Z2DA--436-22-126 Site Preparations - Hazardous Drugs Mixing - IV Cleanroom Mobile Trailer (VA-22-00029124)
Closed Solicitation Posted
- Solicitation number
- 36C25922Q0119
- Agency
-
Veterans Integrated Service Network 19
Veterans Health Administration, Department of Veterans Affairs
- Responses due
- Set-aside
- Service-Disabled Veteran-Owned Small Business
Opportunity facts
- NAICS code
- 236220 Commercial and Institutional Building Construction
- Place of performance
- Fort Harrison, Montana 59636, United States
Notice details come from SAM.gov. Updated .
Notice text
7 versions
Update #7 · Latest ·
AN AMENDMENT TO SOLICITATION 36C25922Q0119 POSTED ON JANUARY 27, 2022. The purpose of this amendment is as follows: Post responses to follow-up questions. All proposals are to be sent via email to Christina.Beeler-Blackburn@va.gov. All other items and conditions remain the same.
Update #6 ·
AN AMENDMENT TO SOLICITATION 36C25922Q0119 POSTED ON JANUARY 26, 2022.
The purpose of this amendment is as follows:
Extend the solicitation due date to 2/1/2022 at 10:30 AM MT. All proposals are to be sent via email to Christina.Beeler-Blackburn@va.gov.
All other items and conditions remain the same.
Update #5 ·
AN AMENDMENT TO SOLICITATION 36C25922Q0119 POSTED ON JANUARY 18, 2022. The purpose of this amendment is as follows: Extend the solicitation due date to 1/26/2022 at 10:30 AM MT. All proposals are to be sent via email to Christina.Beeler-Blackburn@va.gov. All other items and conditions remain the same.
Update #4 ·
AN AMENDMENT TO SOLICITATION 36C25922Q0119 POSTED ON JANUARY 18, 2022.
The purpose of this amendment is as follows:
Extend the solicitation due date to 1/26/2022 at 10:30 AM MT. All proposals are to be sent via email to Christina.Beeler-Blackburn@va.gov.
All other items and conditions remain the same.
Update #3 ·
Will the GC be required to provide a full-time supervisor on site during construction?
Yes, this is standard practice to provide full-time supervision during construction.
Drawings show (2) hose bib connection points. Please clarify which location is preferred?
The preferred location is the hose bib to the plan East (right on the drawing). This would allow for a less complicated connection and would keep the line out of pedestrian traffic.
Hose bibs tend to freeze. Will as separate Frost-free connection to the building be required?
The current connection is old and no longer serviceable. A new frost-free connection is required as part of the site-prep. Â
Is there a shutoff valve located near water connection point?
The shutoff valve is located in the basement of building 141, approximately 40 feet from the exterior wall penetration for the East hose bib.
Please confirm if contractor is responsible for any HVAC requirements?
The pharmacy trailer has a fully contained HVAC system. Site preparations will not include HVAC.
Please confirm trailer configuration. Drawing does not show connection point designation.
Ideally, and if feasible, the VA would like to have the trailer configured so the entry door into the trailer is facing plan West (facing the sliding glass door into building 141).
Who is responsible for relocating existing trash bin?
The VA holds the service contract for the trash bin and will contact the service provider (Tri-County) to have it relocated once it is necessary.
Utility drawings show gray water tanks with 3 gray line water drain. Is a grey water connection required? What location is gray water being drained to?
A gray water connection will not be required to drain the tanks. The contractor providing the trailer (Germfree) will engage the services of a local contractor to empty the gray water tanks regularly.
Scope of work indicates for ramp to conform to anti-slip requirements. Please provide those requirements.
Specific minimum friction rating requirements are not dictated. The general direction would be that if the contractor chooses to use a prefabricated metal ramp, ensure it is outfitted with extruded non-slip decking as part of the system. If the contractor plans to build the ramp, from virgin materials, then a form of industrial strength anti-slip adhesive tape would be acceptable.
Whatever form of anti-slip method is chosen, the contractor shall ensure it will not interfere with cart transport up and down the ramp.Â
SOW calls for installing card reader (PIV) compliant and associated hardware. Please provide system details so that new install is compatible with existing system. Please confirm this requirement.
See Part number:Â HID HU-920PHRNK7 PIV Class
https://www.hidglobal.com/products/readers/pivclass/pivclass-r40
SOW II H to install hard barrier enclosure along canopy length to be tied into ramp barrier. This is not shown on drawings. Please indicate location of canopy enclosure.
Extent of canopy barrier will largely hinge on the ramp positioning (See question 6). Contactor to provide configurations with slopes for approval to the VA prior to installation.
Please clarify finished material and type for exterior of canopy and ramp barriers.
Please refer to line item J in the Scope of Work. VA would expect to see a rigid stud wall construction (wood, metal, etc.) to include wind and weather resistant material on the exterior that are also aesthetic, to some extent.
SOW indicates that trailer skirting is recommended . Please confirm this requirement and R-value designation.
Please refer to line item K in the Scope of Work. It is not recommended, it is a requirement.
Typical trailer skirting is made from board with an R-value of R5 per inch of thickness. The best variety of this board is extruded polystyrene foam board, also called blue board. A framework could be built under the trailer using 2 x 2 lumber, or similar product, then attach the foam board to the constructed framework. Stopping air movement is more important than a high R-value for the skirting as there is no heat source under the trailer. For this reason, enough foamboard to create a rigid system that will hold up to the elements will be acceptable.
SOW indicates requirement for both pedestrian and vehicle barricades. There is nothing shown on drawings. Please clarify this requirement.
The vehicle rated security barricades will double as pedestrian barricades by including mountable fencing onto the barriers. These barricades will be positioned around the North perimeter of the trailer to enclose and protect it from vehicles and to keep pedestrians out of the area around the trailer where utilities will be connected.
The vehicle barriers are called out to have fencing attached. Please confirm type, height etc.
Typical vehicle rated security barricades are 3-4 feet. Attached fencing would be expected to be approximately 4 feet to ensure pedestrians cannot attempt to cross over the barriers. Type of fencing to be used is chain link, or equivalent.
Is contractor bidding removal of any installed items listed in SOW?
The Contractor will be responsible for removing all included site-prep items (utilities, ramp, barriers, fencing, etc.) at the end of the trailer lease. Vehicle rated security barriers may be relocated elsewhere on campus by the contractor, at the CORs discretion.Â
SOW indicates to complete job as specified in section IV. There does not appear to be a section IV included in the SOW. Please provide period of performance information.
Upon award of this project, the Contractor will be given an Administrative Notice to Proceed (ANTP). During this time all required pre-construction submittals such as, safety plans, quality control plan, phasing, schedules, materials submittals, certifications, etc. shall be provided for VA review and approval. All pre-construction submittals are to be provided within 15 days of the ANTP. Additionally, the ANTP is when the Contractor will place orders for any required equipment and materials due to increases in lead times. Following satisfactory submission of all pre-construction submittals and the arrival of required equipment and materials, a Construction Notice to Proceed (CNTP) will be issued. Contractor will have 30 days from the CNTP to provide all work according to contract documents. The total period of performance will be 45 days.
Based on drawings the gray area (ramp area) is about 20 to 25 long. With door entrance at 48 high the slope will be significant. Please provide slope tolerances.
The slope of the ramp does not have to meet stringent VA barrier free guidelines. However, this ramp will be used to transport pharmacy carts and the slope cannot be so significant that pharmacy staff are not able to get the carts up and down the ramp. The VA is expecting the ramp slope to be approximately 1:12.
There is no electrical panel shown on drawings. What panel is power for trailer to be pulled from?
141-MDP (Main Distribution Panel) in Electrical room B-21 of Building 141.
Has a load test been conducted on electrical panel? Can the VA confirm the capacity of panel?
A load test has not been conducted as part of this project, however a test can be performed if deemed necessary. Panel 141-MDP confirmed to have appropriate capacity for the pharmacy trailer s requirements.
Update #2 ·
Project: Site Prep for Hazardous Drugs Mixing IV Cleanroom Suit Trailer I. Scope of Work The Montana VA Health Care System requires a site preparation contract that will allow for immediate use of Germfree s Hazardous Drugs Mixing IV Cleanroom Suit Trailer upon delivery. The trailer will be located at the Fort Harrison VA Medical Center, 3687 Veterans Drive, Fort Harrison, MT 59602. Placement will be at the Administration Building 141. Intent of this project is to provide site preparation to install the Hazardous Drugs Mixing IV Cleanroom Suit Trailer on campus. The trailer will be used by the Fort Harrison VA Medical Center pharmacy staff due to the event that sterile compounding services are temporarily suspended within the facility and interruptions in patient care must be avoided. As part of this site prep, the Contractor shall coordinate site-preparations. The trailer will require connections for electrical, potable water, and data. Complete fire suppression system is not anticipated. The Contractor shall provide all necessary labor, materials, tools, and equipment, to properly execute this site preparation project. The installation shall meet all NFPA, VA, state, and local codes and ordinances. As part of this project, drawings for the trailer are provided by Germfree. These drawings are for reference and informational use only. They shall not be used to exclusively define existing conditions. It shall be the responsibility of the Contractor to perform site investigation to identify site conditions and quantities to ensure integrity throughout the project prior to submitting an offer. Contractor to phase and coordinate all site preparation accordingly to ensure trailer is equipped for immediate occupancy and use. II. General Work includes providing site preparation project for the installation of Germfree s Hazardous Drugs Mixing IV Cleanroom Suit Trailer. The following shall be performed, not necessarily in this order, as part of the trailer installation (see As-Build drawing package). Hazardous Drugs Mixing IV Cleanroom Suit Trailer Site Set-Up A. Germfree provides the delivery and placement of the trailer to Fort Harrison VA Medical Center at the desired location determined by the VA. Orientation of the trailer as per Pictures Stie Plan_Pharmacy Trailer location. B. Fresh water supply building connection to be provided by the VA. Contractor responsible for installation of rigid pipe directly from the building connection to the trailer connection. Due to freezing temperature concerns, the rigid pipe requires a heated solution to be protected from the elements. C. Electrical service, end-to-end, connection shall be the Contractor s responsibility. Electrical to be run from the main basement electrical Room B-21, inside Building 141. Existing penetration exists through the exterior wall at Room B-23A and is to be utilized for electrical service. Once service is outside, use canopy structure for conduit run to nearest connection point on the trailer. A disconnect shall also be required near the connection point to the trailer. D. Data and communication shall be tied into the trailer by the Contractor. Data utility must run at least 2 PCs and label printer in addition to the digital video cameras and digital video recorder, included with the trailer. E. Install card reader (PIV badge compliant) and any associated hardware on exterior of the trailer entrance door for staff accessibility and security. Tie into data connection. The entrance door shall also have a dead-bolt lock from outside to the office to secure the trailer when not in use. F. Trailer entry ramp to be provided as part of this effort. Ramp, landing(s) and handrailing shall be provided as part of a complete system. The trailer entrance door is approximately four (4) feet off the ground. Ensure provided ramp conforms to anti-slip requirements. G. Install hard barrier enclosure over trailer landing and ramp to mitigate the risk of meds being exposed to weather. Enclosure will not be insulated or heated. Ensure adequate lighting is provided within the enclosure. H. Install hard barrier enclosure along canopy length to be tied into the ramp barrier for additional protection from the weather. Enclosure will not be insulated or heated. I. All hard barriers installed as part of this project are to be constructed to be rigid and provide protection from wind and weather. Barrier framework to be covered in a weather resistant sheeting to keep moisture out while providing an aesthetic look. J. Contractor to take all appropriate measures to ensure trailer undercarriage is protected from freezing from the cold weather environment. Installation of trailer skirting or similar insulating material recommended. K. Vehicle rated security barricades shall be required for protection of the trailer. Barricades to include fencing that can be installed as part of a system onto the barricades for pedestrian access control. L. Pedestrian barriers shall be required to mitigate foot traffic around undesired areas of the trailer where utility connections will be run. The above itemized list constitutes a basic outline of work to be performed and in no way summarizes all details for the construction of this project. It is strongly recommended that a detailed inspection of the premises and Germfree s drawings be initiated, by the Contractor, to determine actual needs and conditions for the construction of this project. Contractor shall be responsible for verifying site conditions, determine the type of equipment needed, the number of personnel required and the level of effort to complete the job in the time framed specified in section IV, Period of Performance, below. III. Site Visit The Contractor and subcontractors are strongly encouraged to attend an onsite visit prior to submitting an offer. The Contractor should make an onsite visit prior to delivery to coordinate with Fort Harrison VA Medical Center Engineering for any pre- delivery issues (power, plumbing, etc.). The Contractor shall provide site preparation, delivery, and field installation including seismic strapping or bracing required by VA Seismic Building Code, connection of main power supply, connection of network/security systems, connection of grey water (if required) and connection of fresh water. Site preparation will not require Fort Harrison VA Medical Center to pour a level pad or require a crane to install at the location scouted at the facility. VI. Bid Schedule Base Bid The Contractor shall provide all necessary labor, materials, tools, equipment, and services to complete all work as stated in this scope of work. VII. Privacy Statement The contractor, their personnel, and their subcontractors shall be subject to the Federal laws, regulations, standards, and VA Directives and Handbooks regarding information and information system security as delineated in this contract. A contractor/subcontractor shall request logical (technical) or physical access to VA information and VA information systems for their employees, subcontractors, and affiliates only to the extent necessary to perform the services specified in the contract, agreement, or task order. All contractors, subcontractors, and third-party servicers and associates working with VA information are subject to the same investigative requirements as those of VA appointees or employees who have access to the same types of information. The level and process of background security investigations for contractors must be in accordance with VA Directive and Handbook 0710, Personnel Suitability and Security Program. The Office for Operations, Security, and Preparedness is responsible for these policies and procedures. Contract personnel who require access to national security programs must have a valid security clearance. National Industrial Security Program (NISP) was established by Executive Order 12829 to ensure that cleared U.S. defense industry contract personnel safeguard the classified information in their possession while performing work on contracts, programs, bids, or research and development efforts. The Department of Veterans Affairs does not have a Memorandum of Agreement with Defense Security Service (DSS). Verification of a Security Clearance must be processed through the Special Security Officer located in the Planning and National Security Service within the Office of Operations, Security, and Preparedness. Custom software development and outsourced operations must be located in the U.S. to the maximum extent practical. If such services are proposed to be performed abroad and are not disallowed by other VA policy or mandates, the contractor/subcontractor must state where all non-U.S. services are provided and detail a security plan, deemed to be acceptable by VA, specifically to address mitigation of the resulting problems of communication, control, data protection, and so forth. Location within the U.S. may be an evaluation factor. The contractor or subcontractor must notify the Contracting Officer immediately when an employee working on a VA system or with access to VA information is reassigned or leaves the contractor or subcontractor s employ. The Contracting Officer must also be notified immediately by the contractor or subcontractor prior to an unfriendly termination. VIII. Safety The Dept. of Veterans Affairs (VA) requires strict adherence to the Code of Federal Regulations 29, Part 1926. This includes the requirement that the contractor have a Competent Person on the job at all times (must have a 30-hour OSHA card), and that all contractor employees have received a minimum of ten (10) hours of OSHA construction safety training. Documentation of these requirements shall be submitted and approved prior to performing the work. Contractor must submit a company Site Specific Safety Plan (SSSP) that must be approved by VA Safety prior to work beginning. This plan shall detail fire, construction, and health-related safety measures, in addition to listing Training Records for all employees for the previous year. A company standard or boilerplate safety plan will not be acceptable plan should contain a detailed hazard analysis for each element of construction to be performed such as an Activity Hazard Analysis (AHA) or Job Hazard Analysis (JHA). This entire project shall conform to 100% of all VA standards and specifications, OSHA, AIA Construction Guidelines, Joint Commission Environment of Care Standards, and applicable building codes. The Contractor shall be responsible for the health and safety of their own employees. The VA will inform the Contractor of any hazards such as designated permit confined spaces, electrical hazards, etc. which may affect Contractor employees. The Contractor must take precautions appropriate for the safety of their employees as well as provide equipment necessary for these actions. Contractor employees will notify the VA Representative before entering a designated permit required confined space, so precautions can be taken in advance of the work. The Contractor shall hold harmless and indemnify the Government against any and all liability, claims, and costs of whatsoever kind and nature for injury to or death of any person or persons and for loss or damage to any property occurring in connection with, in any way incident to, or arising out of the occupancy, use, service, operation or performance of work under the terms of the contract, resulting in whole or in part from the negligence acts or omissions of the Contractor, any subcontractor, or any employee, agent, or representative of the Contractor or subcontractor The Contractor is responsible for protection of existing finishes, and VA property, furnishings, fixtures, and equipment (FF&E), located in the areas where demolition, construction, preventative maintenance, and repair work is being performed, as well as along paths of travel to and from these areas. Both exterior and interior finishes and property must be maintained. The contractor is liable for any damage to VA property during the course of the contract. Any damage to existing finishes must be repaired by the Contractor to equal or greater quality than existing finishes. All tasks accomplished by the Contractor personnel will be performed to preclude damage or disfigurement of government-owned FF&E and architectural or building structures. Contractor will report any damage or disfigurement to these items when caused by the Contractor s personnel and will perform repairs or replace government-owned equipment, fixtures, furnishings, grounds and architectural or building structures to their previously existing condition. VHA Supplemental Contract Requirements for Combatting COVID-19 Contractor employees who work in or travel to VHA locations must comply with the following: Documentation requirements: If fully vaccinated, contractors shall show proof of vaccination. NOTE: Acceptable proof of vaccination includes a signed record of immunization from a health care provider or pharmacy, a copy of the COVID-19 Vaccination Record Card (CDC Form MLS-319813_r, published on September 3, 2020), or a copy of medical records documenting the vaccination. If unvaccinated, contractors shall show negative COVID-19 test results dated within three calendar days prior to desired entry date. Test must be approved by the Food and Drug Administration (FDA) for emergency use or full approval. This includes tests available by a doctor s order or an FDA approved over-the-counter test that includes an affiliated telehealth service. Documentation cited in this section shall be digitally or physically maintained on each contractor employee while in a VA facility and is subject to inspection prior to entry to VA facilities and after entry for spot inspections by Contracting Officer Representatives (CORs) or other hospital personnel. Documentation will not be collected by the VA; contractors shall, at all times, adhere to and ensure compliance with federal laws designed to protect contractor employee health information and personally identifiable information. Contractor employees are subject to daily screening for COVID-19 and may be denied entry to VA facilities if they fail to pass screening protocols. As part of the screening process contractors may be asked screening questions found on the COVID-19 Screening Tool. Check regularly for updates. Contractor employees who work away from VA locations, but who will have direct contact with VA patients shall self-screen utilizing the COVID-19 Screening Tool, in advance, each day that they will have direct patient contact and in accordance with their person or persons who coordinate COVID-19 workplace safety efforts at covered contractor workplaces. Contractors shall, at all times, adhere to and ensure compliance with federal laws designed to protect contractor employee health information and personally identifiable information. Contractor must immediately notify their COR or Contracting Officer if contract performance is jeopardized due to contractor employees being denied entry into VA Facilities. For indefinite delivery contracts: Contractor agrees to comply with VHA Supplemental Contract Requirements for any task or delivery orders issued prior to this modification when performance has already commenced. VIX. Period of Performance The period of performance for this contract is thirty (30) days after full NTP. END OF STATEMENT OF WORK
Update #1 ·
Project: Site Prep for Hazardous Drugs Mixing IV Cleanroom Suit Trailer
I. Scope of Work
The Montana VA Health Care System requires a site preparation contract that will allow for immediate use of Germfree s Hazardous Drugs Mixing IV Cleanroom Suit Trailer upon delivery. The trailer will be located at the Fort Harrison VA Medical Center, 3687 Veterans Drive, Fort Harrison, MT 59602. Placement will be at the Administration Building 141. Intent of this project is to provide site preparation to install the Hazardous Drugs Mixing IV Cleanroom Suit Trailer on campus. The trailer will be used by the Fort Harrison VA Medical Center pharmacy staff due to the event that sterile compounding services are temporarily suspended within the facility and interruptions in patient care must be avoided.
As part of this site prep, the Contractor shall coordinate site-preparations. The trailer will require connections for electrical, potable water, and data. Complete fire suppression system is not anticipated.
The Contractor shall provide all necessary labor, materials, tools, and equipment, to properly execute this site preparation project. The installation shall meet all NFPA, VA, state, and local codes and ordinances. As part of this project, drawings for the trailer are provided by Germfree. These drawings are for reference and informational use only. They shall not be used to exclusively define existing conditions.
It shall be the responsibility of the Contractor to perform site investigation to identify site conditions and quantities to ensure integrity throughout the project prior to submitting an offer. Contractor to phase and coordinate all site preparation accordingly to ensure trailer is equipped for immediate occupancy and use.
II. General
Work includes providing site preparation project for the installation of Germfree s Hazardous Drugs Mixing IV Cleanroom Suit Trailer. The following shall be performed, not necessarily in this order, as part of the trailer installation (see As-Build drawing package).
Hazardous Drugs Mixing IV Cleanroom Suit Trailer Site Set-Up
A. Germfree provides the delivery and placement of the trailer to Fort Harrison VA Medical Center at the desired location determined by the VA. Orientation of the trailer as per Pictures Stie Plan_Pharmacy Trailer location.
B. Fresh water supply building connection to be provided by the VA. Contractor responsible for installation of rigid pipe directly from the building connection to the trailer connection. Due to freezing temperature concerns, the rigid pipe requires a heated solution to be protected from the elements.
C. Electrical service, end-to-end, connection shall be the Contractor s responsibility. Electrical to be run from the main basement electrical Room B-21, inside Building 141. Existing penetration exists through the exterior wall at Room B-23A and is to be utilized for electrical service. Once service is outside, use canopy structure for conduit run to nearest connection point on the trailer. A disconnect shall also be required near the connection point to the trailer.
D. Data and communication shall be tied into the trailer by the Contractor. Data utility must run at least 2 PCs and label printer in addition to the digital video cameras and digital video recorder, included with the trailer.
E. Install card reader (PIV badge compliant) and any associated hardware on exterior of the trailer entrance door for staff accessibility and security. Tie into data connection. The entrance door shall also have a dead-bolt lock from outside to the office to secure the trailer when not in use.
F. Trailer entry ramp to be provided as part of this effort. Ramp, landing(s) and handrailing shall be provided as part of a complete system. The trailer entrance door is approximately four (4) feet off the ground. Ensure provided ramp conforms to anti-slip requirements. G. Install hard barrier enclosure over trailer landing and ramp to mitigate the risk of meds being exposed to weather. Enclosure will not be insulated or heated. Ensure adequate lighting is provided within the enclosure.
H. Install hard barrier enclosure along canopy length to be tied into the ramp barrier for additional protection from the weather. Enclosure will not be insulated or heated.
I. All hard barriers installed as part of this project are to be constructed to be rigid and provide protection from wind and weather. Barrier framework to be covered in a weather resistant sheeting to keep moisture out while providing an aesthetic look.
J. Contractor to take all appropriate measures to ensure trailer undercarriage is protected from freezing from the cold weather environment. Installation of trailer skirting or similar insulating material recommended.
K. Vehicle rated security barricades shall be required for protection of the trailer. Barricades to include fencing that can be installed as part of a system onto the barricades for pedestrian access control.
L. Pedestrian barriers shall be required to mitigate foot traffic around undesired areas of the trailer where utility connections will be run.
The above itemized list constitutes a basic outline of work to be performed and in no way summarizes all details for the construction of this project. It is strongly recommended that a detailed inspection of the premises and Germfree s drawings be initiated, by the Contractor, to determine actual needs and conditions for the construction of this project. Contractor shall be responsible for verifying site conditions, determine the type of equipment needed, the number of personnel required and the level of effort to complete the job in the time framed specified in section IV, Period of Performance, below.
III. Site Visit
The Contractor and subcontractors are strongly encouraged to attend an onsite visit prior to submitting an offer. The Contractor should make an onsite visit prior to delivery to coordinate with Fort Harrison VA Medical Center Engineering for any pre- delivery issues (power, plumbing, etc.). The Contractor shall provide site preparation, delivery, and field installation including seismic strapping or bracing required by VA Seismic Building Code, connection of main power supply, connection of network/security systems, connection of grey water (if required) and connection of fresh water. Site preparation will not require Fort Harrison VA Medical Center to pour a level pad or require a crane to install at the location scouted at the facility.
VI. Bid Schedule
Base Bid
The Contractor shall provide all necessary labor, materials, tools, equipment, and services to complete all work as stated in this scope of work.
VII. Privacy Statement
The contractor, their personnel, and their subcontractors shall be subject to the Federal laws, regulations, standards, and VA Directives and Handbooks regarding information and information system security as delineated in this contract.
A contractor/subcontractor shall request logical (technical) or physical access to VA information and VA information systems for their employees, subcontractors, and affiliates only to the extent necessary to perform the services specified in the contract, agreement, or task order.
All contractors, subcontractors, and third-party servicers and associates working with VA information are subject to the same investigative requirements as those of VA appointees or employees who have access to the same types of information. The level and process of background security investigations for contractors must be in accordance with VA Directive and Handbook 0710, Personnel Suitability and Security Program. The Office for Operations, Security, and Preparedness is responsible for these policies and procedures.
Contract personnel who require access to national security programs must have a valid security clearance. National Industrial Security Program (NISP) was established by Executive Order 12829 to ensure that cleared U.S. defense industry contract personnel safeguard the classified information in their possession while performing work on contracts, programs, bids, or research and development efforts. The Department of Veterans Affairs does not have a Memorandum of Agreement with Defense Security Service (DSS). Verification of a Security Clearance must be processed through the Special Security Officer located in the Planning and National Security Service within the Office of Operations, Security, and Preparedness.
Custom software development and outsourced operations must be located in the U.S. to the maximum extent practical. If such services are proposed to be performed abroad and are not disallowed by other VA policy or mandates, the contractor/subcontractor must state where all non-U.S. services are provided and detail a security plan, deemed to be acceptable by VA, specifically to address mitigation of the resulting problems of communication, control, data protection, and so forth. Location within the U.S. may be an evaluation factor.
The contractor or subcontractor must notify the Contracting Officer immediately when an employee working on a VA system or with access to VA information is reassigned or leaves the contractor or subcontractor s employ. The Contracting Officer must also be notified immediately by the contractor or subcontractor prior to an unfriendly termination.
VIII. Safety
The Dept. of Veterans Affairs (VA) requires strict adherence to the Code of Federal Regulations 29, Part 1926. This includes the requirement that the contractor have a Competent Person on the job at all times (must have a 30-hour OSHA card), and that all contractor employees have received a minimum of ten (10) hours of OSHA construction safety training. Documentation of these requirements shall be submitted and approved prior to performing the work.
Contractor must submit a company Site Specific Safety Plan (SSSP) that must be approved by VA Safety prior to work beginning. This plan shall detail fire, construction, and health-related safety measures, in addition to listing Training Records for all employees for the previous year. A company standard or boilerplate safety plan will not be acceptable plan should contain a detailed hazard analysis for each element of construction to be performed such as an Activity Hazard Analysis (AHA) or Job Hazard Analysis (JHA).
This entire project shall conform to 100% of all VA standards and specifications, OSHA, AIA Construction Guidelines, Joint Commission Environment of Care Standards, and applicable building codes.
The Contractor shall be responsible for the health and safety of their own employees. The VA will inform the Contractor of any hazards such as designated permit confined spaces, electrical hazards, etc. which may affect Contractor employees. The Contractor must take precautions appropriate for the safety of their employees as well as provide equipment necessary for these actions. Contractor employees will notify the VA Representative before entering a designated permit required confined space, so precautions can be taken in advance of the work.
The Contractor shall hold harmless and indemnify the Government against any and all liability, claims, and costs of whatsoever kind and nature for injury to or death of any person or persons and for loss or damage to any property occurring in connection with, in any way incident to, or arising out of the occupancy, use, service, operation or performance of work under the terms of the contract, resulting in whole or in part from the negligence acts or omissions of the Contractor, any subcontractor, or any employee, agent, or representative of the Contractor or subcontractor
The Contractor is responsible for protection of existing finishes, and VA property, furnishings, fixtures, and equipment (FF&E), located in the areas where demolition, construction, preventative maintenance, and repair work is being performed, as well as along paths of travel to and from these areas. Both exterior and interior finishes and property must be maintained. The contractor is liable for any damage to VA property during the course of the contract. Any damage to existing finishes must be repaired by the Contractor to equal or greater quality than existing finishes. All tasks accomplished by the Contractor personnel will be performed to preclude damage or disfigurement of government-owned FF&E and architectural or building structures. Contractor will report any damage or disfigurement to these items when caused by the Contractor s personnel and will perform repairs or replace government-owned equipment, fixtures, furnishings, grounds and architectural or building structures to their previously existing condition.
VHA Supplemental Contract Requirements for Combatting COVID-19
Contractor employees who work in or travel to VHA locations must comply with the following:
Documentation requirements:
If fully vaccinated, contractors shall show proof of vaccination.
NOTE: Acceptable proof of vaccination includes a signed record of immunization from a health care provider or pharmacy, a copy of the COVID-19 Vaccination Record Card (CDC Form MLS-319813_r, published on September 3, 2020), or a copy of medical records documenting the vaccination.
If unvaccinated, contractors shall show negative COVID-19 test results dated within three calendar days prior to desired entry date. Test must be approved by the Food and Drug Administration (FDA) for emergency use or full approval. This includes tests available by a doctor s order or an FDA approved over-the-counter test that includes an affiliated telehealth service.
Documentation cited in this section shall be digitally or physically maintained on each contractor employee while in a VA facility and is subject to inspection prior to entry to VA facilities and after entry for spot inspections by Contracting Officer Representatives (CORs) or other hospital personnel.
Documentation will not be collected by the VA; contractors shall, at all times, adhere to and ensure compliance with federal laws designed to protect contractor employee health information and personally identifiable information.Â
Contractor employees are subject to daily screening for COVID-19 and may be denied entry to VA facilities if they fail to pass screening protocols. As part of the screening process contractors may be asked screening questions found on the COVID-19 Screening Tool. Check regularly for updates.
Contractor employees who work away from VA locations, but who will have direct contact with VA patients shall self-screen utilizing the COVID-19 Screening Tool, in advance, each day that they will have direct patient contact and in accordance with their person or persons who coordinate COVID-19 workplace safety efforts at covered contractor workplaces. Contractors shall, at all times, adhere to and ensure compliance with federal laws designed to protect contractor employee health information and personally identifiable information.Â
Contractor must immediately notify their COR or Contracting Officer if contract performance is jeopardized due to contractor employees being denied entry into VA Facilities.
For indefinite delivery contracts: Contractor agrees to comply with VHA Supplemental Contract Requirements for any task or delivery orders issued prior to this modification when performance has already commenced.
VIX. Period of Performance
The period of performance for this contract is thirty (30) days after full NTP.
END OF STATEMENT OF WORK
Files
| File | Type | Posted |
|---|---|---|
| S04- Site Visit Meeting Doc.docx | DOCX document | |
| S06- Questions 2a_VA Response.docx | DOCX document | |
| S06- 36C25922Q0119 Amend 0004.docx | DOCX document | |
| S06- Questions 2 VA Response (1).docx | DOCX document | |
| 36C25922Q0119 0003.docx | DOCX document | |
| 36C25922Q0119 0002.docx | DOCX document | |
| 36C25922Q0119 0001.docx | DOCX document | |
| Package As-Built Pharmacy Trailer 36 Rev E.zip | ZIP file | |
| 36C25922Q0119_1.docx | DOCX document | |
| TRAILER UTILITIES - Rx 53 Pharmacy.pdf | ||
| Past Performance Questionnaire.docx | DOCX document | |
| Site Plan_Pharmacy Trailer Location Proposal_VA 2nd option.pdf | ||
| Pictures - Site Plan_Pharmacy Trailer Location.pdf |
Show all 13
Notice history
| Notice | Type | Posted |
|---|---|---|
| This notice | Solicitation | |
| Z2DA--436-22-126 Site Preparations - Hazardous Drugs Mixing - IV Cleanroom Mobile Trailer (VA-22-00029124) | Pre-Solicitation |