Z1DA--Upgrade Mental Health Restrooms 610-24-511
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- 36C25024B0046
- Agency
-
Veterans Integrated Service Network 10
Veterans Health Administration, Department of Veterans Affairs
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 236220 Commercial and Institutional Building Construction
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10 is seeking bids to upgrade the mental health restrooms at a VA medical facility under Solicitation Number 36C25024B0046. The contractor will be required to provide labor, equipment, materials, and supervision to demolish existing restrooms and install new bathroom fixtures, lighting, and nurse call devices to comply with mental health codes and anti-ligature requirements. The work must be completed within 120 calendar days from the notice to proceed. Interested contractors will need to submit a completed bid schedule, safety and environmental record, and other required documents by the April 5, 2024 deadline.
This solicitation is not set aside for any specific business size or socioeconomic category. The NAICS code is 236220 - Commercial and Institutional Building Construction, and the PSC code is Z1DA - Repair or Alteration of Structures. The incumbent contractor, if any, is not identified. The total award value and budget details are not provided in the available files. The work will take place at the VA - Northern Indiana Health Care System - Marion Campus.
Notice text
4 versions
Update #4 · Latest ·
Questions and Answers:
Are ICRA Barriers required to go up to deck or can we run them up to the ceiling?
The ICRA can go to the ceiling as long as negative pressure is maintained at all times.
Are ICRA barriers required to be 1-hour fire barrier type ?
Yes
GI10, Special Note A "Contractor to remove window(s) for negative air with hepa air filter and waste removal, upon completion and prior to cleanup of the current restroom reinstall window(s) to match existing; repair any damages to adjacent areas". Are we required to remove a window and reinstall for each phase to achieve negative air? Please designate on drawing which windows can be removed for each phase and provide details of window type/wall construction so that we may provide accurate pricing on window removal/replacement & wall repair.
The glass will be removed by removing the interior and exterior seal the frame and glass will be protected and glass re-installed upon completion of the current room being worked on.
At the site visit it was stated that there IS NO med gas work. Please confirm that there is no med-gas work on this project. Drawing PL100 shows a zone valve schedule for med gas and a medical gas alarm panel schedule. Clarify work involving these details.
The schedules were added to make the contractor aware that there is med gas near the scope of work. There is no med gas work.
Drawing AS102 , detail E7 "TYPICAL WALL SECTION" calls out to "provide continuous blocking behind wall mounted standards". Please clarify.
Wall mounted standards are all standard items that will be mounted to the wall for example: grab bars, fixtures, and accessories.
Are the following legends for reference only since there are no plans associated with the described areas?
Zone Valve Schedule (ZV-1)/Observation Room 123 No other reference on plans shown for replacement.
Medical Gas Alarm Panel Schedule/Nurse Station Room 122 No other reference on plans shown for replacement.
Yes, they are only for reference showing that there is med gas near the scope of work.
Is there any work needed that is associated with these areas?
No work associated with these areas.
Update #3 ·
The following documents are to be included in the bid submission:
An original, fully completed, and signed SF 1442 Offer page ( wet ink signature ),
Acknowledgment of any amendments issued either via completing block 19 of the SF1442 or completing blocks 15a, b, and c of the Amendment and attaching to the SF 1442 Offer page;
An original fully completed bid schedule;
An original completed and signed SF 24 Bid Bond;
Completed Representations and Certifications section (FAR 52.204-8, 52.209-5 (Deviation), and 52.209-7);
Fully completed Contractor EMR Certification page; and
Fully completed VAAR 852.219-75.
Bidders are cautioned that failure to submit any of the documents identified in items (1) through (6) in the paragraph above by the date and time specified for receipt of offers may render the bid non-responsive and ineligible for award. Failure to submit the fully completed and signed certification at VAAR clause 852.219-75 (see General Conditions) with the offer will render the bid non-responsive and ineligible for award.
See attached document: Bid Schedule
Update #2 ·
Questions and Answers:
The statement of work calls out to install, re-install or replace nurse call devices. The drawings do not show any work or locations of the nurse call system. Are they new or existing? If existing are we to reuse the existing devices?
There are existing nurse call devices in conduit boxes along with new installation of conduit boxes for nurse call devices. On page AS102 the location of the conduit box with cover is the approximate location of the devices, this will have to be field verified upon start of work and installed according to the TIL. The (1) new device installation is not a part of this project, only the conduit, box, and cover, the (2) existing nurse call devices shall be removed, protected, and reinstalled in their original positions.
The Drawing AD102 (Ceiling Demolition Plan) has three note details, but it does not note any removal of the existing drywall ceiling. Is the existing ceiling to be removed?
The existing ceiling is to be removed and new ceiling to be installed.
The company that manufactures the Avonite Nordic #9119 states that it only comes in ¼ thick x 30 wide x 8 long sheets. They do have other colors that will come ¼ x 48 x 8 sheets. Mist is the closes color to Nordic. Is this product satisfactory? There is no specs on the solid surface material.
A sample must be provided to the VA for review and approval. If approved then the material can be installed. There will also be a submittal required and reviewed by the VA before material can be install. Submittal will be a PDF detailing the product specifications.
The Wall Detail on drawing AS102 shows the solid surface going to the floor. Is this correct or is it to be raised 4 above the floor for the Integral Cove Base?
The solid surface shall be placed 4" above the floor with the resinous flooring creating the integral cove base to meet the solid surface underneath, a bead of sealant shall be placed along the bottom edge of the solid surface prior to the integral cove base installation. See page 3 of this RFI for revised drawing AS102 - Wall Section E7.
With the solid surface material being ¼ thick and the drywall being 5/8 thick, the wall are not going to be even. Is a special trim needed or is tear away vinyl trim ok?
A bead of sealant provided by the solid surface manufacture to match the color of the solid surface will be placed along the top of the solid surface edge, this sealant shall also be used in the seams of the solid surface.
On drawing GI103 (Phasing Plan) the Notes show 10 Phases, but the drawing only shows eight. Please verify.
There are 10 phases, see page 4 of this RFI for revised drawing GI103.
LIST OF ATTACHMENTS
Update #1 ·
Upgrade Mental Health Restrooms
Files
| File | Type | Posted |
|---|---|---|
| 36C25024B0046 0003.docx | DOCX document | |
| 36C25024B0046 0002.docx | DOCX document | |
| Bid Schedule.docx | DOCX document | |
| GI103 Revision.pdf | ||
| 36C25024B0046 0001.docx | DOCX document | |
| AS102 Revision.pdf | ||
| Pre-Bid Site Visit Sign-In Sheet.pdf | ||
| Attachment IV - VHA Directive 1192-01.pdf | ||
| Attachment VI - Combined Specs.pdf | ||
| Attachment V - Drawings.pdf | ||
| Attachment II - RFI Template.doc | DOC document | |
| Attachment I - Wage Determination.pdf | ||
| Attachment III - EMR.docx | DOCX document | |
| 36C25024B0046_1.docx | DOCX document |
Show all 14
Notice history
| Notice | Type | Posted |
|---|---|---|
| Z1DA--Upgrade Mental Health Restrooms - 610-24-511 | Award Notice | |
| This notice | Solicitation | |
| Z1DA--Upgrade Mental Health Restrooms 610-24-511 | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Z2DA--FY27 Multiple Award Task Order Contract, SEED PROJECT NO: 550-25-108, Renovate Bathrooms in B103 PRRTP & B64/7 at the VA Illiana Health Care System (VIHCS), Danville IL. | Veterans Integrated Service Network 12 | No set-aside | |
| Z2DA--561-26-104 Repair Operating Room (OR) & Bathroom Leaks | Veterans Integrated Service Network 2 | Service-Disabled Veteran-Owned Small Business | |
| Modernize 6N Inpatient Restrooms (Swing for 3N) | Veterans Integrated Service Network 16 | Service-Disabled Veteran-Owned Small Business | |
| Z1DA--528A8-22-814 Consolidate Primary Care Reception | Veterans Integrated Service Network 2 | Service-Disabled Veteran-Owned Small Business | |
| Y1DA--NRM-CONST 528-CSI-102 Urology Equipment Site Prep | FY27 NRM | Veterans Integrated Service Network 2 | Service-Disabled Veteran-Owned Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity