Z2DA--CON RRTP RM100 Dining Room Renovation at Fort Harrison, MT 436-23-103
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- 36C25924Q0010
- Agency
-
Veterans Integrated Service Network 19
Veterans Health Administration, Department of Veterans Affairs
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 236220 Commercial and Institutional Building Construction
Notice details come from SAM.gov. Updated .
About this opportunity
This solicitation seeks to procure construction services for the renovation of an existing dining room space located at the Fort Harrison VA Medical Center in Montana. The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 19 is seeking a qualified contractor to provide all labor, materials, equipment and supervision necessary to complete the project. Key requirements include the removal and replacement of casework, flooring, walls and fixtures along with minor electrical and plumbing work. Proposals are due by December 12, 2023 and will be evaluated based on technical qualifications, past performance, and price.
The solicitation is set aside 100% for Service-Disabled Veteran Owned Small Businesses. The primary NAICS code is 236220 for commercial and institutional building construction and the PSC code is Z2DA for repair or alteration of hospitals and infirmaries. The place of performance is the Fort Harrison VA Medical Center in Montana and the estimated award value is between $25,000 to $100,000. The contractor must complete all work within 30 days of receiving the notice to proceed.
Notice text
4 versions
Update #4 · Latest ·
?.## Attachments
Update #3 ·
DEPARTMENT OF VETERANS AFFAIRS
VHA Network Contracting Office 19
Rocky Mountain Acquisition Center
6162 South Willow Drive, Suite 300
Greenwood Village, CO 80111
CONTRACTOR Q&As
Dining Room Renovation RM 100
Question No. 1: What is the RR-1? I don t see it called out on the finish schedule.
Answer No. 1: Please see the wall protection schedule on sheet A-103.
Update #2 ·
Delete This
Update #1 ·
CONSTRUCTION SCOPE OF WORK
DINING ROOM RENOVATION
Project: 436-23-103
Project Name: RRTP RM100 Dining Room Renovation
Project Scope:
The VA Montana Healthcare System requires the services of a qualified General Contracting firm to provide construction services allowing for the renovation of existing dining room space in the Domiciliary at Fort Harrison Medical Center, building 169, room 100. Work is to include removal of existing casework, flooring materials, and water damaged wall sections. New casework will be installed with new floor finish, fresh paint, and minor electrical and plumbing installation. Contractor to provide all labor, material, and services as outlined in the Contract Documents including this Scope of Work, Contract Drawings, and Specifications.
The Contractor shall also be responsible for all damages to persons or property that occurs due to the Contractor s fault or negligence.
The Contractor shall be responsible for supplying all submittals as outlined in the Submittal Register and Specifications, maintaining and tracking a complete list of all submittals, and sending scheduled updates to the COR per Specification section 01 33 23 SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES.
The Contractor shall also be responsible for all materials delivered and work performed until completion and acceptance of the entire work, except for any completed unit of work which may have been accepted under the contract.
Existing Site Conditions. Construction will occur within the Domiciliary at Fort Harrison Medical Center. The project will take place in an occupied healthcare facility and the build activities will require construction to be phased in such a way as to minimize impact to staff and patients. Infection Control measures will be required at all times as defined in the ASHE ICRA assessment, Class III, Group 2, Type C. Construction activity will require constant coordination with VA personnel.
Site Investigation is required for this project to ensure accuracy of design. The Contractor shall be responsible for field verifying all conditions and quantities that may affect the project work prior to bid of this project. Site investigation is to be included in the cost proposal. This work can be performed directly by the General Contracting firm, or indirectly via contract to a third party (Sub-Contractors). The person(s) conducting the site investigation are to check in with the VA Facilities Management Services department and will be escorted to review the project by a VA representative. This work can be done in advance and is intended to limit unforeseen site conditions not indicated on the drawings.
The final construction shall conform to all VA requirements outlined in the FGI Guidelines for Design and Construction of Hospitals, Facilities Guideline Institute (FGI), ADA, Joint Commission Accreditation Standards, ANSI, SMACNA, IBC, NEC, NFPA as well all requirements of the VA design manuals posted by discipline in the VA Technical Information Library at the following web address: http://www.cfm.va.gov/til/dManual.asp
Work shall be completed in conformance with the time schedule requested by the VA Contracting Officer s Representative (COR) or Resident Engineer (RE). The Contractor is solely responsible for preparing all necessary regulatory notifications to meet the time schedule.
Due to requirements in NFPA 101 Life Safety Code, a minimum of two egress routes for each occupied space must be maintained. To ensure the safety of VA patients, staff, and tenants, work is to be structured to allow for egress routes to be maintained throughout the course of construction. Work requiring relocation of tenants, is subject to notification requirements. If Contractor provides a schedule resulting in any violations of NFPA 101 Life Safety Code during any work, they must also submit proposed interim life safety measures for VA review. Any action necessitated by NFPA 101 Life Safety Code will be the responsibility of the Contractor.
Tasks and Requirements:
General Contractor Requirements
Submittals must be reviewed and approved by the VA prior to the start of work.
All demolition shall be required to remove abandoned utilities back to active main.
Installation shall minimize penetrations in finished walls to the extent possible and with any such penetrations repaired to match existing construction or meet and/or exceed required sound transmission coefficient (STC), smoke/fire partition rating requirements after completion of work.
Any new construction shall match surrounding finishes unless indicated otherwise.
Contractor and their Sub-contractors are to provide necessary submittals and plans for approval prior to commencing with any new work not shown/provided in the construction documents.
All damage to floors, walls, ceilings, or any other VA property to be repaired/replaced by the contractor.
Contractor shall be responsible for all construction debris removal. The contractor shall provide their own dumpster as needed.
For interior construction the contractor shall provide dump carts and HEPA carts as needed. Dump carts are to be sealed with a tight-fitting lid during travel to and from the jobsite to the designated dumpster location. Dumpster location and debris removal pathway to be approved by the VA COR.
Temporary egress and life safety signage to be provided by contractor and any ILSMs required shall be coordinated with VA COR and VA safety personnel.
Description of Work:
Setup of Infection Prevention Measure.
Remove sink and associated plumbing.
Remove casework.
Remove water damaged wall sections.
Remove sill at TV alcove.
Remove flooring, base materials, wall guards, and rub rails.
Remove coat rack and marker board.
Install new flooring and base materials.
Relocate light switch at kitchenette alcove.
Install new casework.
Install sink, faucet, and associated plumbing.
Remove trim as necessary to paint.
Paint existing and new walls as indicated.
Paint glazing frames.
Install ice machine and associated drain and water lines.
Connect new water lines and drain to coffee machine.
Connect new water lines if required by refrigerator.
Install new corner guards and rub rail.
Install soap and paper towel dispenser.
Install sound attenuation around soffit.
Period of Performance
The construction period of performance will be 30 days from the Notice to Proceed (NTP).
A Construction NTP will not be awarded until all pre-construction submittals have been approved.
Work Schedule
Normal working hours are from 7:30 AM to 4:30 PM (local time) Monday through Friday except for weekends and established Federal Holidays.
The following Federal legal holidays are observed by this facility:
New Year s Day January 1
Martin Luther King s Birthday Third Monday in January
President s Day Third Monday in February
Memorial Day Last Monday in May
Juneteenth June 19
Independence Day July 4
Labor Day First Monday in September
Columbus Day Second Monday in October
Veteran s Day November 11
Thanksgiving Day Fourth Thursday in November
Christmas Day December 25
Work Performed After Hours: to maintain schedule, work may be performed after hours. Contractor to coordinate these efforts with the VA COR with a minimum of 24-hours notice.
In order to maintain schedule, work performed over the weekend, may be allowed. Contractor to coordinate these efforts with VA COR with a minimum of 48-hours notice.
Privacy Statement
Information Security: The C&A requirements do not apply; a Security Accreditation Package is not required. Incidental exposure to protected health information may occur from accessing the work site. Staff will follow all Privacy & Security policies and procedures.
Appendix
Attachment 1 - 436-23-103_ICRA RRTP RM100 Dining Room Renovation
Attachment 2 - 436-23-103_PCRA RRTP RM100 Dining Room Renovation
Attachment 3 - 01 33 23 SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES
Files
| File | Type | Posted |
|---|---|---|
| ICRA RRTP RM100 Dining Room Renovation REV1.pdf | ||
| 36C25924Q0010 0003.docx | DOCX document | |
| Dining Room Reno SCHEM REV1.pdf | ||
| 36C25924Q0010 0002.docx | DOCX document | |
| RM100 Dining Room Renovation Site Visit Attendance.pdf | ||
| Site Visit Meeting Doc.pdf | ||
| 36C25924Q0010 0001.docx | DOCX document | |
| 36C25924Q0010.docx | DOCX document | |
| RRTP RM100 Dining Room Reno SCHEM.pdf | ||
| RRTP RM100 Dining Room Renovation PCRA.pdf | ||
| NEW - Calculation Worksheet for Self-Performed and Subcontracted Work.docx | DOCX document | |
| RRTP RM100 Dining Room Renovation SPECS.pdf | ||
| Past Performance Questionnaire_Blank_Fillable PDF.pdf | ||
| RRTP RM100 Dining Room Renovation ICRA.pdf |
Show all 14
Notice history
| Notice | Type | Posted |
|---|---|---|
| Z2DA--Dining Room Renovation RRTP RM100 | Award Notice | |
| This notice | Solicitation | |
| Z2DA--CON RRTP RM100 Dining Room Renovation at Fort Harrison, MT 436-23-103 | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| PN: 438-21-403, Renovate First Floor Kitchen (SF) | Veterans Integrated Service Network 23 | Service-Disabled Veteran-Owned Small Business | |
| Z1DA--36C25227B0026 Remodel ENT Procedure Rooms CON 537-19-109 | Veterans Integrated Service Network 12 | Service-Disabled Veteran-Owned Small Business | |
| Z2DA--612A4-27-018 | Replace B650 3rd and 2nd Flooring | Veterans Integrated Service Network 21 | Service-Disabled Veteran-Owned Small Business | |
| Z1DA--528A8-22-814 Consolidate Primary Care Reception | Veterans Integrated Service Network 2 | Service-Disabled Veteran-Owned Small Business | |
| Z1DZ--Replace Dental Vacuum Piping | Veterans Integrated Service Network 21 | Service-Disabled Veteran-Owned Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity