Z2DA--Correct HVAC Deficiencies Bldg. 110A Project # 590-19-110 Hampton VA Medical Center Construction Services
Closed Pre-Solicitation Posted
This opportunity was awarded. See the award notice from , or the latest solicitation from .
- Solicitation number
- 36C24622R0007
- Agency
-
Veterans Integrated Service Network 6
Veterans Health Administration, Department of Veterans Affairs
- Responses due
- Set-aside
- Service-Disabled Veteran-Owned Small Business
Opportunity facts
- NAICS code
- 238220 Plumbing, Heating, and Air-Conditioning Contractors
- Place of performance
- Hampton, VA Medical Center 100 Emancipation Dr. Hampton, Virginia 23667, United States
Notice details come from SAM.gov. Updated .
About this opportunity
This presolicitation notice is for project number 590-19-110 to correct HVAC deficiencies at the Hampton VA Medical Center in Hampton, Virginia. The Department of Veterans Affairs will procure construction services including general, architectural, mechanical, electrical, and plumbing work to supplement the existing HVAC system in building 110A. A request for proposal will be issued on November 23, 2021 via beta.sam.gov. Proposals will be evaluated, and award made to the responsible offeror whose offer conforms to the solicitation and is most advantageous to the government considering the relative importance of price and other factors. The period of performance is 180 calendar days from notice to proceed.
This opportunity is set aside exclusively for service-disabled veteran-owned small businesses. The NAICS code is 238220 for plumbing, heating, and air conditioning contractors with a size standard of $16.5 million. The project value is estimated between $1 million to $5 million. Offerors must meet COVID-19 safety protocols for screening and documentation of vaccination or testing status to work on site at the medical center.
Notice text
PRESOLICITATION NOTICE
This notice is for Solicitation Number 36C24622R0007, Project Number 590-19-110 Correct HVAC Deficiencies, at Hampton VA Medical Center, 100 Emancipation Dr., Hampton, VA 23667.
This shall be a Service-Disabled Veteran Owned Small Businesses (SDVOSB) Set-Aside. As a result, all SDVOSB may submit a proposal, which will be considered by the agency. The North American Industry Classification System (NAICS) code for this action is 238220 (Plumbing, Heating and Air-Conditioning Contractors) with a size standard of $16.5 million. FAR 36.204| Disclosure of the magnitude of construction project is between $1,000,000 and $5,000,000.
Scope of Work:
Provide construction services to correct (heating, ventilation, and air conditioning -HVAC) deficiencies including architectural, and (mechanical, electrical, and plumbing - MEP) in building 110A (Sterile Processing Service - SPS) and all associated work as per attached plans and specifications at Hampton, VA Veterans Medical Center:
General: The following is a summary of the work:
BASE PROPOSAL ITEM I, GENERAL CONSTRUCTION: Work includes, but is not limited to, general construction, alterations, architectural, interior finishes, mechanical and electrical work, and certain other items to supplement the existing outdated and undersized HVAC system to maintain the required SPS temperature and humidity in the space. The project shall include cleaning of the ductwork. The project shall comply with Directive 1116, SPS design guide and the HVAC design manual specifically the requirements in section 2.8 necessary removal of existing construction and certain other items. See the solicitation notice for the instructions to offerors and deduct alternates.
PROPOSAL ITEM II DEDUCT ALTERNATE NO. I: Perform all work described in Base Proposal Item I above except: Proposal Deduct: Eliminate all elements associated with the glycol runaround energy recovery system. Removed elements include glycol coil in AHU, glycol coil in exhaust ductwork, exhaust filter bank, new exhaust ductwork in crawlspace (all ductwork in the crawlspace/pipe basement would be existing to remain if the deduct alternate is taken), glycol insertion pump package, glycol water circulation pump, air separator, expansion tank, chemical feeder, and glycol/water piping. Control points associated with the glycol system would be removed. Electrical deduct shall consist of all electrical connections, conduit, conductors, switches, and appurtenances associated with pumps 110A-GP-1 and 110A-GP-2. Electrical circuit breakers serving these items shall instead be Spare if the deduct is accepted. Architectural deduct work shall consist of concrete equipment base for associated pump along with painting and any other associated general trades work.
Place of Performance: Tasks will be performed at the VA Medical Center, Hampton, VA, 23667. Work will be around an occupied healthcare facility in operation 24 hours a day.
Specific requirements (see drawings for area of work):
General see section 01 00 00
Asbestos and lead Abatement see division 2
Finishes see division 9
HVAC and Piping see division 23
Electrical - see division 26
Controls/Electronics see division 27 and 28
Period of Performance: Contractor shall commence work under this contract promptly after Notice to Proceed (NTP), execute the work diligently, and achieve final completion and acceptance including final cleanup of the premises within one-hundred eighty calendar days including submittals.
Specific site requirements: Contractor and all subcontractors shall obtain a flash badge from the Police Service, provide proof of OSHA 10 training completion, provide TB test results, and shall abstain from smoking within the perimeters of the facility All individuals that enter any VA facility are always required to wear a face mask and will be pre-screened for COVID19; to include Veterans, employees, visitors, volunteers, and contractors (See VHA Supplemental Contract Requirements below).
Construction Safety Requirements: - see attached Hampton Construction Safety Handbook in section 01 35 26
Submittals: - see sections 01 00 00, 01 33 23, and all applicable trade sections
Quality Control: - see section 01 45 00
Schedules: - see section 01 32 16 .15
Environmental and Waste Management: - see sections 01 57 19, and 01 74 19
VHA Supplemental Contract Requirements for Ensuring Adequate COVID-19 Safety Protocols for Federal Contractors
1. Contractor employees who work in or travel to VHA locations must comply with the following:
a. Documentation requirements: 1) If fully vaccinated, shall show proof of vaccination. i. NOTE: Acceptable proof of vaccination includes a signed record of immunization from a health care provider or pharmacy, a copy of the COVID-19 Vaccination Record Card (CDC Form MLS-319813_r, published on September 3, 2020), or a copy of medical records documenting the vaccination.
2) If unvaccinated and granted a medical or religious exception, shall show negative COVID-19 test results dated within three calendar days prior to desired entry date. Test must be approved by the Food and Drug Administration (FDA) for emergency use or full approval. This includes tests available by a doctor s order or an FDA approved over-the-counter test.
3) Documentation cited in this section shall be digitally or physically maintained on each contractor employee while in a VA facility and is subject to inspection prior to entry to VA facilities and after entry for spot inspections by Contracting Officer Representatives (CORs) or other hospital personnel.
4) Documentation will not be collected by the VA; contractors shall always adhere to and ensure compliance with federal laws designed to protect contractor employee health information and personally identifiable information.
2. Contractor employees are subject to daily screening for COVID-19 and may be denied entry to VA facilities if they fail to pass screening protocols. As part of the screening process contractors may be asked screening questions found on the COVID-19 Screening Tool. Check regularly for updates.
a. Contractor employees who work away from VA locations, but who will have direct contact with VA patients shall self-screen utilizing the COVID-19 Screening Tool, in advance, each day that they will have direct patient contact and in accordance with their person or persons who coordinate COVID-19 workplace safety efforts at covered contractor workplaces. Contractors shall always adhere to and ensure compliance with federal laws designed to protect contractor employee health information and personally identifiable information.
Contractor must immediately notify their COR or Contracting Officer if contract performance is jeopardized due to contractor employees being denied entry into VA Facilities.
This project will be procured as 100% set-aside for Service-Disabled Veteran-Owned Small Business (SDVOSB) and must be listed as verified in the Vendor Information Pages (VIP) database at https://www.vip.vetbiz.va.gov/. The VA will issue a Request for Proposal (RFP) on or about 11/23/2021 via Contract Opportunities at https://beta.sam.gov/. A site visit will be scheduled, and the date/time/location will be provided with the solicitation.
Files
| File | Type | Posted |
|---|---|---|
| 36C24622R0007.docx | DOCX document |
Notice history
| Notice | Type | Posted |
|---|---|---|
| Z2DA--Correct HVAC Deficiencies Bldg. 110A | Award Notice | |
| Z2DA--Correct HVAC Deficiencies Bldg. 110A Project # 590-19-110 Hampton VA Medical Center Construction Services | Solicitation | |
| Z2DA--Correct HVAC Deficiencies Bldg. 110A Project # 590-19-110 Hampton VA Medical Center Construction Services | Solicitation | |
| This notice | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Z2DA--FY27 NRM 558-24-160, Domestic Water, Chilled Water and Steam Piping (VA-26-00066009) | Veterans Integrated Service Network 6 | Service-Disabled Veteran-Owned Small Business | |
| Y1DA--590-27-120 Replace Pneumatic Tube System | Veterans Integrated Service Network 6 | Service-Disabled Veteran-Owned Small Business | |
| CON | Z1DA | replace or chillers | 580-23-105 | solicitation | Veterans Integrated Service Network 16 | Service-Disabled Veteran-Owned Small Business | |
| Z1DA--FY27 NRM - Replace B98 and B88 Boiler and Sump Pumps | Veterans Integrated Service Network 21 | No set-aside | |
| Z2DA--FY27 NRM 558-24-160, Domestic Water, Chilled Water and Steam Piping (VA-26-00066009) | Veterans Integrated Service Network 6 | Service-Disabled Veteran-Owned Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity