AM26-91 Stream Crossing Restoration – Peoa, UT

Closed State & local contract opportunity Posted

Solicitation number
AM26-91
State
Utah
Responses due

Opportunity facts

Opportunity details come from utah.bonfirehub.com. Updated .

About this opportunity

The State of Utah Division of Purchasing, conducting on behalf of the Division of Wildlife Resources, is requesting bids for stream crossing restoration work in Peoa under IFB AM26-91, with bids due June 12, 2026 and a mandatory site visit on June 8 at 11 a.m. Award will be made to the lowest cost responsive and responsible vendor.

The scope encompasses excavation and subgrade preparation of approximately 328 square feet in a spring-fed channel; installation of six GEOWEB GW30V geocell panels (4-inch cell depth, 8 feet by 29 feet each); placement of 7.6 to 9.1 tons of 1.5 to 4-inch minus gravel and 12 tons of 4 to 6-inch coarse aggregate; and final grading to blend with adjacent topography. All work must comply with federal, state, and local regulations governing waters of the state and must implement sediment and erosion control best management practices to protect the spring channel and Sage Creek. The contractor is solely responsible for verifying site dimensions and calculating final material quantities to ensure sufficiency for project completion.

Vendors must demonstrate a minimum of five years' experience performing similar restoration work in Utah; own or obtain all equipment necessary for excavation, compaction, material placement, and geocell installation suitable for riparian conditions; possess data logging GPS capability; and maintain current insurance in Utah. Upon mobilization, the contractor and equipment must remain on-site and dedicated to the project during normal working hours until all work is 100 percent complete, with no equipment removal or job hopping permitted before completion.

The contract duration runs from June 11 through June 30, 2026, with all work and invoicing required to be completed by June 30. Vendors must guarantee pricing for the entire project duration. Contractors must maintain workers' compensation and commercial general liability insurance with minimum limits of $1,000,000 per occurrence and $3,000,000 aggregate, register with E-Verify, and comply with Utah Code anti-boycott provisions and restrictions on forced labor and foreign entities.

Opportunity text

Issuing Procurement Unit: State of Utah Division of Purchasing Conducting Procurement Unit: Division of Wildlife Resources The purpose of this IFB is to enter into a contract to provide: Restoration work on a low-water stream crossing. Mandatory Site Visit: on Monday, June 8th at 11 am. It is anticipated that this IFB will result in a single contract award to the lowest cost responsive and responsible vendor. The methodology or formula that will be used to determine the number of contract awards is: Lowest Cost. Length of Contract: Duration of the Project. Vendor must guarantee its pricing for the duration of the project.

Files

File Type Posted
3-Attachment B- Scope of Work.docx DOCX document
1-Vendor Prerequisites - IFB Agency.pdf PDF
2-Attachment A-PO Terms and Conditions.docx DOCX document

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity