pipe lining. Safety improvements for operating personnel and the public, such as standing platforms, railings, access ladders, caution signage, and painting, are also included in the scope. The contract has a Substantial Completion timeframe of 200 days and a Final Completion timeframe of 230 days. Bidders must have a current valid Utility Contractors License, and the successful contractor will be required to provide 100% performance and payment bonds. A pre-bid conference is scheduled for March 7, 2024, and sealed bids are due by 2:50 PM on April 2, 2024.
Paragraph 2:
The project is funded by Gwinnett County, and the contract will be awarded to the responsive and responsible bidder offering the lowest price. No set-aside designations or restrictions on the types of organizations that can respond have been mentioned. The documents do not indicate any incumbent vendors or current contractors, nor do they reference any existing infrastructure or technology that requires integration. The project has an estimated construction budget, but the exact award value is not provided in the available documentation.
Opportunity text
This is a combined major maintenance project for outlet control structures and principal spillways at 3 Natural Resources Conservation Service (NRCS) Dams: Big Haynes Watershed Dam H-3, Big Haynes Watershed Dam H-22, and Big Haynes Watershed Dam H-25. As a project, it entails in-kind replacements or repairs to extend the service life of multiple dam features. Improvements of low-level drain gates, reservoir level maintenance gates, localized concrete repairs, and lining of spillway pipes are some of the maintenance efforts to take place. Safety improvements for operating personnel and the public (i.e., standing platform additions, railings, and access ladders, caution signage, painting) are also coupled to the project.
Files
| File | Type | Posted |
|---|---|---|
| BL036_24 Addendum No 1.pdf | ||
| BL036_24 Ad 3.pdf | ||
| BL036_24 Ad 4.pdf | ||
| BL036_24 Notice.pdf | ||
| BL036_24 Ad 2.pdf | ||
| BL036_24 Award Notice.pdf |