CollectionSystemMap.pdf
PDF 1 MB Posted
- Solicitation number
- 26-049UM-IFB
- Issued by
- Hillsborough County, Florida
About this file
This is a collection system map document prepared by the City of Plant City, Florida, supporting an as-needed annual contract for cured-in-place pipe (CIPP) lining services for wastewater infrastructure rehabilitation. The map illustrates the geographic layout and extent of the City's wastewater collection system, which comprises approximately 160 miles of gravity sewer mains ranging from 8 inches to 36 inches in diameter, along with 4-inch and 6-inch sewer laterals distributed throughout the service area. The contract scope encompasses CIPP lining work, point repairs, reinstatement of service laterals, and associated preparatory and restoration activities across this extensive network. Proposals are due September 24, 2026, and the City intends to establish multiple contractors under this as-needed vehicle to support long-term asset management and regulatory compliance objectives under Rule 62-600.705(2), F.A.C.
The map serves as a planning and reference document for prospective bidders to understand the geographic distribution and scale of the wastewater collection system subject to rehabilitation work. No specific estimated contract value, contract term length beyond the annual designation, set-aside programs, evaluation criteria weighting, incumbent contractor information, or pre-bid meeting dates are identified within this file. The work is designed to prioritize minimization of inflow and infiltration while maintaining the integrity and performance of aging infrastructure across Plant City's service territory.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .