Beaufort county courthouse renovation – phase I
Open State & local contract opportunity Posted
- Solicitation number
- IFB121526
- State
- South Carolina
- Responses due
Opportunity facts
- Jurisdiction
- NIGP codes
- 15007 Boxes, Shoring (For Construction Worker Protection)
- 909 Building Construction Services, New, Including Maintenance And Repair Services
- 90922 Building Construction, Non-Residential (Office Bldg., Etc.)
- 90924 Building Construction, Commercial And Institutional
- 90977 Special Construction: Observatory, Security, Special Rooms, Etc.
- 91220 Construction, Fire Protection (Includes Fire Escapes, Fire And Smoke Barriers, Firestops)
- 92544 General Construction: Management, Scheduling, Cost Estimation - Engineering
- Point of contact
-
- Nicole Sproesser nicole.sproesser@bcgov.net (843) 255-2287
Opportunity details come from procurement.opengov.com. Updated .
About this opportunity
Beaufort County, South Carolina is requesting proposals from qualified general contractors for Phase I of the Beaufort County Courthouse Renovation, with proposals due December 15, 2026. The opportunity was posted November 10, 2026. The prime contractor must submit monthly Small and Minority Business Participation reports to the Beaufort County Compliance Office by the 5th of each month, documenting SBE and MBE subcontract awards, payments, and cumulative expenditures, with supporting payment records available on written request.
The solicitation scope covers renovation of Family Courtrooms 1 and 2, their associated anterooms, the interior vestibule, and bullet-resistant improvements at the judges' dais. The contractor provides labor, supervision, materials, equipment, subcontractors, scheduling, protection, testing, cleanup, and closeout. The project manual describes a broader set of work, including first and second floor foyers, public toilet rooms, the lobby security desk area, mechanical, plumbing, and electrical upgrades, and four alternates. The final contract scope is governed by the approved solicitation, drawings, specifications, addenda, and executed agreement. The project is structured as a single prime contract on a stipulated price basis. The package includes asbestos-containing materials reports for the first floor and for Family Courtrooms 1 and 2, plus a lighting selection document covering LED fixtures with WaveLinx wireless controls and five-year warranties.
Operational constraints are significant. The courthouse operates 9:30 a.m. to 5:00 p.m. ET. Contractors may access the site outside those hours, while only quiet activities such as painting and cleaning are permitted during operating hours. Family Courtrooms 1 and 2 cannot undergo work simultaneously. All on-site personnel must pass background checks and display photo identification badges. The contractor submits a preliminary construction schedule within 10 days of award, a complete schedule within 20 days, and updated schedules with each payment application. Contract administration runs electronically through Procore or an alternative platform, and payment applications use AIA G702 and G703 forms completed electronically. Substitutions for convenience are accepted only within 30 days after the agreement date, and substitutions for cause are due 14 days before the required approval date.
Opportunity text
Beaufort County requests proposals from qualified general contractors to provide labor, supervision, materials, equipment, subcontractors, scheduling, protection, testing, cleanup, and closeout necessary to renovate the Family Courtroom area at the Beaufort County Courthouse. The project is limited to Family Courtrooms 1 and 2, their associated anterooms, the interior vestibule, and bullet-resistant improvements at the judges' dais. The final contract scope shall be governed by the approved solicitation, drawings, specifications, addenda, and executed agreement.
Files
| File | Type | Posted |
|---|---|---|
| BEAUFORT_COUNTY_COURTHOUSE_RENOVATION_–_PHASE_I.pdf | ||
| 2026.06.09_-_CD_BID_SET_-_DRAWINGS.pdf | ||
| E0-1.dwg | DWG drawing | |
| P1-1.dwg | DWG drawing | |
| M2-1.dwg | DWG drawing | |
| A9-1.dwg | DWG drawing | |
| M2-2.dwg | DWG drawing | |
| E2-1.dwg | DWG drawing | |
| E1-1.dwg | DWG drawing | |
| A1-2.dwg | DWG drawing | |
| A3-1.dwg | DWG drawing | |
| A4-3.dwg | DWG drawing | |
| A4-2.dwg | DWG drawing | |
| A2-1.dwg | DWG drawing | |
| M1-2.dwg | DWG drawing | |
| A2-2.dwg | DWG drawing | |
| A4-4.dwg | DWG drawing | |
| A4-1.dwg | DWG drawing | |
| A0-1.dwg | DWG drawing | |
| DD_Lighting_Selections.pdf | ||
| P2-1.dwg | DWG drawing | |
| G0-1.dwg | DWG drawing | |
| 2026.06.09_-_CD_BID_SET_-_PROJECT_MANUAL.pdf | ||
| P0-1.dwg | DWG drawing | |
| E0.1_07-13-2026.pdf | ||
| M1-1.dwg | DWG drawing | |
| BC_Family_Court_2_ACM_Report.pdf | ||
| PAGE_8_-_VECTOR.pdf | ||
| BC_Family_Court_1__ACM_Report.pdf | ||
| M0-1.dwg | DWG drawing | |
| BC_1st_floor_ACM_Report.pdf | ||
| Exhibit_4_-_Monthly_Compliance_Status_Report.pdf |
Show all 32
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity