As_Needed_Cured_In_Place_Pipe_(CIPP)_Lining_Services_(Addendum_#3_Revision).pdf

PDF 365 KB Posted

Attached to
As Needed Cured In Place Pipe (CIPP) Lining Services
Solicitation number
26-049UM-IFB
Issued by
Hillsborough County, Florida

About this file

As-Needed Cured In Place Pipe (CIPP) Lining Services Invitation for Bids

This is an Invitation for Bids (IFB) document for the City of Plant City, Florida, soliciting qualified contractors to provide cured-in-place pipe lining services for trenchless rehabilitation of the city's wastewater collection system. The city operates approximately 160 miles of gravity sewer mains ranging from 8 inches to 36 inches in diameter, plus 4-inch and 6-inch sewer laterals throughout the collection system. The requested services include supervision and administration, sanitary sewer cleaning, CCTV inspection, and CIPP installation across multiple pipe sizes and project locations. A non-mandatory pre-proposal meeting is scheduled for September 9, 2026, at 3:00 p.m. at the Solid Waste and Utilities Maintenance Building in Plant City. The question submission deadline is September 21, 2026, at 2:00 p.m., and proposals must be submitted electronically by October 8, 2026, at 2:00 p.m. through the city's e-procurement portal. The resulting contract will commence upon issuance of a term contract and extend for three years, with the option for two additional one-year renewal periods at the city's sole discretion. The city intends to award up to three lowest responsive bidders for each curing method (water/steam curing or UV curing).

Bid pricing shall remain valid for a minimum of 90 days from the submission deadline, with all costs including labor, materials, supervision, equipment, and supplies necessary for project completion. Bidders must be experienced in CIPP lining services with pipelines ranging from 8 inches to 36 inches in diameter and provide three references from Florida government agencies completed within the last five years. Crew leaders for CCTV inspection and CIPP lining work must possess a minimum of three years' experience in their respective work types and hold NASSCO's Pipeline Assessment Certification Program (PACP) certification. Bidders must identify an FDOT-certified Maintenance of Traffic (MOT) representative and submit manufacturer information for both the CIPP liner and resin system, as well as details on the wet-out facility location and operator. All contractors must maintain comprehensive insurance coverage including workers' compensation, commercial general liability with minimum limits of $500,000 per occurrence and $1,000,000 general aggregate, and commercial automobile liability with minimum combined single limits of $500,000. Contractors must comply with E-Verify requirements for employee eligibility verification and submit sworn statements regarding public entity crimes, immigration law compliance, human trafficking, and foreign country of concern prohibitions. Price escalation requests are permitted annually with a maximum five percent increase, supported by the U.S. Bureau of Labor Statistics Employment Cost Index. The city will not cover permit application or permit fees; however, authorized permit fees will be paid directly by the city.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RESPONSES MUST BE SUBMITTED ELECTRONICALLY TO:

https://procurement.opengov.com/portal/plantcitygov

IFB Invitation for Bids

26-049UM-IFB

As Needed Cured In Place Pipe (CIPP) Lining Services

Release Project Date August 21, 2026

Pre-Proposal Meeting (Non-Mandatory) September 9, 2026, 3:00pm

902 N Mobley St, Plant City, FL 33563– Solid Waste and Utilities Maintenance (SWUM) Building.

Question Submission Deadline September 21, 2026, 2:00pm

Proposal Submission Deadline October 8, 2026, 2:00pm

OpenGov

As Needed Cured In Place Pipe (CIPP) Lining Services

26-049UM-IFB P a g e | 2

City of Plant City

IFB Invitation for Bids

I. Bidder Instructions II. Scope of Work

III. Special Provisions IV. Bid Submission V. Vendor Questionnaire

Attachments:

A - 26-049UM-IFB TechSpec - Rev1 - 15SEP2026

B - CollectionSystemMap

C - Measurement and Payment Plan - Rev1 - 15SEP2026

D - 2026-08-21_CIPP_Lining_Services_Agreement

26-049UM-IFB P a g e | 3

1. Bidder Instructions

1.1. Bid Submissions

Bids shall be received for 26-049UM-IFB As Needed Cured In Place Pipe (CIPP) Lining Services through the City's e-Procurement located at https://procurement.opengov.com/portal/plantcitygov.

1.2. Valid Term

Bids shall be valid for no less than 90 days from the submittal deadline.

1.3. Rejection

The City reserves the right to reject any or all bids at any time and for any reason or no reason.

Bids submitted after the deadline shall be rejected. Bids shall be received for 26-049UM-IFB As

Needed Cured In Place Pipe (CIPP) Lining Services through the City's e-Procurement located at https://procurement.opengov.com/portal/plantcitygov. Bids submitted in an envelope or box shall be rejected. Fax, e-mail, or telephone bids shall be rejected. Bids that are incomplete, unbalanced, conditional, obscure, or which contain terms or additions not called for, alterations or irregularities of any kind, or which do not comply with the contract documents, if applicable, may be rejected at the sole discretion of the City.

1.4. Response Form

Bids shall be made only on the forms included in title Bid Submittals. Bid forms shall be signed by the owner or other authorized individual.

1.5. Insurance Requirements

At a minimum, the contractor shall acquire and maintain until completion of the work the insurance coverage listed below, which constitutes primary coverage. The contractor shall not commence the work until the City of Plant City (City) receives and approves Certificates of

Insurance documenting required coverage. Contractor’s General Liability and Automobile

Liability policies shall include Endorsement CG 20101185, or equivalent, naming the City as

Additional Insured. All required policies shall also include (1) endorsement that waives any right of subrogation against the City for any policy of insurance provided under this requirement or any state or federal Workers’ Compensation or employer’s liability act; (2) endorsement to give the City no less than thirty days’ notice in the event of cancellation or material change. Certificates of Insurance must be accompanied by copies of the requested endorsements.

The contractor understands and agrees that the stipulated limits of coverage listed herein in this insurance section shall not be construed as a limitation of any potential liability to the City, or others, and the City’s failure to request, receive or retain, evidence of this insurance coverage shall not be construed as a waiver of the contractor’s obligation to provide and maintain the insurance coverage specified.

https://procurement.opengov.com/portal/plantcitygov

26-049UM-IFB P a g e | 4

Workers’ Compensation Insurance: Awardee shall procure and maintain during the life of this contract Workers’ Compensation Insurance for all of its employees to be engaged in work on the Project under this Contract, and in case any such work is sublet, Contractor shall require the

Subcontractor similarly to provide Workers’ Compensation Insurance for all the Subcontractor’s employees to be engaged in such work unless such employees are covered by the protection afforded by Contractor’s Workers’ Compensation Insurance. In case any class of employees engaged in hazardous work on the project under this contract is not protected under the

Workers’ Compensation statute, Contractor shall provide and shall cause each Subcontractor to provide adequate insurance for the protection of such of its employees not otherwise protected.

Contractor shall indemnify and hold the City of Plant City harmless for any claim made by the

Subcontractor for Workers” compensation. Note: If Contractor claims to be exempt from

Workers’ Compensation Insurance, then a Certificate of Exemption from the State shall be produced upon request.

Commercial General Liability Insurance: Awardee shall procure and shall maintain during the life of this contract, but not limited to, Independent Contractor, Contractual Premises/Operations, and Personal Injury covering the liability assumed under indemnification provisions of this

Contract, with limits of liability for personal injury and/or bodily injury, including death. Amounts of coverage shall be satisfactory to the Owner, but not less than $500,000.00 for each occurrence, $1,000,000.00 general aggregate, personal/advertising injury of $500,000.00;

Products-Completed Operations aggregate of $1,000,000.00. Also, include in General Liability coverage for the following areas based on the limits of policy, with a minimum of: Fire Damage

(any one (1) fire) $50,000.00; Medical Expense (any one (1) person) $5,000.00. This insurance shall be maintained with an insurance company or companies licensed to do business in the

State of Florida. The City of Plant City shall be named as additional insured on the policy. The

City shall receive a copy of the Additional Insured Endorsement confirming that the Contractor's coverage is Primary and not Contributory.

Commercial Automobile Liability Insurance: Awardee shall procure and shall maintain during the life of this contract Comprehensive Automobile Liability Insurance covering any auto, all owned autos, scheduled autos, hired autos, and non-owned autos. Coverage shall be on an

“occurrence” basis. Such insurance to include coverage for loading and unloading hazards. This coverage shall include Combined Single Limit (CSL) for $500,000.00 or Bodily Injury (Per

Person), Bodily Injury (Per Accident) and Property Damage for $500,000.00 each. This insurance shall be maintained with an insurance company or companies licensed to do business in the State of Florida. The City of Plant City shall be named as additional insured on the policy.

The City shall receive a copy of the Additional Insured Endorsement confirming that the

Contractor's coverage is Primary and not Contributory.

Subcontractor’s Comprehensive Liability and Property Damage Insurance: The Awardee shall require each of its subcontractors to procure and maintain during the life of their contract

Comprehensive Liability and Property Damage insurance coverage in amounts satisfactory to the contractor for its protection, with an insurance company or companies licensed to do business in the State of Florida.

The certificate of insurance shall include as a certificate holder:

26-049UM-IFB P a g e | 5

City of Plant City

Attn: City Manager

302 West Reynolds Street

The City shall be named as additional insured on the policy.

1.6. Completeness

The City may reject bids that are incomplete, conditional, deficient in any way, or which contain unsolicited additions/alterations.

1.7. Review Documents

Bidders must review all specifications and contract documents related to this bid and project.

Failure to review all specifications, forms, contracts, addenda, or other documents shall not relieve a bidder from any obligations contained in this bid or their Contract with the City.

1.8. Familiarity with Project Area

Before submitting a bid, bidders shall become fully acquainted with the project areas. Please see Scope of Work for more detail about the project. Submittal of a bid shall serve as bidder’s acknowledgment that they are fully familiar with the service area.

1.9. Fill-In Required Forms

Bidders must accurately fill in any bid forms/documents included in this packet and submit through the City's e-Procurement portal at:

https://procurement.opengov.com/portal/plantcitygov.

Authorized signatures must be included on forms/documents. Incomplete or missing forms/documents may result in the rejection of the bid.

1.10. Certification

Submittal of a bid shall be deemed as certification that a bidder has fully considered all factors associated with this Invitation for Bids, including any addenda.

1.11. Project Owner

The City of Plant City, Florida owns this project. The City Manager or designee is the City’s authorized representative on this project.

1.12. Verification of Bidder's Capability

The City may, at its sole discretion, determine the bidder’s ability and capacity to perform the work specified in this bid based on, but not limited to, evaluation of the following:

A. Comparable prior project experience (particularly ones similar to this project size/scope).

B. Financial resources.

26-049UM-IFB P a g e | 6

C. Prior bond history.

D. Licensure and certifications.

E. Equipment, machinery, and/or facilities.

F. Background & references.

Bidders deemed to be unqualified to perform the work may have their bid rejected.

1.13. Local Preference

The City has adopted a local preference policy (Section 2-161, Plant City Code). As part of this

Invitation for Bids, the local preference policy provides qualifying bidders with an amount not to exceed 1½ percent of the lowest bid, provided that the cost differential from the lowest bid shall not exceed $2,500. Non-qualifying bidders will not receive the 1½ percent. A bidder qualifies for a local preference if it meets all of the following:

A. Paid its applicable City business tax for the current year in which this Invitation for Bids is issued. Bidders that request local preference must include in their submittal packets a copy of the receipt proving payment of the City’s business tax.

B. Obtained a license issued by the State of Florida allowing it to engage in the business of providing the services requested in this Invitation for Bids.

C. Maintains a physical office located within the city limits of Plant City. The office must be staffed by at least one full-time equivalent employee and must have been established at least six months before the submittal deadline. Post Office boxes are not verifiable and will not be accepted as proof of a physical office location.

D. A bidder that does not meet the criteria above will not receive 1½ percent calculated to the bid price submitted.

1.14. Waiver of Irregularities

The City may waive informalities or irregularities that, in the City’s opinion, do not materially affect a bid.

1.15. Notice of Award

Upon review of the bids and when a determination has been made as to the lowest responsive and responsible bidder, the Procurement Director will issue a Notice of Intent to Award to the selected bidder via the City's e-Procurement Portal.

Once the bidder has completed registration, they will receive "Notice" notifications to their email by clicking “Follow” on this project. Ultimately, it is the sole responsibility of each bidder to periodically check the site for any Notices at https://procurement.opengov.com/portal/plantcitygov.

26-049UM-IFB P a g e | 7

This notice shall be sent to the recommended bidder with copies to all bidders.

1.16. Award

The City intends on awarding to the up to 3 lowest responsive bidders for each curing method.

City personnel will evaluate the bids. Determination of the lowest responsive and responsible bid(s) will be made after a review of all bids submitted. Bid award(s) shall be made to the vendor(s) submitting the lowest responsive and responsible bid(s) meeting specifications for the base bid(s).

The City may award a Contract based on bid responses received from bidders without further discussion of such bids with the selected bidder. Therefore, bids should be submitted based on the most favorable terms available.

Bids that are not greater than $50,000.00 may be awarded by the City Manager. The City

Commission makes the final decision regarding the award or rejection of bids that are greater than $50,000.00.

1.17. Term

The contract resulting from this Invitation for Bids shall commence effective upon issuance of a term contract by the City and extend for a period of three (3) years. The contract may be renewed for two (2) additional one (1) year periods, at the sole discretion of the City of Plant

City.

1.18. Protest Procedures

Any bidder or proposer who is allegedly aggrieved in connection with the issuance of the

Procurement Director’s recommendation and intent to make a competitive award of a contract may protest to the City Manager per Sec. 2-152. Protest Procedure, of the City’s Code.

1.19. Revocation of Award

If the City discovers that the bidder has misrepresented anything in their bid or that the bidder

– in the City’s opinion – is no longer reasonably capable of performing the work as bid, then the

City may revoke the award at any time before issuing the formal Notice to Proceed. The

Procurement Director will issue the revocation in writing.

1.20. Bid Interpretations

The City has the right to define and interpret bid terms, specifications, and conditions.

1.21. Contract Execution & Bid Bond

The selected bidder must sign and return the contract, any required bonds or letter of credit, insurance certificates, and all other required documents within 14 calendar days after the City sends the documents to the selected bidder. Once the City receives the signed contract and all

26-049UM-IFB P a g e | 8 other required documents back from the selected bidder, then the City’s authorized representative will sign the contract.

Failure to sign and return the contract and all other required documents within 14 calendar days may result in the City calling the bid bond or cashing the cashier’s check submitted by the selected bidder with its proposal; barring the selected bidder from consideration on future projects; or both. The City may then select another bidder to perform the work or provide the goods/services specified in this bid.

1.22. Sworn Statement on Public Entity Crimes

A person or affiliate as defined in Section 287.133, Florida Statutes, who has been placed on the convicted vendor list following a conviction for a public entity crime may not submit a bid, proposal, or reply on a contract to provide any goods or services to a public entity; may not submit a bid, proposal, or reply on a contract with a public entity for the construction or repair of a public building or public work; may not submit bids, proposals, or replies on leases of real property to a public entity; may not be awarded or perform work as a contractor, supplier, subcontractor, or consultant under a contract with any public entity; and may not transact business with any public entity above $25,000 for 36 months following the date of being placed on the convicted vendor list.

Bidders must fill out and sign the form titled “SWORN STATEMENT UNDER SECTION

287.133(3)(A), FLORIDA STATUTES, ON PUBLIC ENTITY CRIMES.” Failure to do so may disqualify the bid.

1.23. Other Forms & Documents

Bidders are responsible for reviewing and understanding all specifications, forms or other documents associated with the products described in this bid. Submittal of a bid shall serve as the bidder’s acknowledgment that it has reviewed and understood all such documents.

1.24. Notice to Proceed

Following contract signing by the City, a formal “Notice to Proceed” will be issued in writing to the contractor. The start date will be issued by the City’s Project Manager.

If the contractor begins work before receiving the Notice to Proceed or start date, then the City may stop work on the project, may require the work to be redone at the contractor’s expense and without additional compensation from the City, or both. The City also may revoke the project award and select another bidder to perform the work.

1.25. Changes or Modifications

The City may at any time make changes within the general scope of the contract in any of the following areas:

A. Time of Performance (i.e., hours of the day, days of the week, etc.).

26-049UM-IFB P a g e | 9

B. Location of performance of the services.

C. Quantities to be ordered.

The contractor shall not commence the performance of additional work or other changes not covered by this contract without an executed notice to proceed or purchase order issued by the

City. If the contractor performs additional work beyond the specific requirements of this contract without an executed change order, it shall be at the contractor’s own risk. The City assumes no responsibility for any additional costs for work not specifically authorized by an executed change order.

1.26. Conditions of Performance

Bidders are required to inform themselves fully of the conditions relating to the performance of the work required, including but not restricted to labor and operating conditions under which the work will be or is now being performed; and the successful bidder must apply, so far as possible, such methods and means in carrying out the work that will not cause any interruption or interference with any other work, construction or operation the Owner has underway.

1.27. Payment and Performance Bond

If Payment and Performance Bond is required, it shall be for the amount of the applicable work order. The contractor shall be responsible for recording the payment and performance bond before commencing the work, the contractor shall provide to the City Clerk a certified copy of the recorded bond. As required by 255.05, Florida Statutes, the City may not make any payments to the contractor until the City Clerk receives the certified copy of the recorded bond.

The City will reimburse for the cost of the bond.

1.28. Insurance and Bonds

Insurance and bonds specified in this bid document and the contract shall conform to and shall be insured by companies meeting the criteria outlined below and within the contract document in Bid Submittals.

A. Insurance and bonds shall be countersigned by an agent licensed to do business in the

State of Florida.

B. A surety must be permitted to do business in the State of Florida and shall have been in business and have a record of successful, continuous operation for at least five years.

C. The surety shall have at least the following minimum rating as listed in Best's Financial

Rating: Financial Strength Rating of “A”.

1.29. UNAUTHORIZED ALIEN(S)

The vendor agrees that unauthorized aliens shall not be employed nor utilized in the performance of the requirements of this solicitation. The City shall consider the employment or utilization of unauthorized aliens a violation of Section 274A(e) of the Immigration and

26-049UM-IFB P a g e | 1 0

Naturalization Act (8 U.S.C. 1324a). Such violation shall be cause for unilateral termination of this Agreement by the City. As part of the response to this solicitation, the successful firm will complete and submit the attached form “AFFIDAVIT CERTIFICATION IMMIGRATION LAWS.”

Employers may avail themselves of a program by the U.S. Immigration and Customs

Enforcement called E-Verify. E-Verify is an Internet-based system operated by U.S. Citizenship and Immigration Services (USCIS), part of the Department of Homeland Security (DHS), in partnership with the Social Security Administration (SSA). E-Verify is currently free to employers. E-Verify provides an automated link to federal databases to help employers determine the employment eligibility of new hires and the validity of their Social Security numbers.

If your company wishes to avail itself of this program, you can register online for E-Verify at http://www.dhs.gov/how-do-i/verify-employment-eligibility-e-verify which provides instructions for completing the registration process. At the end of the registration process, you will be required to sign a Memorandum of Understanding (MOU) that provides the terms of the agreement between you as the employer, the SSA, and DHS. An employee who has signatory authority for the employer can sign the MOU. Employers can use their discretion in identifying the best method by which to sign up their locations for E-Verify. To find out more about E-

Verify, please visit E-Verify | USCIS or contact USCIS at 1-888-464-4218.

1.30. Indemnification

Section 1-16, Plant City Code, prohibits the City from indemnifying other parties to an agreement. Therefore, the City cannot indemnify bidders.

1.31. All-Inclusive Cost

The bid shall include all expenses necessary to complete the delivery of products or provide the services described in this Invitation for Bids. The awarded vendor will not be responsible for covering the cost of application fees or permit fees, of applicable permits. The City will pay such authorized fees directly. If selected by the City, the bidder must pay applicable sales tax on any goods or services it purchases. The City is exempt from paying federal and state taxes, including sales tax. The City’s sales tax exemption is not assignable and cannot be applied toward items the vendor purchases, regardless of whether the vendor transfers those items to the City.

1.32. Legal Requirements

Bidders are required to comply with all provisions of federal, state, county and local laws, ordinances, rules and regulations that apply to the services being solicited in this bid. A bidder’s lack of knowledge shall in no way be a cause for relief from responsibility, nor shall it constitute a cognizable defense against the legal effects thereof.

Submittal of a bid shall constitute the bidder’s affirmation that they are familiar with and shall comply with all federal, state, and local laws, ordinances, rules and regulations which affect those engaged or employed in the provision of such services, or equipment used in the https://www.dhs.gov/verify-employment-eligibility-e-verify

26-049UM-IFB P a g e | 1 1 provision of such services, or which in any way affects the conduct of the provision of such services. No plea of misunderstanding shall be considered on account of the bidder’s ignorance thereof. If a bidder believes provisions in the bid documents are contrary to or inconsistent with any law, ordinance, or regulation, then the bidder shall promptly report those provisions in writing to the City.

1.33. Public Records

Bidders understand that Florida has a broad public records law and that documents in the possession of the City can only be maintained confidential to the extent allowed under the

Florida Public Records Act, Florida Statute 119.

1.34. Contract Documents

The contract attached hereto is a draft of the contract required by the City to award the project described in this bid. It is the bidder’s responsibility to review and understand the contract. If the bidder requires any modifications or additional terms and conditions to the contract, the bidder shall detail the desired changes on a separate page titled “Additional

Terms/Modifications”. That page then must be attached to the bid response and submitted as part of the bidder’s proposal. Contract modification requests after the bidder’s bid has been submitted shall not be considered.

1.35. Bid Preparation & Submittal Expenses

The City shall not be responsible for any expense incurred by a bidder in reviewing, evaluating, preparing, or submitting a bid. Bidders are solely responsible for the entire expense of responding to this bid.

1.36. Cooperative Procurement Agreement

Per Chapter 69-1119, Laws of Florida, Hillsborough County, all municipalities, local public agencies, boards and other authorities existing within Hillsborough County have the authority to purchase goods or services, at the same purchase price obtained by any other such public entity. The submission of a bid in response to this advertisement shall constitute a bid under the same conditions, during the effective period of the bid, to all the other public entities listed herein:

Hillsborough County Board of

County Commissioners 601 E. Kennedy Blvd. #2500 Tampa, FL 33601 Phone: (813) 272-5790

FAX: (813) 272-6290

www.hillsboroughcounty.org

Hillsborough Co. Aviation

Authority P. O. Box 22287 Tampa International Airport Tampa, FL 33622-2287 Phone: (813) 870-8730

FAX: (813) 875-6670

www.tampaairport.com

Clerk of Circuit Court 601 E. Kennedy Blvd.-13th Floor P.O. Box 1110 Tampa, FL 33601 Phone: (813) 276-8100 Ext.7721

FAX: (813) 272-

5521www.hillsclerk.com https://www.hillsboroughcounty.org/ https://www.tampaairport.com/ https://www.hillsclerk.com/

26-049UM-IFB P a g e | 1 2

University of South Florida Procurement Services 3702 Spectrum Blvd. UTC135-P Tampa, FL 33612 813-974-2481 – Telephone 813-974-5362 – Fax

Tampa-Hillsborough County Expressway Authority 1104 East Twiggs St. Suite #300 Tampa, Florida 33602 813-272-6740 – Telephone 813-276-2492 – Fax

Tax Collector 601 E. Kennedy Blvd., 14th Floor Tampa, FL 33602 Phone: (813) 307-6222

FAX: (813) 307-

6521www.hillstax.org

Tampa Palms Community Dev.

Dist.

16311 Tampa Palms Blvd W Tampa, FL 33647 Phone: (813) 977-3933 Fax: (813) 977-6571 www.tpoa.net

Hillsborough Area Regional

Transit Authority 4305 E. 21st Street Tampa, FL 33605 813-623-5835 – Telephone 813-664-1119 – Fax

The Children's Board of Hills.

County 1002 E. Palm Avenue Tampa, FL 33605 Phone: (813) 229-2884

FAX: (813) 228-

8122www.childrensboard.org

Tampa Sports Authority 4201 N. Dale Mabry Highway Tampa, FL 33607 813-673-4300 – Telephone 813-673-4312 – Fax

Hillsborough Community

College 39 Columbia Drive Tampa, FL 33606 813-253-7060 – Telephone 813-253-7561 – Fax

Hillsborough Co. Sheriff’s

Office P.O. Box 3371 Tampa, FL 33601 813-247-8033 – Telephone 813-247-8246 – Fax

City of Temple Terrace P.O. Box 16930 Temple Terrace, FL 33687 813-506-6420 – Telephone 813-989-7185 – Fax

Tampa Port Authority P.O. Box 2192 Tampa, FL 33601 813-905-5164 – Telephone 813-905-5109 – Fax

Housing Authority of Plant

City 1306 Larrick Ln.

Plant City, FL 33563 813-752-0569

City of Tampa Housing Auth.

1614 Union Street Tampa, FL 33607 813-253-0551 – Telephone 813-4522 – Fax

Supervisor of Elections 601 E. Kennedy Blvd., 16th Floor Tampa, FL 33602 Phone: (813) 276-8274

FAX: (813) 272-7043

www.votehillsborough.org

Property Appraiser 601 E. Kennedy Blvd., 16th Floor Tampa, FL 33602 Phone: (813) 272-6100

FAX: (813) 272-

5519www.hcpafl.org

Hillsborough County School Board P. O. Box 3408 Tampa, FL 33601-3408 Phone: (813) 272-4329

FAX: (813) 272-4007

Community Redevelopment

Agency of the City of Plant City 302 W. Reynolds Street Plant City, Florida 33563

City of Tampa Procurement Department Tampa Municipal Office Building, 2nd Floor 306 E. Jackson St.

Tampa, FL 33602

State Attorney’s Office Tampa, FL 33602 813-272-5400 – Telephone 813-272-7014 – Fax

2. Scope of Work https://www.hillstax.org/ https://www.tpoa.net/ https://www.childrensboard.org/ https://www.votehillsborough.org/ https://www.hcpafl.org/

26-049UM-IFB P a g e | 1 3

To provide the full scope of work as per the attached plans and specifications for the As Needed

Cured In Place Pipe (CIPP) Lining Services.

2.1. Scope of Work

The City is seeking the services of Cured-in-Place Pipe (CIPP) contractors licensed in the State of

Florida to provide complete pipelining services. The selected Contractor(s) will be responsible for delivering full trenchless rehabilitation services, regardless of project location, for a wide range of assignments as requested by the City.

Services shall include, but are not limited to, the following:

• Supervision and administration of all work

• Sanitary sewer cleaning

• CCTV inspection of sanitary sewer pipelines

• CIPP installation

3. Special Provisions

3.1. Closeout Submittals

Awarded vendor shall provide closeout submittals. Data will be used for Operations and

Maintenance Manuals. Submittals to include full product and service detailed information. For example, including manufactures, names, colors, designs, warranties, guarantees, certifications, distributors, operations and maintenance instructions, care and upkeep, shop drawings, as-builts, and with samples.

3.2. Time for Performance

The Awarded shall commence work within thirty (30) calendar days following issuance of the

Notice to Proceed (NTP), unless otherwise authorized by the City.

This is an as needed contract, and individual projects will be authorized by the City on a project-by-project basis. The required completion schedule for each project will be established in the applicable work authorization, purchase order, or other written notice issued by the City.

3.3. Indefinite Quantity

The quantities of goods and services specified herein have been determined by the City and are deemed to be fairly accurate estimates of the work to be performed. However, payment will be made based on the actual goods and services measured in place. If the measurement is different than the original quantity bid by the contractor, then a change order will be executed for the actual amount whether over or under the quantity that was bid.

3.4. Contractor Qualifications

A. The Bidder must be experienced in Cured In Place Pipe (CIPP) lining services, including

CIPP installation in pipelines ranging from 8 inches to 36 inches in diameter, and similar

26-049UM-IFB P a g e | 1 4 work. The Bidder should submit 3 references from Florida government agencies that the

Bidder has completed projects for within the last five (5) years. Appropriate documentation to be provided upon request by the City.

B. The Bidder shall submit the names and resumes of the crew leaders for each type of work listed below. These individuals shall have a minimum of three (3) years each of experience in the applicable work type. NASSCO’s Pipeline Assessment Certification

Program (PACP) certification is required.

1. Supervising CCTV Inspection

2. CIPP lining

C. The Bidder shall identify a representative who holds an FDOT-certified MOT (Temporary

Traffic Control) certification, or demonstrate that the certification will be provided by an applicable subcontractor. All required licenses and certifications shall be maintained in accordance with applicable law.

D. The Bidder shall submit, as part of the bid, the following information:

1. Manufacturer of the CIPP liner, including company name and address, in accordance with the Attachment A.

2. Manufacturer of the resin system, including company name and address, in accordance with the Attachment A.

3. Location and operator of the wet-out facility to be used for this project.

4. Curing Method (2 types). The Bidder must be qualified in the execution of one

Curing method to be eligible to bid under this solicitation.

a. Water/ Steam Curing

b. UV Curing

Failure to provide this information may result in the bid being deemed non-responsive

3.5. Additional Information

A. The contractor must provide City’s authorized representative with telephone number(s) and job title for all management personnel assigned to the project before work commences.

B. The contractor shall be responsible for performing the work necessary to meet City standards in a safe, neat, and good workmanlike manner, using only generally accepted methods in carrying out the work, and complying with all federal and state laws, and all ordinances and codes of the City relating to such work.

26-049UM-IFB P a g e | 1 5

C. All work performed shall be subject to inspection and acceptance by the City’s appointed representative before payment. The contractor shall be required to correct any work determined to be unsatisfactory or below industry standards at no additional cost to the

City.

D. The contractor shall warrant against all defects in material and workmanship for one year after acceptance.

3.6. Safety

The contractor shall be responsible for all means and methods as they relate to safety and shall comply with all applicable local, state and federal requirements that are safety-related. The contractor shall be solely responsible for initiating, maintaining and supervising all safety precautions and programs in connection with the Work.

3.7. Cleanup

At the end of each workday, as well as after completion of all work on the project and before making an application for acceptance of the work, the contractor shall clean/police the site of operations, including any areas under the control of the City that have been used by the

Contractor in connection with the work. All debris shall be removed and hauled off by the

Contractor.

3.8. Definitions

Wherever used in any of the contract documents, the meaning shall be given to the terms herein defined:

A. The term “contractor” means the person, bidder or corporation to whom the herein

Contract is awarded by the Owner and who is subject to the terms hereof.

B. The term “subcontractor” means a person, bidder or corporation supplying services and materials, labor and materials, or only services or labor for work in connection with the project.

3.9. Accident Prevention

Precaution shall be exercised the use of modern safety rules and practices at all times for the protection of persons (including employees) and property, and hazardous conditions shall be guarded against or eliminated.

3.10. Qualifications for Employment

No person shall be employed in violation of the State or the National Labor Laws. No person under the age of sixteen years shall be employed on the project under their contract. No person whose age or physical condition is such as to make this employment dangerous to their health or safety or the health or safety of others shall be employed on the project under their contract;

provided, that shall not operate against the employment of physically handicapped persons, 26-049UM-IFB P a g e | 1 6 otherwise employable, where such persons may be safely assigned to work which they can ably perform.

3.11. Substitutions

Unless otherwise stated, the reference in the specifications to any article, device, product, materials, fixture, form, or type of construction, etc., by name, make or catalog number, shall be interpreted as establishing a standard of quality and shall not be construed as limiting competition. The determination of whether an article, device, product, material, fixture, form or type of construction is equal to that named is solely in the determination of the Owner. No

Substitutions shall be permitted without the prior express written authorization from the Owner.

3.12. Patents

The contractor shall hold and save the owner and its officers, agents, servants, and employees harmless from liabilities of any nature or kind, including costs and expenses for, or on account of, any patented or unpatented invention, process, article or appliance manufactured or used in the performance of the contract, including its use by the owner at any time during the prosecution or after completion of the work unless otherwise specifically stipulated in the contract documents.

3.13. Use of Premises

The contractor shall confine their apparatus, storage of materials, and construction operations to such limits as may be directed by the Owner and shall not unreasonably encumber the premises with his materials. Any damage done to public or private property shall be repaired at the contractor’s expense to the preconstruction condition or better. A preconstruction video must be made to determine actual preconstruction conditions should a dispute arise. Be sure to note the address, type of sod, any existing damage and show these items on the video.

The contractor shall not load or permit any part of any structure to be loaded to such an extent as to endanger its safety.

The contractor shall provide and maintain at their own expense, in a sanitary condition, such accommodations for the use of his employees as is necessary to comply with the requirements and regulations of the State Department of Environmental Regulation and Health Department.

They shall commit no public nuisance.

3.14. Overtime Work by Owner Employees

Where the contractor elects to work on a Saturday, Sunday or a holiday, or longer than an eight-hour work shift on a regular working day, such work shall be considered as overtime work. On all such overtime work an inspector will be present. The contractor shall reimburse the owner for the full amount of the straight time plus overtime costs for employees of the owner required to work overtime hours. The Contractor by these specifications does hereby authorize the owner to deduct the cost of overtime work at the rate of TBD per hour from the amount due or to become due him.

26-049UM-IFB P a g e | 1 7

Overtime due to special construction problems such as concrete, finishing, asphalt rolling, making live sewer hookups, alleviating traffic problems, etc., may not be charged if the City

Manager considers the overtime to be mutually justified. Normal engineering inspection hours are 7:00 a.m. to 5:00 p.m. Monday through Friday.

Recognized Holidays shall be as follows:

A. New Year’s Day

B. Martin Luther King Day

C. Strawberry Festival Parade Day

D. Memorial Day

E. Independence Day

F. Labor Day

G. Veteran’s Day

H. Thanksgiving Day

I. Day after Thanksgiving

J. Christmas Eve’s Day

K. Christmas Day

3.15. References

Any reference in this document to any specification, publication, or test method shall be construed as meaning the latest edition, revision, change, or modification of same.

3.16. Award of Projects

Project Quotes and Work Orders:

a. This annual bid is for rehabilitation of gravity sewer and storm water pipelines by CIPP lining for multiple project work orders at various locations throughout Plant City according to the requirements of the Bid Documents. The project work order locations may be anywhere within Plant City.

b. The City Project Manager will perform a preliminary estimate for each project utilizing the unit prices from the Vendors and provide a preliminary lowest vendor.

The first awarded lowest bid Vendor shall be given the opportunity to provide a Project Schedule for the Services and shall acknowledge the request within minimum of 72 hours. Should the first awarded lowest bid Vendor be unsuccessful or unable to provide the Services to the City within the City’s required timeframe, the City reserves the right to request the Services from the second awarded lowest bid Vendor and so on until a Vendor is able to provide the Services. The City Project Manager reserves the right to request pricing from multiple vendors simultaneously and may select the vendor

26-049UM-IFB P a g e | 1 8 based on the lowest price or the most advantageous schedule, whichever is in the best interest of the City.

c. The approved quote amount on any individual work order shall be the maximum compensation payable to the Vendor for that work order. The work order price may only be changed for altered quantities authorized by the City Project Manager. If the Vendor desires to make a claim for a change in quantity or schedule of an authorized work order, any such claim shall be submitted to the City Project Manager in writing within three (3) working days of the occurrence of the event giving rise to the claim.

Project Schedules:

a. Installation of CIPP shall be initiated, executed, and completed within the dates of the construction schedule submitted by the Vendor and approved by the City.

Out of Scope Work:

A. When preparing a preliminary estimate, if it is known or reasonably anticipated that there are necessary items of construction that are not included on the price sheets of the bid or, during the course of executing a work order, the City Project Manager determines that there are necessary items of construction that are not included on the price sheets of the bid, then the City Project Manager will request a cost proposal from the Vendor(s) for the “out of scope” work. The City shall not be obligated for payment over the amount identified in the proposal.

The “out of scope” services shall not be greater than fifteen-percent (15%) of the “in-scope” services.

3.17. Price Escalation

Company warrants that all prices stated in its bid shall remain firm for the term of twelve (12) months. Requests for price adjustments (increase or decrease) must be made in writing to the other party at least sixty (60) days prior to the twelve-month anniversary of this agreement. All requests for price adjustment(s) shall be supported by Employment Cost Index according to the

U.S. Bureau of Labor Statistics average for Civilian Workers Compensation 12-month, not seasonally adjusted current dollar for June of the most recent year. Total price adjustments shall not exceed five (5) percent annually. All requests for price adjustments are subject to review and approval by the other party.

4. Bid Submission

Pursuant to and in compliance with your Invitation to Bid, Instruction to Bidders and other documents related thereto, the undersigned does hereby propose to furnish all labor, materials, supervision, equipment, tools, transportation and supplies necessary for the As Needed Cured

In Place Pipe (CIPP) Lining Services, in accordance with all plans and specifications attached hereto. It shall be completed in accordance with the City of Plant City Standards, complete and ready to use; as required by and in strict accordance with the specifications and all addenda.

CIPP LINING SERVICES

26-049UM-IFB P a g e | 1 9

Line Item Description Quantity Unit of

Measure Unit Cost Total

1 Mobilization (<$50,000) 1 LS

2 Mobilization (>$50,000) 1 LS

3-A CCTV Sanitary pipe inspection -includes light cleaning 8”-10”

Diameter

20,000 LF

3-B CCTV Sanitary pipe inspection -includes light cleaning 12”-15”

Diameter

2,800 LF

3-C CCTV Sanitary pipe inspection -includes light cleaning 18”-24”

Diameter

3,300 LF

3-D CCTV Sanitary pipe inspection -includes light cleaning 27”-36”

Diameter

2,800 LF

3-E CCTV Sanitary pipe inspection -includes Heavy cleaning 8”-10”

Diameter

2,000 LF

3-F CCTV Sanitary pipe inspection -includes Heavy cleaning 12”-15”

Diameter

1,000 LF

3-G CCTV Sanitary pipe inspection -includes Heavy cleaning 18”-24”

Diameter

1,000 LF

3-H CCTV Sanitary pipe inspection -includes Heavy cleaning 27”-36”

Diameter

1,000 LF

4-A Furnish & Install 8" CIPP Lining (6 mm)

15,000 LF

4-B 8" CIPP Thickness Variance 1.5 mm

15,000 LF

5-A Furnish & Install 10" CIPP Lining (6 mm)

5,000 LF

26-049UM-IFB P a g e | 2 0

Line Item Description Quantity Unit of

Measure Unit Cost Total

5-B 10" CIPP Thickness Variance 1.5 mm

5,000 LF

6-A Furnish & Install 12" CIPP Lining (6 mm)

1,800 LF

6-B 12" CIPP Thickness Variance 1.5 mm

1,800 LF

7-A Furnish & Install 15" CIPP Lining

(7.5 mm)

1,000 LF

7-B 15" CIPP Thickness Variance 1.5 mm

1,000 LF

8-A Furnish & Install 18" CIPP Lining (9 mm)

1,200 LF

8-B 18" CIPP Thickness Variance 1.5 mm

1,200 LF

9-A Furnish & Install 21" CIPP Lining (9 mm)

600 LF

9-B 21" CIPP Thickness Variance 1.5 mm

600 LF

10-A Furnish & Install 24" CIPP Lining

(10.5 mm)

1,500 LF

10-B 24" CIPP Thickness Variance 1.5 mm

1,500 LF

11-A Furnish & Install 27" CIPP Lining

(10.5 mm)

600 LF

11-B 27" CIPP Thickness Variance 1.5 mm

600 LF

12-A Furnish & Install 30" CIPP Lining

(12 mm)

600 LF

12-B 30" CIPP Thickness Variance 1.5 mm

600 LF

26-049UM-IFB P a g e | 2 1

Line Item Description Quantity Unit of

Measure Unit Cost Total

13-A Furnish & Install 33" CIPP Lining

(15 mm)

600 LF

13-B 33" CIPP Thickness Variance 1.5 mm

600 LF

14-A Furnish & Install 36" CIPP Lining

(15 mm)

1,000 LF

14-B 36" CIPP Thickness Variance 1.5 mm

1,000 LF

15-A 4" Lateral Lining - Lateral Length up to and Including 20 LF

500 EA

15-B 4" Lateral Lining - Lateral Length

Over 20 LF

500 EA

16-A 6" Lateral Lining - Lateral Length up to and Including 20 LF

500 EA

16-B 6" Lateral Lining - Lateral Length

Over 20 LF

50 EA

17-A Cleanout Installation up to 5' depth 50 EA

17-B Additional 5' depth cleanout installation

20 CF

18 Lateral Reinstatements 100 EA

19-A POST CCTV Sanitary pipe inspection: 8”-10” Diameter

20,000 LF

19-B POST CCTV Sanitary pipe inspection: 12”-15” Diameter

2,800 LF

19-C POST CCTV Sanitary pipe inspection: 18”-24” Diameter

3,300 LF

19-D POST CCTV Sanitary pipe inspection: 27”-36” Diameter

2,800 LF

20 CCTV Sewer Lateral: 4" and 6" 5,000 LF

26-049UM-IFB P a g e | 2 2

Line Item Description Quantity Unit of

Measure Unit Cost Total

21 Remove Protruding Tap 20 EA

22 Plugs 10 ED

23 Bypass Pumper Truck4 100 HR

24 Vac-Truck 100 HR

25 Bypass pump (up to 400 GPM) 10 ED

26 Bypass pump (more than 400

GPM)

10 ED

27 Maintenance of Traffic (MOT) -

Flagmen (two crews in team)

10 ED

28 Maintenance of Traffic (MOT) -

Barrels

100 EA

29 Maintenance of Traffic (MOT) -

Cones

100 EA

30 Maintenance of Traffic (MOT) -

Signages

100 EA

31 Maintenance of Traffic (MOT) -

PCMS

10 ED

32 Maintenance of Traffic (MOT) -

Portable Light Towers

10 ED

33 Expedited Mobilization 5 LS

34 Chemical Grouting 50 Gal

35-A Pavement Restoration –SP 9.5

(FDOT Spec)

500 SF

35-B Sidewalk Restoration – Concrete

(6" Thick and 5' Wide)

500 SF

35-C Landscape Restoration – Sods 56 SY

26-049UM-IFB P a g e | 2 3

Line Item Description Quantity Unit of

Measure Unit Cost Total

35-D Landscape Restoration – Mulch 56 SY

TOTAL

UV CURING

Line Item Description Quantity Unit of

Measure Unit Cost Total No Bid

4-C Furnish & Install 8"

CIPP Lining (6 mm) -

UV Curing

15,000 LF

5-C Furnish & Install 10"

CIPP Lining (6 mm) -

UV Curing

5,000 LF

6-C Furnish & Install 12"

CIPP Lining (6 mm) -

UV Curing

1,800 LF

7-C Furnish & Install 15"

CIPP Lining (7.5 mm)

- UV Curing

1,000 LF

8-C Furnish & Install 18"

CIPP Lining (9 mm) -

UV Curing

1,200 LF

9-C Furnish & Install 21"

CIPP Lining (9 mm) -

UV Curing

600 LF

10-C Furnish & Install 24"

CIPP Lining (10.5

mm) - UV Curing

1,500 LF

11-C Furnish & Install 27"

CIPP Lining (10.5

mm) - UV Curing

600 LF

26-049UM-IFB P a g e | 2 4

Line Item Description Quantity Unit of

Measure Unit Cost Total No Bid

12-C Furnish & Install 30"

CIPP Lining (12 mm)

- UV Curing

600 LF

13-C Furnish & Install 33"

CIPP Lining (15 mm)

- UV Curing

600 LF

14-C Furnish & Install 36"

CIPP Lining (15 mm)

- UV Curing

1,000 LF

TOTAL

5. Vendor Questionnaire

5.1. Evidence that the bidder is qualified to transact business in the State of Florida.*

Vendors shall include most recent Sunbiz document.

*Response required

5.2. W-9*

Please upload your W-9.

*Response required

5.3. Conflict of Interest Disclosure*

For purposes of determining any possible conflict of interest, all bidders/proposers must disclose if any Plant City Commissioner(s), employee(s), is also an owner, corporate officer, agency, employee, etc., of their business.

Indicate either “yes” (a City employee, an elected official is also associated with your business), or “no”. If yes, give person(s) name(s) and position(s) with your business.

☐ Yes

☐ No

*Response required

When equals "Yes"

5.3.1. Conflict of Interest "Yes" Response*

Please enter the following information:

Name(s):

26-049UM-IFB P a g e | 2 5

Position(s):

Firm Name:

Title:

Address:

Telephone No.:

E-Mail Address:

*Response required

5.4. No Contact Clause*

The City of Plant City has established a solicitation silence policy (No Contact Clause) that prohibits oral and written communication regarding all formal solicitations for goods and services (formal bids, Request for Proposals, Requests for Qualifications) issued by the City through the City Procurement Division.

The period commences when the procurement document is received and terminates when the

City Commissioners, City Manager, or their designee, approves an award.

When the solicitation silence period is in effect, no oral or written communication is allowed regarding the solicitation between prospective bidders/proposers and members of the City

Commissioners, the City Manager, City employees or members of the Approved Review

Committee. All questions or requests for information regarding the solicitation must be directed to the designated Procurement Representative listed in the solicitation.

Any information thought to affect the committee or staff recommendation submitted after bids are due, should be directed to the Procurement Manager or his appointed representative. It shall be the Procurement Manager’s decision whether to consider this information in the decision process.

Any attempt by a vendor/proposer to influence a member or members of the aforementioned shall be grounds to disqualify the proposer from consideration during the selection process.

All proposers must agree to comply with this policy by signing the following statement and including it with their submittal.

Hereby agree to abide by the City’s “No Contact Clause” and understand the violation of this policy shall result in disqualification of my proposal/submittal.

☐ Please confirm

*Response required

5.5. Drug-Free Workplace*

The undersigned vendor per Florida Statute 287.087 hereby certifies that the vendor does:

A. Publish a statement notifying employees that the unlawful manufacture, distribution, dispensing, possession or use of a controlled substance is prohibited in the workplace

26-049UM-IFB P a g e | 2 6 and specifying the actions that will be taken against employees for violations of such prohibition.

B. Inform employees about the dangers of drug abuse in the workplace, the business’s policy of maintaining a drug-free workplace, any available drug counseling, rehabilitation programs, employee assistance programs and the penalties that may be imposed upon employees for drug abuse violations.

C. Give each employee engaged in providing the commodities or contractual services that are under quote a copy of the statement specified in subsection (1).

D. In the statement specified in subsection (1), notify the employees that, as a condition of working on the commodities or contractual services that are under quote, the employee will abide by the terms of the statement and will notify the employer of any conviction of, a plea of guilty or nolo contendre to, any violation of Chapter 1893 or of any controlled substance law of the United States or any state, for a violation occurring in the workplace no later than five (5) days after such conviction.

E. Impose a sanction on or require the satisfactory participation in a drug abuse assistance or rehabilitation program, if such is available in the employee’s community, by any employee who is so convicted.

F. Make a good faith effort to continue to maintain a drug-free workplace through the implementation of this section.

As the person authorized to sign the…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .