As Needed Cured In Place Pipe (CIPP) Lining Services
Closed State & local contract opportunity
- Solicitation number
- 26-049UM-IFB
- State
- Florida
- Responses due
Opportunity facts
- Jurisdiction
- NIGP codes
- Point of contact
-
- Gaby Hinds ghinds@plantcitygov.com (813) 730-1304
Opportunity details come from procurement.opengov.com. Updated .
About this opportunity
The City of Plant City is requesting proposals for an as-needed annual contract for cured-in-place pipe (CIPP) lining services for trenchless rehabilitation of its wastewater collection system, with proposals due September 24, 2026. Work scope includes CIPP lining, point repairs, reinstatement of service laterals, and preparatory and restoration activities across approximately 160 miles of gravity sewer mains ranging from 8 inches to 36 inches in diameter, plus 4-inch and 6-inch sewer laterals throughout the collection system.
The contract supports the City's compliance with Rule 62-600.705(2), F.A.C. and long-term asset management objectives, with emphasis on minimizing inflow and infiltration. The City intends to establish multiple contractors under this as-needed vehicle.
Technical specifications, line-item pricing structure, and a collection system map are attached. No estimated contract value, contract term length beyond "annual," set-aside or preference program, evaluation criteria weighting, incumbent information, or pre-bid meeting date are identified in the source materials. The specific technical requirements, material standards, and CIPP methodology are detailed in the attached IFB technical specification and pricing worksheet.
Opportunity text
The City of Plant City owns and operates an extensive wastewater collection system consisting of approximately 160 miles of gravity sewer mains, ranging in diameter from 8 inches to 36 inches, and 4‑inch and 6‑inch sewer laterals. Maintaining the integrity and performance of this aging infrastructure is essential to ensuring reliable wastewater conveyance, minimizing inflow and infiltration (I & I), and meeting evolving regulatory requirements.
To support compliance with Rule 62-600.705(2), F.A.C. and to advance the City's long‑term asset management goals, the City of Plant City intends to establish an annual contract for cured‑in‑place pipe (CIPP) lining services. The selected contractor(s) will provide trenchless rehabilitation of existing gravity sewer mains throughout the collection system. Work under this contract will include, but not be limited to, CIPP lining, point repairs, reinstatement of service laterals, and related preparatory and restoration activities.
Files
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity