This document is a Bid and Deduct Schedule for a federal contract opportunity to upgrade the mental health restrooms at the VA - Northern Indiana Health Care System - Marion Campus.
The base bid requires the contractor to provide all labor, equipment, materials, and supervision necessary to upgrade the restrooms in Building 185 - 1st Floor North, including installing, re-installing, or replacing bathroom fixtures, lighting fixtures, and nurse call devices in accordance with Mental Health Codes and Anti-Ligature Requirements. The work is to be completed within 120 calendar days from the notice to proceed. The related federal contract opportunity, Solicitation Number 36C25024B0046, is for the Upgrade Mental Health Restrooms 610-24-511 project, issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25024B0046 0003.docx | DOCX document | |
| 36C25024B0046 0002.docx | DOCX document | |
| AS102 Revision.pdf | ||
| Pre-Bid Site Visit Sign-In Sheet.pdf | ||
| GI103 Revision.pdf | ||
| 36C25024B0046 0001.docx | DOCX document | |
| Attachment VI - Combined Specs.pdf | ||
| Attachment IV - VHA Directive 1192-01.pdf | ||
| 36C25024B0046_1.docx | DOCX document | |
| Attachment III - EMR.docx | DOCX document | |
| Attachment I - Wage Determination.pdf | ||
| Attachment II - RFI Template.doc | DOC document | |
| Attachment V - Drawings.pdf |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BID & DEDUCT SCHEDULE
Project # 610-24-511 Upgrade Mental Health Restrooms
All work to be completed at: VA – Northern Indiana Health Care System – Marion Campus, 1700 E 38th Street, Marion, IN 46953 BASE BID: Contractor will provide all labor, equipment, materials, and supervision necessary to upgrade the restrooms in Building 185 – 1st Floor North. This work also includes but is not limited to installing, re-installing, or replacing the bathroom fixtures, lighting fixtures and nurse call devices in accordance with Mental Health Codes and Anti-Ligature Requirements.
Work to be completed within 120 calendar days from notice to proceed.
Base Bid: $_______________________________