Appendix A - Project Data Form.pdf
PDF 149 KB Posted
- Attached to
- Architectural and Engineering Services for MacFarlane Greenhouse - Growth Chamber Expansion
- Solicitation number
- 2120271004
- Issued by
- New Hampshire
About this file
Appendix A - Project Data Form is a standardized submission document used by firms responding to state and local contract opportunities, in this case for architectural and engineering design services for the MacFarlane Greenhouse - Growth Chamber Expansion project at the University of New Hampshire (UNH) Facilities Project Management in New Hampshire. The form requires firms to submit a minimum of three but no more than five representative projects that demonstrate relevant experience and capability. For each project, firms must identify the project delivery method (Design/Build, Construction Management, or Design/Bid/Build), facility type, and whether the work involved new construction or renovation. The form requests comprehensive project information including the project name and address, owner contact details, key firm members and their roles, a detailed project description emphasizing similarities to the proposed MacFarlane Greenhouse expansion, and project components such as gross square footage and the percentage of new construction.
The form additionally requires documentation of major subconsultants with key personnel and their assigned roles, prime contractor information, and detailed construction cost data including original contract amounts, change orders, and final contract amounts with explanations if change orders exceed five percent of the original amount. The submission must include the complete project schedule for both design and construction phases, specifying dates for schematic design completion, design development, construction documents, notice to proceed, and substantial completion, with explanations required if substantial completion varies more than three weeks from the contracted completion date. Firms must provide representative project photographs and any additional supporting documentation to substantiate their qualifications and experience relevant to the MacFarlane Greenhouse expansion project.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
APPENDIX A - PROJECT DATA FORM
(Complete and submit this form for a minimum of 3 but no more than 5 representative projects)
FIRM: _________________________________________________________________________________
Project Delivery Method: Design/Build; Construction Management; Design/Bid/Build
Facility Type: ____________________________________________________________________________
New or Renovation: ________________________________________________________________________
Project Name: ________________________________________________________________________
Project Address: ________________________________________________________________________
Owner’s Name: ________________________________________________________________________
Owner’s Address: ________________________________________________________________________
Owner’s Contact: ___________________________________ Phone Number: ________________________
Owner’s Email: _____________________________________
Firm’s Key Members Who Worked on this Project
Name Role in Project Role for Proposed Project
1. Project Description: (please emphasize similarities to proposed project):
2. Project Components.
Gross SF ___________ % of project that was new construction_______
Describe extent of site work and site utilities included in construction cost below
3. Major Subconsultants with their Key Individuals and Roles:
Firm Key Individual Role in Project Role in Proposed Project, if any
4. Prime Contractor: ________________________________________________________________________
Address: _______________________________________________________________________________
Contact Name: ______________________________ Phone Number: _____________________
5. Construction Costs:
Original Contract Amount: $____________________
Change Order Total: $____________________
Final Contract Amount: $____________________
If Change Order Total exceeds 5% of the Original Contract Amount, please explain:
6. Project Schedule:
DESIGN CONSTRUCTION
Original Hire Date Original Hire Date
Schematic Design Completed (date)
Notice to Proceed Date
Design Development Completed (date)
Contracted Completion Date
Construction Documents Completed (date)
Date of Substantial Completion (final payment)
If Date of Substantial Completion varies more than three weeks from the Contracted Completion Date, please explain:
7. Additional Comments/Information: In addition to filling out this form completely, please feel free to attach other project information hereto.
8. Photographs: Please attach representative photographs of project.
| FIRM: |
| DesignBuild: Off |
| Construction Management: Off |
| DesignBidBuild: Off |
| Facility Type: |
| New or Renovation: |
| Project Name: |
| Project Address 1: |
| Project Address 2: |
| Owners Name: |
| Owners Address 1: |
| Owners Address 2: |
| Owners Contact: |
| Phone Number: |
| Owners Email: |
| NameRow1: |
| Role in ProjectRow1: |
| Role for Proposed ProjectRow1: |
| NameRow2: |
| Role in ProjectRow2: |
| Role for Proposed ProjectRow2: |
| NameRow3: |
| Role in ProjectRow3: |
| Role for Proposed ProjectRow3: |
| NameRow4: |
| Role in ProjectRow4: |
| Role for Proposed ProjectRow4: |
| NameRow5: |
| Role in ProjectRow5: |
| Role for Proposed ProjectRow5: |
| Project Description please emphasize similarities to proposed project 1: |
| Project Description please emphasize similarities to proposed project 2: |
| Project Description please emphasize similarities to proposed project 3: |
| Project Description please emphasize similarities to proposed project 4: |
| Project Description please emphasize similarities to proposed project 5: |
| Project Description please emphasize similarities to proposed project 6: |
| Project Description please emphasize similarities to proposed project 7: |
| Project Description please emphasize similarities to proposed project 8: |
| 1: |
| 2: |
| 3: |
| 4: |
| 5: |
| Gross SF: |
| of project that was new construction: |
| Describe extent of site work and site utilities included in construction cost below 1: |
| Describe extent of site work and site utilities included in construction cost below 2: |
| Describe extent of site work and site utilities included in construction cost below 3: |
| FirmRow1: |
| Key IndividualRow1: |
| Role in ProjectRow1_2: |
| Role in Proposed Project if anyRow1: |
| FirmRow2: |
| Key IndividualRow2: |
| Role in ProjectRow2_2: |
| Role in Proposed Project if anyRow2: |
| FirmRow3: |
| Key IndividualRow3: |
| Role in ProjectRow3_2: |
| Role in Proposed Project if anyRow3: |
| FirmRow4: |
| Key IndividualRow4: |
| Role in ProjectRow4_2: |
| Role in Proposed Project if anyRow4: |
| Prime Contractor: |
| Address: |
| Contact Name: |
| Phone Number_2: |
| undefined: |
| undefined_2: |
| undefined_3: |
| If Change Order Total exceeds 5 of the Original Contract Amount please explain 1: |
| If Change Order Total exceeds 5 of the Original Contract Amount please explain 2: |
| If Change Order Total exceeds 5 of the Original Contract Amount please explain 3: |
| If Change Order Total exceeds 5 of the Original Contract Amount please explain 4: |
| Original Hire Date: |
| Original Hire Date_2: |
| Schematic Design Completed date: |
| Notice to Proceed Date: |
| Design Development Completed date: |
| Contracted Completion Date: |
| Construction Documents Completed date: |
| Date of Substantial Completion final payment: |
| explain 1: |
| explain 2: |
| explain 3: |
File details come from the government source that posted it. Updated .