City of Ontario, California is soliciting electronic bids through PlanetBids for the Pedestrian Intersection Improvements and Pavement Rehabilitation Project (Contract No. 2026, ST2711/ST2712/ST2714), due November 18, 2026 at 11:00 a.m. The file lists San Bernardino County as the jurisdiction. No set-aside or preference program is stated.

The work spans three bid schedules covering Milliken Avenue, Vineyard Avenue, and four pedestrian intersection locations. Scope includes slot grinding and grinding of approximately 5,200 square yards of existing asphalt concrete pavement, approximately 8,500 square yards of asphalt concrete leveling course, approximately 1,895 tons of asphalt rubber hot mix overlay, approximately 865 linear feet of Portland cement concrete sidewalk, and 770 square feet of curb and gutter. Additional work includes curb ramps, detectable warning surfaces, utility appurtenance adjustments, traffic signal detection loops, a video detection system, and thermoplastic striping and marking.

Bidders must hold a California Class A contractor's license and provide Department of Industrial Relations registration for themselves and all subcontractors. Bidders must also provide valid California Air Resources Board Certificates of Reported Compliance for their fleet and all subcontractor fleets. The project is subject to California prevailing wage requirements, the CARB In-Use Off-Road Diesel-Fueled Fleets Regulations effective January 1, 2024, Public Works contractor registration, and Iran Contracting Act certification.

The bid guarantee must be not less than 10 percent of the total bid price, in cash, certified check, cashier's check, or bid bond. The successful bidder must provide a Performance Bond and a Payment Bond, each equal to 100 percent of the contract price, within 10 calendar days of notification of intent to award. Liquidated damages are $4,200 per calendar day for delay beyond the completion date. Retention is 5 percent of progress payments, with 10 percent permitted if the City determines the work is substantially complex. The City may substitute securities for retained amounts under Public Contract Code Section 22300 at the bidder's expense. Work must finish within 70 working days, commencing 10 calendar days after the Notice to Proceed.

The City will award to the lowest responsible bidder meeting responsiveness criteria and reserves the right to reject any or all bids. The mandatory pre-bid meeting and site walk have already been held. The opportunity was posted November 9, 2026.

Opportunity text

The work to be performed under this contract consists of slot grinding existing pavement, placement of asphalt base pavement, placement of asphalt leveling course, placement of ARHM overlay, placement of PCC sidewalk, removal and replacement of PCC curb & gutter, curb ramps, installation of detectable warning surfaces, adjustment of water valves & covers, adjustment of manhole rings & covers, installation of traffic signal loops, installation of video detection system, thermoplastic striping and marking removal and replacement, and other appurtenances necessary to complete the improvements as described in the Plans and Specifications.

Files

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for State & Local Contractors