Advertisement for emergency generator improvements 2026
Closed State & local contract opportunity Posted
- Solicitation number
- PE-66166-NONST-2027-000000047
- State
- Georgia
- Responses due
Opportunity facts
- Jurisdiction
- NIGP codes
- 28539 Generators, Stationary Type (Not Automotive)
- 69040 Engines, Motors And Parts (Power Generation)
- 69054 Monitors And Alarms, Power Generator
- 93625 Electrical Equipment (Except Cable And Wires, And Lighting Fixtures) Maintenance And Repair
- 93639 Generators, Portable And Stationary, Including Parts And Accessories Maintenance And Repair
- Point of contact
-
- Brenda Strickland brendas@bainbridgecity.com (229) 248-2000
Opportunity details come from ssl.doas.state.ga.us. Updated .
About this opportunity
The City of Bainbridge, Georgia is soliciting bids for the installation of emergency generators at 49 locations under the Emergency Generator Improvements 2026 solicitation, with bids due November 10, 2026 at 10:00 a.m. Bidders must download all addenda from QuestCDN and confirm receipt with the project engineer, Carter & Sloope, Inc., no later than 48 hours before the bid deadline.
Addendum No. 1 supersedes the posted scope of 40 fixed generators, 10 portable-generator hookups, and 5 portable generators. The corrected scope is 39 fixed generators, 7 portable-generator hookups, and 3 portable generators, each with a concrete pad. Work includes transfer switches, conduit, wiring, and all appurtenances. Generators range from 15 kW to 200 kW at 120/240 volts, 208/120 volts, or 480/277 volts, and transfer switches range from 125 to 400 amperes. All units run on diesel. All switches must be installed with enclosures per Section 16231 of the Technical Specifications. Addendum No. 1 also removes the Utility Contractor's license requirement and revises Exhibit B to list transfer switch sizes at each location.
Work must reach completion within 365 consecutive calendar days, and the work location is throughout Bainbridge, Georgia.
Opportunity text
SCOPE OF WORK - WORK TO BE DONE SHALL CONSIST OF FURNISHING ALL PRODUCTS AND PERFORMING ALL LABOR FOR THE INSTALLATION OF 40 FIXED GENERATORS, 10 HOOKUPS FOR PORTABLE GENERATORS, AND 5 PORTABLE GENERATORS WITH CONCRETE PADS, TRANSFER SWITCHES, CONDUIT, WIRING, AND ALL OTHER APPURTENANCES NECESSARY FOR COMPLETE INSTALLATION IN ACCORDANCE WITH THE PLAN AND SPECIFICATIONS. TIME ALLOTTED FOR COMPLETION OF WORK: 365 CONSECUTIVE CALENDAR DAYS.
Files
| File | Type | Posted |
|---|---|---|
| Addendum No_ 1 _ Emergency Generators.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity