This is Construction Bid Addendum No. 1 issued by the Michigan Department of Technology, Management and Budget (DTMB), State Facilities Administration Design and Construction Division for the Bellamy Creek Correctional Facility Housing Unit 2 ADA Ramps and Improvements project. The addendum, issued June 4, 2026, with a bid opening date of June 10, 2026, provides clarifications and modifications to the original bidding documents. Key modifications include alterations to cells 132, 133, 134, and 135; clarification that stainless steel desk dimensions are 30" x 18"; extended epoxy flooring in front of ramps and adjacent to showers with added stainless steel gates; replacement of epoxy flooring specifications with resinous flooring (Stonhard product) for shower rooms and ramps; addition of a Class A flammability-rated plastic dust barrier under existing stairs; and deletion of work related to exhaust fan replacement. The project professional is Straub Pettitt Mann Architecture with project director Scott DeKorte. Reissued drawing sheets include A1, A2, and A5, with detailed specifications for cell modifications, shower room renovations, and ramp improvements throughout the Lower B-Wing corridor.
The addendum addresses eight items with specific clarifications regarding materials, fixtures, and construction logistics. The Owner will furnish combi toilet-sink units and reusable shower heads and controls from existing demolished showers, with removed toilets and sinks to be turned over to the Facility. The project specifications include a Folding Shower Seat (Norix Group Ironman Detention Furnishings ADA shower seat) and require ADA compliance throughout. Contractors may value engineer equal epoxy products to the specified Stonhard standard. The Facility will maintain one available escort during construction with a second available only by special arrangement with 48 hours' notice. Standard working hours are Monday through Friday, 7 a.m. to 3:30 p.m., though the Facility demonstrates flexibility. The Facility is working to maintain a vacant Lower B-Wing during construction to minimize operational disruption. Acknowledgement of this addendum is required in the bid submission; failure to acknowledge may result in bid rejection.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Drawings 19527.pdf | ||
| Specifications 19527.pdf | ||
| LEIN Request 19527.pdf | ||
| Advertisement 19527.pdf | ||
| 472_19527_SMD Addendum_1 Photos.pdf | ||
| Service Disabled Veteran Owned Business Info Sheet 2025.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DTMB-0414 (Rev 6/16)
DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET
State Facilities Administration Design and Construction Division
CONSTRUCTION BID ADDENDUM NO. 1
This form identifies an Addendum to Bidding Documents, and incorporates interpretations or clarifications, modifications, acceptance of proposed “or equal” materials, and other information into the Bidding Documents.
Addenda will be numbered by the Professional and distributed through www.michigan.gov/SIGMAVSS as an attachment.
TO:
ALL BIDDERS
DATE ISSUED
June 4, 2026
PROJECT NAME
Bellamy Creek Correctional Facility – Housing Unit 2 ADA ramps and improvements
FILE NUMBER
472/19527.SMD
PROFESSIONAL
Straub Pettitt Mann Architecture Richard Mann
PROJECT DIRECTOR
Scott DeKorte
BID OPENING DATE:
June 10, 2026
ADDENDUM ITEMS:
Reissued are sheets A1, A2, and A5
Item 1:
Refer to reissued sheet A1. Alteration will be made to cell numbers: 132, 133, 134 and 135.
Item 2:
Refer to reissued sheet A2. Clarified dimensions on cell stainless steel desk to be 30” x 18”.
It
Item 3:
Refer to reissued sheet A5. Extended epoxy flooring in front of the ramps and adjacent to the showers, to be the width of ramp and to extend past the existing drinking fountain.
Added stainless steel gates to the new showers. Added details 6/A5 and 7/A5 of new stainless-steel gates.
Shower walls to receive a spray-on waterproofing base coat compatible with the top epoxy high-performance coating. Extend high-performance coating on existing walls in shower room, including existing shower.
Shower floor to receive a resinous flooring over new compatible mud bed. Extend resinous flooring to trench drains, across room to janitor closet and into existing shower, then out into the Wing corridor.
Labeled grab bars, shower seat, shower heads and shower controls. Eliminated soap dish, shower curtains and track.
Item 4:
Refer to sheets A3 and A4 (not reissued). Add a Class A flammability rated plastic sheet on the underside of the existing stair to the upper level for a dust barrier.
The notes that mention epoxy flooring shall be changed to resinous flooring.
Item 5:
Refer to Sheet MP2 (not reissued):
Delete all work related to replacing the existing exhaust fan. The exhaust fan was replaced a few years ago and meets current MDOC standards.
The shower heads, shower controls, combi toilet-sink units will be furnished by the Owner for this project.
http://www.michigan.gov/SIGMAVSS
Item 6:
Clarifications:
1. Reuse the existing shower control buttons and shower heads from the existing demolished showers. The Facility has a spare set so that both new showers will have a high and low shower head.
2. Turn over removed toilets and sinks to the Facility.
3. The Owner will furnish the combi toilet-sink units. The Owner is ordering them now in an effort to not delay the construction by waiting on the units to be ordered by the Contractor after contract award.
4. The Facility is working to have the entire Lower B-Wing vacant of inmates during the time of construction.
5. One escort will be made available during the project. A second escort may be made available only through special arrangement with the Facility at least 48 hours in advance and only for a day or two at a time.
6. The Facility is flexible with working hours; however, generally they are used to Monday through Friday 7 am to 3:30 pm.
Item 7:
Specifications Section 102813.63 Detention Toilet Accessories:
Add Folding Shower Seat: Norix Group Ironman Detention Furnishings ADA shower seat. Shower seat shall be recess mounted, stainless steel with ADA compliant “L” shaped seat. Compliant with ADA 4.21.3 and 4.26.3, and ANSI 610.3.2 and 610.4.
Item 8:
Questions:
o Please clarify the dimensions for the desk. See addendum item 2.
o Drawing sheet A5 shows CMU with waterproofing with nothing else on the walls. The drawing also shows Stonhard overlayment on the floor at the shower drain. See addendum item 3.
o Lighting in noted on the architectural drawing. There are no electrical plans. Will we be using the same circuit and wiring that the existing lighting is connected to? Yes. The new fixtures are a one-for-one replacement/upgrade.
o The drawings call for an epoxy floor coating at the new ramp, the specs for the resinous flooring only call fro Stonhard which was assumed to only be used at the shower rooms. Will the Stonhard flooring be used at the ramp or will a different epoxy/resinous product be used at the ramp? The intent is to continue the resinous flooring from the shower room out into the corridor space and up the ramp. Also see addendum item 4.
o The drawings are shower a mud bed running to the French drains and no finish over this such as epoxy, tile, etc. Having a mudbed only will not create and finish look and is meant as an underlayment, will you please advise if that is what you are looking for or if a flooring product will need to go over the mud bed? The resinous flooring will extend to the edge of the trench drain. See revisions made to sheet A5 in addendum item 3.
o Can we value engineer an equal epoxy product to the Stonhard product? Yes, the specifications use Stonhard as the “Standard of Design.”
Attached herewith are the Pre-Bid Attendance sign-in sheet and the drawing sheets A1, A2 and A5.
Photos are included under a separate file.
s
ACKNOWLEDGEMENT: This Addendum must be acknowledged by the Bidder in the space provided in the Bid Summary and Bid Form. Failing to acknowledge Addenda may be cause for the Bid to be rejected. Addenda will become part of the Contract Documents.
PROFESSIONAL: DATE
Richard Mann, Straub Pettitt Mann Architecture June 4, 2026
APPROVED BY:
Scott DeKorte DATE June 4, 2026
A2
A5
A3
UP
INMATE
ALTERNATE 1
INMATE
INMATE
INMATE
INMATE
INMATE
INMATE
INMATE
INMATE
INMATE
INMATE
INMATE
INMATE
INMATE
INMATE
INMATE
INMATE
INMATE
INMATE
INMATE
INMATE
INMATE
INMATE
INMATE
INMATE
INMATE
INMATE
INMATE
INMATE
INMATE
INMATE
INMATE
INMATE
INMATE
INMATE
INMATE
INMATE
INMATE
INMATE
INMATE
INMATE
INMATE
INMATE
INMATE
INMATE
INMATE
INMATE
KITCHENETTE KITCHENETTE
STORAGE GAMEROOM
CORRIDOR
CORRIDOR
CONTROL
LEVEL
CONTROL
LEVEL
INMATE
LIBRARY
DAY
ROOM
CORRIDOR
OFFICE OFFICE OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
MECHANICAL
DAYROOM
CORRIDOR
ELECTRICAL
COSTIC
RM
INMATE
ALTERNATE 1
INMATE
ALTERNATE 1
INMATE
ALTERNATE 1
INMATE
INMATE
INMATE
INMATE
INMATE
INMATE
INMATE
INMATE
INMATE
INMATE
UP
RA
M P
B. W
IN
G C
ORR
ID
OR A. W
ING CORRIDOR
OBSERVATION
EXITEX
IT
EXISTING RECREATION COURTYARD
TO REMAIN
FL
OOR
IN
FIL
L
CODE COMPLIANCE:
MICHIGAN REHABILITATION CODE FOR EXISTING BUILDINGS 2021
MICHIGAN MECHANICAL CODE 2021
MICHIGAN PLUMBING CODE 2021
NATIONAL ELECTRIC CODE 2023
LIFE SAFETY CODE: NFPA 101-2012
ALTERATION LEVEL 2
USE GROUP:
1-3 CONDITION IV
EXISTING DETENTION AND CORRECTIONAL
CONSTRUCTION TYPE:
2B
II (0,0,0)
NUMBER OF STORIES: 2
TOTAL BUILDING AREA: 18018.23 sf AREA OF RENOVATIONS: 12092.12 sf
OCCUPANCY: 250
BUILDING FULLY SPRINKLED.
NOTE: AT COMPLETION OF ALL CONSTRUCTION ACTIVITIES, THE
CONTRACTOR SHALL CLEAN AREA OF CONSTRUCTION FROM TOP TO BOTTOM INSIDE,
INCLUDING BUT NOT LIMITED TO FLOORS EQUIPMENT, FURNITURE,
DOORS, WINDOWS, PLUMBING FIXTURES, AND LIGHT FIXTURES.
RE
NOVATE
SHOW
ER
S
RENOVATE CELLS BASE BID
STARC TEMPORARY WALL/
OR NON COMP. PLYWOOD
AND STEEL STUD
P e t t i t t Y a s t e
S t r a u b
200S
LAWSON,C MICHIGAN
UITE
48017-1311
F A X248-658-7781 248-658-7777 P H O N E
C850 NORTH ROOKS ROAD
PL
UR
IB
U
E S
U N U
M
C I
R C
U M
S P
I C
E
S I
Q U
E R
E I S
P E
N I
N S
U L
A M
A M
OE
N
A M
D
EP
A R
TM
EN
T O
F
TE
C H
N O
LO
G
Y , M
A N
A G
EM
EN
T A
N D
B U
D G
ET
ST
A
TE
O F
M
IC
H
IG
A N
A D
A M
P . L
A C
H , R
A , D
IR
EC
TO
R
ST
A
TE
F
A C
IL
IT
IE
S
A D
M
IN
IS
TR
A
TI
O N
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N D
IV
IS
IO
N
A1
ADDENDUM No.1 6/4/2026
RELEASED FOR BIDS 5/15/2026
100% OWNER REVIEW 5/14/2026
90% OWNER REVIEW 3/30/2026
RELEASED FOR REBID 2/9/2022
REVISED FOR PERMITTING 10/18/2022
RELEASED FOR BIDS 9/1/2022
HOUSING UNIT 2 FLOOR PLAN
FILE NO: 472/19527. SMD
ACCT NO: 472 IBC MAINTPROJ
1727 BLUEWATER HWY
IONA, MI 48846
BELLAMY CREEK
CORRECTIONAL FACILITY
HOUSING UNIT 2
ADA RAMPS AND
IMPROVEMENT
LOWER AND CORE LEVEL PLAN
SCALE: 3/32" = 1'-0"
AutoCAD SHX Text
PROJECT NUMBER 2013
2"
ADA COMPLIANT COMBY UNIT
GRAB BAR
EXT.BED
M A
X 3'
-0
M
IN
'-9
3'-6"
2' -1
1"
1'-35 8"
3' -4
EXT. FINNED TUBE
RAD COVER.
M A
X 3'
-5
M
IN
'-3
2' -4
7"
1'-
18"X36" POLISHED
STAINLESS STEEL
MIRROR
REPAINT CEILING, TYP.
REPAINT WALLS, TYP.
3'-5"
MAX. 9"
MIN. 7"
INSTALL TOILET PAPER HOLDER IN
EXISTING CMU WALL. CORE DRILL APPROX. 5"Ø HOLE,
APPROX 4 1/2" DEEP (VERIFY REQUIREMENTS WITH PRODUCT
TO BE INSTALLED). STACK UNITS ON OPPOSITE SIDES OF WALL.
PATCH CMU AT NEW OPENING AND BACKSIDE.
EXT. PERF. ENCLOSURE PLATE
NOTE: REMOVE EXISTING ANCHORS AT
REMOVE ITEMS AND PATCH HOLES
FLUSH WITH WALL FACES.
ANTI-LIGATURE
PLATE THIS SIDE
ANTI-LIGATURE
PLATE THIS SIDE
T.P. HOLDER
OPP. CELL
T.P. HOLDER
'-0
1'-6"
3'-35
8" NEW 30" X 18"
STAINLESS STEEL
12" X 12" LOCKERS
RELOCATED
SEAL BETWEEN MIRROR
AND CMU ALL AROUND
SECURITY HEAD SS SCREWS
INTO EXPN ANCHORS.
2' -6
SEAL BET. DESK
AND CMU
ALL AROUND
SEAL BETWEEN COMBY
UNIT AND CMU. ALL AROUND.
SEAL BETWEEN COMBY
UNIT AND FLOOR.
8"
LOCKER BASE
RELOCATED
THRU BOLT DESK
AND LOCKERS W/
MIN. 3 8"Ø BOLTS.
CUT OFF EXCESS
THREADS AND WELD
TIGHTENED NUT TO
BOLT
2"
1'-6
2'-6"
2'-6"
2"2"
" 2"
1'-6"
FABRICATE FROM 10 ga STAINLESS STEEL
NOTE:
DEGREASE AND #4 BRUSH FINISH POWDER COAT
GRIND AND DEBURR ALL SHARP EDGES.
ALL SHEET METAL BREAKS 90 DEGREES WITH 0.06 INNER
RADIUS.
1/2" DIAMETER HOLES FOR 3/8" FASTENERS
1'-
2'-6"
MOUNT DESKS BACK TO BACK USE 3/8"
STEEL THROUGH BOLTS. TACK WELD NUT TO
BOLT. CUT OFF EXCESS BOLT THREADS
REMOVE EXISTING CONC. DESK
REMOVE EXISTING CONC. STOOL
SAW CUT CMU WALL
4'-8" (AREA TO REMOVE)
1'-
2'
-0
RECONSTRUCT OPENING WITH
NEW 6" CMU GROUTED SOLID
AND HORIZONTAL JOINT REINF.
EXISTING STEEL BED PLANK AND SKIRT TO REMAIN
#4 DOWELS X MIN. 12" LONG
VERTICAL AND HORIZONTAL, TYPICAL AT
5 LOCATIONS
PATCH EXISTING SLEEVE THRU
WALL WITH CMU OR GROUT
EXISTING BED TO REMAIN
REMOVE EXISTING GRAB
BAR
REMOVE EXISTING GRAB
BAR
REMOVE EXISTING
LAVATORY
REMOVE EXISTING
MIRROR
REMOVE EXISTING
TOILET
EXISTING FINNED TUBE
COVER TO REMAIN
4' -8
SAW CUT AND REMOVE
APPROX. 4'-8"" WIDE
SECTION OF EXISTING
CMU WALL TO FIRST
JOINT ABOVE DESK
B
1/
2" 2'
-6
1'-
1'-
1/ 2"
3' -9
1'-
2' -6
A
BARRIER FREE
TURNING RADIUS
EXISTING SLIDING DOOR TO REMAIN
C
CORE DRILL 4" DEEP HOLE
IN EXISTING WALL FOR
NEW TOILET PAPER
HOLDERS. VERIFY DIAMETER
WITH APPROVED SHOP
DRAWINGS.
EXISTING
PLUMBING
OPENING
TO REMAIN
FURNISHINGS
1 NEW STAINLESS STEEL DESK
2 NEW COMBY ADA SINK AND TOILET
3 NEW 1-1/2" DIA. GRAB BAR
4 RELOCATED 12" X 12" X 6' LOCKER
5 EXISTING 2'-6" X 7'-6" METAL BED
6 NEW 18"X36" POLISHED STAINLESS STEEL
MIRROR
CELL ELEVATION A
3/4"=1'-0"
CELL ELEVATION B
3/4"=1'-0"
TYPICAL CELL PLAN
1/2"=1'-0"
NOTE: EXISTING TOILETS, SINKS, GRAB BARS AND MIRRORS ARE TO BE TURNED OVER TO THE FACILITY.
DESK PLAN
DESK FRONT
DESK ISOMETRIC
DESK SIDE
ROOM FINISH SCHEDULE:
CELLS:
FLOOR: NO WORK
WALLS: PAINT OR REPAINT
BASE: PAINT OR REPAINT
CEILING: PAINT OR REPAINT
SHOWER ROOMS:
FLOOR: RESINOUS FLOOR COATING
BASE: PAINT OR REPAINT
SHOWER WALLS: EPOXY WALL COATINGS
WALLS: PAINT OR REPAINT
CEILING: PAINT OR REPAINT
RAMP:
FLOOR: RESINOUS FLOOR COATING
BASE/WALL AT RAMP: RESINOUS COATING
WALL: PAINT OR REPAINT
BASE AT MASONRY: PAINT OR REPAINT
CEILING: NO WORK
NOTE: PATCH EXISTING VCT AT FLOORS.
P e t t i t t Y a s t e
S t r a u b
200S
LAWSON,C MICHIGAN
UITE
48017-1311
F A X248-658-7781 248-658-7777 P H O N E
C850 NORTH ROOKS ROAD
PL
UR
IB
U
E S
U N U
M
C I
R C
U M
S P
I C
E
S I
Q U
E R
E I S
P E
N I
N S
U L
A M
A M
OE
N
A M
D
EP
A R
TM
EN
T O
F
TE
C H
N O
LO
G
Y , M
A N
A G
EM
EN
T A
N D
B U
D G
ET
ST
A
TE
O
F M
IC
H
IG
A
N
A D
A M
P . L
A C
H , R
A , D
IR
EC
TO
R
ST
A
TE
F
A C
IL
IT
IE
S
A D
M
IN
IS
TR
A
TI
O N
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N D
IV
IS
IO
N
A2
ADDENDUM No.1 6/4/2026
RELEASED FOR BIDS 5/15/2026
100% OWNER REVIEW 5/14/2026
90% OWNER REVIEW 3/30/2026
RELEASED FOR REBID 12/9/2022
RELEASED FOR BIDS 9/1/2022
CELL PLAN AND DETAILS
FILE NO: 472/19527. SMD
ACCT NO: 472 IBC MAINTPROJ
1727 BLUEWATER HWY
IONA, MI 48846
BELLAMY CREEK
CORRECTIONAL FACILITY
HOUSING UNIT 2
ADA RAMPS AND
IMPROVEMENT
A1
DESK AND STOOL ELEVATION C
3/4"=1'-0"
TYPICAL DEMO. TYPICAL NEW WORK.
NOTE: TYPICAL DEMOLITION AND NEW WORK TO OCCUR IN CELLS NOTED ON SHEET A1.
5'-0"
2' -1
2"
3'-0"
2' -0
12"X 48" STEEL ACCESS PANEL
BUILT INTO STAINLESS STEEL FILLER PANEL
ROLL IN TYPE ADA SHOWERADA TRANSFER
SHOWER UNIT
CYLINDER OPERATED
CAM LOCK
STAINLESS STEEL FILLER PANEL
BETWEEN SHOWER UNITS
2" MUD BED
SLOPED IN WALK
AREA
18X33 "L" GRAB
BAR
FOLDING SHOWER
SEAT
REUSE OWNER FURNISHED
SHOWER HEADS
48" GRAB BAR
30" GRAB BAR EACH END
A3
2' -0
5'
-0
3' -0
'-0
A5
REINSTALL EXISTING METAL GATE AND PANEL
EXISTING DRINKING
FOUNTAIN TO REMAIN
5' -4
'-2
REMOVE AND REPLACE EXISTING CEILING MOUNTED LIGHT FIXTURES.
NEW SLOPED MUD BED ON CONCRETE SLAB/
SLOPE TO TRENCH DRAINS
NOTE: PREPARE AND PATCH EXISTING PLASTER CEILING OR DRYWALL CEILING.
A5
A5
3'-0"
NEW 4" x 8" x 16" CMU
WITH WATER PROOFING
3'-0"
REMOVE EXISTING TILES WITHIN OUTLINE AND INSTALL
EPOXY FLOORING
INSTALL
NEW STAINLESS
STEEL GATE
INSTALL
NEW STAINLESS
STEEL GATE
EXISTING METAL
GATE
3' -0
A5
A5
A5
EXISTING DRINKING
FOUNTAIN TO REMAIN
REMOVE AND PROTECT EXISTING
METAL GATE AND PANEL
EXISTING CEILING
ACCESS DOOR TO
REMAIN
REMOVE EXISTING PLASTER CEILING
THIS AREA
3'-0"
ROLL IN TYPE
ADA SHOWER UNIT
MUD BED
TRENCH DRAIN
1'-0"
4"
2"
EXISTING DOUBLE 5/8"
GYPSUM BOARD CEILING
REPLACE/ PATCH AS
NEEDED
NEW LIGHT FIXTURE
MAX. 14" PER FOOT
SLOPE TO DRAIN
WATER PROOFING ON
NEW4" x 8" x 16" CMU
7'-
REUSE OWNER
FURNISHED
SHOWER HEADS
REUSE OWNER
FURNISHED
SHOWER CONTROLS
4"
4"
3"
4"
4"4"
SLOPED MUD BED
MAX. 14" PER FOOT
RESINOUS
FLOORING
STONHARD OVERLAYMENT
SPRAY ON TYPE WATER PROOFING AND
HIGH-PERFORMANCE EPOXY COATING
ON CMU WALL
POLYETHYLENE
BACKER
ROD
STONESET
GROUT (PITCHED
TO ADA
COMPLIANCE)
4"21
2"
15 8"
A5
ACCESS DOOR
SHOWER ROOM- NEW WORK
SCALE: 1/2"= 1'-0"
SHOWER ROOM- DEMOLITION
SCALE: 1/2"= 1'-0"
P e t t i t t Y a s t e
S t r a u b
200S
LAWSON,C MICHIGAN
UITE
48017-1311
F A X248-658-7781 248-658-7777 P H O N E
C850 NORTH ROOKS ROAD
PL
UR
IB
U
E S
U N
U M
C I
R C
U M
S P
I C
E
S I
Q U
E R
E I S
P E
N I
N S
U L
A M
A M
OE
N
A M
D
EP
A R
TM
EN
T O
F
TE
C H
N O
LO
G
Y , M
A N
A G
EM
EN
T A
N D
B U
D G
ET
ST
A
TE
O F
M
IC
H
IG
A N
A D
A M
P . L
A C
H , R
A , D
IR
EC
TO
R
ST
A
TE
F
A C
IL
IT
IE
S
A D
M
IN
IS
TR
A
TI
O N
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N D
IV
IS
IO
N
A5
ADDENDUM No.1 6/3/2026
RELEASED FOR BIDS 5/15/2026
100% OWNER REVIEW 5/14/2026
90% OWNER REVIEW 3/30/2026
RELEASED FOR REBID 12/9/2022
RELEASED FOR BIDS 9/1/2022
SHOWER PLAN AND DETAILS
FILE NO: 472/19527. SMD
ACCT NO: 472 IBC MAINTPROJ
1727 BLUEWATER HWY
IONA, MI 48846
BELLAMY CREEK
CORRECTIONAL FACILITY
HOUSING UNIT 2
ADA RAMPS AND
IMPROVEMENT
A5
A5
SHOWER ROOM SECTION
3/8"=1'-0"A5
2 SHOWER ROOM ELEVATION
3/8"=1'-0"A5
3 RAMP ELEVATION
3/8"=1'-0"A5
1. NEW 60"X36" ROLL-IN SHOWER UNIT
2. NEW 36"X36" TRANSFER SHOWER UNIT
3. NEW TRENCH DRAIN - SEE SECTION DETAIL 8/A5
SHOWER ROOM SCHEDULE
TRENCH DRAIN DETAIL
1 1/2" = 1'-0"
NEW LIGHT FIXTURE MODEL DETAIL:
1. COOPER LIGHTING MODEL: FVS8- 4 - LD4 - 2 - STD - 40 - VNV - P187 - EDC1 - WL
2. KURTZON LIGHTING MODEL: VL-S - 1 - 1X4 - 2 - LEDH - 840 - UNV - 3 - SW
EXISTING FINNED TUBE RADIATION AND COVER TO
REMAIN
PROTECTED DURING CONSTRUCTION, REPAIR/
REPLACE IF DAMAGED
BY CONSTRUCTION ACTIVITY REMOVE EXISTING CONC.
MASONRY WALLS
REMOVE EXISTING FLUORESCENT SURFACE MOUNT
LIGHT FIXTURE
6" CONC. FLOOR
SLAB
STAINLESS
STEEL PANEL
NOTE: TURN OVER EXISTING SHOWER DOORS TO THE
FACILITY. REMOVE AND REINSTALL EXISTING SHOWER
CONTROLS AND HEADS INT0 NEW SHOWERS. FACILITY
WILL PROVIDE FORTH CONTROL AND SHOWER HEAD.
SHOWER DRAIN SECTION
3/8"=1'-0"A5
STAINLESS STEEL GATE JAMB
1 1/2" = 1'-0"
A5
A5
STAINLESS STEEL GATE
1 1/2" = 1'-0"A5
STAINLESS STEEL GATE
W/2"x2" SQUARE MESH
FASTEN TO CMU
| Sheets and Views |
| HU2 Plans - 2026-A3 RAMP |
| HU2 Plans - 2026-A5 SHOWER ROOM |
| HU2 Plans - 2026-A4 RAMP DETAILS |
| HU2 Plans - 2026-A2 CELLS |
| HU2 Plans - 2026-C3 SITE DETAILS |
| HU2 Plans - 2026-C1 SITE DEMO |
| HU2 Plans - 2026-C2 SITE |
| HU2 Plans - 2026-A1 FLOOR PLAN |
| HU2 Plans - 2026-P1 Demo |
| HU2 Plans - 2026-P2 New Work |
| A5.pdf |
| Sheets and Views |
| A5 SHOWER ROOM |
| A1.pdf |
| Sheets and Views |
| A1 FLOOR PLAN |
| A2.pdf |
| Sheets and Views |
| A2 CELLS |
| A5.pdf |
| Sheets and Views |
| A5 SHOWER ROOM |
| A5.pdf |
| Sheets and Views |
| A5 SHOWER ROOM |