Architectural and Engineering Services for MacFarlane Greenhouse - Growth Chamber Expansion
Closed State & local contract opportunity Posted
- Solicitation number
- 2120271004
- State
- New Hampshire
- Responses due
Opportunity facts
Updated .
About this opportunity
USNH, representing UNH Facilities Project Management, is soliciting statements of qualifications for architectural and engineering design services for the MacFarlane Greenhouse Growth Chamber Expansion in Durham, New Hampshire, with qualifications due November 13, 2026 at 12:00 p.m. EST under Solicitation 2120271004. This is a quality-based selection, and fee submissions are evaluated only after the selection decision and are subject to review and negotiation. Minority and women-owned firms and enterprises are encouraged to participate. Pricing under any resulting agreement is expected to be available to all four USNH institutions and to NHCUC member institutions, where applicable.
The A/E scope runs from Schematic Design through Construction Documents and Construction Administration. The project demolishes most existing greenhouses, retains the newest structure, adds a 3,400-square-foot greenhouse on the east side, builds a head-end structure to the south, and provides unconditioned storage sheds. Required work includes MEP/FP modernization with BAS integration, electrical distribution upgrades, plumbing replacements, site improvements, hazardous materials coordination, and compliance with New Hampshire State Building Codes and State Fire Marshal requirements. Delivery is Construction Manager at Risk, with the CM engaging at the end of Schematic Design. The A/E team must provide cost estimating through Schematic Design and maintain design-to-budget discipline under a modified ConsensusDocs 240 agreement. Services are scheduled to begin January 2027 and conclude by October 2027.
The anticipated construction budget is $9.0 million, with $3.0 million (30%) funded federally as a 1:1 grant match and $6.0 million (70%) from non-federal sources. Basic Services fees are stipulated by phase: Schematic Design 20%, Design Development 25%, Construction Documents 25%, Construction Phase 25%, and Final Completion and Warranty Period Support 5%. Additional Services are compensated separately on a lump-sum basis.
Submissions must include a cover letter, business information, completed Statement of Qualifications forms, three to five project data forms with images, key personnel identification, firm capacity information, and a surety letter stating total bonding capacity, current liability, and available capacity. The package is a single PDF not exceeding 50 MB. Firms must acknowledge debarment status, accept USNH terms, and comply with USNH insurance requirements, including $1.0 million per claim and $2.0 million aggregate professional liability for this project size. Evaluation emphasizes team qualifications, comparable project experience, design-to-budget performance, agricultural research facility experience, and cost management, among other criteria. No weighting is stated.
Shortlisted firms are notified by November 20, 2026, and an informational meeting is held November 24, 2026 at 9:00 a.m. at the MacFarlane Research Greenhouse, 13 Botanical Lane, Durham. Written questions are due December 7, 2026 at 12:00 p.m., with responses by December 14, 2026. Formal proposals are due January 8, 2027 at 12:00 p.m., followed by interviews and oral presentations on January 21, 2027, and award is expected the week of January 25, 2027. Responses are submitted through UShopNH, and the primary contact is Karen Sayers at Karen.Sayers@usnh.edu.
Opportunity text
USNH, representing UNH Facilities Project Management, is requesting proposals for Design Services for MacFarlane Greenhouse - Growth Chamber Expansion.