This is a bid set document for the Stockdale North Recharge Facility Recovery Lines & Structures Project issued by the City of Upland, California. The project scope includes the removal and disposal of existing traffic signal structures and hardware, construction of new traffic signal structures with electrical equipment and necessary wiring per project plans, and removal and reconstruction of ADA curb ramps at 16th Street and San Antonio Avenue. The work is classified under Heavy and Civil Engineering Construction (NAICS 237310 and 237990). Bids are due electronically through the PlanetBids Vendor Portal on June 23, 2026 at 3:00 PM PDT. A pre-bid question deadline of June 16, 2026 at 3:00 PM PDT has been established, with no in-person pre-bid meeting scheduled. The contract will be awarded as a lump sum to a single bidder, and the project contact is Harry Parr at 909-931-4193 or hparr@uplandca.gov.
Bid submission requires submission of a bid bond, non-collusion declaration, Iran Contracting Act certification, public works contractor registration, workers' compensation certificate, and fleet compliance certification. Contractors must be registered as public works contractors and demonstrate compliance with all applicable state and local requirements. The specific pricing and funding sources are not detailed in this bid set summary, though the project involves infrastructure improvements typical of municipal capital projects funded through local or regional mechanisms.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Kern County, California
VOLUME 1 – CONTRACT DOCUMENTS
SPECIFICATIONS No. GBJPA 2026-02
STOCKDALE NORTH RECHARGE FACILITY
RECOVERY LINES & STRUCTURES PROJECT
FOR BIDDING PURPOSES ONLY
JULY 2026
Prepared by: Dee Jaspar & Associates, Inc.
2730 Unicorn Road, Bldg A
Bakersfield, CA 93308 Tel: (661) 393-4796
Mandatory Pre-Bid Conference will begin at 11:00 a.m. on Thursday, August 13th, 2026.
Prospective Bidders should meet at the offices of Rosedale-Rio Bravo Water Storage District
849 Allen Rd Bakersfield, CA 93314
Bids will be received until 2:00 p.m. local time on Wednesday, August 26th, 2026. at the offices of Rosedale-Rio Bravo Water Storage District 849 Allen Rd Bakersfield, CA 93314
EFelix Highlight
EFelix Highlight
EFelix Highlight
This Page Intentionally Left Blank
CONTRACT DOCUMENTS
FOR BIDDING PURPOSES ONLY
Groundwater Banking Joint Powers Authority
TOC-1
Specifications No. GBJPA 2026-02 Recovery Lines & Structures Project
July 2026 Table of Contents
TABLE OF CONTENTS
Section Title … Page
A – NOTICE INVITING BIDS
A-1 Invitation for Bids .....................................................................................A-1 A-2 Submitting Bids and Bid Opening .................................................................................A-1 A-3 Location of the Work ................................................................................... A-2 A-4 Description of Work.............................................................................................................A-2 A-5 Classification of Contractors License / Contractor Registration ....................A-2 A-6 Award of Contract................................................................................................................... A-3 A-7 Site Conditions .......................................................................................................................A-4 A-8 Certified Checks and Bonds .............................................................................................A-4 A-9 Contract Retention ..............................................................................................................A-5 A-10 Wage Rates / Compliance Monitoring.......................................................................A-5 A-11 Use of Apprentices...................................................................................................................A-6 A-12 Contract Documents............................................................................................................A-6 A-13 Substitute Securities .................................................................................... A-7 A-14 Grant Requirements .................................................................................... A-7
B – INSTRUCTIONS TO BIDDERS
B-1 Form of Proposal and Signature ...................................................................................B-1 B-2 Preparation of the Proposal .............................................................................................B-1 B-3 Responsible Bidder and Responsive Bid ..................................................................B-2 B-4 Brokerage of Work Not Favorably Considered .....................................................B-2 B-5 Equalizing Factors...................................................................................................................B-2 B-6 Servicing and Maintenance .............................................................................................B-3 B-7 Local Conditions..................................................................................................................B-3 B-8 Execution of Contract........................................................................................................B-3 B-9 Bonds ............................................................................................................................................B-4 B-10 Workers’ Compensation Insurance .............................................................................B-5 B-11 Public Liability and Property Damage Insurance..................................................B-5 B-12 Subcontracts...............................................................................................................................B-7 B-13 Non-Collusion Affidavits ................................................................................................B-8 B-14 Bidder’s Bond .......................................................................................................................B-8 B-15 Construction Schedule ...................................................................................................B-9 B-16 Bid Submission and Opening Procedures ...............................................................B-10
PROPOSAL
PROPOSAL BOND
PROPOSAL BIDDING SCHEDULE
SCOPE OF WORK - MEASUREMENT AND PAYMENT
INFORMATION REQUIRED OF BIDDER
AGREEMENT
TOC-2
Specifications No. GBJPA 2026-02 Recovery Lines & Structures Project
FAITHFUL PERFORMANCE BOND
PAYMENT BOND
NON-COLLUSION AFFIDAVIT
SUBCONTRACTOR NON-COLLUSION AFFIDAVIT
NOTICE TO BIDDERS OF JOB SITE TOUR
NOTICE OF AWARD
NOTICE TO PROCEED FORM
NOTICE TO PROCEED CHECKLIST
C – GENERAL CONDITIONS
C-1 Definitions ................................................................................................C-1 C-2 Correlation and Intent of Documents .........................................................................C-6 C-3 Assignment..................................................................................................................................C-6 C-4 Subcontracts................................................................................................................................C-6 C-5 Suspension of Work – Damages for Delay ..............................................................C-7 C-6 Time of Work – Termination for Delay – Time Extensions ..........................C-8 C-7 Termination for Reasons Other Than Delay ........................................................C-9 C-8 Authority of the Engineer ..............................................................................................C-10 C-9 Changes and Extra Work .................................................................................................C-11 C-10 Changes of Contract Price ...............................................................................................C-15 C-11 Changes of Contract Time...............................................................................................C-18 C-12 Right-of-Way – Construction Roads ..........................................................................C-19 C-13 Notice and Service Thereof ............................................................................................C-20 C-14 Personal Attention...............................................................................................................C-21 C-15 Construction Program........................................................................................................C-21 C-16 Survey Requirements.........................................................................................................C-22 C-17 Plans and Specifications ...................................................................................................C-22 C-18 Inspection of Work .............................................................................................................C-23 C-19 Conditions Affecting Work.............................................................................................C-24 C-20 Compliance with Laws – Permits - Taxes ..............................................................C-25 C-21 Indemnification ........................................................................................................................C-25 C-22 Protection of Work Site, Existing Structures, Roadways, Utilities, etc. .....C-26 C-23 Workers and Wages ...............................................................................................................C-27 C-24 Clean-up ...................................................................................................................................C-30 C-25 Safety .........................................................................................................................................C-30 C-26 Accidents.....................................................................................................................................C-31 C-27 Guarantee ................................................................................................................................C-32 C-28 Payments to Contractor and Completion ..................................................................C-32 C-29 Contract Closeout ....................................................................................................................C-39 C-30 Satisfaction of Liens............................................................................................................C-42 C-31 Claims Against the GBJPA and Payment of Attorneys’ Fees .........................C-43 C-32 Waiver of Interest in Certain Situations ....................................................................C-43 C-33 Assignment of Antitrust Actions ...................................................................................C-43 C-34 Notice of Latent or Hazardous Conditions...............................................................C-43 C-35 Claims............................................................................................................................................C-44
TOC-3
Specifications No. GBJPA 2026-02 Recovery Lines & Structures Project
D – SPECIAL CONDITIONS
D-1 The Requirement ......................................................................................D-1 D-2 Special Provisions ....................................................................................... D-1 D-3 Description of Work...........................................................................................................D-4 D-4 Beginning and Completion of Work...........................................................................D-8 D-5 Liquidated Damages for Delays....................................................................................D-10 D-6 Qualifications of Bidders .................................................................................................D-10 D-7 Materials ..................................................................................................................................D-11 D-8 Submittals ...............................................................................................................................D-12 D-9 Temporary Use of Facilities ...........................................................................................D-19 D-10 Trade Names or Approved Equals...............................................................................D-19 D-11 Underground Facilities......................................................................................................D-21 D-12 Site Access .............................................................................................................................D-24 D-13 Deleted .........................................................................................................................................D-25 D-14 Responsibility for Repair of Facilities........................................................................D-25 D-15 Relief from Duty of Protecting Work.........................................................................D-25 D-16 Guarantees and Warranties .............................................................................................D-25 D-17 Access Roads and Staging Area ...................................................................................D-26 D-18 Cooperation with Others ..................................................................................................D-27 D-19 Fire Protection.......................................................................................................................D-27 D-20 Excavation Safety Plan .....................................................................................................D-27 D-21 Claims for Extra Cost ........................................................................................................D-28 D-22 Survey Requirements.........................................................................................................D-29 D-23 Verification of Existing Dimensions .........................................................................D-29 D-24 Quality Control .....................................................................................................................D-29 D-25 Right to Operate Unsatisfactory Equipment............................................................D-30 D-26 Deleted .....................................................................................................................................D-30 D-27 Crossing of Existing Creeks, Reservoirs, and Ponds...........................................D-30 D-28 Deleted .....................................................................................................................................D-30 D-29 Prevention of Water Pollution and Prevention of Air Pollution .....................D-30 D-30 Landscape Preservation ....................................................................................................D-32 D-31 Valley Fever – Notices to Employees ........................................................................D-32 D-32 Superintendence ...................................................................................................................D-33 D-33 Special Environmental Requirements ........................................................................D-33 D-34 Record Drawings ......................................................................................................................D-37 D-35 Special Controls ...................................................................................................................D-39 D-36 Products, Materials, and Equipment ...........................................................................D-42 D-37 Project Meetings .....................................................................................................................D-43 D-38 Specification Drawings.....................................................................................................D-45 D-39 Special Construction Conditions ..................................................................................D-45
Submittal Transmittal Form Substitution Request Form
TOC-4
Specifications No. GBJPA 2026-02 Recovery Lines & Structures Project
TECHNICAL CONDITIONS
E – EARTHWORK
E-1 General .....................................................................................................E-1 E-2 Clearing and Grubbing........................................................................................................E-1 E-3 Excavation ................................................................................................................................E-1 E-4 Dewatering .............................................................................................................................E-5 E-5 Compaction and Moisture Conditioning...................................................................E-6 E-6 Backfill..........................................................................................................................................E-8 E-7 Embankment Construction...............................................................................................E-9 E-8 Disposal of Materials ..........................................................................................................E-11 E-9 Construction at Roadways, Crossings and Private Driveways........................E-12 E-10 Pavement and Surfacing .......................................................................................................E-12
F – CONCRETE
F-1 General......................................................................................................... F-1 F-2 Contractor Submittals.................................................................................. F-2 F-3 Quality Assurance ....................................................................................... F-4 F-4 Materials ...................................................................................................... F-5 F-5 Concrete Composition................................................................................. F-10 F-6 Mixing of Concrete ..................................................................................... F-11 F-7 Forms ............................................................................................................ F-11 F-8 Handling and Placing of Concrete .............................................................. F-12 F-9 Tolerances for Concrete Construction ........................................................ F-14 F-10 Reinforcing Steel ......................................................................................... F-15 F-11 Concrete Finishes ........................................................................................ F-17 F-12 Curing and Protection ................................................................................. F-17 F-13 Repair of Concrete ...................................................................................... F-18 F-14 Joints and Waterstops.................................................................................. F-18 F-15 Grout for Equipment and Metalwork ......................................................... F-19 F-16 Construction of Concrete Lining ................................................................ F-19 F-17 Concrete Slurry............................................................................................ F-21 F-18 Geo-Textile Fabric ...................................................................................... F-21 F-19 Rip-Rap........................................................................................................ F-21 F-20 Measurement and Payment ......................................................................... F-22
TOC-5
Specifications No. GBJPA 2026-02 Recovery Lines & Structures Project
G– HDPE PIPE, FITTINGS, AND SPECIALS
G-1 General Piping Requirements .....................................................................I-1 G-2 High Density Polyethylene (HDPE) and PVC Pipe....................................I-4 G-3 Installation ................................................................................................... I-7 G-4 Backfill of Pipeline.................................................................................... .. I-12 G-5 Field Hydrostatic Testing of Pipe .......................................................... ... I-14
H – PAINTING AND COATING
H-1 General ........................................................................................................ L -1 H-2 Quality Control ............................................................................................ L-1 H-3 Materials ...................................................................................................... L-1 H-4 Surface Preparation ..................................................................................... L-2 H-5 Schedule for Painting and Protective Coatings ..........................................L-2 H-6 Application .................................................................................................. L-4 H-7 Inspection .................................................................................................... L-5 H-8 Payment ....................................................................................................... L-5
APPENDICES:
APPENDIX A – SOILS REPORT
**END OF SECTION*
TOC-6
Specifications No. GBJPA 2026-02 Recovery Lines & Structures Project
Groundwater Banking Joint Powers Authority Section A
A-1 Specifications No. GBJPA 2026-02 Recovery Lines & Structures Project
Notice
SECTION A
NOTICE
GROUNDWATER BANKING JOINT POWERS AUTHORITY
Kern County, California
NOTICE INVITING BIDS
A-1 Invitation for Bids
NOTICE IS HEREBY GIVEN that sealed bids will be received by the GROUNDWATER BANKING JOINT AUTHORITY, hereinafter referred to as the Joint Powers Authority, for furnishing all labor, services, materials, tools, equipment, supplies, transportation, utilities, and all other items and facilities necessary therefore, as provided in the Contract Documents for the acceptable completion of the Work described in Section A-4, together with all appurtenances thereto, in strict accordance with the Plans and Specifications on file at the office of the Joint Powers Authority.
Bids shall be made in accordance with the prevailing hourly rate of per diem wages for this locality and project as determined by the Director of Industrial Relations pursuant to Labor Code Section 1770 et seq. Prevailing wage schedules for Kern County are available from the Department of Industrial Relations-Division of Labor Statistics & Research via the internet at www.dir.ca.gov. Copies of the prevailing rates of per diem wages are also on file at the office of the Joint Powers Authority and will be made available to any interested party on request.
This project is being funded in part by a grant from the Small Surface Water and Groundwater Storage Projects (SSWGSP) program which is being administered by the U.S. Bureau of Reclamation (Reclamation).
The Contractor, its Subcontractors and Suppliers will be required to comply with all applicable Federal requirements.
A-2 Submitting Bids and Bid Opening
Bids will be received at the offices of the Joint Powers Authority, 849 Allen Rd, Bakersfield, CA 93314, on or before 2:00 p.m., local time, on Wednesday, August 26th, 2026. Said bids shall be opened and read aloud commencing at the time and date just specified. Bids shall be timely submitted in sealed envelopes marked as directed in Section B-16.
http://www.dir.ca.gov/ EFelix Highlight
EFelix Highlight
A-2 Specifications No. GBJPA 2026-02 Recovery Lines & Structures Project
It is the sole responsibility of the bidder to ensure that their bid is received in proper time and at the proper location and in the proper format. Facsimile bids will not be accepted.
Bids received after said deadline time will be returned unopened to the bidder.
A mandatory pre-bid conference and tour will be held on Thursday, August 13th at 11:00 a.m. commencing at the Rosedale-Rio Bravo Water Storage District office located at 849 Allen Rd, Bakersfield, CA 93314, and then continued at the project site.
A-3 Location of the Work
The work to be constructed hereunder is located within Kern County, California, in the vicinity of Bakersfield, California, just west of the intersection of State Route 43 (Enos Lane) and Stockdale highway.
A-4 Description of Work
The description of the work is as follows:
1. Furnish and install approximately 1,570 LF of 15” PIP PVC pipe from Well SN-1 to the existing Rosedale 1 Channel including all fittings, appurtenances, connections, and canal discharge piping.
2. Furnish and install approximately 2,355 LF of 15” PIP PVC pipe from Well SN-2 to the existing Rosedale 1 Channel including all fittings, appurtenances, connections, and canal discharge piping.
3. Install the District furnished precast concrete turnout structure and wing walls.
4. Furnish and install approximately 40 LF of 48” Triple Wall HDPE, concrete cutoff wall, slurry backfill, geotextile fabric, rock riprap, and weir boards.
5. Furnish and install reinforced concrete spillway to Rosedale 1 Channel in the northwest corner of the Stockdale North Recharge Facility.
A-5 Classification of Contractors License / Contractor Registration
A contractor submitting a proposal shall possess, at the time the contract is awarded, that classification of contractor’s license required by law to enable the contractor to perform the Work contemplated under the Contract Documents. Specifically, the Contractor must
A-3 Specifications No. GBJPA 2026-02 Recovery Lines & Structures Project possess a Class A – General Engineering Contractor’s license Contractors shall provide the Joint Powers Authority with their Contractor’s license number and expiration date as provided in the proposal.
No contractor or subcontractor may be listed on a proposal unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)].
No contractor or subcontractor may be awarded the contract for the project unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5.
A-6 Award of Contract
Each bid shall be made on the proposal forms furnished by the Joint Powers Authority and shall be in accordance with the Contract Documents. The Proposal Bidding Schedule includes places to enter bid prices for each of the various items of work. Bidders will be required to submit prices for all items on the bid schedule. Award of the Contract, if made by the Joint Powers Authority, will be to the responsible Bidder submitting the lowest responsive Bid Proposal on the basis of the prices in the Base Bid in accordance with California Public Contract Code Section 20103.8(a). See Section B-16 for further particulars of the bidding and basis of award.
Proposals will be accepted until the date and time specified in the Notice Inviting Bids.
The Contract will be awarded as soon as practicable to the lowest responsible bidder that has submitted a responsive bid, price and other factors considered, provided its Bid is reasonable and is in the best interest of the Joint Powers Authority to accept.
The Joint Powers Authority reserves the right, after opening bids, to reject any or all bids, or to make award to the lowest responsive and responsible bidder and reject all other bids. Refer to Paragraph B-3 for information regarding “Responsible Bidder” and submission of a “Responsive Bid”.
The successful Bidder will be notified in writing by Joint Powers Authority of the Award of Contract within 60 days after opening of Bids. Accompanying the Notice of Award will be four copies of the Contract, which successful Bidder will be required to execute properly and return to Joint Powers Authority, together with properly executed Performance Bond, Payment Bond, Certificates of Insurance and Endorsement, and Subcontractor Non-Collusion Affidavits, all within 10 days after date of receipt of such Notice of Award. Joint Powers Authority will promptly determine whether such Contract, Bonds, and Certificates of Insurance and Endorsement are as required by the Specifications and, upon such determination, will forward a fully signed copy of the Contract to successful Bidder.
A-4 Specifications No. GBJPA 2026-02 Recovery Lines & Structures Project
A-7 Site Conditions
Each bidder shall carefully examine the Plans, read the Specifications and the forms of the Contract Documents, and shall visit the site of the proposed work to fully inform himself as to all existing conditions and limitations that may affect the execution of work under the Contract, and each such bidder shall include in the bid prices the cost of all incidentals and appurtenances. The failure or omission of any bidder to receive or examine any form, instrument, addendum, or other document, or his failure to visit the worksite and acquaint himself with conditions at the construction site, shall in no respect relieve any such bidder from any obligation imposed by his bid or by the Contract. The submittal of a bid shall be taken as prima facie evidence of compliance with all instructions contained herein. All Bidders must contact the Joint Powers Authority to coordinate site visits.
A-8 Certified Checks and Bonds
Each bid shall be under sealed cover and must be accompanied by a Bid Guarantee in the form of either cash, a certified or cashier’s check, or by a corporate surety bond on the form furnished by the Joint Powers Authority and made payable to the Groundwater Banking Joint Powers Authority as a guaranty that the bidder will, if an award is made to him in accordance with the terms of his bid, promptly secure worker’s compensation insurance, liability insurance, and any other insurance required by the Contract Documents, execute a contract in the required form, and furnish satisfactory bonds for the faithful performance of the Contract and for the payment of claims of all persons supplying labor and materials for the construction of the work. Should the successful bidder fail to so perform, the Joint Powers Authority shall be entitled to retain the moneys represented by said check or bond as liquidated damages on account of the delay and inconvenience occasioned to the Joint Powers Authority, it being expressly agreed and understood that the amount of said check or bond constitutes reasonable damages and that it is impracticable or extremely difficult to ascertain actual damages. Said cash, check or bidder’s bond shall be in an amount not less than ten percent (10%) of the amount of the bid items identified in the Proposal Bond form included in the Contract Documents. The Faithful Performance Bond and Payment Bond shall each be not less than one hundred percent (100%) of the total amount of the bid price named in the contract.
The Joint Powers Authority reserves the right to reject any bond, if in the opinion of the Engineer or the Joint Powers Authority’s Attorney, the Surety’s acknowledgment is not legally sufficient. All sureties utilized by bidders shall be legally qualified to do business in the State of California, shall carry a current Best’s Insurance Guide rating of “A” or better, Class X or better, and shall furnish such reports as to their financial condition, from time to time, as may be requested by the Joint Powers Authority, including the Financial Statement of Bonding Company furnished with the Bond. The premiums for all said bonds shall be paid by the bidder. If any surety becomes unacceptable to the Joint Powers Authority in the absolute judgment and discretion of the Joint Powers
A-5 Specifications No. GBJPA 2026-02 Recovery Lines & Structures Project
Authority, then the bidder/contractor shall promptly furnish at its own expense such additional bonds as may be required by the Joint Powers Authority to protect the Joint Powers Authority’s interests and the interests of persons supplying labor or materials in the prosecution of the work contemplated by these Contract Documents.
In the event of any conflict between the terms of the Contract Documents and the terms of the bonds, the terms of the Contract Documents shall control and the bonds shall be deemed to be amended thereby. The Joint Powers Authority shall be entitled to exercise any and all rights granted by the Contract Documents in the event of default, without control by the surety, provided that the Joint Powers Authority promptly notifies the surety at the time or before the exercise of such rights. The exercise by the Joint Powers Authority of such rights shall not affect the liability of the surety under the bonds.
Bid security of unsuccessful bidder will be returned to the bidder within sixty (60) days of the time the execution of the contract by the Joint Powers Authority and the successful bidder award of contract is made.
A-9 Contract Retention
At the request and expense of the Contractor and pursuant to Public Contract Code section 22300, securities equivalent to any amount withheld by the Joint Powers Authority to ensure the Contractor’s performance under the Contract shall be deposited with the Joint Powers Authority as substitute security, or, at the Contractor’s request, with a state or federally chartered bank in California as the escrow agent. Escrow instructions shall conform to the requirements of Public Contract Code section 22300.
A-10 Wage Rates / Compliance Monitoring
Bids shall be made in accordance with the prevailing hourly rate of per diem wages for this locality and project as determined by the Director of Industrial Relations pursuant to Labor Code section 1770 et seq and in accordance with the Davis-Bacon Act, the more stringent shall apply. A copy of the prevailing wage rate schedules are on file at the office of the Joint Powers Authority and by this reference incorporated herein. The Contractor shall post a copy of said documents at each job site. The Contractor and any Subcontractor under him shall pay not less than the specified prevailing rate of per diem wages for general, holiday and overtime work to all workers employed in the execution of this contract.
This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations. Each contractor and subcontractor shall furnish the records specified in Labor Code section 1776 directly to the Labor Commissions, in the manner set forth in Labor Code section 1771.4. Contractors shall be required to post job site notices, as prescribed by regulation.
A-6 Specifications No. GBJPA 2026-02 Recovery Lines & Structures Project
A-11 Use of Apprentices
If the project requires the employment of workers in any apprenticeable craft or trade, once awarded, the Contractor or Subcontractors must apply to the Joint Apprenticeship Council unless already covered by local apprenticeship standards under Labor Code Section 1777.5, and the Contractor shall otherwise comply with Section 1777.5.
A-12 Contract Documents
The Contract Documents shall consist of the Notice Inviting Bids, the Instructions to Bidders, the accepted Proposal and Proposal Bidding Schedule, the Contractor’s Licensing Statement, the Information Required of Bidders, the Agreement, the Proposal Bond, the Faithful Performance Bond, the Payment Bond, the Non-Collusion Affidavits, the Notice of Award, Notice to Proceed Checklist and Notice to Proceed Form, General Conditions, Special Conditions, the Plans and Specifications, Appendices and any change order or Addenda, setting forth any modifications or interpretations of any of said Documents, all of which documents are on file or will be on file in the office of the Joint Powers Authority, 849 Allen Rd, Bakersfield, CA 93314, and which are hereby referred to and made a part of this Notice Inviting Bids.
Questions regarding the type of work required may be addressed to the following:
Curtis Skaggs Dee Jaspar and Associates
Tel. 661-332-6347 CSkaggs@djacivil.com
All questions or inquiries regarding the project or the Contract Documents shall be directed solely to the person listed above. Bidders shall not contact any participants in the project regarding the project or the Contract Documents prior to the time that the bids are opened.
Electronic copies of the plans and project manual may be requested from Curtis Skaggs at the email address above.
Joint Powers Authority may amend any provision or part of the Specifications at any time prior to three days before closing time, provided that the closing time set forth may be extended by Joint Powers Authority at any time prior to said closing time. Such amendments, if any, will be in the form of addenda which will be issued simultaneously to all persons who have obtained a copy of the Contract Documents from the Joint Powers Authority, and are on the planholder’s list. Addenda will be emailed ONLY to all parties recorded by the Engineer as having received the Contract Documents. If you wish to receive addenda by some means other than email, please advise the Engineer immediately. Questions received less than three days prior to the date for opening of bids will not be answered. Only questions answered by formal written Addenda will be mailto:CSkaggs@djacivil.com EFelix Highlight
A-7 Specifications No. GBJPA 2026-02 Recovery Lines & Structures Project binding. Oral and other interpretations or responses will be without legal effect and are not to be relied upon by the Bidders unless they are integrated into the written Contract Documents.
A-13 Substitute Securities
Pursuant to Public Contract Code Section 22300, equivalent securities may be substituted for monies withheld to ensure performance of the contract. The Joint Powers Authority reserves the right to solely determine the adequacy of the securities being proposed by the Contractor and the value of those securities. The Joint Powers Authority shall also be entitled to charge an administrative fee, as determined by Joint Powers Authority in its sole discretion, for substituting equivalent securities for retention amounts. The Joint Powers Authority’s decisions with respect to the administration of the provisions of Section 22300 shall be final and shall include, but not be limited to, determinations of what securities are equivalent, the value of the securities, the negotiability of the securities, the costs of administration and the determination of whether or not the administration should be accomplished by an independent agency or by the Joint Powers Authority. The Joint Powers Authority shall be entitled, at any time, to request the deposit of additional securities of a value designated by Joint Powers Authority, in Joint Powers Authority’s sole discretion, to satisfy this requirement. If the Joint Powers Authority does not receive satisfactory securities within twelve (12) consecutive days of the date of the written request, Joint Powers Authority shall be entitled to withhold amounts due Contractor until securities of satisfactory value to Joint Powers Authority have been received.
A-14 Grant Requirements
Buy America Domestic Procurement
All of the iron, steel, manufactured products, and construction materials used in the project must be produced in the United States.
1. All iron and steel used in the project must be produced in the United States.
This means all manufacturing processes, from the initial melting stage through the application of coatings, occurred in the United States;
2. All manufactured products used in the project must be produced in the United
States. This means the manufactured product was manufactured in the United States; and the cost of the components of the manufactured product that are mined, produced, or manufactured in the United States is greater than 55 percent of the total cost of all components of the manufactured product, unless another standard for determining the minimum amount of domestic content of
A-8 Specifications No. GBJPA 2026-02 Recovery Lines & Structures Project the manufactured product has been established under applicable law or regulation; and
3. All construction materials are manufactured in the United States. This means that all manufacturing processes for the construction material occurred in the United States.
Federal Wage Rate Requirements
All laborers and mechanics employed by the Contractor or subcontractors in the performance of construction, alteration, or repair work on the project shall be paid wages at rates not less than those prevailing on similar projects in the locality, as determined by the Secretary of Labor in accordance with Subchapter IV of Chapter 31 of Title 40, U.S.
Code (commonly referred to as the Davis-Bacon Act).
Good Faith Effort
The Contractor must take all necessary affirmative steps to assure that minority business, women's business enterprises, and labor surplus area firms are used when possible.
Affirmative steps must include:
1. Placing qualified small and minority businesses and women's business enterprises on solicitation lists;
2. Assuring that small and minority businesses, and women's business enterprises are solicited whenever they are potential sources;
3. Dividing total requirements, when economically feasible, into smaller tasks or quantities to permit maximum participation by small and minority businesses, and women's business enterprises;
4. Establishing delivery schedules, where the requirement permits, which encourage participation by small and minority businesses, and women's business enterprises;
5. Using the services and assistance, as appropriate, of such organizations as the
Small Business Administration and the Minority Business Development Agency of the Department of Commerce; and
EFelix Highlight
A-9 Specifications No. GBJPA 2026-02 Recovery Lines & Structures Project
6. Requiring the prime contractor, if subcontracts are to be let, to take the affirmative steps listed in paragraphs 1 through 5 above.
Date: Groundwater Banking Joint Powers Authority
By: /s/ Dan Bartel General Manager
A-10 Specifications No. GBJPA 2026-02 Recovery Lines & Structures Project
**This Page is Intentionally Left Blank**
Groundwater Banking Joint Powers Authority Section B
B - 1 Specifications No. GBJPA 2026-02 Recovery Lines & Structures Project
Instructions to Bidders
SECTION B
INSTRUCTIONS TO BIDDERS
B-1 Form of Proposal and Signature
The Proposal shall be submitted only on the forms attached hereto or copies thereof and shall be enclosed in sealed envelopes (to be provided at the mandatory pre-bid conference) and marked and addressed as described in Paragraph B-16. The bidder shall state in figures the unit prices or the specific sums, as the case may be, for which he proposes to supply the labor, materials, supplies, or machinery, and perform the work required by the Contract and other Contract Documents, including the Specifications. If the unit price and the total amount named by a bidder for any item are not in agreement, the unit price alone will be considered as representing the bidder's intention and the totals will be corrected to conform thereto.
If the Proposal is made by an individual, it shall be signed by him and his full name and address shall be given; if it is made by a firm, it shall be signed with the co-partnership name by a member of the firm, who shall also sign his own name, and the name and address of each member of such firm shall be given; and if it is made by a corporation the name of the corporation shall be signed by its duly authorized officer or officers attested by the corporate seal, the names and titles of all officers of the corporation shall be given, and the address of the corporation and the state in which incorporated shall be stated.
Proposals will be considered only from persons licensed as required under applicable provisions of the Contractors’ State License Law (California Business and Professional Code, Section 7000 et seq.) and rules and regulations adopted pursuant thereto; and each bidder shall insert his license number in the place provided in the Proposal. No oral, telephonic, or telegraphic proposal or modification of a proposal will be considered.
B-2 Preparation of the Proposal
Blank spaces in the Proposal shall be properly filled. The phraseology of the Proposal must not be changed, and no additions shall be made to the items mentioned therein.
Unauthorized conditions, limitations, or provisos attached to a Proposal will render it informal and may cause its rejection. If erasures, interlineations or other changes appear on the form, each erasure, interlineation or change must be initialed by the person signing the Proposal. Alternative proposals will not be considered unless specifically provided for in the Proposal Bidding Schedule.
Proposals may be withdrawn without prejudice by written or telegraphic requests received from bidder prior to the time for opening of bids, and Proposals so withdrawn will be returned to bidders unopened when reached in the process of opening bids. No Proposal may be withdrawn after the hour fixed for opening bids without rendering the accompanying certified or cashier’s check or bidder’s bond subject to retention as
B - 2 Specifications No. GBJPA 2026-02 Recovery Lines & Structures Project liquidated damages in like manner as in the case of failure to execute the Contract after award, as in the Contract Documents herein provided.
No Proposal received after the time fixed or at any place other than the place stated in the Notice Inviting Bids will be considered. All bids will be opened and read publicly. Refer to Paragraph B-16 of the “Bid Submission and Opening Procedures” for information regarding the procedures for opening of bids. Bidders, their representatives and other interested parties are invited to be present at the opening. Where bonds are required, the bidder shall name in his Proposal the surety or sureties which have agreed to furnish said bonds.
B-3 Responsible Bidder and Responsive Bid
A “Responsive Bid” is one that materially conforms in all respects to the requirements set forth in Section A–Notice Inviting Bids and Section B–Instructions to Bidders. The Joint Powers Authority reserves the right to waive any irregularities in the bids received.
A “Responsible Bidder” is one that has the qualifications, general competency, and resources to perform the Work covered by the Proposal. Among other matters, a Responsible Bidder is one that can demonstrate successful completion of projects involving work of scope and complexity comparable to that being installed under the Contract Documents. Bids shall identify such projects and provide the information indicated in the “Information Required of Bidder” form. Joint Powers Authority expressly reserves the right to reject any bid if it determines that bidder's business or technical organization, financial resources, plant and equipment to be used in performing work, or lack of successful experience in performing work of similar scope and complexity, is such that it is not in Joint Powers Authority's best interest to accept the bid.
B-4 Brokerage of Work Not Favorably Considered
In general, the brokerage of work will not be favorably considered, and the subletting of the entire Contract or of substantial complete units of it will be permitted only upon an adequate showing of the necessity involving some new condition not reasonably foreseen at the time of the Proposal.
B-5 Equalizing Factors
Wherever applicable, equalizing elements or factors not specifically mentioned or provided for herein, such as interest during construction, cost of transportation, inspection (including salaries and travel subsistence expenses), installation and operation, or any other factor or element in addition to that of price which would affect the total cost or value to the Joint Powers Authority, will be taken into consideration in comparing bids for award of the Contract.
B - 3 Specifications No. GBJPA 2026-02 Recovery Lines & Structures Project
B-6 Servicing and Maintenance
Each bidder must, if requested, furnish evidence that there is an efficient service organization which regularly carries a stock of repair parts for the proposed equipment to be furnished and installed in the work and that the organization is conveniently located for prompt service.
B-7 Local Conditions
Before submitting a Proposal, the bidder shall carefully examine the Plans, read the Specifications, visit the site of work, and fully inform himself as to all conditions and limitations, including the character of equipment and facilities needed preliminary to and during the prosecution of the work, the uncertainty of weather, site accessibility, groundwater level, and soil conditions along the line of work, and as to all other matters which can in any way affect the work to be done. Failure to do so will not release bidders from the responsibility for estimating properly the difficulty or cost of successfully performing the work. The Joint Powers Authority makes no representation or warranty regarding the accuracy or interpretation of information derived from maps, plans, specifications, profiles, drawings, borings, or other investigations and will not be responsible for any understanding or representations concerning conditions made by any of its officers or agents, including the Engineer or his assistants, prior to the execution of the Contract. The quantities of work or material stated in the unit price items of the Bidding Schedule are given only as a basis for the comparison of bids, and the Joint Powers Authority does not represent or warrant that the actual amount of work or material will correspond therewith, but reserves the right to increase or decrease the quantity of any unit price items of the work as may be deemed necessary or expedient by the Engineer.
The project to which the work covered by the Contract Documents pertains is being funded in part by a grant from the Small Surface Water and Groundwater Storage Projects (SSWGSP) program, which is being administered by the United States Bureau of Reclamation (Reclamation).
B-8 Execution of Contract
The Joint Powers Authority reserves the right to accept or reject bids for a period of sixty
(60) days after date of opening, and no bid can be withdrawn during said period. A bidder to whom award is made shall execute a written Contract with the Joint Powers Authority in the form attached hereto and obtain insurance and faithful performance and labor and material bonds of the types and character and in the amounts required in Paragraph B-9, B-10, and B-11, within ten (10) calendar days from the date of the mailing of a notice from the Joint Powers Authority to the bidder of the acceptance of his Proposal, or such additional time as may be allowed by the Engineer. If a bidder to whom award is made fails or refuses to so perform, his Bid Guarantee shall become the property of the Joint Powers Authority, as provided for in Paragraph A-8, and the award
B - 4 Specifications No. GBJPA 2026-02 Recovery Lines & Structures Project will be annulled, and in the…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .