Claremont Boulevard Complete Street Improvement Project Between Ninth Street and Foothill Boulevard
Closed State & local contract opportunity Posted
- Solicitation number
- 2026-02
- State
- California
- Responses due
Opportunity facts
- Jurisdiction
- Points of contact
-
- Salomon Abdel-Aziz procurements@lavta.org (925) 455-7572
- Brianna Greenwood bgreenwood@coachella.org (760) 398-5744
- Curtis M. Skaggs cskaggs@djacivil.com (661) 393-4796
- Anda Wright awright@cosb.org (858) 720-2478
- Luz Granados lgranados@wvwd.org (909) 875-1804
- Austin Frisby afrisby@cityofsolanabeach.ca.gov (858) 720-2474
- Melissa Mudgett mmudgett@slorta.org (805) 781-4467
- Bryce Swetek bswetek@montsan.org (805) 883-6872
- Harry Parr hparr@uplandca.gov (909) 931-4193
- Brennan Adams badams@cityofshastalake.gov (530) 275-7469
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
The City of Upland, California is requesting bids on traffic signal improvements at 16th Street and San Antonio Avenue under Invitation 2026-02, with bids due electronically June 23, 2026 at 3:00 PM PDT.
The scope consists of removal and disposal of existing traffic signal structures and hardware; construction of new traffic signal structures, electrical equipment, and necessary wiring per project plans; and removal and reconstruction of ADA curb ramps. Work is classified under Heavy and Civil Engineering Construction (NAICS 237310 and 237990). The contract will be awarded as a lump sum to a single bidder.
Bid submission requires certification and compliance documentation: bid bond, non-collusion declaration, Iran Contracting Act certification, public works contractor registration, workers' compensation certificate, and fleet compliance certification. Bids must be submitted through the PlanetBids Vendor Portal. Questions are due June 16, 2026 at 3:00 PM PDT; no in-person pre-bid meeting is scheduled. The project contact is Harry Parr at 909-931-4193 or hparr@uplandca.gov.
Opportunity text
16 versions
Update #16 · Latest ·
The Contractor shall perform all Work within the time stipulated the contract and shall provide all labor, materials, equipment, tools, utility services, and transportation to complete all of the Work required in strict compliance with the Contract Documents as specified in Article 5 below for the following Project: Claremont Boulevard Complete Street Improvement Project Between Ninth Street and Foothill Boulevard.
Update #15 ·
Sewer flow monitoring and inflow & infiltration (I & I) detection (level-sensing, etc.) during the wet weather season (3-6 months).
Update #14 ·
The City of Hollister is requesting Statements of Qualifications (SOQs) from qualified traffic engineering firms to provide professional traffic engineering services on an as-needed basis. The City intends to establish one or more on-call professional services agreements with qualified firms capable of providing traffic engineering expertise in support of development review, capital improvement projects, resident traffic concerns, parking studies, and transportation-related planning efforts. Services will be assigned through individual task orders based upon City priorities and available funding. Assignments may vary from small technical reviews to comprehensive traffic impact studies. The initial agreement term shall be three (3) years with the option to extend for up to two (2) additional one-year terms upon mutual agreement
Update #13 ·
The City of Lemoore ("City") is soliciting sealed proposals from qualified firms to provide on-call well and pump maintenance, repair, inspection, testing, and related services (the "Services") for the City's potable water well facilities. This solicitation is an on-call procurement for maintenance and repair services for potable water well facilities. It is not being converted to a qualifications-based engineering procurement, nor is it a public works construction bid at the contract level. Certain Task Orders may be designated by the City as public works when required by applicable law. Proposers shall submit hourly labor rates, equipment rates, service rates, and a materials markup on the Proposal Schedule provided in this Booklet
Update #12 ·
The RTA is seeking proposals from qualified Proposers to provide landscape maintenance services at three (3) RTA facility locations and various bus stop locations (as needed) within San Luis Obispo County. The required services and performance conditions are described in the Scope of Services (Exhibit 1) and include information on the approximate landscape areas to be maintained under this service contract as well as the services the RTA is requesting to be done on a weekly basis and additional assignments as needed.
Update #11 ·
The work to be done consists of furnishing all materials, equipment, tools, supervision, labor and incidentals required to complete the above stated project. The work includes: Constructing six (6) pedestrian ramps at various street intersection corners, including traffic control, demolition of existing surface improvements and patching, per the List of Ramp Locations (Exhibit A).
Update #10 ·
Install approximately 3,925 LF of 15" PVC pipeline, precast turnout structure, HDPE culvert, reinforced concrete spillway, and associated appurtenances for irrigation and canal discharge improvements.
Update #9 ·
The project includes improvements to numerous existing roads, construction of a new roadway, and an improvement of a 2-acre open space area adjacent to Moody Creek.Work includes pavement widening, curb, gutter, sidewalk, utilities, drainage infrastructure and lighting improvements to Grand Avenue, Shasta Way, Cascade Boulevard and Shasta Dam Boulevard (SR-151).Construction of Wonderland Boulevard including a section consistent with an 84-ft right of way per City of Shasta Lake Construction Standards (COSLCS) including landscaped medians, complete street design components, utility design and coordination (water, wastewater, stormwater, joint utility trench & irrigation), safe crossing infrastructure to open space across Wonderland Boulevard.Improvements to a 2-acre open space adjacent to Moody Creek with improved trails, and signage, and enhanced water-wise landscaping and shade tree planting, green sustainable stormwater infrastructure including bioretention and bioswales
Update #8 ·
This proposal outlines the scope of work for the demolition, reconstruction, and installation of stone veneer on existing columns at the Roemer Facility.
Update #7 ·
The work to be performed under this contract generally consists of the removal and disposal of existing traffic signal structures and hardware; and construction of new traffic signal structures, electrical equipment, and necessary wiring as shown on the project plans. The work also includes removal and reconstruction of ADA curb ramps.
Update #6 ·
The City of Imperial (City) invites qualified consultants to submit proposals for Feasibility, Design, and Engineering Services for the Imperial Regional Park Development Project. The city seeks a skilled, multidisciplinary design and engineering team capable of providing feasibility analysis, master planning, design development, construction documentation, and optional construction-phase support for a 143-acre regional park. The project will serve the Citys 22,000 residents and a regional population exceeding 100,000 within 10 miles, emphasizing public accessibility, recreation, and environmental resilience. This project will employ Federal Appropriation Funds and must comply with all applicable federal, state, and local labor and environmental regulations, including prevailing wages under California Labor Code 1770?et seq.
Update #5 ·
The Contractor shall perform within the time stipulated the Contract as herein defined, and shall provide all labor, materials, equipment, tools, utility services, and transportation to complete in a work like manner all of the work required in connection with the following titled Project and in strict compliance with the Contract Documents as specified in Article 5: Lemon Crest Elementary School Kitchen Expansion.
Update #4 ·
The Livermore Amador Valley Transit Authority (LAVTA) seeks a qualified contractor to remove two existing monument signs and design, fabricate, and install two new monument signs at the Livermore Transit Center (2500 Railroad Avenue, Livermore, CA). Work includes demolition of existing signs; construction of new foundations; fabrication and installation of new monument signage; electrical power and lighting; restoration of disturbed site areas; and reinstallation or replacement of dedication plaques. The contractor must coordinate all work to maintain public safety and accessibility during transit operations
Update #3 ·
Work to be done includes the furnishing of all labor, materials and equipment necessary for crack sealing, asphalt patching, concrete, ARAM, slurry seal and all related and necessary work as defined in the contract documents.
Update #2 ·
The City of Brawley intends to replace existing windows and exterior doors at the Brawley Public Library, located at 400 Main Street, Brawley, Ca 92227, with the exception of those in the Childrens Reading room. Additionally, selected exterior doors and their corresponding frames will be replaced as part of the scope of work. It is intended that the work be completed in every respect under the Contract, and such items or details not mentioned above that are required by the Contract documents shall be furnished, performed, placed, constructed, or installed by the Contractor.
Update #1 ·
The City is requesting proposals to provide: Landscape Maintenance Services for: Bagdouma Park.
Files
Show all 13
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity