472/19527. SMD; Bellamy Creek CF - ADA Egress Ramps

Closed State & local contract opportunity Posted

Solicitation number
RFQ 171 260000000310 2
State
Michigan
Responses due

Opportunity facts

Jurisdiction
UNSPSC codes
Show all 19

Updated .

About this opportunity

The Michigan Department of Technology, Management and Budget is soliciting bids for ADA egress ramps and housing unit improvements at Bellamy Creek Correctional Facility in Ionia under contract 472/19527.SMD, with bids due June 10, 2026. A Service Disabled Veteran Owned Business (SDVOB) preference of 10% applies to eligible bidders who submit required documentation including DD214, proof of service-connected disability, and proof of business ownership (51 percent or more owned by one or more veterans with a service-connected disability).

The scope encompasses ADA-compliant egress ramps, cell modifications in Housing Unit 2 (including alterations to cells 132–135), and shower room renovations within approximately 12,092 square feet of the 18,018-square-foot facility. Work includes concrete ramp installation with slopes between 7.5% and 8%, stainless steel fixtures, grab bars, mirrors, guardrails, handrails, shower room trench drains, waterproofing, and mechanical systems. Materials include resinous flooring (Stonhard product specification with value-engineering allowance for equivalent epoxy products) and Norix Group Ironman Detention Furnishings ADA shower seats. The project must comply with Michigan Rehabilitation Code for Existing Buildings 2021, Michigan Mechanical Code 2021, Michigan Plumbing Code 2021, and NFPA 101-2012 Life Safety Code for Level 2 alterations.

Contractors must satisfy prevailing wage requirements applicable to public works projects in Michigan, provide proof of insurance and bonding capacity, and comply with criminal background screening via LEIN (Michigan Law Enforcement Information Network) as a mandatory prerequisite for facility access. Standard working hours are Monday through Friday, 7 a.m. to 3:30 p.m., with one facility escort available during construction and a second available by special arrangement with 48 hours' notice. The contractor assumes responsibility for demolition, permits, inspections, and one-year warranty. Addendum No. 1 was issued June 4, 2026; acknowledgement of this addendum is required in bid submission. The project professional is Straub Pettitt Mann Architecture with project director Scott DeKorte.

Opportunity text

472/19527.SMD; Bellamy Creek CF - ADA Egress Ramps

Files

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for State & Local Contractors