AMP 111 Wyatt F. Jeltz Senior Center Hydronics Replacement

Closed State & local contract opportunity Posted

Solicitation number
IFB2026-004
State
Oklahoma
Responses due

Opportunity facts

Points of contact

Opportunity details come from constructionbidsource.com. Updated .

About this opportunity

The Oklahoma City Housing Authority is requesting bids on hydronics replacement at the Wyatt F. Jeltz Senior Center under a lump-sum construction contract, with bids due September 3, 2026. The project is subject to the Build America, Buy America Act, requiring all iron, steel, manufactured products, and construction materials to be produced in the United States, with iron and steel melted and poured domestically and manufactured products containing at least 55 percent domestic content — a mandatory compliance filter.

The scope consists of removing ceilings in corridors and common areas, partially removing drywall ceilings in individual living units, installing a new hydronics loop, connecting individual branch lines, and installing replacement ceilings. The facility is located at 1225 N. Kate Ave, Oklahoma City, Oklahoma 73117. Construction is limited to 8 a.m. to 5 p.m., excluding weekends and holidays, to allow normal building operations to continue throughout the project period.

Two alternates are specified for asbestos abatement: one for abatement and/or encapsulation of asbestos-containing material in existing piping insulation and another for abatement of asbestos-containing material in existing ceiling texture and drywall compound. Bidders must submit BABA Compliance Certification with their bids along with manufacturer certifications and step certifications for iron and steel products. Failure to comply may result in bid disqualification, contract termination, and financial penalties. The successful bidder must execute the contract and provide all required bonds and insurance certificates within ten calendar days of notice of award. Contract questions must be submitted in writing to the architect no later than seven calendar days prior to the bid due date, with responses issued via addendum to all registered plan holders. The project is funded through federal infrastructure programs subject to HUD requirements and forms.

Opportunity text

The project consists of replacing hydronic supply and return piping in one (1) building. The scope shall consist of removing ceilings in the corridor and common area, partially removing drywall ceilings in individual living units, installing the new hydronics loop, connecting individual branch lines and installing replacement ceilings, using the scope outlined within the Contract Documents