26ITB0921226K-CRB Abatement & Demolition Services for Fulton County Jail Project

Open State & local contract opportunity Posted

Solicitation number
PE-66096-NONST-2026-000000223
State
Georgia
Responses due

Opportunity facts

Jurisdiction
UNSPSC codes
Show all 28
Point of contact

Opportunity details come from ssl.doas.state.ga.us. Updated .

About this opportunity

Fulton County, Georgia, through its Department of Real Estate and Asset Management, is soliciting sealed bids under ITB 26ITB0921226K-CRB for abatement and demolition services on the Fulton County Jail Project, with bids due November 20, 2026 at 11:00 a.m. Attendance at the mandatory pre-bid conference and guided site visit is required, and bidders that do not attend are precluded from contract award. Each firm may send two representatives, who must be named by email to purchasing representative Craig Bogan (craig.bogan@fultoncountyga.gov) before the conference. Bidders must also hold appropriate Georgia licensing, including a General Contractors License and any required professional licenses, and must enroll in E-Verify under the Georgia Security and Immigration Compliance Act.

The scope covers demolition of three buildings on the jail campus at 901 Rice Street, N.W., Atlanta: the Bellwood Annex, Fulton County Accountability Court, and Jefferson Place Transition Housing. Work includes structures and foundations, utilities, pavement, and debris disposal, plus identification, abatement, and lawful disposal of hazardous materials, including asbestos-containing materials, lead-based paints, and hazardous coatings. Erosion and sedimentation control, clearing and grubbing, and site restoration to green space are included across approximately 32.86 acres, with an estimated 3.30 acres disturbed. Phase 1 and Phase 2 are priced as a single demolition package. Insurance requirements appear in Addendum 1.

Bidders must submit a bid bond equal to 5% of the total bid amount. The successful bidder must furnish separate performance and payment bonds, each at 100% of the contract price, before Notice to Proceed. Substantial completion is required within 270 calendar days of Notice to Proceed, with final completion within 300 calendar days, and liquidated damages of $500.00 per calendar day apply to work remaining uncompleted after those periods. Award goes to the lowest responsive and responsible bidder. The County anticipates Board approval on Wednesday, December 2, 2026.

Questions and clarifications are due by 2:00 p.m. on Thursday, November 12, 2026, with answers issued by addenda. The solicitation description places the pre-bid conference and site visit on Tuesday, November 10, 2026, while the attached ITB file summary lists Monday, November 9, 2026 at 11:00 a.m. at the Emma Darnell Aviation Museum & Conference Center. The County provides transportation for site-visit participants, with a shuttle departing immediately after the conference.

Opportunity text

Fulton County, Georgia "County" The scope of work includes demolition and removal of existing buildings, utilities, pavement, and other noted structures; identification, handling, abatement, removal, transportation, and lawful disposal of hazardous materials associated with the demolition activities, including, but not limited to, asbestos-containing materials (ACM), lead-containing materials, hazardous coatings, and other regulated substances identified in the project documents or encountered during demolition; installation and maintenance of erosion and sedimentation control measures; clearing and grubbing of vegetation within designated disturbance limits; demolition debris removal and disposal; temporary stabilization; and all incidental work necessary to create the proposed green space for a future facility. The project site consists of approximately 32.86 acres, with an estimated 3.30 acres of disturbed area. Bidders shall provide pricing for both Phase 1 and Phase 2 as shown in the drawings as a single demolition package. All provisions of the project plans and specifications shall apply and shall be recognized by all bidders. PROJECT SITE VISIT The County will conduct a mandatory guided tour of the facility site immediately following the Pre-Bid Conference on Tuesday, November 10, 2026. Attendance at the project site visit is mandatory. The County will provide transportation for all participants. Only two (2) representatives from each firm will be allowed to participate as space is limited. Please note that bidders who do not participate in the mandatory project site visit will be precluded from contract award. Prior to the Pre-Bid Conference, interested Bidders must contact the purchasing representative, Craig Bogan, via email at craig.bogan@fultoncountyga.gov and provide the names of the two (2) representatives to be added to the list to attend. The shuttle will depart immediately following the Pre-Bid Conference from the Lower Parking Lot at the Emma

Files

File Type Posted
26ITB0921226K_CRB.pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for State & Local Contractors