751/20089. JBB Stateline Grade Extension Culvert & Bridge
Cancelled State & local contract opportunity Posted
- Solicitation number
- RFQ 171 200000000248 4
- State
- Michigan
- Responses due
Opportunity facts
- Jurisdictions
- UNSPSC codes
- 72121004 Paper or pulp mill construction and remodeling service
- 72121501 Chemical plant construction service
- 95122402 Cold storage installation
- 95122400 Industrial buildings and structures
- 72121005 Pharmaceutical manufacturing plant construction and remodeling service
- 95122401 Workshop
- 95121600 Transport buildings and structures
- 72121002 Food product manufacturing or packing plant construction and remodeling service
- 72121007 Truck and automobile assembly plant constructionand remodeling service
- 72121008 Warehouse construction and remodeling service
Show all 19
- 72121000 New industrial building and warehouse construction services
- 72121500 Industrial plant construction services
- 72121001 Dry cleaning plant construction and remodeling service
- 72121003 Grain elevator construction and remodeling service
- 72121401 Bank building construction service
- 72121502 Mine loading and discharging station construction service
- 72121507 Tank construction and servicing
- 72121508 Preparation plant construction service
- 95122403 Warehouse store
Updated .
About this opportunity
The Michigan Department of Technology, Management and Budget (DTMB), in cooperation with the Department of Natural Resources, procured construction services for the Korpela to Wakefield Stateline Grade Extension Culvert & Bridge Replacement project located in Gogebic County along the Stateline Rail Trail extension between Marenisco and Wakefield. The project involved the installation and replacement of three structures across three distinct sites: an 8-foot-wide by 6-foot-tall by 24-foot-long precast concrete box culvert with wingwalls near Koskela Road; an 8-foot-wide by 5-foot-tall by 24-foot-long precast concrete box culvert with wingwalls near Pikka Road; and a 45-foot-long precast concrete bridge with a 15-foot clear width over McVichie Creek on geosynthetically reinforced soil (GRS) or L-wall abutments. Incidental work included soil erosion and sedimentation control measures, demolition, clearing, excavation, grading, riprap installation, railing installation, and trail surface restoration. The project required contractors to be responsible and responsive, evaluated on best value criteria including price and qualitative factors such as technical approach, personnel quality, and management plans, with compliance mandated for prevailing wage rates, Michigan Right-to-Know Law, nondiscrimination requirements, and environmental regulations. A mandatory prebid phone conference was originally scheduled for April 9, 2020, at 10:00 a.m. EST; electronic bids were initially due April 22, 2020, at 2:00 p.m., but this deadline was extended to July 2, 2020, due to COVID-19, with a subsequent addendum issued June 17, 2020, canceling the project entirely. Substantial completion was required by October 30, 2020, with final completion by December 4, 2020, and bidders were required to submit a five percent bid security, performance bond, and payment bond for all bids exceeding $50,000.
Qualified Disabled Veteran (QDV) businesses received a ten percent preference in bid evaluation if they met contract requirements. All bidders with contract values exceeding $100,000 were required to certify Michigan-based business status. No incumbent vendors or current contractors were identified in the procurement documents, and the project involved designing and constructing new infrastructure with no requirement for integration with existing systems. Liquidated damages of $150 per calendar day applied for delays beyond substantial completion and $100 per day for delays beyond final completion, with a $15,000 contingency allowance included for unforeseen conditions. Mobilization costs were capped at four percent of the base bid and closeout costs at six percent. The project was funded through State of Michigan appropriations; however, the procurement was canceled due to COVID-19, making the project no longer available for bidding as of the June 17, 2020 addendum.
Opportunity text
751/20089.JBB Stateline Grade Extension Culvert & Bridge
Files
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity